I want to search for...
Permit #2025020894
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00030-0420 |
| CONDITIONED SPACE: 1809 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 33 sqft |
| Total Square Footage: 2248 sqft |
| Block: 00030 |
| Subdivision: - |
| Job Phone: 239-571-5325 |
| Location Address: 26 PRINCESS KIM LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/25/2025 |
| NOC: RECORDED |
| Applicant name: RYAN SCOTT DAVIS |
| Owner: SYNERGY HOMES LLC |
|
Address 581 NW MERCANTILE PLACE PORT SAINT LUCIE, FL 34986 |
| Lot: 0420 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SYNERGY HOMES, LLC
| Status | Location Address | State License Number |
| ACTIVE |
1 HARGROVE GRADE, SUITE B1 PALM COAST, FL 32137 |
CBC1254289 (Exp: 08/31/2026) |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/11/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 6/6/2025 - PREVIOUS INSPECTION NOTES 6/6/25: Scheduled too early! Not Ready! NO POWER! Also: 1)portable toilet is still in driveway. FBC [A]107.4 | |||
| BLD - BUILDING FINAL | 06/11/2025 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/11/2025 12:13:31 PM *** 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25: 1). Master bathroom: Right side vanity sink leaking in cabinet. FBC-[A] 110.3.11 / FBC-[A] 111.1 2). Main breaker needs to be labeled. NEC 408.4 (A) 3). Front entry and garage entry door are both missing the insulating seal around door perimeter. FBC [A]107.4 4). Garage interior door: door handle is broken/defective. FBC [A]107.4 5). ODU needs to be 3" above finished grade. FBCR M1305.1.4.1 (Currently grade directly at the pad is dug lower than finished grade adjacent to sides of pad. > needs to be lowered to meet pad finished grade.) New inspection due to canceled inspection 6/6/2025 - PREVIOUS INSPECTION NOTES 6/6/25: Scheduled too early! Not Ready! NO POWER! Also: 1)portable toilet is still in driveway. FBC [A]107.4 | |||
| BLD - BUILDING FINAL | 06/10/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/10/2025 2:38:05 PM *** 6/10/25: 1). Master bathroom: Right side vanity sink leaking in cabinet. FBC-[A] 110.3.11 / FBC-[A] 111.1 2). Main breaker needs to be labeled. NEC 408.4 (A) 3). Front entry and garage entry door are both missing the insulating seal around door perimeter. FBC [A]107.4 4). Garage interior door: door handle is broken/defective. FBC [A]107.4 5). ODU needs to be 3" above finished grade. FBCR M1305.1.4.1 (Currently grade directly at the pad is dug lower than finished grade adjacent to sides of pad. > needs to be lowered to meet pad finished grade.) New inspection due to canceled inspection 6/6/2025 - PREVIOUS INSPECTION NOTES 6/6/25: Scheduled too early! Not Ready! NO POWER! Also: 1)portable toilet is still in driveway. FBC [A]107.4 | |||
| ROW - STORMWATER FINAL | 06/10/2025 | APPROVED | TPOLACEK |
| Note: CORRECTIONS MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/6/2025 - PREVIOUS INSPECTION NOTES 06/06/25 TPOLACEK**** ALL BARE EARTH ON LEFT SIDE VACANT MUST BE COVERED WITH SEED AND STRAW Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage | |||
| ROW - STORMWATER FINAL | 06/06/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 06/06/25 TPOLACEK**** ALL BARE EARTH ON LEFT SIDE VACANT MUST BE COVERED WITH SEED AND STRAW Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage | |||
| BLD - BUILDING FINAL | 06/06/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/6/2025 9:11:50 AM *** 6/6/25: Scheduled too early! Not Ready! NO POWER! Also: 1)portable toilet is still in driveway. FBC [A]107.4 | |||
| BLD - BUILDING FINAL | 06/04/2025 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 06/04/2025 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ELECTRIC - EARLY POWER | 06/04/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 6/3/2025 - PREVIOUS INSPECTION NOTES 6/3/25: NO CHANGE FROM PREVIOUS INSPECTION! 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 6/2/2025 - PREVIOUS INSPECTION NOTES 6/2/25: NO LOCK BOX LOCATED ON SITE. Found rear SGD unlocked. 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 New inspection due to canceled inspection 5/30/2025 - PREVIOUS INSPECTION NOTES FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS | |||
| ELECTRIC - EARLY POWER | 06/04/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/4/2025 1:12:54 PM *** 6/4/25: FPL emailed to release power New inspection due to canceled inspection 6/3/2025 - PREVIOUS INSPECTION NOTES 6/3/25: NO CHANGE FROM PREVIOUS INSPECTION! 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 6/2/2025 - PREVIOUS INSPECTION NOTES 6/2/25: NO LOCK BOX LOCATED ON SITE. Found rear SGD unlocked. 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 New inspection due to canceled inspection 5/30/2025 - PREVIOUS INSPECTION NOTES FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS | |||
| U -UTILITY RESIDENTIAL FINAL | 06/04/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 no irr-no cc | |||
