I want to search for...
Permit #2025030108
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00390-0050 |
| CONDITIONED SPACE: 1809 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 33 sqft |
| Total Square Footage: 2248 sqft |
| Block: 00390 |
| Subdivision: - |
| Job Phone: 239-571-5325 |
| Location Address: 69 POST VIEW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/11/2025 |
| NOC: RECORDED |
| Applicant name: RYAN SCOTT DAVIS |
| Owner: SYNERGY HOMES LLC |
|
Address 581 NW MERCANTILE PLACE 106 PORT SAINT LUCIE, FL 34986 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SYNERGY HOMES, LLC
| Status | Location Address | State License Number |
| ACTIVE |
1 HARGROVE GRADE, SUITE B1 PALM COAST, FL 32137 |
CBC1254289 (Exp: 08/31/2026) |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 06/09/2025 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/6/2025 - PREVIOUS INSPECTION NOTES 06/06/25 TPOLACEK*** HOT PATCH STILL NOT COMPLETED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/5/2025 - PREVIOUS INSPECTION NOTES 06/05/25 TPOLACEK*** HOT PATCH IS NOT COMPLETE AND THERE IS SEDIMENT IN PIPE THAT NEEDS TO BE CLEARED OUT. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/06/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 06/06/25 TPOLACEK*** HOT PATCH STILL NOT COMPLETED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/5/2025 - PREVIOUS INSPECTION NOTES 06/05/25 TPOLACEK*** HOT PATCH IS NOT COMPLETE AND THERE IS SEDIMENT IN PIPE THAT NEEDS TO BE CLEARED OUT. | |||
| BLD - BUILDING FINAL | 06/06/2025 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/6/2025 2:29:51 PM *** 6/5/2025 - PREVIOUS INSPECTION NOTES 6/5/25 1. Loose outlet in master bath NEC 406.5 2. Switched outlet in master bedroom not functioning properly (always on) 3. Loose outlet in front right bedroom on front wall NEC 406.5 4. Missing several door knobs | |||
| ROW - STORMWATER FINAL | 06/06/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/5/2025 - PREVIOUS INSPECTION NOTES 06/05/25 TPOLACEK*** THE BACK PROPERTY LINE IN VACANT LOT ALL DISTURBED BARE GROUND MUST HAVE SEED AND STRAW. Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage | |||
| ROW - STORMWATER FINAL | 06/05/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 06/05/25 TPOLACEK*** THE BACK PROPERTY LINE IN VACANT LOT ALL DISTURBED BARE GROUND MUST HAVE SEED AND STRAW. Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage | |||
| BLD - BUILDING FINAL | 06/05/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 6/5/25 1. Loose outlet in master bath NEC 406.5 2. Switched outlet in master bedroom not functioning properly (always on) 3. Loose outlet in front right bedroom on front wall NEC 406.5 4. Missing several door knobs | |||
| ROW - FINAL APRON (AFTER POUR) | 06/05/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 06/05/25 TPOLACEK*** HOT PATCH IS NOT COMPLETE AND THERE IS SEDIMENT IN PIPE THAT NEEDS TO BE CLEARED OUT. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/04/2025 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 06/04/2025 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/03/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/03/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ELECTRIC - EARLY POWER | 05/23/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| ELECTRIC - EARLY POWER | 05/20/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/20/2025 3:54:43 PM *** 5/20/25: ** No change from previous inspection. 1). Front and rear outlet boxes are completely taped shut. Could not check. FBC [A]107.4 / FBC-[A]110.1 2). Need dumpster on site. FBC 3302.2 5/16/2025 - PREVIOUS INSPECTION NOTES 5/16/25: 1). Front and rear outlet boxes are completely taped shut. Could not check. FBC [A]107.4 / FBC-[A]110.1 (Note: driveway and walkway being poured upon arrival). | |||
| ELECTRIC - EARLY POWER | 05/16/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/16/2025 1:12:35 PM *** 5/16/25: 1). Front and rear outlet boxes are completely taped shut. Could not check. FBC [A]107.4 / FBC-[A]110.1 (Note: driveway and walkway being poured upon arrival). | |||
| GRAVITY SEWER TEST | 05/15/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 FBC P-311.1 NEED PORTABLE BATHROOM | |||
| SEWER TIE IN | 05/15/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 FBC P-311.1 NEED PORTABLE BATHROOM ELECTRICAL CONDUIT FOR ALARM PANEL WAS SEPERATED AT HUB CONNECTION AND WIRING WAS EXSPOSED | |||
| ROW- PRE-APRON (PRE-POUR) | 05/15/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 5/14/2025 - PREVIOUS INSPECTION NOTES 05/14/25 TPOLACEK*** POUR AREA WASHED OUT INTO MITERED ENDS AND CULVERT. SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 05/14/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 05/14/25 TPOLACEK*** POUR AREA WASHED OUT INTO MITERED ENDS AND CULVERT. SEE ATTACHED PHOTOS | |||
| PEP TANK INSTALLATION REQUEST | 05/02/2025 | APPROVED | CBOWERMASTER |
| U-CROSS CONNECTION | 05/02/2025 | APPROVED | DHANEY |
| INSULATION | 05/01/2025 | APPROVED | CVANSTRAHLEN |
| LATH/BRICK/ WATER BARRIER | 04/29/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/29/2025 2:39:16 PM *** | |||
