Permit #2025021406

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00060-0030
CONDITIONED SPACE: 1800 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 2246 sqft
Block: 00060
Subdivision: -
Job Phone: 689-250-2429
Location Address: 4 RYERTON PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/13/2025
NOC: RECORDED
Applicant name: RYAN M COURECH
Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC

Address

688 N ORLANDO AVENUE

MAITLAND, FL 32751

Address

SUITE 207

MAITLAND, FL 32751

Lot: 0030
Contracted Stated Job Value: ¤208,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN
Original Permit #: 2024010999

Contractor

MCH CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

668 N ORLANDO AVE, STE 207

MAITLAND, FL 32751

CBC1262898 (Exp: 08/31/2026) 407-602-8257

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997
DUSTIN ARCHER
Status Location Address State License Number Phone
ACTIVE

2785 WRIGHTS ROAD SUITE 1133

OVIEDO, FL 32765

CMC1251099 (Exp: 08/31/2026) 407-391-1145
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 10/29/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 10/29/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/28/2025 APPROVED TPOLACEK
Note: 10/22/2025 - PREVIOUS INSPECTION NOTES 10-22-25 TPOLACEK*** FINAL SURVEY FROM BEFORE SOD AND AFTER SOD HAVE ALL THE SAME ELEVATIONS EXCEPT 5 NUMBERS. PLEASE EXPLAIN HOW THE ELEVATIONS BEFORE AND AFTER SOD HAVE NOT CHANGED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/16/2025 - PREVIOUS INSPECTION NOTES 10-16-25 TPOLACEK*** FINAL SUREVY MUST BE CONDUCTED AT FINAL GRADE WITH ALL SOD IN PLACE. CREW WAS ON SITE JUST INSTALLING SOD AT THE TIME INSPECTOR ARRIVED. SEE ATTACHED PHOTO. THIS SURVEY WILL BE REJECTED AND A NEW SURVEY WILL NEED TO BE SHOT WITH NEW FIELD DATE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.E.(5) "(5) Final Lot Grading & Drainage Certification shall comply with all of the following: (a) A complete Final Lot Grading & Drainage Certification form provided by the City and consisting of three parts. • The completed Final Lot Grading & Drainage Certification checklist • A blank page or pages as necessary to be completed by the professional engineer, describing discrepancies between the City approved Lot Grading & Drainage Plan and the Final Lot Grading & Drainage Plan along with an explanation of any modifications, improvements and/or other means incorporated to ensure properly functioning grading and drainage conditions are consistent with the intent of the approved Lot Grading & Drainage Plan to include engineering design of any physically constructed drainage conveyances such as trickle channels, retaining walls, pipelines, yard inlets and similar drainage structures. • The “as constructed” Final Lot Grading & Drainage Plan that graphically documents, illustrates and depicts the as constructed lot grading and drainage conditions at completion of the home after completion of all site improvements and landscaping including installation of sod."
ROW FIELD SURVEY /GRADING CERTIFICATION 10/28/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
BLD - BUILDING FINAL 10/23/2025 Approval - Private Provider PPROVIDER
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/22/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 10-22-25 TPOLACEK*** FINAL SURVEY FROM BEFORE SOD AND AFTER SOD HAVE ALL THE SAME ELEVATIONS EXCEPT 5 NUMBERS. PLEASE EXPLAIN HOW THE ELEVATIONS BEFORE AND AFTER SOD HAVE NOT CHANGED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/16/2025 - PREVIOUS INSPECTION NOTES 10-16-25 TPOLACEK*** FINAL SUREVY MUST BE CONDUCTED AT FINAL GRADE WITH ALL SOD IN PLACE. CREW WAS ON SITE JUST INSTALLING SOD AT THE TIME INSPECTOR ARRIVED. SEE ATTACHED PHOTO. THIS SURVEY WILL BE REJECTED AND A NEW SURVEY WILL NEED TO BE SHOT WITH NEW FIELD DATE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.E.(5) "(5) Final Lot Grading & Drainage Certification shall comply with all of the following: (a) A complete Final Lot Grading & Drainage Certification form provided by the City and consisting of three parts. • The completed Final Lot Grading & Drainage Certification checklist • A blank page or pages as necessary to be completed by the professional engineer, describing discrepancies between the City approved Lot Grading & Drainage Plan and the Final Lot Grading & Drainage Plan along with an explanation of any modifications, improvements and/or other means incorporated to ensure properly functioning grading and drainage conditions are consistent with the intent of the approved Lot Grading & Drainage Plan to include engineering design of any physically constructed drainage conveyances such as trickle channels, retaining walls, pipelines, yard inlets and similar drainage structures. • The “as constructed” Final Lot Grading & Drainage Plan that graphically documents, illustrates and depicts the as constructed lot grading and drainage conditions at completion of the home after completion of all site improvements and landscaping including installation of sod."
