Permit #2025030243

Permit Details

Status: CANCEL

Parcel Id: 07-11-31-7009-00320-0290
CONDITIONED SPACE: 1851 sqft
GARAGE: 411 sqft
OPENED PORCH (WITH ROOF) : 39 sqft
OPENED PORCH (WITH ROOF) : 74 sqft
Total Square Footage: 2375 sqft
Block: 00320
Subdivision: -
Job Phone: 904-531-5923
Location Address: 130 FENIMORE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
NOC: Unknown
Applicant name: MATTHEW C BROWN
Owner: BRIGHTLAND HOMES OF FLORIDA LLC

Address

15725 N DALLAS PARKWAY

ADDISON, TX 75001

Address

SUITE 300

ADDISON, TX 75001

Lot: 0290
Contracted Stated Job Value: ¤250,000.00
Job Description: Single Family Residence
Type: CN
Original Permit #: 2024060517

Contractor

BRIGHTLAND HOMES OF FLORIDA, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

3505 EAST FRONTAGE RD

ADDISON, TX 75001

STE 145

TAMPA, FL 33607

CGC1527097 (Exp: 08/31/2026) 904-531-5923

Sub Contractors

JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980
GREGORY WILLIAM FARIS
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC1822274 (Exp: 08/31/2026) 407-333-2665
OLIN MARSHALL CANNON
Status Location Address State License Number Phone
INACTIVE

1794 ROGERO RD #2

JACKSONVILLE, FL 32211

CFC1426140 (Exp: 08/31/2026) 904-343-4344
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
LARRY LAVON TURNAGE
Status Location Address State License Number Phone
CANCEL

531 CODISCO WAY

SANFORD, FL 32771

CMC1249777 (Exp: 08/31/2024) 407-333-2665
OLIN MARSHALL CANNON
Status Location Address State License Number Phone
INACTIVE

