Permit #2025020958
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7007-00400-0360 |
| Block: 00400 |
| Subdivision: - |
| Job Phone: 386-931-0184 |
| Location Address: 56 FURNESS PL |
| Type: PO - POOL |
| Issue Date: 03/26/2025 |
| NOC: RECORDED |
| Applicant name: ROY CHARLES WALDHAUER II |
| Owner: SOUSA ISABELLA |
|
Address 24 PAHQUIOQUE AVE APT 3 DANBURY, CT 06810 |
| Lot: 0360 |
| Contracted Stated Job Value: ¤88,000.00 |
| Job Description: Enclosed Swimming Pool |
| Type: CN |
Contractor
WALDHAUER & SON INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1600 N STATE STREET # 102 BUNNELL, FL 32110 |
CPC057029 (Exp: 08/31/2026) | 386-263-8272 |
Sub Contractors
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 2413 Bunnell, FL 32110 |
EC13002161 (Exp: 08/31/2028) | (386) 437-2966 | 386-437-5042 |
ROY CHARLES WALDHAUER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1600 N STATE STREET # 102 , 0 |
CRC1327300 (Exp: 08/31/2026) | 386-263-8272 | 386-263-8289 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 02/06/2026 | FINAL APPROVED | HCAMACHO |
| U -UTILITY RESIDENTIAL FINAL | 01/14/2026 | FINAL APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/13/2026 | APPROVED | TPOLACEK |
| Note: 1/8/2026 - PREVIOUS INSPECTION NOTES 01-08-26 TPOLACEK*** FINAL SURVEY MUST INDICATE FFE OF POOL DECK, THERE SHOULD BE A MARKER INDICATING WHERE EACH SHOT WAS TAKEN NEXT TO THE ELEVATION (IE. AN X OR A /) SURVEY MUST CAPTURE ALL DRAINAGE CONVEYANCES AND SHOW POSITIVE FALL. DRAINAGE MAY NOT NEG IMPACT ADJOINING PROPERTIES OR SUBJECT PROPERTY. "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/13/2026 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL INSPECTION | 01/13/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/08/2026 | Disapproved - NO FEE | TPOLACEK |
| Note: 01-08-26 TPOLACEK*** FINAL SURVEY MUST INDICATE FFE OF POOL DECK, THERE SHOULD BE A MARKER INDICATING WHERE EACH SHOT WAS TAKEN NEXT TO THE ELEVATION (IE. AN X OR A /) SURVEY MUST CAPTURE ALL DRAINAGE CONVEYANCES AND SHOW POSITIVE FALL. DRAINAGE MAY NOT NEG IMPACT ADJOINING PROPERTIES OR SUBJECT PROPERTY. "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ELECTRIC AND ALARM | 11/19/2025 | APPROVED | HCAMACHO |
| POOL DECK | 06/17/2025 | APPROVED | HCAMACHO |
| POOL DECK | 06/16/2025 | Disapproved - NO FEE | JSTEWART |
| Note: Please remove Rebar from pool shell wall, bent over to Pool deck, Does not meet Clearance from soil, and concrete coverage. Min 3" from soil at ground and 2" clearence from the top of the slab coverage. FBC R404.1.3.3.7.4 | |||
| STEEL AND GROUND | 04/01/2025 | APPROVED | HCAMACHO |
Review History
| Department | Status | Date In | Date Out |
| BFLOOD | COMPLETE | 02/19/2025 | 02/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/19/2025 | 02/24/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/19/2025 | 02/24/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/19/2025 | 02/24/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/19/2025 | 02/26/2025 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM The top of the slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of the slope. (H)H.Land Development Code Technical Manual, Section 300.01 (D)(6) (V-!7) The subject lot drainage must not negatively impact any adjacent property. Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. (J)J.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6)) (V_16) | |||
| ZON | COMPLETE | 02/19/2025 | 02/20/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤25.86) | 03/26/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/26/2025 |
| INSPECTION- POOL | ¤160.00 | 03/26/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤68.64 | 03/26/2025 |
| SURCHARGE FS 533.721 | ¤2.33 | 03/26/2025 |
| SURCHARGE - FS 468.631 | ¤3.49 | 03/26/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 03/26/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/26/2025 |
| SITE PLAN 30 | ¤30.00 | 03/26/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤328.60 |