I want to search for...

Permit #2025020894

Permit Details

Status: COED

Parcel Id: 07-11-31-7024-00030-0420
CONDITIONED SPACE: 1809 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 2248 sqft
Block: 00030
Subdivision: -
Job Phone: 239-571-5325
Location Address: 26 PRINCESS KIM LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/25/2025
NOC: RECORDED
Applicant name: RYAN SCOTT DAVIS
Owner: SYNERGY HOMES LLC

Address

581 NW MERCANTILE PLACE

PORT SAINT LUCIE, FL 34986

Lot: 0420
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SYNERGY HOMES, LLC
Status Location Address State License Number
ACTIVE

1 HARGROVE GRADE, SUITE B1

PALM COAST, FL 32137

CBC1254289 (Exp: 08/31/2026)

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/11/2025 CANCELLED BY APPLICANT WEB
Note: 6/6/2025 - PREVIOUS INSPECTION NOTES 6/6/25: Scheduled too early! Not Ready! NO POWER! Also: 1)portable toilet is still in driveway. FBC [A]107.4
BLD - BUILDING FINAL 06/11/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/11/2025 12:13:31 PM *** 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25: 1). Master bathroom: Right side vanity sink leaking in cabinet. FBC-[A] 110.3.11 / FBC-[A] 111.1 2). Main breaker needs to be labeled. NEC 408.4 (A) 3). Front entry and garage entry door are both missing the insulating seal around door perimeter. FBC [A]107.4 4). Garage interior door: door handle is broken/defective. FBC [A]107.4 5). ODU needs to be 3" above finished grade. FBCR M1305.1.4.1 (Currently grade directly at the pad is dug lower than finished grade adjacent to sides of pad. > needs to be lowered to meet pad finished grade.) New inspection due to canceled inspection 6/6/2025 - PREVIOUS INSPECTION NOTES 6/6/25: Scheduled too early! Not Ready! NO POWER! Also: 1)portable toilet is still in driveway. FBC [A]107.4
BLD - BUILDING FINAL 06/10/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/10/2025 2:38:05 PM *** 6/10/25: 1). Master bathroom: Right side vanity sink leaking in cabinet. FBC-[A] 110.3.11 / FBC-[A] 111.1 2). Main breaker needs to be labeled. NEC 408.4 (A) 3). Front entry and garage entry door are both missing the insulating seal around door perimeter. FBC [A]107.4 4). Garage interior door: door handle is broken/defective. FBC [A]107.4 5). ODU needs to be 3" above finished grade. FBCR M1305.1.4.1 (Currently grade directly at the pad is dug lower than finished grade adjacent to sides of pad. > needs to be lowered to meet pad finished grade.) New inspection due to canceled inspection 6/6/2025 - PREVIOUS INSPECTION NOTES 6/6/25: Scheduled too early! Not Ready! NO POWER! Also: 1)portable toilet is still in driveway. FBC [A]107.4
ROW - STORMWATER FINAL 06/10/2025 APPROVED TPOLACEK
Note: CORRECTIONS MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/6/2025 - PREVIOUS INSPECTION NOTES 06/06/25 TPOLACEK**** ALL BARE EARTH ON LEFT SIDE VACANT MUST BE COVERED WITH SEED AND STRAW Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage
ROW - STORMWATER FINAL 06/06/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 06/06/25 TPOLACEK**** ALL BARE EARTH ON LEFT SIDE VACANT MUST BE COVERED WITH SEED AND STRAW Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage
BLD - BUILDING FINAL 06/06/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/6/2025 9:11:50 AM *** 6/6/25: Scheduled too early! Not Ready! NO POWER! Also: 1)portable toilet is still in driveway. FBC [A]107.4
BLD - BUILDING FINAL 06/04/2025 CANCELLED BY APPLICANT WEB
ROW - FINAL APRON (AFTER POUR) 06/04/2025 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ELECTRIC - EARLY POWER 06/04/2025 CANCELLED BY APPLICANT WEB
Note: 6/3/2025 - PREVIOUS INSPECTION NOTES 6/3/25: NO CHANGE FROM PREVIOUS INSPECTION! 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 6/2/2025 - PREVIOUS INSPECTION NOTES 6/2/25: NO LOCK BOX LOCATED ON SITE. Found rear SGD unlocked. 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 New inspection due to canceled inspection 5/30/2025 - PREVIOUS INSPECTION NOTES FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS
ELECTRIC - EARLY POWER 06/04/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/4/2025 1:12:54 PM *** 6/4/25: FPL emailed to release power New inspection due to canceled inspection 6/3/2025 - PREVIOUS INSPECTION NOTES 6/3/25: NO CHANGE FROM PREVIOUS INSPECTION! 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 6/2/2025 - PREVIOUS INSPECTION NOTES 6/2/25: NO LOCK BOX LOCATED ON SITE. Found rear SGD unlocked. 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 New inspection due to canceled inspection 5/30/2025 - PREVIOUS INSPECTION NOTES FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS
