Permit #2025030071

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01300-0130
Block: 01300
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-503-6922
Location Address: 10 EDISON LN
Type: PO - POOL
Issue Date: 03/25/2025
NOC: RECORDED
Applicant name: JOSE E ORTIZ JR
Owner: THOMPSON JAMES MICHAEL & PATRICIA MARY TRUSTEES

Address

10 EDISON LANE

PALM COAST, FL 32164

Lot: 0130
Contracted Stated Job Value: ¤100,000.00
Job Description: Pool build
Type: CN

Contractor

JOSE E ORTIZ JR LLC
Status Location Address State License Number Phone
ACTIVE

4601 E MOODY BLVD A3

PALM COAST, FL 32164

CPC1460694 (Exp: 08/31/2026) 386-313-6055

Sub Contractors

CHRISTOPHER I HALL
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 2413

Bunnell, FL 32110

EC13002161 (Exp: 08/31/2028) (386) 437-2966 386-437-5042
RICHARD SWAN TOWNSEND II
Status Location Address State License Number Phone
ACTIVE

3111 OPPORTUNITY CT SUITE D

PORT ORANGE, FL 32129

CGC1515792 (Exp: 08/31/2026) 386-756-8770

Inspection History

Type Request Date Result Inspector
POOL FINAL 05/01/2026 FINAL APPROVED HCAMACHO
ROW - FINAL INSPECTION 04/10/2026 APPROVED FSLADISH
Note: 4/10/26 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. ____________________________________________________________________________________________________________________________ 3/6/2026 - PREVIOUS INSPECTION NOTES 3/6/26 BUILDER CALLED AND ASKED TO PLEASE CANCEL THIS INSPECTION FOR TODAY. Inspector Notes from Inspection 9465 Inspector Notes from Inspection 9463 3/4/26 AS THIS SURVEY HAS FAILED TWICE WHILE I WAS IN THE AREA STOPPED BY TO CONDUCT A FIELD SURVEY TO INVESTIGATE GRADE. DUE TO ROCK BEING USED AROUND REAR OF POOL DETERMINED IT MAY HAVE CAUSE ANOMOLIES IS THE ELEVATION SHOTS. I HAVE DETERMINED THAT DRAINAGE WILL WORK AT THE TIME OF THIS INSECTION AND AM APPROVING THIS SURVEY AS NOTED. 2/25/2026 - PREVIOUS INSPECTION NOTES 2/25/26 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR OF THE POOL DECK ON THIS SURVEY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING POOL DECK. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." PLEASE SEE PHOTO FOR REFERENCE. 12/16/2025 - PREVIOUS INSPECTION NOTES 12/16/25 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR NEIGHBORING PROPERTY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING ADJACENT PROPERTY. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." 3/4/26 I WAS IN THE AREA, SO I STOPPED BY TO CONDUCT A FIELD SURVEY TO INVESTIGATE GRADE DUE TO SURVEY FAILING TWICE. DUE TO ROCK BEING USED AROUND REAR OF POOL DETERMINED IT MAY HAVE CAUSED ANOMOLIES WITH THE ELEVATION SHOTS. I HAVE DETERMINED THAT DRAINAGE WILL WORK AT THE TIME OF THIS INSPECTION AND AM APPROVING THIS FIELD SURVEY AS NOTED THAT THE FRONT SWALE WHERE ENTRY AND EXIT WAS USED WILL NEED TO BE CORRECTED. BUILDER IS REQUIRED TO DIG OUT HIGH BARE SPOT IN COPC ROW AND MAKE SURE WHEN SOD IS LAID IN THIS AREA IT MATCHES GRADE ON BOTH SIDES OF ENTRY POINT. THIS CORRECTION WILL NEED TO BE COMPLETED BEFORE ROW FINAL PASSAGE. AREA OUTLINED IN PAINT.
U -UTILITY RESIDENTIAL FINAL 03/06/2026 FINAL APPROVED BWRIGHT
ROW FIELD SURVEY /GRADING CERTIFICATION 03/06/2026 APPROVED - AS NOTED FSLADISH
Note: 3/6/26 This is a duplicate inspection passed on 3/5/26. approving as noted. Inspector Notes from Inspection 9465 Inspector Notes from Inspection 9463 3/4/26 AS THIS SURVEY HAS FAILED TWICE WHILE I WAS IN THE AREA STOPPED BY TO CONDUCT A FIELD SURVEY TO INVESTIGATE GRADE. DUE TO ROCK BEING USED AROUND REAR OF POOL DETERMINED IT MAY HAVE CAUSE ANOMOLIES IS THE ELEVATION SHOTS. I HAVE DETERMINED THAT DRAINAGE WILL WORK AT THE TIME OF THIS INSECTION AND AM APPROVING THIS SURVEY AS NOTED. 2/25/2026 - PREVIOUS INSPECTION NOTES 2/25/26 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR OF THE POOL DECK ON THIS SURVEY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING POOL DECK. