I want to search for...
Permit #2025030106
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00310-0230 |
| CONDITIONED SPACE: 1809 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 33 sqft |
| Total Square Footage: 2248 sqft |
| Block: 00310 |
| Subdivision: - |
| Job Phone: 239-571-5325 |
| Location Address: 14 RYDELL LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/19/2025 |
| NOC: RECORDED |
| Applicant name: RYAN SCOTT DAVIS |
| Owner: SYNERGY HOMES LLC |
|
Address 581 NW MERCANTILE PLACE 106 PORT ST LUCIE, FL 34986 |
| Lot: 0230 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SYNERGY HOMES, LLC
| Status | Location Address | State License Number |
| ACTIVE |
1 HARGROVE GRADE, SUITE B1 PALM COAST, FL 32137 |
CBC1254289 (Exp: 08/31/2026) |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/11/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| ROW - STORMWATER FINAL | 06/11/2025 | APPROVED | TPOLACEK |
| Note: CORRECTIONS HAVE BEEN MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 HOLE IN BACK YARD NOT FILLED IN AND SODDED TO GRADE. IT WAS NOT CAUGHT ON PRIOR INSPECTION BUT THERE IS A HIGH SPOT IN THE SWAL ON THE RIGHT SIDE AS INDICATED ON THE FINAL SURVEY COMING OUT OF THE RIGHT CULVERT AT 25.40 GOING UP TO A 25.90. THIS AREA OULINED IN PINK PAINT NEEDS TO BE LOWERERD. 6/6/2025 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM CM ASKING TO CANCEL AS HOT PATCH IS NOT COMPLETED 6/4/2025 - PREVIOUS INSPECTION NOTES 06/04/25 TPOLACEK*** THERE IS TRASH AND DEBRIS ON THE SIDES AND REAR OF STRUCTURE AS WELL AS A HOLE WHERE A TREE HAS BEEN REMOVED. Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage | |||
| ROW - STORMWATER FINAL | 06/10/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 6/10/25 HOLE IN BACK YARD NOT FILLED IN AND SODDED TO GRADE. IT WAS NOT CAUGHT ON PRIOR INSPECTION BUT THERE IS A HIGH SPOT IN THE SWALE ON THE RIGHT SIDE AS INDICATED ON THE FINAL SURVEY COMING OUT OF THE RIGHT CULVERT AT 25.40 GOING UP TO A 25.90. THIS AREA OULINED IN PINK PAINT NEEDS TO BE LOWERERD. 6/6/2025 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM CM ASKING TO CANCEL AS HOT PATCH IS NOT COMPLETED 6/4/2025 - PREVIOUS INSPECTION NOTES 06/04/25 TPOLACEK*** THERE IS TRASH AND DEBRIS ON THE SIDES AND REAR OF STRUCTURE AS WELL AS A HOLE WHERE A TREE HAS BEEN REMOVED. Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage | |||
| BLD - BUILDING FINAL | 06/10/2025 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: not hot water on any faucet | |||
| ROW - FINAL APRON (AFTER POUR) | 06/10/2025 | APPROVED | FSLADISH |
| Note: 6/10/25 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 6/6/2025 - PREVIOUS INSPECTION NOTES 6/4/2025 - PREVIOUS INSPECTION NOTES 06/04/25 TPOLACEK*** OVER POUR CONCRETE NEEDS TO BE CHIPPED OFF THE INSIDE OF PIPE AND PIPE SHOULD BE FREE AND CLEAR OF ANY DEBRIS, HOT PATCH NOT COMPLETED | |||
| ROW - FINAL APRON (AFTER POUR) | 06/06/2025 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 6/4/2025 - PREVIOUS INSPECTION NOTES 06/04/25 TPOLACEK*** OVER POUR CONCRETE NEEDS TO BE CHIPPED OFF THE INSIDE OF PIPE AND PIPE SHOULD BE FREE AND CLEAR OF ANY DEBRIS, HOT PATCH NOT COMPLETED | |||
| BLD - BUILDING FINAL | 06/06/2025 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2490 Please fix items before next inspection #1-Fl approval number for slidding door , do not match Fl approval number on sheet #2- add foam on hole garage left wall ( conduit for electrical wire ) | |||
| ROW - STORMWATER FINAL | 06/06/2025 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: RECIEVED TEXT FROM CM ASKING TO CANCEL AS HOT PATCH IS NOT COMPLETED 6/4/2025 - PREVIOUS INSPECTION NOTES 06/04/25 TPOLACEK*** THERE IS TRASH AND DEBRIS ON THE SIDES AND REAR OF STRUCTURE AS WELL AS A HOLE WHERE A TREE HAS BEEN REMOVED. Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage | |||
| U -UTILITY RESIDENTIAL FINAL | 06/04/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 no irr-no cc | |||
| ROW - FINAL APRON (AFTER POUR) | 06/04/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 06/04/25 TPOLACEK*** OVER POUR CONCRETE NEEDS TO BE CHIPPED OFF THE INSIDE OF PIPE AND PIPE SHOULD BE FREE AND CLEAR OF ANY DEBRIS, HOT PATCH NOT COMPLETED | |||