U -UTILITY RESIDENTIAL FINAL 06/04/2025 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 no irr-no cc
ROW - STORMWATER FINAL 06/04/2025 CANCELLED BY APPLICANT WEB
ELECTRIC - EARLY POWER 06/03/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/3/2025 11:26:17 AM *** 6/3/25: NO CHANGE FROM PREVIOUS INSPECTION! 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 6/2/2025 - PREVIOUS INSPECTION NOTES 6/2/25: NO LOCK BOX LOCATED ON SITE. Found rear SGD unlocked. 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 New inspection due to canceled inspection 5/30/2025 - PREVIOUS INSPECTION NOTES FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/03/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 06/03/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ELECTRIC - EARLY POWER 06/02/2025 CANCELLED BY APPLICANT WEB
Note: 5/30/2025 - PREVIOUS INSPECTION NOTES FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS
ELECTRIC - EARLY POWER 06/02/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/2/2025 12:43:09 PM *** 6/2/25: NO LOCK BOX LOCATED ON SITE. Found rear SGD unlocked. 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 New inspection due to canceled inspection 5/30/2025 - PREVIOUS INSPECTION NOTES FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS
ELECTRIC - EARLY POWER 05/30/2025 Disapproved - NO FEE CVANSTRAHLEN
Note: FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS
ROW- PRE-APRON (PRE-POUR) 05/15/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/14/2025 - PREVIOUS INSPECTION NOTES 05/14/25 TPOLACEK** BOTH MITERED END FOOTERS ARE WASHED IN, CONCRETE AND DEBRIS IN UPPER POUR AREA MUST BE REMOVED AND LEFT SIDE APRON SLOPE EXCEEDS THE MAXIMUM 8% SLOPE. PLEASE MAKE CORRECTIONS.
ROW- PRE-APRON (PRE-POUR) 05/14/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 05/14/25 TPOLACEK** BOTH MITERED END FOOTERS ARE WASHED IN, CONCRETE AND DEBRIS IN UPPER POUR AREA MUST BE REMOVED AND LEFT SIDE APRON SLOPE EXCEEDS THE MAXIMUM 8% SLOPE. PLEASE MAKE CORRECTIONS.
INSULATION 05/07/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/7/2025 2:17:57 PM *** 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25: NOT READY! INSTALLATION STILL IN PROGRESS. *** Silt fence still needs repair. FBC 3307.1 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 5/5/2025 2:09:29 PM *** 5/5/25: Spoke with CM about previous note. Informed me that the Excavator will be at site to correct on 5/6/25. Check at next inspection. 5/5/2025 - PREVIOUS INSPECTION NOTES 5/5/25: 1). Excess dirt from job site needs to be removed from neighboring vacant lot and silt fence repaired. FBC 3307.1 New inspection due to canceled inspection Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4
INSULATION 05/06/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 5/6/2025 10:38:38 AM *** 5/6/25: NOT READY! INSTALLATION STILL IN PROGRESS. *** Silt fence still needs repair. FBC 3307.1 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 5/5/2025 2:09:29 PM *** 5/5/25: Spoke with CM about previous note. Informed me that the Excavator will be at site to correct on 5/6/25. Check at next inspection. 5/5/2025 - PREVIOUS INSPECTION NOTES 5/5/25: 1). Excess dirt from job site needs to be removed from neighboring vacant lot and silt fence repaired. FBC 3307.1 New inspection due to canceled inspection Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4
ALL ROUGH 05/05/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 5/5/2025 11:00:22 AM *** 5/5/25: 1). Excess dirt from job site needs to be removed from neighboring vacant lot and silt fence repaired. FBC 3307.1 New inspection due to canceled inspection Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4
ALL ROUGH 05/05/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/5/2025 2:09:29 PM *** 5/5/25: Spoke with CM about previous note. Informed me that the Excavator will be at site to correct on 5/6/25. Check at next inspection. 5/5/2025 - PREVIOUS INSPECTION NOTES 5/5/25: 1). Excess dirt from job site needs to be removed from neighboring vacant lot and silt fence repaired. FBC 3307.1 New inspection due to canceled inspection Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4
U-CROSS CONNECTION 05/05/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cc
LATH/BRICK/ WATER BARRIER 05/01/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/1/2025 10:18:48 AM *** Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4
ALL ROUGH 05/01/2025 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4
GRAVITY SEWER TEST 05/01/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 3/31/2025 - PREVIOUS INSPECTION NOTES NOTHING TO INSPECT. WORK NOT STARTED NEED SILT FENCE TO BE FINISHED FBC 3307.1 THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 05/01/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 3/31/2025 - PREVIOUS INSPECTION NOTES NOTHING TO INSPECT. WORK NOT STARTED NEED SILT FENCE TO BE FINISHED FBC 3307.1 THIS WAS A VIRTUAL INSPECTION
