I want to search for...
Permit #2025021206
Permit Details
Status: COED
| Parcel Id: 07-11-31-7065-00180-0260 |
| CONDITIONED SPACE: 1809 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 33 sqft |
| Total Square Footage: 2248 sqft |
| Block: 00180 |
| Subdivision: - |
| Job Phone: 239-571-5325 |
| Location Address: 101 KASHMIR TRL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/04/2025 |
| NOC: RECORDED |
| Applicant name: RYAN SCOTT DAVIS |
| Owner: SYNERGY HOMES LLC |
|
Address 581 NW MERCANTILE PLACE 106 PORT SAINT LUCIE, FL 34986 |
| Lot: 0260 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SYNERGY HOMES, LLC
| Status | Location Address | State License Number |
| ACTIVE |
1 HARGROVE GRADE, SUITE B1 PALM COAST, FL 32137 |
CBC1254289 (Exp: 08/31/2026) |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 06/24/2025 | FINAL APPROVED | DHANEY |
| Note: Inspector Notes from Inspection 9035 No IRR. No CC | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/23/2025 | APPROVED | GBERTOLA |
| Note: 6/23/25AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 6/17/2025 - PREVIOUS INSPECTION NOTES 6/17/25=The final survey doesn’t reflect what it’s on the ground. In the backyard, there is a low spot where at least 4 to 5 inches of water is pooling, preventing it from reaching the front swale. Also, on the left side, you are impacting the neighboring lot with the stormwater. .Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement Technical Manual, Section 300.01 (A)(1)(C)(6)(V_16) 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/25 YOUR ELEVATIONS IN THE REAR ON THE CENTER RIGHT DOES NOT HAVE POSITIVE FLOW. IN THE REAR LEFT CORNER YOUR ELEVATIONS SHOW WATER POOLING AT THE 21.50. ON YOUR LEFT SIDE PROPERTY LINE YOUR SITE PLAN SHOWS AN INSIDE SWALE YOUR FINAL SURVEY SHOWS A COMMON SWALE WHICH MAY WORK BUT YOUR ELEVATION SHOTS SHOW INCONSISTENT FLOW AS SHOWN IN ENCLOSED PHOTO. SEE PHOTO FOR REFERENCE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/23/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW - STORMWATER FINAL | 06/23/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/23/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/17/2025 | Disapproved - NO FEE | GBERTOLA |
| Note: 6/17/25=The final survey doesn’t reflect what it’s on the ground. In the backyard, there is a low spot where at least 4 to 5 inches of water is pooling, preventing it from reaching the front swale. Also, on the left side, you are impacting the neighboring lot with the stormwater. .Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement Technical Manual, Section 300.01 (A)(1)(C)(6)(V_16) 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/25 YOUR ELEVATIONS IN THE REAR ON THE CENTER RIGHT DOES NOT HAVE POSITIVE FLOW. IN THE REAR LEFT CORNER YOUR ELEVATIONS SHOW WATER POOLING AT THE 21.50. ON YOUR LEFT SIDE PROPERTY LINE YOUR SITE PLAN SHOWS AN INSIDE SWALE YOUR FINAL SURVEY SHOWS A COMMON SWALE WHICH MAY WORK BUT YOUR ELEVATION SHOTS SHOW INCONSISTENT FLOW AS SHOWN IN ENCLOSED PHOTO. SEE PHOTO FOR REFERENCE. | |||
| BLD - BUILDING FINAL | 06/13/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/25 1. Workers present at time of inspection. Did not do inspection FBC(A) 110.5 2. Construction debris in garage --Please only schedule inspection when ready | |||
| BLD - BUILDING FINAL | 06/13/2025 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/13/2025 1:56:46 PM *** New inspection due to canceled inspection 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/25 1. Workers present at time of inspection. Did not do inspection FBC(A) 110.5 2. Construction debris in garage --Please only schedule inspection when ready | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/12/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 6/12/25 YOUR ELEVATIONS IN THE REAR ON THE CENTER RIGHT DOES NOT HAVE POSITIVE FLOW. IN THE REAR LEFT CORNER YOUR ELEVATIONS SHOW WATER POOLING AT THE 21.50. ON YOUR LEFT SIDE PROPERTY LINE YOUR SITE PLAN SHOWS AN INSIDE SWALE YOUR FINAL SURVEY SHOWS A COMMON SWALE WHICH MAY WORK BUT YOUR ELEVATION SHOTS SHOW INCONSISTENT FLOW AS SHOWN IN ENCLOSED PHOTO. SEE PHOTO FOR REFERENCE. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 fee | |||
| BLD - BUILDING FINAL | 06/12/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 6/12/25 1. Workers present at time of inspection. Did not do inspection FBC(A) 110.5 2. Construction debris in garage --Please only schedule inspection when ready | |||
