I want to search for...

Permit #2025021385

Permit Details

Status: COED

Parcel Id: 07-11-31-7032-00180-0040
CONDITIONED SPACE: 1809 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 2248 sqft
Block: 00180
Subdivision: -
Job Phone: 239-571-5325
Location Address: 31 ROYAL PALM LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/05/2025
NOC: RECORDED
Applicant name: RYAN SCOTT DAVIS
Owner: SYNERGY HOMES LLC

Address

581 NW MERCANTILE PLACE 106

PORT SAINT LUCIE, FL 34986

Lot: 0040
Contracted Stated Job Value: ¤200,000.00
Job Description: Single Family Residence
Type: CN

Contractor

SYNERGY HOMES, LLC
Status Location Address State License Number
ACTIVE

1 HARGROVE GRADE, SUITE B1

PALM COAST, FL 32137

CBC1254289 (Exp: 08/31/2026)

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/12/2025 APPROVED CVANSTRAHLEN
Note:
BLD - BUILDING FINAL 06/11/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: number 3 was not fix completed . pleasefix item #3-Insulation crew was working on side , missing lightbold in attic , garage door was not inspected and insulation certification need for final
ROW - STORMWATER FINAL 06/11/2025 CANCELLED BY APPLICANT TPOLACEK
Note: SPOKE WITH CM THEY PUT DOWN WRONG SOD IN BACK. SOD MUST MATCH EXISTING SO THEY WILL GET ST AUGUSTINE AND CALL IN FOR INSPECTION ONCE COMPLETED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/10/2025 - PREVIOUS INSPECTION NOTES 06/10/25 TPOLACEK*** BUILDER NEEDS TO ADD ST AUGUSTINE SOD THE REAR PROPERTY LINE WHERE BARE EARTH WAS DISTURBED DURING LOT CLEARING AS WELL AS LEFT SIDE PROPERTY LINE AT LEAST ONE MORE COURSE OF SOD AND ALL DISTURBED ROOTS REMOVED. ADJOINIING LOTS SHOULD BE AS GOOD OR BETTER THAN BEFORE CONSTRUCTION. INSPECTIONS/ ROW SEC 300,03 F5 V-21 "5. SEC 300,03 F5. All disturbed areas of the site and the swale shall be stabilized with vegetation. The sod in the swale shall match the sod on the property. MATCH EXISTING GRADE AT PROPERTY LINE" Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage ***INSPECTOR NOTE*** THIS IS NOT A BUILDERS PUNCH LIST. THIS IS A NOTE FOR OTHER INSPECTORS ONLY*** PLEASE MAKE SURE TO CHECK BACK PROPERTY LINE. THE ADJOINING PROPERTY HAS SAINT AUGUSTINE SOD AND THERE IS A STRIP OF BARE EARTH FROM WHEN BUILDER CLEARED LOT THAT NEEDS TO HAVE SOD MATCHING EXISTING GRADE.
ROW - STORMWATER FINAL 06/11/2025 APPROVED TPOLACEK
Note: CORRECTIONS MADE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/11/2025 - PREVIOUS INSPECTION NOTES SPOKE WITH CM THEY PUT DOWN WRONG SOD IN BACK. SOD MUST MATCH EXISTING SO THEY WILL GET ST AUGUSTINE AND CALL IN FOR INSPECTION ONCE COMPLETED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/10/2025 - PREVIOUS INSPECTION NOTES 06/10/25 TPOLACEK*** BUILDER NEEDS TO ADD ST AUGUSTINE SOD THE REAR PROPERTY LINE WHERE BARE EARTH WAS DISTURBED DURING LOT CLEARING AS WELL AS LEFT SIDE PROPERTY LINE AT LEAST ONE MORE COURSE OF SOD AND ALL DISTURBED ROOTS REMOVED. ADJOINIING LOTS SHOULD BE AS GOOD OR BETTER THAN BEFORE CONSTRUCTION. INSPECTIONS/ ROW SEC 300,03 F5 V-21 "5. SEC 300,03 F5. All disturbed areas of the site and the swale shall be stabilized with vegetation. The sod in the swale shall match the sod on the property. MATCH EXISTING GRADE AT PROPERTY LINE" Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage ***INSPECTOR NOTE*** THIS IS NOT A BUILDERS PUNCH LIST. THIS IS A NOTE FOR OTHER INSPECTORS ONLY*** PLEASE MAKE SURE TO CHECK BACK PROPERTY LINE. THE ADJOINING PROPERTY HAS SAINT AUGUSTINE SOD AND THERE IS A STRIP OF BARE EARTH FROM WHEN BUILDER CLEARED LOT THAT NEEDS TO HAVE SOD MATCHING EXISTING GRADE.
U -UTILITY RESIDENTIAL FINAL 06/10/2025 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 no irr-no cc
ROW - STORMWATER FINAL 06/10/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 06/10/25 TPOLACEK*** BUILDER NEEDS TO ADD ST AUGUSTINE SOD THE REAR PROPERTY LINE WHERE BARE EARTH WAS DISTURBED DURING LOT CLEARING AS WELL AS LEFT SIDE PROPERTY LINE AT LEAST ONE MORE COURSE OF SOD AND ALL DISTURBED ROOTS REMOVED. ADJOINIING LOTS SHOULD BE AS GOOD OR BETTER THAN BEFORE CONSTRUCTION. INSPECTIONS/ ROW SEC 300,03 F5 V-21 "5. SEC 300,03 F5. All disturbed areas of the site and the swale shall be stabilized with vegetation. The sod in the swale shall match the sod on the property. MATCH EXISTING GRADE AT PROPERTY LINE" Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage ***INSPECTOR NOTE*** THIS IS NOT A BUILDERS PUNCH LIST. THIS IS A NOTE FOR OTHER INSPECTORS ONLY*** PLEASE MAKE SURE TO CHECK BACK PROPERTY LINE. THE ADJOINING PROPERTY HAS SAINT AUGUSTINE SOD AND THERE IS A STRIP OF BARE EARTH FROM WHEN BUILDER CLEARED LOT THAT NEEDS TO HAVE SOD MATCHING EXISTING GRADE.
