Permit #2025021206

Permit Details

Status: COED

Parcel Id: 07-11-31-7065-00180-0260
CONDITIONED SPACE: 1809 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 2248 sqft
Block: 00180
Subdivision: -
Job Phone: 239-571-5325
Location Address: 101 KASHMIR TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/04/2025
NOC: RECORDED
Applicant name: RYAN SCOTT DAVIS
Owner: SYNERGY HOMES LLC

Address

581 NW MERCANTILE PLACE 106

PORT SAINT LUCIE, FL 34986

Lot: 0260
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SYNERGY HOMES, LLC
Status Location Address State License Number
ACTIVE

1 HARGROVE GRADE, SUITE B1

PALM COAST, FL 32137

CBC1254289 (Exp: 08/31/2026)

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 06/24/2025 FINAL APPROVED DHANEY
Note: Inspector Notes from Inspection 9035 No IRR. No CC
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/23/2025 APPROVED GBERTOLA
Note: 6/23/25AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 6/17/2025 - PREVIOUS INSPECTION NOTES 6/17/25=The final survey doesn’t reflect what it’s on the ground. In the backyard, there is a low spot where at least 4 to 5 inches of water is pooling, preventing it from reaching the front swale. Also, on the left side, you are impacting the neighboring lot with the stormwater. .Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement Technical Manual, Section 300.01 (A)(1)(C)(6)(V_16) 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/25 YOUR ELEVATIONS IN THE REAR ON THE CENTER RIGHT DOES NOT HAVE POSITIVE FLOW. IN THE REAR LEFT CORNER YOUR ELEVATIONS SHOW WATER POOLING AT THE 21.50. ON YOUR LEFT SIDE PROPERTY LINE YOUR SITE PLAN SHOWS AN INSIDE SWALE YOUR FINAL SURVEY SHOWS A COMMON SWALE WHICH MAY WORK BUT YOUR ELEVATION SHOTS SHOW INCONSISTENT FLOW AS SHOWN IN ENCLOSED PHOTO. SEE PHOTO FOR REFERENCE.
ROW FIELD SURVEY /GRADING CERTIFICATION 06/23/2025 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
ROW - STORMWATER FINAL 06/23/2025 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
ROW - FINAL APRON (AFTER POUR) 06/23/2025 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/17/2025 Disapproved - NO FEE GBERTOLA
Note: 6/17/25=The final survey doesn’t reflect what it’s on the ground. In the backyard, there is a low spot where at least 4 to 5 inches of water is pooling, preventing it from reaching the front swale. Also, on the left side, you are impacting the neighboring lot with the stormwater. .Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement Technical Manual, Section 300.01 (A)(1)(C)(6)(V_16) 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/25 YOUR ELEVATIONS IN THE REAR ON THE CENTER RIGHT DOES NOT HAVE POSITIVE FLOW. IN THE REAR LEFT CORNER YOUR ELEVATIONS SHOW WATER POOLING AT THE 21.50. ON YOUR LEFT SIDE PROPERTY LINE YOUR SITE PLAN SHOWS AN INSIDE SWALE YOUR FINAL SURVEY SHOWS A COMMON SWALE WHICH MAY WORK BUT YOUR ELEVATION SHOTS SHOW INCONSISTENT FLOW AS SHOWN IN ENCLOSED PHOTO. SEE PHOTO FOR REFERENCE.
BLD - BUILDING FINAL 06/13/2025 CANCELLED BY APPLICANT WEB
Note: 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/25 1. Workers present at time of inspection. Did not do inspection FBC(A) 110.5 2. Construction debris in garage --Please only schedule inspection when ready
BLD - BUILDING FINAL 06/13/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/13/2025 1:56:46 PM *** New inspection due to canceled inspection 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/25 1. Workers present at time of inspection. Did not do inspection FBC(A) 110.5 2. Construction debris in garage --Please only schedule inspection when ready
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/12/2025 Disapproved - NO FEE FSLADISH
Note: 6/12/25 YOUR ELEVATIONS IN THE REAR ON THE CENTER RIGHT DOES NOT HAVE POSITIVE FLOW. IN THE REAR LEFT CORNER YOUR ELEVATIONS SHOW WATER POOLING AT THE 21.50. ON YOUR LEFT SIDE PROPERTY LINE YOUR SITE PLAN SHOWS AN INSIDE SWALE YOUR FINAL SURVEY SHOWS A COMMON SWALE WHICH MAY WORK BUT YOUR ELEVATION SHOTS SHOW INCONSISTENT FLOW AS SHOWN IN ENCLOSED PHOTO. SEE PHOTO FOR REFERENCE. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 fee