| ELECTRIC - EARLY POWER | 06/02/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 6/2/25 Okay to release e-mail to FPL | |||
| GRAVITY SEWER TEST | 05/30/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 05/30/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 05/23/2025 | APPROVED | FSLADISH |
| Note: 5/23/25 PIPE ELEVATION GOOD. BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| PEP TANK INSTALLATION REQUEST | 05/20/2025 | APPROVED | CBOWERMASTER |
| Note: 5/19/2025 7:50:01 AM- PREVIOUS INSPECTION NOTES Stucco needs to be complete | |||
| INSULATION | 05/19/2025 | APPROVED | CVANSTRAHLEN |
| Note: . | |||
| INSULATION | 05/16/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/16/2025 1:34:27 PM *** 5/16/25: Not Ready! Contractors still working on finishing. FBC [A]107.4 Please check water pressure. No pressure in lines. --->>> Will still need to be checked at re-inspection. | |||
| LATH/BRICK/ WATER BARRIER | 05/16/2025 | APPROVED | RSIMS |
| U-CROSS CONNECTION | 05/16/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: No IRR. No CC | |||
| PEP TANK INSTALLATION REQUEST | 05/16/2025 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: Stucco needs to be complete | |||
| ALL ROUGH | 05/15/2025 | APPROVED | MCONTRYMAN |
| WALL SHEATHING | 05/07/2025 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/07/2025 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 05/07/2025 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 05/06/2025 | APPROVED | BBEMBRY |
| TIE BEAM / LINTEL | 04/25/2025 | APPROVED | MCONTRYMAN |
| MONOLITHIC SLAB | 04/17/2025 | APPROVED | MCONTRYMAN |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/15/2025 | APPROVED | MGIBSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/10/2025 | APPROVED | STHOMAS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/27/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/20/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/10/2025 | 04/10/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/10/2025 | 04/10/2025 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/27/2025 | 03/27/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/25/2025 | 03/03/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/25/2025 | 03/03/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/25/2025 | 02/25/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/25/2025 | 03/03/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/25/2025 | 02/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/25/2025 | 02/27/2025 |
| LOCATE | COMPLETE | 02/25/2025 | 03/03/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/25/2025 | 02/28/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/25/2025 | 02/26/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/25/2025 | 02/25/2025 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/25/2025 | 03/04/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/23/2025 |
| UTILITY PEP REINSPECTION | ¤40.00 | 06/23/2025 |
| SEWER CREDIT | (¤1,466.00) | 03/04/2025 |
| SEWER INSPECTION | ¤25.00 | 03/04/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 03/04/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 03/04/2025 |
| SITE PLAN 30 | ¤30.00 | 03/04/2025 |
| WATER- TURN ON | ¤25.00 | 03/04/2025 |
| ADJUSTMENT 10% | (¤120.20) | 03/04/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/04/2025 |
| INSPECTION - RESIDENTIAL | ¤913.00 | 03/04/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤258.96 | 03/04/2025 |
| CONNECTION FEES | ¤1,187.26 | 03/04/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 03/04/2025 |
| IMPACT FEE FIRE | ¤434.51 | 03/04/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/04/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/04/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 03/04/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/04/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 03/04/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/04/2025 |
| SURCHARGE FS 533.721 | ¤10.82 | 03/04/2025 |
| SURCHARGE - FS 468.631 | ¤16.23 | 03/04/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/04/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/04/2025 |
| SW ENG PRE APRON | ¤30.00 | 03/04/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/04/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/04/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,013.25 |