1794 ROGERO RD #2

JACKSONVILLE, FL 32211

CFC1426140 (Exp: 08/31/2026) 904-343-4344
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
ROW - DRAINAGE 09/08/2025 EMADISON
Note: 9/5/2025 - PREVIOUS INSPECTION NOTES ** 09/05/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/08/25 ___________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/05/25 ________________________________________________________________________________________________________________________ 9/3/2025 - PREVIOUS INSPECTION NOTES ** 09/03/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/04/25 ________________________________________________________________________________________________________________________ 8/26/2025 - PREVIOUS INSPECTION NOTES ** 08/26/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/27/25 ___________________________________________________________________________________________________________________ 8/25/2025 - PREVIOUS INSPECTION NOTES ** 08/25/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/26/25 ___________________________________________________________________________________________________________________ ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ 8/22/2025 - PREVIOUS INSPECTION NOTES 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 09/05/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/05/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/08/25 ___________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/05/25 ________________________________________________________________________________________________________________________ 9/3/2025 - PREVIOUS INSPECTION NOTES ** 09/03/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/04/25 ________________________________________________________________________________________________________________________ 8/26/2025 - PREVIOUS INSPECTION NOTES ** 08/26/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/27/25 ___________________________________________________________________________________________________________________ 8/25/2025 - PREVIOUS INSPECTION NOTES ** 08/25/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/26/25 ___________________________________________________________________________________________________________________ ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ 8/22/2025 - PREVIOUS INSPECTION NOTES 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 09/04/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/04/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/05/25 ________________________________________________________________________________________________________________________ 9/3/2025 - PREVIOUS INSPECTION NOTES ** 09/03/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/04/25 ________________________________________________________________________________________________________________________ 8/26/2025 - PREVIOUS INSPECTION NOTES ** 08/26/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/27/25 ___________________________________________________________________________________________________________________ 8/25/2025 - PREVIOUS INSPECTION NOTES ** 08/25/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/26/25 ___________________________________________________________________________________________________________________ ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ 8/22/2025 - PREVIOUS INSPECTION NOTES 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 09/03/2025 Disapproved -FEE REQUIRED RRICKS
Note: ** 09/03/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 09/04/25 ________________________________________________________________________________________________________________________ 8/26/2025 - PREVIOUS INSPECTION NOTES ** 08/26/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/27/25 ___________________________________________________________________________________________________________________ 8/25/2025 - PREVIOUS INSPECTION NOTES ** 08/25/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/26/25 ___________________________________________________________________________________________________________________ ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ 8/22/2025 - PREVIOUS INSPECTION NOTES 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 08/26/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/26/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/27/25 ___________________________________________________________________________________________________________________ 8/25/2025 - PREVIOUS INSPECTION NOTES ** 08/25/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/26/25 ___________________________________________________________________________________________________________________ ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ 8/22/2025 - PREVIOUS INSPECTION NOTES 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 08/25/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/25/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/26/25 ___________________________________________________________________________________________________________________ ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ 8/22/2025 - PREVIOUS INSPECTION NOTES 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 08/22/2025 Disapproved -FEE REQUIRED EMADISON
Note: 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/22/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 08/21/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/22/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 ___________________________________________________________________________________________________________________ ** 08/21/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/25/25 _______________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 08/20/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/20/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/21/25 _______________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 08/19/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/19/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/20/25 ___________________________________________________________________________________________________________________ 8/18/2025 - PREVIOUS INSPECTION NOTES ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 08/18/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/18/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/19/25 ___________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 08/15/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/15/25 BUILDER IS STILL REQUIRED TO OPEN SWALE (TEMPORARY PIPE) IS CLOGGED EITHER OPEN PIPE OR REMOVE AND OPEN SWALE ** RE-ESTABLISH ALL SILT FENCE AROUND SITE ** FOLLOW UP INSPECTION 08/18/25 ___________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 08/11/2025 Disapproved - NO FEE EMADISON
Note: ** 08/11/25 BUILD CONTACTED G. BERTOLA REGARDING THIS LOT THEY ARE NOT GOING TO BUILD ON IT THE CITY AND THE BUILDER ARE WORKING ON A PLAN FOR ALL NECESSARY CORRECTIONS SO THAT THIS LOT DOES NOT NEGATIVELY IMPACT THE STORMWATER DRAINAGE SYSTEM, ANY ADJACENT PROPERTIES OT THE ROADWAY. ** AS NOTED IN PREVIOUS INSPECTIONS CORRECTIONS REQUIRED _____________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 08/08/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/08/25THIS PERMIT IS NOW A PRIORITY 1 STATUS INSPECTION HOLD HAS BEEN IMPLIMENTED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE AND RESULT IN APPROVED INSPECTION. INSPECTIONS WILL BE CONDUCTED ON A DAILY BASIS UNTIL ALL CORRECTIONS HAVE BEEN MADE AND FEES WILL BE INCURRED WITH EACH FAILED INSPECTION. ** BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/11/25 ________________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 07/31/2025 Disapproved - NO FEE EMADISON
Note: Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25 _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 07/31/25 BUILDER NEEDS TO OPEN THER ROADSIDE SWALE "TEMPORARY CULVERT PIPE" TO ALLOW FOR THE FLOW OF STORMWATER. ** BUILDER YOU NEED TO MOW OR WEED WHACK THE OVERGROWTH OF WEEDS WITHIN THE ROADSIDE SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/08/25
ROW - DRAINAGE 01/07/2025 APPROVED - AS NOTED EMADISON
Note: ** 01/08/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 01/03/2025 Disapproved - NO FEE GBERTOLA
Note: 1/3/25= THE BUILDER CALLED AT 8:05 AM AND EXPLAINED THAT HE NEEDS MORE TIME UNTIL TUESDAY TO FIX THE FRONT SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 01/02/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NEED TO DO THE FOLLOWING 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. AS STATED FROM THE FIRST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------ 12/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 12/26/2024 Disapproved - NO FEE PFLANAGAN
Note: 1) NEED TO CLEAN STREET OF ALL DIRT AND MUD 2) NEED TO KEEP OPEN THE SWALE AT ALL TIMES OR PUT A TEMP. CULVERT OF A MINIMUM OF 12" ROUND SO WATER CAN FLOW TO OUTFALL. 3) NEED TO INSTALL SILT FENCE AROUND THE PROPERTY LINE. YOU WILL HAVE 7DAYS TO MAKE ALL CORRECTIONS IF ALL CORRECTIONS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
WILDLIFE CHECK - ENVIRONMENTAL 06/18/2024 APPROVED DRODRIGUEZ
WATER METER INSTALLATION REQUEST
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW FIELD SURVEY /GRADING CERTIFICATION
FORMBOARD SURVEY (OFFICE USE ONLY)
GEOTECHNICAL REPORT APPROVAL (OFFICE USE)
PLUMBING 1ST ROUGH UNDERGROUND
GRAVITY SEWER TEST
SEWER TIE IN
ELECTRIC - EARLY POWER
MONOLITHIC SLAB
LATH/BRICK/ WATER BARRIER
TIE BEAM / LINTEL
ALL ROUGH
WALL SHEATHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL
ROOF VALLEY & METAL
INSULATION
BLD - BUILDING FINAL
ROW - STORMWATER FINAL
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
ZON COMPLETE 06/24/2024 06/24/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Site plan and survey have incorrect panel number
ELEC COMPLETE 06/24/2024 06/27/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in office. NEC 2020 210.52
ENGIN1 COMPLETE 06/24/2024 06/24/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 06/24/2024 06/24/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLENV COMPLETE 06/13/2024 06/18/2024
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 06/18/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
BADMIN COMPLETE 06/12/2024 06/18/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 06/12/2024 06/18/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
CUSVC COMPLETE 06/12/2024 06/14/2024
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 06/12/2024 06/17/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in office. NEC 2020 210.52
ENGIN1 COMPLETE 06/12/2024 06/12/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/12/2024 06/17/2024
LOCATE COMPLETE 06/12/2024 06/24/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 06/12/2024 06/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/12/2024 06/13/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON HOLD 06/12/2024 06/13/2024
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Site plan and survey have incorrect panel number
SWALE COMPLETE 06/12/2024 10/01/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤3.00)
ADMINISTRATIVE RESIDENTIAL ¤30.00
ADMINISTRATIVE - RESID PP ¤225.00
FC IMPACT FEE EMS ¤62.00
IMPACT FEE FIRE ¤434.51
FC IMPACT FEE LAW ENFORCEMENT ¤218.00
FC IMPACT FEE LIBRARY ¤268.00
IMPACT FEE PARKS ¤1,828.01
IMPACT FEE SCHOOL ¤5,450.00
IMPACT FEE TRANSPORTATION ¤1,916.00
SURCHARGE FS 533.721 ¤2.52
SURCHARGE - FS 468.631 ¤3.78
SW ENG - FOUNDATION SURVEY ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG INSPECTION 80 ¤80.00
SW ENG PRE APRON ¤30.00
SW ENG - REVIEW 20 ¤20.00
Fees Total Due: ¤10,884.82 Total Paid: ¤0.00