BLD - BUILDING FINAL 06/10/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next ins[ection #1- master bathroom and share bathroom do not have the exhausted fan install #2-missing thermostat #3-Insulation crew was working on side , garage door was not inspected and insulation certification need for final
ROW - FINAL APRON (AFTER POUR) 06/10/2025 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/09/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 06/09/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ELECTRIC - EARLY POWER 06/02/2025 APPROVED CVANSTRAHLEN
GRAVITY SEWER TEST 05/27/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 05/27/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 05/20/2025 APPROVED - AS NOTED TPOLACEK
Note: 05/20/25 TPOLACEK*** PLEASE MAKE SURE FOOTERS ARE 6" DEEP BELOW THE BOTTOM OF THE PIPE BEFORE POURING APPROVING AS NOTED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
INSULATION 05/14/2025 APPROVED CVANSTRAHLEN
Note:
INSULATION 05/13/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Notes front previous inspections are not fix Inspector Notes from Inspection 2420 Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE #2-FBCR P2503.5 -NEEDS PRESSURE TEST ON WATER LINES
ALL ROUGH 05/09/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE #2-FBCR P2503.5 -NEEDS PRESSURE TEST ON WATER LINES
LATH/BRICK/ WATER BARRIER 05/08/2025 APPROVED CVANSTRAHLEN
U-CROSS CONNECTION 05/08/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cc
LATH/BRICK/ WATER BARRIER 04/30/2025 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 04/29/2025 APPROVED CVANSTRAHLEN
WALL SHEATHING 04/28/2025 CANCELLED BY INSPECTOR CVANSTRAHLEN
Note: do not need this inspection
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/28/2025 APPROVED CVANSTRAHLEN
TIE BEAM / LINTEL 04/21/2025 APPROVED CVANSTRAHLEN
MONOLITHIC SLAB 04/14/2025 APPROVED CVANSTRAHLEN
PLUMBING 1ST ROUGH UNDERGROUND 04/10/2025 APPROVED MGIBSON
Note: 4/9/2025 - PREVIOUS INSPECTION NOTES Please call Robert Martin with any questions 386-986-7848
PLUMBING 1ST ROUGH UNDERGROUND 04/09/2025 CANCELLED BY APPLICANT RMARTIN
Note: Please call Robert Martin with any questions 386-986-7848
FOUND SURVEY APPROVED (OFFICE) 04/07/2025 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 04/07/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 04/01/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 04/16/2025 04/21/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/07/2025 04/07/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/07/2025 04/07/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 04/02/2025 04/07/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SWALE COMPLETE 02/28/2025 03/07/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 02/27/2025 03/05/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 02/27/2025 03/05/2025
Note: Released By: KENNETH SANDOE - - KSANDOE@PALMCOASTGOV.COM
CUSVC COMPLETE 02/27/2025 02/27/2025
Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM
ELEC COMPLETE 02/27/2025 03/05/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/27/2025 02/28/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 02/27/2025 03/04/2025
LOCATE COMPLETE 02/27/2025 03/04/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 02/27/2025 03/04/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/27/2025 02/28/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 02/27/2025 02/28/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 06/11/2025
REINSPECTION RESIDENTIAL ¤40.00 06/11/2025
REINSPECTION RESIDENTIAL ¤40.00 06/11/2025
SW ENG REINSPECTION 20 ¤20.00 06/11/2025
SW ENG - REVIEW 20 ¤20.00 03/05/2025
SW ENG RES REVIEW 200 ¤200.00 03/05/2025
SEWER CREDIT (¤1,466.00) 03/05/2025
SEWER INSPECTION ¤25.00 03/05/2025
SEWER CAPITAL FACILITY ¤6,120.52 03/05/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 03/05/2025
SITE PLAN 30 ¤30.00 03/05/2025
WATER- TURN ON ¤25.00 03/05/2025
ADJUSTMENT 10% (¤120.20) 03/05/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/05/2025
INSPECTION - RESIDENTIAL ¤913.00 03/05/2025
PLAN REVIEW - RESIDENTIAL ¤258.96 03/05/2025
CONNECTION FEES ¤1,187.26 03/05/2025
FC IMPACT FEE EMS ¤62.00 03/05/2025
IMPACT FEE FIRE ¤434.51 03/05/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/05/2025
FC IMPACT FEE LIBRARY ¤268.00 03/05/2025
IMPACT FEE PARKS ¤1,828.01 03/05/2025
IMPACT FEE SCHOOL ¤5,450.00 03/05/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 03/05/2025
WATER -IRRIGATION INSPECTION ¤25.00 03/05/2025
SURCHARGE FS 533.721 ¤10.82 03/05/2025
SURCHARGE - FS 468.631 ¤16.23 03/05/2025
SW ENG - FOUNDATION SURVEY ¤20.00 03/05/2025
SW ENG INSPECTION 80 ¤80.00 03/05/2025
SW ENG PRE APRON ¤30.00 03/05/2025
Fees Total Due: ¤0.00 Total Paid: ¤22,073.25