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." PLEASE SEE PHOTO FOR REFERENCE. 12/16/2025 - PREVIOUS INSPECTION NOTES 12/16/25 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR NEIGHBORING PROPERTY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING ADJACENT PROPERTY. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." 3/4/26 I WAS IN THE AREA, SO I STOPPED BY TO CONDUCT A FIELD SURVEY TO INVESTIGATE GRADE DUE TO SURVEY FAILING TWICE. DUE TO ROCK BEING USED AROUND REAR OF POOL DETERMINED IT MAY HAVE CAUSED ANOMOLIES WITH THE ELEVATION SHOTS. I HAVE DETERMINED THAT DRAINAGE WILL WORK AT THE TIME OF THIS INSPECTION AND AM APPROVING THIS FIELD SURVEY AS NOTED THAT THE FRONT SWALE WHERE ENTRY AND EXIT WAS USED WILL NEED TO BE CORRECTED. BUILDER IS REQUIRED TO DIG OUT HIGH BARE SPOT IN COPC ROW AND MAKE SURE WHEN SOD IS LAID IN THIS AREA IT MATCHES GRADE ON BOTH SIDES OF ENTRY POINT. THIS CORRECTION WILL NEED TO BE COMPLETED BEFORE ROW FINAL PASSAGE. AREA OUTLINED IN PAINT.
ROW - FINAL INSPECTION 03/06/2026 CANCELLED BY APPLICANT FSLADISH
Note: 3/6/26 BUILDER CALLED AND ASKED TO PLEASE CANCEL THIS INSPECTION FOR TODAY. Inspector Notes from Inspection 9465 Inspector Notes from Inspection 9463 3/4/26 AS THIS SURVEY HAS FAILED TWICE WHILE I WAS IN THE AREA STOPPED BY TO CONDUCT A FIELD SURVEY TO INVESTIGATE GRADE. DUE TO ROCK BEING USED AROUND REAR OF POOL DETERMINED IT MAY HAVE CAUSE ANOMOLIES IS THE ELEVATION SHOTS. I HAVE DETERMINED THAT DRAINAGE WILL WORK AT THE TIME OF THIS INSECTION AND AM APPROVING THIS SURVEY AS NOTED. 2/25/2026 - PREVIOUS INSPECTION NOTES 2/25/26 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR OF THE POOL DECK ON THIS SURVEY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING POOL DECK. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." PLEASE SEE PHOTO FOR REFERENCE. 12/16/2025 - PREVIOUS INSPECTION NOTES 12/16/25 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR NEIGHBORING PROPERTY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING ADJACENT PROPERTY. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." 3/4/26 I WAS IN THE AREA, SO I STOPPED BY TO CONDUCT A FIELD SURVEY TO INVESTIGATE GRADE DUE TO SURVEY FAILING TWICE. DUE TO ROCK BEING USED AROUND REAR OF POOL DETERMINED IT MAY HAVE CAUSED ANOMOLIES WITH THE ELEVATION SHOTS. I HAVE DETERMINED THAT DRAINAGE WILL WORK AT THE TIME OF THIS INSPECTION AND AM APPROVING THIS FIELD SURVEY AS NOTED THAT THE FRONT SWALE WHERE ENTRY AND EXIT WAS USED WILL NEED TO BE CORRECTED. BUILDER IS REQUIRED TO DIG OUT HIGH BARE SPOT IN COPC ROW AND MAKE SURE WHEN SOD IS LAID IN THIS AREA IT MATCHES GRADE ON BOTH SIDES OF ENTRY POINT. THIS CORRECTION WILL NEED TO BE COMPLETED BEFORE ROW FINAL PASSAGE. AREA OUTLINED IN PAINT.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/05/2026 APPROVED - AS NOTED FSLADISH
Note: 3/4/26 AS THIS SURVEY HAS FAILED TWICE WHILE I WAS IN THE AREA STOPPED BY TO CONDUCT A FIELD SURVEY TO INVESTIGATE GRADE. DUE TO ROCK BEING USED AROUND REAR OF POOL DETERMINED IT MAY HAVE CAUSE ANOMOLIES IS THE ELEVATION SHOTS. I HAVE DETERMINED THAT DRAINAGE WILL WORK AT THE TIME OF THIS INSECTION AND AM APPROVING THIS SURVEY AS NOTED. 2/25/2026 - PREVIOUS INSPECTION NOTES 2/25/26 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR OF THE POOL DECK ON THIS SURVEY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING POOL DECK. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." PLEASE SEE PHOTO FOR REFERENCE. 12/16/2025 - PREVIOUS INSPECTION NOTES 12/16/25 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR NEIGHBORING PROPERTY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING ADJACENT PROPERTY. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement."