| ALL ROUGH | 04/29/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/29/2025 2:34:49 PM *** 4/28/2025 - PREVIOUS INSPECTION NOTES 4/28/25: 1). No water pressure. FBCR P2503.5 2). No 5ft. head pressure. FBCR P2503.7 3). Fireblocking at top area over electrical panel doers not meet code requirements. 4). Slab at guest bathroom drain needs to be (properly) repaired to meet original. Visual inspection shows that dry cement/mortar was put in the hole and water poured over it. Please have cement product pre-mixed before pouring into the hole in order to meet original slab requirements along with termite control requirements. FBC [A]107.4 / FBCR 318 | |||
| ALL ROUGH | 04/28/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/28/2025 11:20:24 AM *** 3). Fireblocking at top area over electrical panel doers not meet code requirements. FBC-R302.11 4/28/25: 1). No water pressure. FBCR P2503.5 2). No 5ft. head pressure. FBCR P2503.7 3). Fireblocking at top area over electrical panel doers not meet code requirements. 4). Slab at guest bathroom drain needs to be (properly) repaired to meet original. Visual inspection shows that dry cement/mortar was put in the hole and water poured over it. Please have cement product pre-mixed before pouring into the hole in order to meet original slab requirements along with termite control requirements. FBC [A]107.4 / FBCR 318 | |||
| WALL SHEATHING | 04/23/2025 | APPROVED | MCONTRYMAN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/23/2025 | APPROVED | MCONTRYMAN |
| ROOF VALLEY & METAL | 04/23/2025 | APPROVED | MCONTRYMAN |
| ROW - DRAINAGE | 04/17/2025 | APPROVED | TPOLACEK |
| Note: 04/17/25 TPOLACEK*** TRUSSES HAVE BEEN FLOWN AND ARE OUTOF SWALE. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/15/2025 - PREVIOUS INSPECTION NOTES 04/15/25 TPOLACEK*** BUILDER MUST EITHER FLY TRUSSES OR REMOVE FROM ROW. NEXT INSPECTION THURSDAY 04/17/25 | |||
| ROW - DRAINAGE | 04/15/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 04/15/25 TPOLACEK*** BUILDER MUST EITHER FLY TRUSSES OR REMOVE FROM ROW. NEXT INSPECTION THURSDAY 04/17/25 | |||
| TIE BEAM / LINTEL | 04/11/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/11/2025 9:01:20 AM *** | |||
| MONOLITHIC SLAB | 04/03/2025 | APPROVED | JSTEWART |
| FOUND SURVEY APPROVED (OFFICE) | 04/01/2025 | APPROVED | RRICKS |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/31/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: FBC P-311.1 NEED PORTABLE BATHROOM | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/27/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/25/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/01/2025 | 04/01/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/01/2025 | 04/01/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/27/2025 | 03/27/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/04/2025 | 03/11/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/04/2025 | 03/11/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/04/2025 | 03/04/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/04/2025 | 03/10/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/04/2025 | 03/04/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/04/2025 | 03/07/2025 |
| LOCATE | COMPLETE | 03/04/2025 | 03/11/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/04/2025 | 03/07/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/04/2025 | 03/07/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/04/2025 | 03/04/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/04/2025 | 03/18/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/06/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/06/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/06/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/06/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/06/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/06/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/06/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/11/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/11/2025 |
| SEWER INSPECTION | ¤25.00 | 03/11/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 03/11/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 03/11/2025 |
| SITE PLAN 30 | ¤30.00 | 03/11/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/11/2025 |
| SW ENG PRE APRON | ¤30.00 | 03/11/2025 |
| ADJUSTMENT 10% | (¤120.20) | 03/11/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/11/2025 |
| INSPECTION - RESIDENTIAL | ¤913.00 | 03/11/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤258.96 | 03/11/2025 |
| CONNECTION FEES | ¤1,187.26 | 03/11/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 03/11/2025 |
| IMPACT FEE FIRE | ¤434.51 | 03/11/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/11/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/11/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 03/11/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/11/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 03/11/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/11/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/11/2025 |
| SURCHARGE FS 533.721 | ¤10.82 | 03/11/2025 |
| SURCHARGE - FS 468.631 | ¤16.23 | 03/11/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/11/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,569.25 |