| ROW - STORMWATER FINAL | 06/04/2025 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC - EARLY POWER | 06/03/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/3/2025 11:26:17 AM *** 6/3/25: NO CHANGE FROM PREVIOUS INSPECTION! 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 6/2/2025 - PREVIOUS INSPECTION NOTES 6/2/25: NO LOCK BOX LOCATED ON SITE. Found rear SGD unlocked. 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 New inspection due to canceled inspection 5/30/2025 - PREVIOUS INSPECTION NOTES FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/03/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/03/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ELECTRIC - EARLY POWER | 06/02/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 5/30/2025 - PREVIOUS INSPECTION NOTES FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS | |||
| ELECTRIC - EARLY POWER | 06/02/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/2/2025 12:43:09 PM *** 6/2/25: NO LOCK BOX LOCATED ON SITE. Found rear SGD unlocked. 1). Could not inspect attic light due to attic access panel in place and large pile of construction trash directly under attic access. FBC-[A] 110.1 / FBC[A] 110.5 New inspection due to canceled inspection 5/30/2025 - PREVIOUS INSPECTION NOTES FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS | |||
| ELECTRIC - EARLY POWER | 05/30/2025 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 05/15/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/14/2025 - PREVIOUS INSPECTION NOTES 05/14/25 TPOLACEK** BOTH MITERED END FOOTERS ARE WASHED IN, CONCRETE AND DEBRIS IN UPPER POUR AREA MUST BE REMOVED AND LEFT SIDE APRON SLOPE EXCEEDS THE MAXIMUM 8% SLOPE. PLEASE MAKE CORRECTIONS. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/14/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 05/14/25 TPOLACEK** BOTH MITERED END FOOTERS ARE WASHED IN, CONCRETE AND DEBRIS IN UPPER POUR AREA MUST BE REMOVED AND LEFT SIDE APRON SLOPE EXCEEDS THE MAXIMUM 8% SLOPE. PLEASE MAKE CORRECTIONS. | |||
| INSULATION | 05/07/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/7/2025 2:17:57 PM *** 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25: NOT READY! INSTALLATION STILL IN PROGRESS. *** Silt fence still needs repair. FBC 3307.1 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 5/5/2025 2:09:29 PM *** 5/5/25: Spoke with CM about previous note. Informed me that the Excavator will be at site to correct on 5/6/25. Check at next inspection. 5/5/2025 - PREVIOUS INSPECTION NOTES 5/5/25: 1). Excess dirt from job site needs to be removed from neighboring vacant lot and silt fence repaired. FBC 3307.1 New inspection due to canceled inspection Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4 | |||
| INSULATION | 05/06/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/6/2025 10:38:38 AM *** 5/6/25: NOT READY! INSTALLATION STILL IN PROGRESS. *** Silt fence still needs repair. FBC 3307.1 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 5/5/2025 2:09:29 PM *** 5/5/25: Spoke with CM about previous note. Informed me that the Excavator will be at site to correct on 5/6/25. Check at next inspection. 5/5/2025 - PREVIOUS INSPECTION NOTES 5/5/25: 1). Excess dirt from job site needs to be removed from neighboring vacant lot and silt fence repaired. FBC 3307.1 New inspection due to canceled inspection Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4 | |||
| ALL ROUGH | 05/05/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/5/2025 11:00:22 AM *** 5/5/25: 1). Excess dirt from job site needs to be removed from neighboring vacant lot and silt fence repaired. FBC 3307.1 New inspection due to canceled inspection Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4 | |||
| ALL ROUGH | 05/05/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/5/2025 2:09:29 PM *** 5/5/25: Spoke with CM about previous note. Informed me that the Excavator will be at site to correct on 5/6/25. Check at next inspection. 5/5/2025 - PREVIOUS INSPECTION NOTES 5/5/25: 1). Excess dirt from job site needs to be removed from neighboring vacant lot and silt fence repaired. FBC 3307.1 New inspection due to canceled inspection Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4 | |||
| U-CROSS CONNECTION | 05/05/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cc | |||
| LATH/BRICK/ WATER BARRIER | 05/01/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/1/2025 10:18:48 AM *** Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4 | |||
| ALL ROUGH | 05/01/2025 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4 | |||
| GRAVITY SEWER TEST | 05/01/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 3/31/2025 - PREVIOUS INSPECTION NOTES NOTHING TO INSPECT. WORK NOT STARTED NEED SILT FENCE TO BE FINISHED FBC 3307.1 THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 05/01/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 3/31/2025 - PREVIOUS INSPECTION NOTES NOTHING TO INSPECT. WORK NOT STARTED NEED SILT FENCE TO BE FINISHED FBC 3307.1 THIS WAS A VIRTUAL INSPECTION | |||