BLD - BUILDING FINAL 06/12/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 6/12/25 1. Workers present at time of inspection. Did not do inspection FBC(A) 110.5 2. Construction debris in garage --Please only schedule inspection when ready
ELECTRIC - EARLY POWER 06/02/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 6/2/25 Okay to release e-mail to FPL
GRAVITY SEWER TEST 05/30/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 05/30/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 05/23/2025 APPROVED FSLADISH
Note: 5/23/25 PIPE ELEVATION GOOD. BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
PEP TANK INSTALLATION REQUEST 05/20/2025 APPROVED CBOWERMASTER
Note: 5/19/2025 7:50:01 AM- PREVIOUS INSPECTION NOTES Stucco needs to be complete
INSULATION 05/19/2025 APPROVED CVANSTRAHLEN
Note: .
INSULATION 05/16/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 5/16/2025 1:34:27 PM *** 5/16/25: Not Ready! Contractors still working on finishing. FBC [A]107.4 Please check water pressure. No pressure in lines. --->>> Will still need to be checked at re-inspection.
LATH/BRICK/ WATER BARRIER 05/16/2025 APPROVED RSIMS
U-CROSS CONNECTION 05/16/2025 APPROVED - AS NOTED BWRIGHT
Note: No IRR. No CC
PEP TANK INSTALLATION REQUEST 05/16/2025 Disapproved -FEE REQUIRED CBOWERMASTER
Note: Stucco needs to be complete
ALL ROUGH 05/15/2025 APPROVED MCONTRYMAN
WALL SHEATHING 05/07/2025 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/07/2025 APPROVED BTAYLOR
ROOF VALLEY & METAL 05/07/2025 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 05/06/2025 APPROVED BBEMBRY
TIE BEAM / LINTEL 04/25/2025 APPROVED MCONTRYMAN
MONOLITHIC SLAB 04/17/2025 APPROVED MCONTRYMAN
PLUMBING 1ST ROUGH UNDERGROUND 04/15/2025 APPROVED MGIBSON
FORMBOARD SURVEY (OFFICE USE ONLY) 04/10/2025 APPROVED STHOMAS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 03/27/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 03/20/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 04/10/2025 04/10/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/10/2025 04/10/2025
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
BLD COMPLETE 03/27/2025 03/27/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN COMPLETE 02/25/2025 03/03/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 02/25/2025 03/03/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 02/25/2025 02/25/2025
Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM
ELEC COMPLETE 02/25/2025 03/03/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/25/2025 02/25/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 02/25/2025 02/27/2025
LOCATE COMPLETE 02/25/2025 03/03/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 02/25/2025 02/28/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/25/2025 02/26/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 02/25/2025 02/25/2025
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
SWALE COMPLETE 02/25/2025 03/04/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 06/23/2025
UTILITY PEP REINSPECTION ¤40.00 06/23/2025
SEWER CREDIT (¤1,466.00) 03/04/2025
SEWER INSPECTION ¤25.00 03/04/2025
SEWER CAPITAL FACILITY ¤6,120.52 03/04/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 03/04/2025
SITE PLAN 30 ¤30.00 03/04/2025
WATER- TURN ON ¤25.00 03/04/2025
ADJUSTMENT 10% (¤120.20) 03/04/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/04/2025
INSPECTION - RESIDENTIAL ¤913.00 03/04/2025
PLAN REVIEW - RESIDENTIAL ¤258.96 03/04/2025
CONNECTION FEES ¤1,187.26 03/04/2025
FC IMPACT FEE EMS ¤62.00 03/04/2025
IMPACT FEE FIRE ¤434.51 03/04/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/04/2025
FC IMPACT FEE LIBRARY ¤268.00 03/04/2025
IMPACT FEE PARKS ¤1,828.01 03/04/2025
IMPACT FEE SCHOOL ¤5,450.00 03/04/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 03/04/2025
WATER -IRRIGATION INSPECTION ¤25.00 03/04/2025
SURCHARGE FS 533.721 ¤10.82 03/04/2025
SURCHARGE - FS 468.631 ¤16.23 03/04/2025
SW ENG - FOUNDATION SURVEY ¤20.00 03/04/2025
SW ENG INSPECTION 80 ¤80.00 03/04/2025
SW ENG PRE APRON ¤30.00 03/04/2025
SW ENG - REVIEW 20 ¤20.00 03/04/2025
SW ENG RES REVIEW 200 ¤200.00 03/04/2025
Fees Total Due: ¤0.00 Total Paid: ¤22,013.25