I want to search for...

Permit #2025030108

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00390-0050
CONDITIONED SPACE: 1809 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 2248 sqft
Block: 00390
Subdivision: -
Job Phone: 239-571-5325
Location Address: 69 POST VIEW DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/11/2025
NOC: RECORDED
Applicant name: RYAN SCOTT DAVIS
Owner: SYNERGY HOMES LLC

Address

581 NW MERCANTILE PLACE 106

PORT SAINT LUCIE, FL 34986

Lot: 0050
Contracted Stated Job Value: ¤200,000.00
Job Description: Single Family Residence
Type: CN

Contractor

SYNERGY HOMES, LLC
Status Location Address State License Number
ACTIVE

1 HARGROVE GRADE, SUITE B1

PALM COAST, FL 32137

CBC1254289 (Exp: 08/31/2026)

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 06/09/2025 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/6/2025 - PREVIOUS INSPECTION NOTES 06/06/25 TPOLACEK*** HOT PATCH STILL NOT COMPLETED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/5/2025 - PREVIOUS INSPECTION NOTES 06/05/25 TPOLACEK*** HOT PATCH IS NOT COMPLETE AND THERE IS SEDIMENT IN PIPE THAT NEEDS TO BE CLEARED OUT.
ROW - FINAL APRON (AFTER POUR) 06/06/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 06/06/25 TPOLACEK*** HOT PATCH STILL NOT COMPLETED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/5/2025 - PREVIOUS INSPECTION NOTES 06/05/25 TPOLACEK*** HOT PATCH IS NOT COMPLETE AND THERE IS SEDIMENT IN PIPE THAT NEEDS TO BE CLEARED OUT.
BLD - BUILDING FINAL 06/06/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/6/2025 2:29:51 PM *** 6/5/2025 - PREVIOUS INSPECTION NOTES 6/5/25 1. Loose outlet in master bath NEC 406.5 2. Switched outlet in master bedroom not functioning properly (always on) 3. Loose outlet in front right bedroom on front wall NEC 406.5 4. Missing several door knobs
ROW - STORMWATER FINAL 06/06/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/5/2025 - PREVIOUS INSPECTION NOTES 06/05/25 TPOLACEK*** THE BACK PROPERTY LINE IN VACANT LOT ALL DISTURBED BARE GROUND MUST HAVE SEED AND STRAW. Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage
ROW - STORMWATER FINAL 06/05/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 06/05/25 TPOLACEK*** THE BACK PROPERTY LINE IN VACANT LOT ALL DISTURBED BARE GROUND MUST HAVE SEED AND STRAW. Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage
BLD - BUILDING FINAL 06/05/2025 Disapproved - NO FEE MCONTRYMAN
Note: 6/5/25 1. Loose outlet in master bath NEC 406.5 2. Switched outlet in master bedroom not functioning properly (always on) 3. Loose outlet in front right bedroom on front wall NEC 406.5 4. Missing several door knobs
ROW - FINAL APRON (AFTER POUR) 06/05/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 06/05/25 TPOLACEK*** HOT PATCH IS NOT COMPLETE AND THERE IS SEDIMENT IN PIPE THAT NEEDS TO BE CLEARED OUT.
ROW - FINAL APRON (AFTER POUR) 06/04/2025 CANCELLED BY APPLICANT WEB
U -UTILITY RESIDENTIAL FINAL 06/04/2025 FINAL APPROVED LFITZGERALD
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/03/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 06/03/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ELECTRIC - EARLY POWER 05/23/2025 APPROVED CVANSTRAHLEN
Note:
ELECTRIC - EARLY POWER 05/20/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/20/2025 3:54:43 PM *** 5/20/25: ** No change from previous inspection. 1). Front and rear outlet boxes are completely taped shut. Could not check. FBC [A]107.4 / FBC-[A]110.1 2). Need dumpster on site. FBC 3302.2 5/16/2025 - PREVIOUS INSPECTION NOTES 5/16/25: 1). Front and rear outlet boxes are completely taped shut. Could not check. FBC [A]107.4 / FBC-[A]110.1 (Note: driveway and walkway being poured upon arrival).
ELECTRIC - EARLY POWER 05/16/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 5/16/2025 1:12:35 PM *** 5/16/25: 1). Front and rear outlet boxes are completely taped shut. Could not check. FBC [A]107.4 / FBC-[A]110.1 (Note: driveway and walkway being poured upon arrival).
GRAVITY SEWER TEST 05/15/2025 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 FBC P-311.1 NEED PORTABLE BATHROOM
SEWER TIE IN 05/15/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 FBC P-311.1 NEED PORTABLE BATHROOM ELECTRICAL CONDUIT FOR ALARM PANEL WAS SEPERATED AT HUB CONNECTION AND WIRING WAS EXSPOSED
ROW- PRE-APRON (PRE-POUR) 05/15/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 5/14/2025 - PREVIOUS INSPECTION NOTES 05/14/25 TPOLACEK*** POUR AREA WASHED OUT INTO MITERED ENDS AND CULVERT. SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 05/14/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 05/14/25 TPOLACEK*** POUR AREA WASHED OUT INTO MITERED ENDS AND CULVERT. SEE ATTACHED PHOTOS
PEP TANK INSTALLATION REQUEST 05/02/2025 APPROVED CBOWERMASTER
U-CROSS CONNECTION 05/02/2025 APPROVED DHANEY
INSULATION 05/01/2025 APPROVED CVANSTRAHLEN