| WALL SHEATHING | 04/22/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/22/2025 12:41:46 PM *** | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/22/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/22/2025 12:53:48 PM *** 4/22/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Silt fence needs to be repaired on the left side. FBC 3307.1 2). 2-ply truss D2 needs to be connected as required. Marked on MiTek packet. FBC [A]107.4 | |||
| ROOF VALLEY & METAL | 04/22/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/22/2025 12:41:33 PM *** | |||
| TIE BEAM / LINTEL | 04/16/2025 | APPROVED | RSIMS |
| Note: 4/15/2025 - PREVIOUS INSPECTION NOTES 4/15/25: 1). Dowel rods do not meet the minimum clearance (2" from face of block) as required. (FBC-R606.3.4) at front entry. Spray painted orange. 2). Silt fence needs to be complete on left and right sides and repaired on right side. FBC 3307.1 3). Please move trusses from swale area to allow for free flow of water. FBC 3303.5. Also, remove excess dirt pushed (well past property marker) onto neighboring wooded lot on left side. FBC 3303.5 | |||
| TIE BEAM / LINTEL | 04/15/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/15/2025 2:51:22 PM *** 4/15/25: 1). Dowel rods do not meet the minimum clearance (2" from face of block) as required. (FBC-R606.3.4) at front entry. Spray painted orange. 2). Silt fence needs to be complete on left and right sides and repaired on right side. FBC 3307.1 3). Please move trusses from swale area to allow for free flow of water. FBC 3303.5. Also, remove excess dirt pushed (well past property marker) onto neighboring wooded lot on left side. FBC 3303.5 | |||
| MONOLITHIC SLAB | 04/07/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/7/2025 10:28:16 AM *** | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/03/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: 3/31/2025 - PREVIOUS INSPECTION NOTES NOTHING TO INSPECT. WORK NOT STARTED NEED SILT FENCE TO BE FINISHED FBC 3307.1 | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/01/2025 | APPROVED | RRICKS |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/31/2025 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NOTHING TO INSPECT. WORK NOT STARTED | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/26/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/12/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/16/2025 | 04/21/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/01/2025 | 04/01/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/01/2025 | 04/01/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/26/2025 | 03/26/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/19/2025 | 02/27/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/18/2025 | 02/24/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/18/2025 | 02/24/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/18/2025 | 02/19/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/18/2025 | 02/24/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/18/2025 | 02/19/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/18/2025 | 02/21/2025 |
| LOCATE | COMPLETE | 02/18/2025 | 02/20/2025 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/18/2025 | 02/21/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/18/2025 | 02/19/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/18/2025 | 02/20/2025 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/11/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/10/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/06/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/06/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/06/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/06/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/06/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/25/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/25/2025 |
| SEWER CREDIT | (¤1,147.00) | 02/25/2025 |
| SEWER INSPECTION | ¤25.00 | 02/25/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 02/25/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 02/25/2025 |
| SITE PLAN 30 | ¤30.00 | 02/25/2025 |
| CONNECTION FEES | ¤1,187.26 | 02/25/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 02/25/2025 |
| IMPACT FEE FIRE | ¤434.51 | 02/25/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/25/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/25/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 02/25/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/25/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 02/25/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/25/2025 |
| SURCHARGE FS 533.721 | ¤10.82 | 02/25/2025 |
| SURCHARGE - FS 468.631 | ¤16.23 | 02/25/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/25/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/25/2025 |
| SW ENG PRE APRON | ¤30.00 | 02/25/2025 |
| WATER- TURN ON | ¤25.00 | 02/25/2025 |
| ADJUSTMENT 10% | (¤120.20) | 02/25/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/25/2025 |
| INSPECTION - RESIDENTIAL | ¤913.00 | 02/25/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤258.96 | 02/25/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,502.25 |