I want to search for...
Permit #2025030243
Permit Details
Status: CANCEL
| Parcel Id: 07-11-31-7009-00320-0290 |
| CONDITIONED SPACE: 1851 sqft |
| GARAGE: 411 sqft |
| OPENED PORCH (WITH ROOF) : 39 sqft |
| OPENED PORCH (WITH ROOF) : 74 sqft |
| Total Square Footage: 2375 sqft |
| Block: 00320 |
| Subdivision: - |
| Job Phone: 904-531-5923 |
| Location Address: 130 FENIMORE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| NOC: Unknown |
| Applicant name: MATTHEW C BROWN |
| Owner: BRIGHTLAND HOMES OF FLORIDA LLC |
|
Address 15725 N DALLAS PARKWAY ADDISON, TX 75001 |
|
Address SUITE 300 ADDISON, TX 75001 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
| Original Permit #: 2024060517 |
Contractor
BRIGHTLAND HOMES OF FLORIDA, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3505 EAST FRONTAGE RD ADDISON, TX 75001 |
STE 145 TAMPA, FL 33607 |
CGC1527097 (Exp: 08/31/2026) | 904-531-5923 |
Sub Contractors
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
GREGORY WILLIAM FARIS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC1822274 (Exp: 08/31/2026) | 407-333-2665 |
OLIN MARSHALL CANNON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1794 ROGERO RD #2 JACKSONVILLE, FL 32211 |
CFC1426140 (Exp: 08/31/2026) | 904-343-4344 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
LARRY LAVON TURNAGE
| Status | Location Address | State License Number | Phone |
| CANCEL |
531 CODISCO WAY SANFORD, FL 32771 |
CMC1249777 (Exp: 08/31/2024) | 407-333-2665 |
OLIN MARSHALL CANNON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1794 ROGERO RD #2 JACKSONVILLE, FL 32211 |
CFC1426140 (Exp: 08/31/2026) | 904-343-4344 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - DRAINAGE | 09/08/2025 | EMADISON | |
| Note: 9/5/2025 - PREVIOUS INSPECTION NOTES ** 09/05/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/08/25 ___________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/05/25 ________________________________________________________________________________________________________________________ 9/3/2025 - PREVIOUS INSPECTION NOTES ** 09/03/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/04/25 ________________________________________________________________________________________________________________________ 8/26/2025 - PREVIOUS INSPECTION NOTES ** 08/26/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/27/25 ___________________________________________________________________________________________________________________ 8/25/2025 - PREVIOUS INSPECTION NOTES ** 08/25/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/26/25 ___________________________________________________________________________________________________________________ ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ 8/22/2025 - PREVIOUS INSPECTION NOTES 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 09/05/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/05/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/08/25 ___________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/05/25 ________________________________________________________________________________________________________________________ 9/3/2025 - PREVIOUS INSPECTION NOTES ** 09/03/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/04/25 ________________________________________________________________________________________________________________________ 8/26/2025 - PREVIOUS INSPECTION NOTES ** 08/26/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/27/25 ___________________________________________________________________________________________________________________ 8/25/2025 - PREVIOUS INSPECTION NOTES ** 08/25/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/26/25 ___________________________________________________________________________________________________________________ ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ 8/22/2025 - PREVIOUS INSPECTION NOTES 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 09/04/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/04/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/05/25 ________________________________________________________________________________________________________________________ 9/3/2025 - PREVIOUS INSPECTION NOTES ** 09/03/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/04/25 ________________________________________________________________________________________________________________________ 8/26/2025 - PREVIOUS INSPECTION NOTES ** 08/26/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/27/25 ___________________________________________________________________________________________________________________ 8/25/2025 - PREVIOUS INSPECTION NOTES ** 08/25/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/26/25 ___________________________________________________________________________________________________________________ ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ 8/22/2025 - PREVIOUS INSPECTION NOTES 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 09/03/2025 | Disapproved -FEE REQUIRED | RRICKS |
| Note: ** 09/03/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/04/25 ________________________________________________________________________________________________________________________ 8/26/2025 - PREVIOUS INSPECTION NOTES ** 08/26/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/27/25 ___________________________________________________________________________________________________________________ 8/25/2025 - PREVIOUS INSPECTION NOTES ** 08/25/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/26/25 ___________________________________________________________________________________________________________________ ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ 8/22/2025 - PREVIOUS INSPECTION NOTES 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 08/26/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/26/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/27/25 ___________________________________________________________________________________________________________________ 8/25/2025 - PREVIOUS INSPECTION NOTES ** 08/25/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/26/25 ___________________________________________________________________________________________________________________ ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ 8/22/2025 - PREVIOUS INSPECTION NOTES 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 08/25/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/25/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/26/25 ___________________________________________________________________________________________________________________ ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ 8/22/2025 - PREVIOUS INSPECTION NOTES 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 08/22/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 08/21/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 08/20/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 08/19/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 08/18/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 08/15/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 08/11/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 08/08/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 07/31/2025 | Disapproved - NO FEE | EMADISON |
| Note: Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 | |||
| ROW - DRAINAGE | 01/07/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 01/03/2025 | Disapproved - NO FEE | GBERTOLA |
| Note: 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 01/02/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 12/26/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| WILDLIFE CHECK - ENVIRONMENTAL | 06/18/2024 | APPROVED | DRODRIGUEZ |
| WATER METER INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | |||
| GRAVITY SEWER TEST | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER | |||
| MONOLITHIC SLAB | |||
| LATH/BRICK/ WATER BARRIER | |||
| TIE BEAM / LINTEL | |||
| ALL ROUGH | |||
| WALL SHEATHING | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | |||
| ROOF VALLEY & METAL | |||
| INSULATION | |||
| BLD - BUILDING FINAL | |||
| ROW - STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 06/24/2024 | 06/24/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Site plan and survey have incorrect panel number | |||
| ELEC | COMPLETE | 06/24/2024 | 06/27/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in office. NEC 2020 210.52 | |||
| ENGIN1 | COMPLETE | 06/24/2024 | 06/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/24/2024 | 06/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 06/13/2024 | 06/18/2024 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 06/18/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| BADMIN | COMPLETE | 06/12/2024 | 06/18/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/12/2024 | 06/18/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/12/2024 | 06/14/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 06/12/2024 | 06/17/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in office. NEC 2020 210.52 | |||
| ENGIN1 | COMPLETE | 06/12/2024 | 06/12/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/12/2024 | 06/17/2024 |
| LOCATE | COMPLETE | 06/12/2024 | 06/24/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/12/2024 | 06/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/12/2024 | 06/13/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 06/12/2024 | 06/13/2024 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Site plan and survey have incorrect panel number | |||
| SWALE | COMPLETE | 06/12/2024 | 10/01/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤3.00) | |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | |
| ADMINISTRATIVE - RESID PP | ¤225.00 | |
| FC IMPACT FEE EMS | ¤62.00 | |
| IMPACT FEE FIRE | ¤434.51 | |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | |
| FC IMPACT FEE LIBRARY | ¤268.00 | |
| IMPACT FEE PARKS | ¤1,828.01 | |
| IMPACT FEE SCHOOL | ¤5,450.00 | |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | |
| SURCHARGE FS 533.721 | ¤2.52 | |
| SURCHARGE - FS 468.631 | ¤3.78 | |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG INSPECTION 80 | ¤80.00 | |
| SW ENG PRE APRON | ¤30.00 | |
| SW ENG - REVIEW 20 | ¤20.00 | |
| Fees | Total Due: ¤10,884.82 | Total Paid: ¤0.00 |