ROW FIELD SURVEY /GRADING CERTIFICATION 03/05/2026 APPROVED - AS NOTED FSLADISH
Note: *** NOTES ADDED BY FSLADISH 3/5/2026 12:04:16 PM *** 3/4/26 I WAS IN THE AREA, SO I STOPPED BY TO CONDUCT A FIELD SURVEY TO INVESTIGATE GRADE DUE TO SURVEY FAILING TWICE. DUE TO ROCK BEING USED AROUND REAR OF POOL DETERMINED IT MAY HAVE CAUSED ANOMOLIES WITH THE ELEVATION SHOTS. I HAVE DETERMINED THAT DRAINAGE WILL WORK AT THE TIME OF THIS INSPECTION AND AM APPROVING THIS FIELD SURVEY AS NOTED THAT THE FRONT SWALE WHERE ENTRY AND EXIT WAS USED WILL NEED TO BE CORRECTED. BUILDER IS REQUIRED TO DIG OUT HIGH BARE SPOT IN COPC ROW AND MAKE SURE WHEN SOD IS LAID IN THIS AREA IT MATCHES GRADE ON BOTH SIDES OF ENTRY POINT. THIS CORRECTION WILL NEED TO BE COMPLETED BEFORE ROW FINAL PASSAGE. AREA OUTLINED IN PAINT. Inspector Notes from Inspection 9463 3/4/26 AS THIS SURVEY HAS FAILED TWICE WHILE I WAS IN THE AREA STOPPED BY TO CONDUCT A FIELD SURVEY TO INVESTIGATE GRADE. DUE TO ROCK BEING USED AROUND REAR OF POOL DETERMINED IT MAY HAVE CAUSE ANOMOLIES IS THE ELEVATION SHOTS. I HAVE DETERMINED THAT DRAINAGE WILL WORK AT THE TIME OF THIS INSECTION AND AM APPROVING THIS SURVEY AS NOTED. 2/25/2026 - PREVIOUS INSPECTION NOTES 2/25/26 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR OF THE POOL DECK ON THIS SURVEY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING POOL DECK. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." PLEASE SEE PHOTO FOR REFERENCE. 12/16/2025 - PREVIOUS INSPECTION NOTES 12/16/25 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR NEIGHBORING PROPERTY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING ADJACENT PROPERTY. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." 3/4/26 I WAS IN THE AREA, SO I STOPPED BY TO CONDUCT A FIELD SURVEY TO INVESTIGATE GRADE DUE TO SURVEY FAILING TWICE. DUE TO ROCK BEING USED AROUND REAR OF POOL DETERMINED IT MAY HAVE CAUSED ANOMOLIES WITH THE ELEVATION SHOTS. I HAVE DETERMINED THAT DRAINAGE WILL WORK AT THE TIME OF THIS INSPECTION AND AM APPROVING THIS FIELD SURVEY AS NOTED THAT THE FRONT SWALE WHERE ENTRY AND EXIT WAS USED WILL NEED TO BE CORRECTED. BUILDER IS REQUIRED TO DIG OUT HIGH BARE SPOT IN COPC ROW AND MAKE SURE WHEN SOD IS LAID IN THIS AREA IT MATCHES GRADE ON BOTH SIDES OF ENTRY POINT. THIS CORRECTION WILL NEED TO BE COMPLETED BEFORE ROW FINAL PASSAGE. AREA OUTLINED IN PAINT.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/25/2026 Disapproved -FEE REQUIRED FSLADISH
Note: 2/25/26 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR OF THE POOL DECK ON THIS SURVEY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING POOL DECK. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." PLEASE SEE PHOTO FOR REFERENCE. 12/16/2025 - PREVIOUS INSPECTION NOTES 12/16/25 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR NEIGHBORING PROPERTY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING ADJACENT PROPERTY. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement."
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/16/2025 Disapproved - NO FEE FSLADISH
Note: 12/16/25 YOUR SURVEY DOES NOT MATCH YOUR SITE PLAN. YOUR SITE PLAN SHOWS DRAINAGE OF OF REAR POOL DECK FLOWING RIGHT AND LEFT TRHU A SWALE, YOUR SURVEY SHOWS DRAINAGE ALL RUNNING TO THE REAR NEIGHBORING PROPERTY. YOU MAY NOT HAVE ADVERSE DRAINAGE AFFECTING ADJACENT PROPERTY. REAR YARD DRAIAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement."
ELECTRIC AND ALARM 07/03/2025 APPROVED CVANSTRAHLEN
POOL DECK 05/22/2025 APPROVED CVANSTRAHLEN
Note:
POOL DECK 05/21/2025 Disapproved -FEE REQUIRED MKRASKI
Note: 1. Perimeter bondn wire for 4 points of bonding of pool steel missing NEC 680.26.4 2. Please have footing plans on site with Building Dept. stamp of approval for next inspection FBC 107.3.1
POOL DECK 05/13/2025 CANCELLED BY APPLICANT WEB
STEEL AND GROUND 03/31/2025 APPROVED MCONTRYMAN