| ROW - STORMWATER FINAL | 06/04/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 06/04/25 TPOLACEK*** THERE IS TRASH AND DEBRIS ON THE SIDES AND REAR OF STRUCTURE AS WELL AS A HOLE WHERE A TREE HAS BEEN REMOVED. Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/03/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED New inspection due to canceled inspection New inspection due to canceled inspection 5/28/2025 - PREVIOUS INSPECTION NOTES ** 05/28/25 LEFT SIDE PROPERTY LINE BUILDER NEEDS TO REMOVE HIGH SPOT IN THE ROW AS THIS SREA WILL CAUSE STORMWATER TO POND AND NOT FLOW IN THE SWALE. SOD WILL BE RQUIRED IN THIS LOCATION. NOTE AREA OUTLINED WITH PINK PAINT. ** REMOVE THE GRASS FROM EDGE OF ROADWAY FINAL GRADE SHOULD BE 2 INCHES BELOW EDGE OF ROAD BEFORE SOD IS SET IN PLACE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/03/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 5/28/2025 - PREVIOUS INSPECTION NOTES ** 05/28/25 LEFT SIDE PROPERTY LINE BUILDER NEEDS TO REMOVE HIGH SPOT IN THE ROW AS THIS SREA WILL CAUSE STORMWATER TO POND AND NOT FLOW IN THE SWALE. SOD WILL BE RQUIRED IN THIS LOCATION. NOTE AREA OUTLINED WITH PINK PAINT. ** REMOVE THE GRASS FROM EDGE OF ROADWAY FINAL GRADE SHOULD BE 2 INCHES BELOW EDGE OF ROAD BEFORE SOD IS SET IN PLACE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/02/2025 | CANCELLED BY APPLICANT | WEB |
| Note: New inspection due to canceled inspection 5/28/2025 - PREVIOUS INSPECTION NOTES ** 05/28/25 LEFT SIDE PROPERTY LINE BUILDER NEEDS TO REMOVE HIGH SPOT IN THE ROW AS THIS SREA WILL CAUSE STORMWATER TO POND AND NOT FLOW IN THE SWALE. SOD WILL BE RQUIRED IN THIS LOCATION. NOTE AREA OUTLINED WITH PINK PAINT. ** REMOVE THE GRASS FROM EDGE OF ROADWAY FINAL GRADE SHOULD BE 2 INCHES BELOW EDGE OF ROAD BEFORE SOD IS SET IN PLACE. | |||
| ELECTRIC - EARLY POWER | 06/02/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 5/30/2025 - PREVIOUS INSPECTION NOTES FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS | |||
| ELECTRIC - EARLY POWER | 06/02/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| ELECTRIC - EARLY POWER | 05/30/2025 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/28/2025 | APPROVED | EMADISON |
| Note: ** 05/28/25 AT THE LEFT SIDE PROPERTY LINE ELEVATION SHOT IT .25 HIGHER DUE TO HIGH SPOT THIS INSPECTOR IS APPROVING FINAL SURVEY BUT WILL REQUIRE AREA IN QUESTION TO BE CORRECTED IN FIELD SURVEY | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/28/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 05/28/25 LEFT SIDE PROPERTY LINE BUILDER NEEDS TO REMOVE HIGH SPOT IN THE ROW AS THIS SREA WILL CAUSE STORMWATER TO POND AND NOT FLOW IN THE SWALE. SOD WILL BE RQUIRED IN THIS LOCATION. NOTE AREA OUTLINED WITH PINK PAINT. ** REMOVE THE GRASS FROM EDGE OF ROADWAY FINAL GRADE SHOULD BE 2 INCHES BELOW EDGE OF ROAD BEFORE SOD IS SET IN PLACE. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/14/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 05/14/25 TPOLACEK*** PLEASE MAKE SURE TO BACKFILL OR EXTEND FORM BAORDS TO PREVENT OVER POUR. 4 Concrete extending past the formboards DRAWING 300.G/14 DRAWING 300.G/14. Technical Manual, Drawing 300.E Concrete extending past the formboards, in the swale, must be removed. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR 5/12/2025 - PREVIOUS INSPECTION NOTES 05/12/25 TPOLACEK*** POUR AREA IS UNDER WATER. IT IS THER BUILDERS RESPOSIBILTY TO CHECK PRE POUR WHEN THERE IS RAIN TO MAKE SURE SITE IS READY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/9/2025 - PREVIOUS INSPECTION NOTES 05/09/25 TPOLACEK**** SITE NOT READY FOR INSPECTION. SEE PHOTO | |||
| ROW- PRE-APRON (PRE-POUR) | 05/12/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 05/12/25 TPOLACEK*** POUR AREA IS UNDER WATER. IT IS THER BUILDERS RESPOSIBILTY TO CHECK PRE POUR WHEN THERE IS RAIN TO MAKE SURE SITE IS READY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/9/2025 - PREVIOUS INSPECTION NOTES 05/09/25 TPOLACEK**** SITE NOT READY FOR INSPECTION. SEE PHOTO | |||
| U-CROSS CONNECTION | 05/09/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cc | |||
| ROW- PRE-APRON (PRE-POUR) | 05/09/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 05/09/25 TPOLACEK**** SITE NOT READY FOR INSPECTION. SEE PHOTO | |||
| GRAVITY SEWER TEST | 05/09/2025 | APPROVED | MGIBSON |
| SEWER TIE IN | 05/09/2025 | APPROVED | MGIBSON |
