I want to search for...
Permit #2025021361
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00250-0040 |
| CONDITIONED SPACE: 1504 sqft |
| GARAGE: 396 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2012 sqft |
| Block: 00250 |
| Subdivision: - |
| Job Phone: 407-476-8195 |
| Location Address: 8 FRENEAU LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/28/2025 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: INB BFS LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
|
Address SUITE 220 ORLANDO, FL 32803 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 11/12/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PASSING AS NOTED THAT THIS DIDN'T GET CATCHED BY THE PREVIOUS INSPECTORS REMOVE BERM ALONG THE PROPERTY LINE SO YOU WILL COMMON SWALE FOR THE TWO HOMES PER TECH. MANUAL STATES FROM THE HOUSE TO THE LEFT Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1, in expectation that eventually the vacant lot will be developed and graded to match the adjoining property elevation. --------------------------------------------------------------------------------- 11/10/2025 - PREVIOUS INSPECTION NOTES 11-10-25 TPOLACEK** RECIEVED TEXT ASKING TO CANCEL INSPECTION 11/7/2025 - PREVIOUS INSPECTION NOTES RRicks Hot Patch has been damaged before curing, please repair as needed. | |||
| ROW - STORMWATER FINAL | 11/10/2025 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 11-10-25 TPOLACEK** RECIEVED TEXT ASKING TO CANCEL INSPECTION 11/7/2025 - PREVIOUS INSPECTION NOTES RRicks Hot Patch has been damaged before curing, please repair as needed. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/07/2025 | FINAL APPROVED | BHAINES |
| Note: Inspector Notes from Inspection 9035 No IRR, NO CC | |||
| BLD - BUILDING FINAL | 11/07/2025 | APPROVED | CVANSTRAHLEN |
| WILDLIFE CHECK - ENVIRONMENTAL | 11/07/2025 | APPROVED | DRODRIGUEZ |
| ROW - FINAL APRON (AFTER POUR) | 11/07/2025 | APPROVED - AS NOTED | RRICKS |
| Note: 11/07/2025 RRicks Approved as noted - Hot patch needs to be repaired, it was damaged by tires before fully cured. This will be repaired before the Final ROW is approved. At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 11/07/2025 | Disapproved - NO FEE | RRICKS |
| Note: RRicks Hot Patch has been damaged before curing, please repair as needed. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/04/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/04/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U-CROSS CONNECTION | 11/04/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: No IRR, NO CC | |||
| ROW- PRE-APRON (PRE-POUR) | 10/02/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/02/25 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL _________________________________________________________________________________________________________ 9/26/2025 - PREVIOUS INSPECTION NOTES ** 09/26/25 CANCELLED BY BUILDER TEXT FROM FRANKIE | |||
| ELECTRIC - EARLY POWER | 09/29/2025 | APPROVED | HCAMACHO |
| ROW- PRE-APRON (PRE-POUR) | 09/26/2025 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 09/26/25 CANCELLED BY BUILDER TEXT FROM FRANKIE | |||
| INSULATION | 08/29/2025 | APPROVED | HCAMACHO |
| Note: 8/27/2025 - PREVIOUS INSPECTION NOTES Repair air baffles at Batt Insulation. Crushed and ran to the sub fascia (impeding air flow). Baffle should terminate to the exterior edge of the wall. FBC R806.3 / FBC R402.2.3 master exhaust duct connection at fan assembly requires a mechanical connection. FBCR M1601.4.1 Inspector Notes from Inspection 2420 Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-exhausted flex for share bathroom need to have 2 points of attachements by fan #3- please fix and seal opening in kitchen wall left of sink plumbing (exterior light coming through mason wall to the inside ) repair before next inspection , Mark with red market #4-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( top of front door ) | |||
| INSULATION | 08/27/2025 | Disapproved - NO FEE | JSTEWART |
| Note: Repair air baffles at Batt Insulation. Crushed and ran to the sub fascia (impeding air flow). Baffle should terminate to the exterior edge of the wall. FBC R806.3 / FBC R402.2.3 master exhaust duct connection at fan assembly requires a mechanical connection. FBCR M1601.4.1 Inspector Notes from Inspection 2420 Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-exhausted flex for share bathroom need to have 2 points of attachements by fan #3- please fix and seal opening in kitchen wall left of sink plumbing (exterior light coming through mason wall to the inside ) repair before next inspection , Mark with red market #4-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( top of front door ) | |||