WALL SHEATHING 04/22/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/22/2025 12:41:46 PM ***
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/22/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4
ROOF VALLEY & METAL 04/22/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/22/2025 12:41:33 PM ***
TIE BEAM / LINTEL 04/16/2025 APPROVED RSIMS
Note: 4/15/2025 - PREVIOUS INSPECTION NOTES 4/15/25: 1). Dowel rods do not meet the minimum clearance (2" from face of block) as required. (FBC-R606.3.4) at front entry. Spray painted orange. 2). Silt fence needs to be complete on left and right sides and repaired on right side. FBC 3307.1 3). Please move trusses from swale area to allow for free flow of water. FBC 3303.5. Also, remove excess dirt pushed (well past property marker) onto neighboring wooded lot on left side. FBC 3303.5
TIE BEAM / LINTEL 04/15/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 4/15/2025 2:51:22 PM *** 4/15/25: 1). Dowel rods do not meet the minimum clearance (2" from face of block) as required. (FBC-R606.3.4) at front entry. Spray painted orange. 2). Silt fence needs to be complete on left and right sides and repaired on right side. FBC 3307.1 3). Please move trusses from swale area to allow for free flow of water. FBC 3303.5. Also, remove excess dirt pushed (well past property marker) onto neighboring wooded lot on left side. FBC 3303.5
MONOLITHIC SLAB 04/07/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/7/2025 10:28:16 AM ***
PLUMBING 1ST ROUGH UNDERGROUND 04/03/2025 APPROVED - AS NOTED MGIBSON
Note: 3/31/2025 - PREVIOUS INSPECTION NOTES NOTHING TO INSPECT. WORK NOT STARTED NEED SILT FENCE TO BE FINISHED FBC 3307.1
FOUND SURVEY APPROVED (OFFICE) 04/01/2025 APPROVED RRICKS
PLUMBING 1ST ROUGH UNDERGROUND 03/31/2025 Disapproved -FEE REQUIRED MGIBSON
Note: NOTHING TO INSPECT. WORK NOT STARTED
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 03/26/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 03/12/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 04/16/2025 04/21/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/01/2025 04/01/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/01/2025 04/01/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/26/2025 03/26/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SWALE COMPLETE 02/19/2025 02/27/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 02/18/2025 02/24/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 02/18/2025 02/24/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 02/18/2025 02/19/2025
Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM
ELEC COMPLETE 02/18/2025 02/24/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/18/2025 02/19/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 02/18/2025 02/21/2025
LOCATE COMPLETE 02/18/2025 02/20/2025
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 02/18/2025 02/21/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/18/2025 02/19/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/18/2025 02/20/2025
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 06/11/2025
REINSPECTION RESIDENTIAL ¤40.00 06/10/2025
REINSPECTION RESIDENTIAL ¤40.00 06/06/2025
REINSPECTION RESIDENTIAL ¤40.00 06/06/2025
REINSPECTION RESIDENTIAL ¤40.00 06/06/2025
SW ENG REINSPECTION 20 ¤20.00 06/06/2025
SW ENG REINSPECTION 30 ¤30.00 06/06/2025
SW ENG - REVIEW 20 ¤20.00 02/25/2025
SW ENG RES REVIEW 200 ¤200.00 02/25/2025
SEWER CREDIT (¤1,147.00) 02/25/2025
SEWER INSPECTION ¤25.00 02/25/2025
SEWER CAPITAL FACILITY ¤6,120.52 02/25/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 02/25/2025
SITE PLAN 30 ¤30.00 02/25/2025
CONNECTION FEES ¤1,187.26 02/25/2025
FC IMPACT FEE EMS ¤62.00 02/25/2025
IMPACT FEE FIRE ¤434.51 02/25/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/25/2025
FC IMPACT FEE LIBRARY ¤268.00 02/25/2025
IMPACT FEE PARKS ¤1,828.01 02/25/2025
IMPACT FEE SCHOOL ¤5,450.00 02/25/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 02/25/2025
WATER -IRRIGATION INSPECTION ¤25.00 02/25/2025
SURCHARGE FS 533.721 ¤10.82 02/25/2025
SURCHARGE - FS 468.631 ¤16.23 02/25/2025
SW ENG - FOUNDATION SURVEY ¤20.00 02/25/2025
SW ENG INSPECTION 80 ¤80.00 02/25/2025
SW ENG PRE APRON ¤30.00 02/25/2025
WATER- TURN ON ¤25.00 02/25/2025
ADJUSTMENT 10% (¤120.20) 02/25/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/25/2025
INSPECTION - RESIDENTIAL ¤913.00 02/25/2025
PLAN REVIEW - RESIDENTIAL ¤258.96 02/25/2025
Fees Total Due: ¤0.00 Total Paid: ¤22,502.25