| INSULATION | 05/06/2025 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-Fl approval number for slidding door , do not match Fl approval number on sheet #2- add foam on hole garage left wall ( conduit for electrical wire ) | |||
| PEP TANK INSTALLATION REQUEST | 05/06/2025 | APPROVED | CBOWERMASTER |
| ALL ROUGH | 05/02/2025 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-Fl approval number for slidding door , do not match Fl approval number on sheet #2-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE | |||
| GRAVITY SEWER TEST | 05/02/2025 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 05/01/2025 | APPROVED | CVANSTRAHLEN |
| ROOF VALLEY & METAL | 04/25/2025 | APPROVED | CVANSTRAHLEN |
| WALL SHEATHING | 04/23/2025 | APPROVED | CVANSTRAHLEN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/23/2025 | APPROVED | CVANSTRAHLEN |
| TIE BEAM / LINTEL | 04/16/2025 | APPROVED | CVANSTRAHLEN |
| MONOLITHIC SLAB | 04/08/2025 | APPROVED | CVANSTRAHLEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/03/2025 | APPROVED | MGIBSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/01/2025 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/28/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/25/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/01/2025 | 04/01/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/01/2025 | 04/01/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/28/2025 | 03/28/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/13/2025 | 03/19/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Final PEP location to be provided by COPC. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lid/cover. | |||
| ENGIN1 | COMPLETE | 03/13/2025 | 03/13/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/13/2025 | 03/13/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/04/2025 | 03/11/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/04/2025 | 03/11/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/04/2025 | 03/04/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/04/2025 | 03/10/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/04/2025 | 03/04/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/04/2025 | 03/07/2025 |
| LOCATE | COMPLETE | 03/04/2025 | 03/11/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/04/2025 | 03/07/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/04/2025 | 03/05/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Flow arrow doesn't agree with elevations in back of the yard - 27.30 to 27.40 to 27.50. 1.Change flow arrow or confirm proposed elevations. Note: Final PEP location to be provided by COPC. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lid/cover. | |||
| ZON | COMPLETE | 03/04/2025 | 03/04/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/04/2025 | 03/07/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/10/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/10/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/10/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/10/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/19/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/19/2025 |
| SEWER CREDIT | (¤1,342.00) | 03/19/2025 |
| SEWER INSPECTION | ¤25.00 | 03/19/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 03/19/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 03/19/2025 |
| SITE PLAN 30 | ¤30.00 | 03/19/2025 |
| WATER- TURN ON | ¤25.00 | 03/19/2025 |
| ADJUSTMENT 10% | (¤120.20) | 03/19/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/19/2025 |
| INSPECTION - RESIDENTIAL | ¤913.00 | 03/19/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤258.96 | 03/19/2025 |
| CONNECTION FEES | ¤1,187.26 | 03/19/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 03/19/2025 |
| IMPACT FEE FIRE | ¤434.51 | 03/19/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/19/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/19/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 03/19/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/19/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 03/19/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/19/2025 |
| SURCHARGE FS 533.721 | ¤10.82 | 03/19/2025 |
| SURCHARGE - FS 468.631 | ¤16.23 | 03/19/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/19/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/19/2025 |
| SW ENG PRE APRON | ¤30.00 | 03/19/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,157.25 |