LATH/BRICK/ WATER BARRIER 04/29/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/29/2025 2:39:16 PM ***
ALL ROUGH 04/29/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/29/2025 2:34:49 PM *** 4/28/2025 - PREVIOUS INSPECTION NOTES 4/28/25: 1). No water pressure. FBCR P2503.5 2). No 5ft. head pressure. FBCR P2503.7 3). Fireblocking at top area over electrical panel doers not meet code requirements. 4). Slab at guest bathroom drain needs to be (properly) repaired to meet original. Visual inspection shows that dry cement/mortar was put in the hole and water poured over it. Please have cement product pre-mixed before pouring into the hole in order to meet original slab requirements along with termite control requirements. FBC [A]107.4 / FBCR 318
ALL ROUGH 04/28/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 4/28/2025 11:20:24 AM *** 3). Fireblocking at top area over electrical panel doers not meet code requirements. FBC-R302.11 4/28/25: 1). No water pressure. FBCR P2503.5 2). No 5ft. head pressure. FBCR P2503.7 3). Fireblocking at top area over electrical panel doers not meet code requirements. 4). Slab at guest bathroom drain needs to be (properly) repaired to meet original. Visual inspection shows that dry cement/mortar was put in the hole and water poured over it. Please have cement product pre-mixed before pouring into the hole in order to meet original slab requirements along with termite control requirements. FBC [A]107.4 / FBCR 318
WALL SHEATHING 04/23/2025 APPROVED MCONTRYMAN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/23/2025 APPROVED MCONTRYMAN
ROOF VALLEY & METAL 04/23/2025 APPROVED MCONTRYMAN
ROW - DRAINAGE 04/17/2025 APPROVED TPOLACEK
Note: 04/17/25 TPOLACEK*** TRUSSES HAVE BEEN FLOWN AND ARE OUTOF SWALE. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/15/2025 - PREVIOUS INSPECTION NOTES 04/15/25 TPOLACEK*** BUILDER MUST EITHER FLY TRUSSES OR REMOVE FROM ROW. NEXT INSPECTION THURSDAY 04/17/25
ROW - DRAINAGE 04/15/2025 Disapproved - NO FEE TPOLACEK
Note: 04/15/25 TPOLACEK*** BUILDER MUST EITHER FLY TRUSSES OR REMOVE FROM ROW. NEXT INSPECTION THURSDAY 04/17/25
TIE BEAM / LINTEL 04/11/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/11/2025 9:01:20 AM ***
MONOLITHIC SLAB 04/03/2025 APPROVED JSTEWART
FOUND SURVEY APPROVED (OFFICE) 04/01/2025 APPROVED RRICKS
PLUMBING 1ST ROUGH UNDERGROUND 03/31/2025 APPROVED - AS NOTED MGIBSON
Note: FBC P-311.1 NEED PORTABLE BATHROOM
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 03/27/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 03/25/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 04/01/2025 04/01/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/01/2025 04/01/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/27/2025 03/27/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN COMPLETE 03/04/2025 03/11/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 03/04/2025 03/11/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 03/04/2025 03/04/2025
Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM
ELEC COMPLETE 03/04/2025 03/10/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/04/2025 03/04/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 03/04/2025 03/07/2025
LOCATE COMPLETE 03/04/2025 03/11/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 03/04/2025 03/07/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/04/2025 03/07/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/04/2025 03/04/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 03/04/2025 03/18/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 06/06/2025
SW ENG - INSPECTION 20 ¤20.00 06/06/2025
SW ENG - INSPECTION 20 ¤20.00 06/06/2025
SW ENG REINSPECTION 20 ¤20.00 06/06/2025
SW ENG REINSPECTION 20 ¤20.00 06/06/2025
SW ENG REINSPECTION 20 ¤20.00 06/06/2025
SW ENG REINSPECTION 30 ¤30.00 06/06/2025
SW ENG - REVIEW 20 ¤20.00 03/11/2025
SW ENG RES REVIEW 200 ¤200.00 03/11/2025
SEWER INSPECTION ¤25.00 03/11/2025
SEWER CAPITAL FACILITY ¤6,120.52 03/11/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 03/11/2025
SITE PLAN 30 ¤30.00 03/11/2025
SW ENG INSPECTION 80 ¤80.00 03/11/2025
SW ENG PRE APRON ¤30.00 03/11/2025
ADJUSTMENT 10% (¤120.20) 03/11/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/11/2025
INSPECTION - RESIDENTIAL ¤913.00 03/11/2025
PLAN REVIEW - RESIDENTIAL ¤258.96 03/11/2025
CONNECTION FEES ¤1,187.26 03/11/2025
FC IMPACT FEE EMS ¤62.00 03/11/2025
IMPACT FEE FIRE ¤434.51 03/11/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/11/2025
FC IMPACT FEE LIBRARY ¤268.00 03/11/2025
IMPACT FEE PARKS ¤1,828.01 03/11/2025
IMPACT FEE SCHOOL ¤5,450.00 03/11/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 03/11/2025
WATER -IRRIGATION INSPECTION ¤25.00 03/11/2025
WATER -IRRIGATION INSPECTION ¤25.00 03/11/2025
SURCHARGE FS 533.721 ¤10.82 03/11/2025
SURCHARGE - FS 468.631 ¤16.23 03/11/2025
SW ENG - FOUNDATION SURVEY ¤20.00 03/11/2025
Fees Total Due: ¤0.00 Total Paid: ¤23,569.25