| ALL ROUGH | 08/21/2025 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-exhausted flex for share bathroom need to have 2 points of attachements by fan #3- please fix and seal opening in kitchen wall left of sink plumbing (exterior light coming through mason wall to the inside ) repair before next inspection , Mark with red market #4-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( top of front door ) | |||
| LATH/BRICK/ WATER BARRIER | 08/20/2025 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2467 8/13/25 1. Please repair silt fence by next inspection to avoid failure and fees FBC 3307.1 --Engineering is okay Inspector Notes from Inspection 2460 1. Truss HJ03 and T02 missing Eng. | |||
| ELECTRIC-TUG | 08/19/2025 | APPROVED | HCAMACHO |
| ROOF VALLEY & METAL | 08/13/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 8/13/25 1. Please repair silt fence by next inspection to avoid failure and fees FBC 3307.1 --Engineering is okay Inspector Notes from Inspection 2460 1. Truss HJ03 and T02 missing Eng. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/12/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Truss HJ03 and T02 missing Eng. | |||
| ROOF SHEATHING | 08/07/2025 | APPROVED | FWILLIS |
| WALL SHEATHING | 08/07/2025 | APPROVED | FWILLIS |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 08/06/2025 | APPROVED | RRICKS |
| GRAVITY SEWER TEST | 07/31/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 07/31/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| TIE BEAM / LINTEL | 07/25/2025 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 07/17/2025 | APPROVED | JSTEWART |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/14/2025 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 07/10/2025 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 06/12/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/15/2025 | 07/15/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/15/2025 | 07/15/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 07/09/2025 | 07/10/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 03/17/2025 | 03/18/2025 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM After action report was submitted and accepted by FWC meeting the requirements for 10.04.01 of the LDC. Staff suggests placing silt fence as soon as possible to prevent gopher tortoises from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. In future submittals, acceptance email for after action report is required to be submitted. | |||
| MECH | COMPLETE | 03/06/2025 | 03/07/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/27/2025 | 03/05/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/27/2025 | 03/05/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/27/2025 | 03/03/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/27/2025 | 03/03/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/27/2025 | 02/27/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/27/2025 | 03/04/2025 |
| LOCATE | COMPLETE | 02/27/2025 | 03/04/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/27/2025 | 03/04/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM State card is page with preparers signature. upload this page for state card | |||
| SW1 | COMPLETE | 02/27/2025 | 02/28/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/27/2025 | 02/28/2025 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/27/2025 | 03/04/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| PLENV | HOLD | 02/27/2025 | 03/06/2025 |
| Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 03/06/2025 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤25.00 | 05/28/2025 |
| ADJUSTMENT 10% | (¤103.61) | 05/28/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/28/2025 |
| INSPECTION - RESIDENTIAL | ¤783.75 | 05/28/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤222.30 | 05/28/2025 |
| CONNECTION FEES | ¤1,187.26 | 05/28/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 05/28/2025 |
| IMPACT FEE FIRE | ¤434.51 | 05/28/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/28/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/28/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 05/28/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/28/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 05/28/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/28/2025 |
| SURCHARGE FS 533.721 | ¤9.32 | 05/28/2025 |
| SURCHARGE - FS 468.631 | ¤13.99 | 05/28/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/28/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/28/2025 |
| SW ENG PRE APRON | ¤30.00 | 05/28/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/28/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/28/2025 |
| SEWER CREDIT | (¤1,147.00) | 05/28/2025 |
| SEWER INSPECTION | ¤25.00 | 05/28/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 05/28/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 05/28/2025 |
| SITE PLAN 30 | ¤30.00 | 05/28/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,099.19 |