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/16/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 10-16-25 TPOLACEK*** FINAL SUREVY MUST BE CONDUCTED AT FINAL GRADE WITH ALL SOD IN PLACE. CREW WAS ON SITE JUST INSTALLING SOD AT THE TIME INSPECTOR ARRIVED. SEE ATTACHED PHOTO. THIS SURVEY WILL BE REJECTED AND A NEW SURVEY WILL NEED TO BE SHOT WITH NEW FIELD DATE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.E.(5) "(5) Final Lot Grading & Drainage Certification shall comply with all of the following: (a) A complete Final Lot Grading & Drainage Certification form provided by the City and consisting of three parts. • The completed Final Lot Grading & Drainage Certification checklist • A blank page or pages as necessary to be completed by the professional engineer, describing discrepancies between the City approved Lot Grading & Drainage Plan and the Final Lot Grading & Drainage Plan along with an explanation of any modifications, improvements and/or other means incorporated to ensure properly functioning grading and drainage conditions are consistent with the intent of the approved Lot Grading & Drainage Plan to include engineering design of any physically constructed drainage conveyances such as trickle channels, retaining walls, pipelines, yard inlets and similar drainage structures. • The “as constructed” Final Lot Grading & Drainage Plan that graphically documents, illustrates and depicts the as constructed lot grading and drainage conditions at completion of the home after completion of all site improvements and landscaping including installation of sod."
ELECTRIC - EARLY POWER 09/26/2025 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 09/17/2025 APPROVED TPOLACEK
Note: 09-17-25 TPOLACEK*** CULVERT MITERED END FORM BOARDS SHALL NOT EXCEED 6" FROM END OF PIPE EXTENDING OUT. PLEASE MOVE BOARD BACK TO BETWEEN 3" AND 6" FROM END OF CULVERT. PLEASE CLEAN ALL DELETERIOUS MATERIALS FROM POUR AREA UP BY GARAGE AND WALK. APPROVING AS NOTED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
U-CROSS CONNECTION 08/26/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-o cc
U - SEWER TIE IN 08/26/2025 APPROVED MGIBSON
GRAVITY SEWER TEST 08/26/2025 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 08/08/2025 APPROVED CBOWERMASTER
INSULATION 08/01/2025 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 07/28/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 07/24/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 07/18/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/17/2025 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 07/10/2025 APPROVED RRICKS
TIE BEAM / LINTEL 06/20/2025 Approval - Private Provider PPROVIDER
Note: 6/3/2025 - PREVIOUS INSPECTION NOTES slab is not done
PLUMBING 1ST ROUGH UNDERGROUND 06/03/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 06/03/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: slab is not done
MONOLITHIC SLAB 06/03/2025 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 06/02/2025 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 04/08/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
SW1 COMPLETE 10/29/2025 10/29/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Apporved based on the final survey and field inspection.
SW1 HOLD 07/10/2025 07/10/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Notes: Foundation Survey approved and released. After further review on the grading and drainage site plan, the proposed common swale on the left side is changing the existing elevations by more than a 0.1' along an improved lot. If a common swale cannot be achieved, interior swales are allowed. Please revise site plan so that there proposed elevations along the left property line are not changed by more than a 0.1' with an interior swale moving water to the front of the property. Please feel free to call or email if there are any questions or concerns.
SW1 COMPLETE 07/09/2025 07/10/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 07/09/2025 07/09/2025
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BLD COMPLETE 05/29/2025 06/02/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 05/27/2025 05/27/2025
Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Inspection must be scheduled before I can result the uploaded report
SW1 COMPLETE 03/07/2025 03/07/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
MECH COMPLETE 03/07/2025 03/10/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/07/2025 03/07/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 03/07/2025 03/07/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN COMPLETE 02/28/2025 03/05/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 02/28/2025 03/03/2025
Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/28/2025 02/28/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
LOCATE COMPLETE 02/28/2025 03/04/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 02/28/2025 02/28/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Random elevation of 30.5 on right side of property that doesn't agree with drainage plan.
ZON COMPLETE 02/28/2025 02/28/2025
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
MECH HOLD 02/28/2025 03/05/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct layout without city approval stamp from another permit
SWALE COMPLETE 02/28/2025 03/07/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI REINSPECTION 1 ¤35.00 10/30/2025
RSI REINSPECTION 1 ¤35.00 10/30/2025
SURCHARGE FS 533.721 ¤6.17 03/13/2025
SURCHARGE - FS 468.631 ¤9.25 03/13/2025
SW ENG - FOUNDATION SURVEY ¤20.00 03/13/2025
SW ENG INSPECTION 80 ¤80.00 03/13/2025
SW ENG PRE APRON ¤30.00 03/13/2025
SW ENG - REVIEW 20 ¤20.00 03/13/2025
SW ENG RES REVIEW 200 ¤200.00 03/13/2025
SEWER CREDIT (¤3,512.73) 03/13/2025
SEWER INSPECTION ¤25.00 03/13/2025
SEWER CAPITAL FACILITY ¤6,120.52 03/13/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 03/13/2025
SITE PLAN 30 ¤30.00 03/13/2025
WATER- TURN ON ¤25.00 03/13/2025
ADJUSTMENT 10% (¤68.52) 03/13/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/13/2025
INSPECTION - RESIDENTIAL ¤572.00 03/13/2025
PLAN REVIEW - APPROVED MASTER ¤83.20 03/13/2025
CONNECTION FEES ¤1,187.26 03/13/2025
FC IMPACT FEE EMS ¤62.00 03/13/2025
IMPACT FEE FIRE ¤434.51 03/13/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/13/2025
FC IMPACT FEE LIBRARY ¤268.00 03/13/2025
IMPACT FEE PARKS ¤1,828.01 03/13/2025
IMPACT FEE SCHOOL ¤5,450.00 03/13/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 03/13/2025
WATER -IRRIGATION INSPECTION ¤25.00 03/13/2025
Fees Total Due: ¤0.00 Total Paid: ¤19,479.81