Permit #2025030107
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-01480-0210 |
| CONDITIONED SPACE: 1809 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 33 sqft |
| Total Square Footage: 2248 sqft |
| Block: 01480 |
| Subdivision: - |
| Job Phone: 239-571-5325 |
| Location Address: 41 LEMA LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/25/2025 |
| NOC: RECORDED |
| Applicant name: RYAN SCOTT DAVIS |
| Owner: SYNERGY HOMES LLC |
|
Address 581 NW MERCANTILE PLACE 106 PORT ST LUCIE, FL 34986 |
| Lot: 0210 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SYNERGY HOMES, LLC
| Status | Location Address | State License Number |
| ACTIVE |
1 HARGROVE GRADE, SUITE B1 PALM COAST, FL 32137 |
CBC1254289 (Exp: 08/31/2026) |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 06/18/2025 | APPROVED | PFLANAGAN |
| Note: TALKED WITH CONTRACTOR THAT THEY NEED TO THE SOD FROM OUT IN THE ROAD PASSING THAT HE STATED THAT IT WILL BE DONE | |||
| U -UTILITY RESIDENTIAL FINAL | 06/18/2025 | FINAL APPROVED | DHANEY |
| Note: Inspector Notes from Inspection 9035 No IRR. No cc | |||
| ROW - FINAL APRON (AFTER POUR) | 06/17/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/17/2025 | APPROVED | PFLANAGAN |
| Note: FINAL SURVEY MEETS CITY STANDARDS | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/17/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| BLD - BUILDING FINAL | 06/17/2025 | FINAL APPROVED | JSTEWART |
| ELECTRIC - EARLY POWER | 06/09/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Authorize release of email to FPL. | |||
| GRAVITY SEWER TEST | 06/06/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 FBC 3303.5 SWALE BLOCKED BY PORTABL THI SWAS A VIRRUAL INSPECTION | |||
| SEWER TIE IN | 06/06/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 FBC 3303.5 SWALE BLOCKED BY PORTABL THIS WAS A VIRTUAL INSPECTION | |||
| ROW - DRAINAGE | 06/06/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 06/06/25 SITE IS DOING FINAL GRADE WORK BUILDER WILL BE RESPONSIBLE TO CLEAN ALL ERODED SEDIMENT OUT OF THE CULVERT PIPE BEFORE THE THE ROW STORMWATER FINAL ________________________________________________________________________________________________________________ PLEASE CAN YOU CHECK THE FRONT SWALE AND A CULVER PIPE. GBERTOLA | |||
| ROW- PRE-APRON (PRE-POUR) | 05/30/2025 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. --------------------------------------------------------------------------------------------- 5/29/2025 - PREVIOUS INSPECTION NOTES ** 05/29/25 CULVERT PIPE IS OUT OF TOLERANCE BUILDER NEEDS TO REFERENCE THE SWALE PLAN FOR THE INVERT ELEVATION FOR THE CULVERT ** NEED TO REMOVE EXCESS MATERIAL THAT HAS WASHED IN AROUND THE CULVERT PIPE NEEDS TO BE BURIED HALF WAY UP CULVERT TO THE SPRING LINE ** SEE ATTACHED PHOTO __________________________________________________________________________________________________________________ 5/28/2025 - PREVIOUS INSPECTION NOTES CANCELED BY GRAYSON AT 10:04AM FROM TEXT MESSAGE | |||
| ROW- PRE-APRON (PRE-POUR) | 05/29/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/29/25 CULVERT PIPE IS OUT OF TOLERANCE BUILDER NEEDS TO REFERENCE THE SWALE PLAN FOR THE INVERT ELEVATION FOR THE CULVERT ** NEED TO REMOVE EXCESS MATERIAL THAT HAS WASHED IN AROUND THE CULVERT PIPE NEEDS TO BE BURIED HALF WAY UP CULVERT TO THE SPRING LINE ** SEE ATTACHED PHOTO __________________________________________________________________________________________________________________ 5/28/2025 - PREVIOUS INSPECTION NOTES CANCELED BY GRAYSON AT 10:04AM FROM TEXT MESSAGE | |||
| ROW- PRE-APRON (PRE-POUR) | 05/28/2025 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: CANCELED BY GRAYSON AT 10:04AM FROM TEXT MESSAGE | |||
| INSULATION | 05/27/2025 | APPROVED | MCONTRYMAN |
| PEP TANK INSTALLATION REQUEST | 05/27/2025 | APPROVED | CBOWERMASTER |
| ALL ROUGH | 05/23/2025 | APPROVED | JSTEWART |
| Note: 5/21/2025 - PREVIOUS INSPECTION NOTES | |||
| LATH/BRICK/ WATER BARRIER | 05/22/2025 | APPROVED | JSTEWART |
| ALL ROUGH | 05/21/2025 | CANCELLED BY APPLICANT | JSTEWART |
| U-CROSS CONNECTION | 05/21/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: No IRR. No cc | |||
| WALL SHEATHING | 05/16/2025 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/16/2025 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 05/16/2025 | APPROVED | KSANDOE |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 05/15/2025 | APPROVED | RRICKS |
| TIE BEAM / LINTEL | 05/05/2025 | APPROVED | FWILLIS |
| Note: 5/2/2025 - PREVIOUS INSPECTION NOTES | |||
| TIE BEAM / LINTEL | 05/02/2025 | CANCELLED BY APPLICANT | FWILLIS |
| TIE BEAM / LINTEL | 04/28/2025 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 04/25/2025 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/22/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: FBC 3303.5 SWALE BLOCKED BY PORTABL | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/17/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 04/03/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/15/2025 | 05/15/2025 |
| Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/15/2025 | 05/15/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/17/2025 | 04/17/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/20/2025 | 03/24/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/20/2025 | 03/20/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/20/2025 | 03/20/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/04/2025 | 03/10/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/04/2025 | 03/10/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/04/2025 | 03/06/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/04/2025 | 03/10/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/04/2025 | 03/05/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/04/2025 | 03/07/2025 |
| LOCATE | COMPLETE | 03/04/2025 | 03/11/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/04/2025 | 03/07/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/04/2025 | 03/05/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM 29.70 and 29.60 in the backyard appears to be a typo - Please confirm. | |||
| ZON | COMPLETE | 03/04/2025 | 03/05/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/04/2025 | 03/20/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/17/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/17/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/25/2025 |
| SW ENG PRE APRON | ¤30.00 | 03/25/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/25/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/25/2025 |
| SEWER CREDIT | (¤1,042.46) | 03/25/2025 |
| SEWER INSPECTION | ¤25.00 | 03/25/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 03/25/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 03/25/2025 |
| SITE PLAN 30 | ¤30.00 | 03/25/2025 |
| WATER- TURN ON | ¤25.00 | 03/25/2025 |
| ADJUSTMENT 10% | (¤120.20) | 03/25/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/25/2025 |
| INSPECTION - RESIDENTIAL | ¤913.00 | 03/25/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤258.96 | 03/25/2025 |
| CONNECTION FEES | ¤1,187.26 | 03/25/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 03/25/2025 |
| IMPACT FEE FIRE | ¤434.51 | 03/25/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/25/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/25/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 03/25/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/25/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 03/25/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/25/2025 |
| SURCHARGE FS 533.721 | ¤10.82 | 03/25/2025 |
| SURCHARGE - FS 468.631 | ¤16.23 | 03/25/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/25/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,406.79 |