Review History

Department Status Date In Date Out
BADMIN COMPLETE 03/20/2026 03/20/2026
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BADMIN HOLD 02/24/2026 02/24/2026
Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM CAN NOT SCHEDULE FINAL SURVEY INSPECTION. NOC EXPIRED 1/17/2026
ZON COMPLETE 03/20/2025 03/20/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/20/2025 03/21/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ELEC COMPLETE 03/20/2025 03/25/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BFLOOD COMPLETE 03/03/2025 03/05/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 03/03/2025 03/07/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Need pool plans uploaded. 2. Need 3rd pg of the TDH form. 3. If there is a screen, need plans.
ELEC HOLD 03/03/2025 03/07/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit pool plans
MECH COMPLETE 03/03/2025 03/05/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/03/2025 03/05/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 03/03/2025 03/04/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Screen plan dimensions do not match the pool deck dimensions. Screen would not meet the minimum rear setback at the size shown on plans

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EXTENSION ¤40.00 03/05/2026
RSI REINSPECTION 1 ¤35.00 03/05/2026
REINSPECTION RESIDENTIAL ¤40.00 05/21/2025
SURCHARGE FS 533.721 ¤2.41 03/25/2025
SURCHARGE - FS 468.631 ¤3.62 03/25/2025
SW ENG INSPECTION 40 ¤40.00 03/25/2025
SW ENG - REVIEW 20 ¤20.00 03/25/2025
SITE PLAN 30 ¤30.00 03/25/2025
INSPECTION- POOL ¤160.00 03/25/2025
PLAN REVIEW - RESIDENTIAL ¤78.00 03/25/2025
ADJUSTMENT 10% (¤26.80) 03/25/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/25/2025
Fees Total Due: ¤0.00 Total Paid: ¤452.23