I want to search for...
Permit #2025030255
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00030-0070 |
| CONDITIONED SPACE: 1800 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 2246 sqft |
| Block: 00030 |
| Subdivision: - |
| Job Phone: 689-250-2429 |
| Location Address: 5 LUTHER DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/19/2025 |
| NOC: RECORDED |
| Applicant name: RYAN M COURECH |
| Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC |
|
Address 688 N ORLANDO AVENUE MAITLAND, FL 32751 |
|
Address 207 MAITLAND, FL 32751 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤208,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
| Original Permit #: 2024010999 |
Contractor
MCH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
668 N ORLANDO AVE, STE 207 MAITLAND, FL 32751 |
CBC1262898 (Exp: 08/31/2026) | 407-602-8257 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
DUSTIN ARCHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2785 WRIGHTS ROAD SUITE 1133 OVIEDO, FL 32765 |
CMC1251099 (Exp: 08/31/2026) | 407-391-1145 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 11/03/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 11/03/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/31/2025 | APPROVED | TPOLACEK |
| Note: NOTE TO INSPECTOR PLEASE MAKE SURE FINAL SURVEY SHOWS THE ROADSIDE SWALE FLOWS CORRECTLY OR BE FLAT SO WATER WILL NO SIT IN THE SWALES. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/31/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 10-31-25 TPOLACEK*** ALTHOUGH FINAL SURVEY INDICATES AN INSIDE SWALE ALONG RIGHT SIDE THERE IS A COMMON SWALE THAT WILL WORK. FRONT RIGHT SIDE OF ROADSIDE SWALE HAS A HIGH AREA ALONG PROPERTY LINE. AS PER INSPECTOR NOTE BUILDER WILL NEED TO GRADE SWALE TO ALLOW DRAINAGE TO FLOW DOWNSTREAM. | |||
| BLD - BUILDING FINAL | 10/28/2025 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 09/19/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/19/25 CORRECTIONS MADE READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 SITE NOT READY FOR INSPECTION TOO MUCH WATER THROUGH OUT POUR AREA ** SEE ATTACHED PHOTOS __________________________________________________________________________________________________________________ 9/5/2025 - PREVIOUS INSPECTION NOTES ** 09/05/25 BUILDER NEEDS TO RE-ESTABLISH THE SITES BENCH MARK AND IDENTIFY LOCATIONAS AS THIS INSPECTOR WAS UNABLE TO ACATE BENCH MARK. THE SWALE PLAN SHOWS POWER POLE SURVEY NOTES SHOE EDGE OF PAVEMENT ON RIGHT SIDE . THERE IS A NAIL IN POWER POLE WHICH DOES NOT SHOOT THE CORRECT ELEVATION. THERE IS ALSO A NAIL AND DISK IN CENTER WHICH DOES NOT SHOOT THE CORRECT ELEVATION. RESCHEDULE INSPECTION ONCE YOU HAVE RE-ESTABLISHED BENCH MARK | |||
| ROW- PRE-APRON (PRE-POUR) | 09/11/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/11/25 SITE NOT READY FOR INSPECTION TOO MUCH WATER THROUGH OUT POUR AREA ** SEE ATTACHED PHOTOS __________________________________________________________________________________________________________________ 9/5/2025 - PREVIOUS INSPECTION NOTES ** 09/05/25 BUILDER NEEDS TO RE-ESTABLISH THE SITES BENCH MARK AND IDENTIFY LOCATIONAS AS THIS INSPECTOR WAS UNABLE TO ACATE BENCH MARK. THE SWALE PLAN SHOWS POWER POLE SURVEY NOTES SHOE EDGE OF PAVEMENT ON RIGHT SIDE . THERE IS A NAIL IN POWER POLE WHICH DOES NOT SHOOT THE CORRECT ELEVATION. THERE IS ALSO A NAIL AND DISK IN CENTER WHICH DOES NOT SHOOT THE CORRECT ELEVATION. RESCHEDULE INSPECTION ONCE YOU HAVE RE-ESTABLISHED BENCH MARK | |||
| ROW- PRE-APRON (PRE-POUR) | 09/05/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/05/25 BUILDER NEEDS TO RE-ESTABLISH THE SITES BENCH MARK AND IDENTIFY LOCATIONAS AS THIS INSPECTOR WAS UNABLE TO ACATE BENCH MARK. THE SWALE PLAN SHOWS POWER POLE SURVEY NOTES SHOE EDGE OF PAVEMENT ON RIGHT SIDE . THERE IS A NAIL IN POWER POLE WHICH DOES NOT SHOOT THE CORRECT ELEVATION. THERE IS ALSO A NAIL AND DISK IN CENTER WHICH DOES NOT SHOOT THE CORRECT ELEVATION. RESCHEDULE INSPECTION ONCE YOU HAVE RE-ESTABLISHED BENCH MARK | |||
| ROW - DRAINAGE | 09/04/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/04/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 9/3/2025 - PREVIOUS INSPECTION NOTES ** 09/03/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE IN ORDER FOR THE STORMWATER TO FLOW TO THE OUTFALL. ** DUE TO PREVIOUS DRAINAGE INSPECTIONS ON THIS SITE THE PERMIT IS BEING PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTIL ALL CORRECTIONS HAVE BEEN MADE. THIS SITE WILL ALSO HAVE FOLLOW UP INSPECTIONS DAILY UNTIL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 09/04/25 _________________________________________________________________________________________________________________ 9/2/2025 - PREVIOUS INSPECTION NOTES ** 09/02/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE IN ORDER FOR THE STORMWATER TO FLOW TO THE OUTFALL. ** DUE TO PREVIOUS DRAINAGE INSPECTIONS ON THIS SITE THE PERMIT IS BEING PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTIL ALL CORRECTIONS HAVE BEEN MADE. THIS SITE WILL ALSO HAVE FOLLOW UP INSPECTIONS DAILY UNTIL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 09/03/25 _________________________________________________________________________________________________________________ Please check the front swale. I just received a complaint that the front swale is being blocked.per Gbertola | |||
| ROW - DRAINAGE | 09/03/2025 | Disapproved -FEE REQUIRED | RRICKS |
| Note: ** 09/03/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE IN ORDER FOR THE STORMWATER TO FLOW TO THE OUTFALL. ** DUE TO PREVIOUS DRAINAGE INSPECTIONS ON THIS SITE THE PERMIT IS BEING PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTIL ALL CORRECTIONS HAVE BEEN MADE. THIS SITE WILL ALSO HAVE FOLLOW UP INSPECTIONS DAILY UNTIL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 09/04/25 _________________________________________________________________________________________________________________ 9/2/2025 - PREVIOUS INSPECTION NOTES ** 09/02/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE IN ORDER FOR THE STORMWATER TO FLOW TO THE OUTFALL. ** DUE TO PREVIOUS DRAINAGE INSPECTIONS ON THIS SITE THE PERMIT IS BEING PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTIL ALL CORRECTIONS HAVE BEEN MADE. THIS SITE WILL ALSO HAVE FOLLOW UP INSPECTIONS DAILY UNTIL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 09/03/25 _________________________________________________________________________________________________________________ Please check the front swale. I just received a complaint that the front swale is being blocked.per Gbertola | |||
| ROW - DRAINAGE | 09/02/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/02/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE IN ORDER FOR THE STORMWATER TO FLOW TO THE OUTFALL. ** DUE TO PREVIOUS DRAINAGE INSPECTIONS ON THIS SITE THE PERMIT IS BEING PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTIL ALL CORRECTIONS HAVE BEEN MADE. THIS SITE WILL ALSO HAVE FOLLOW UP INSPECTIONS DAILY UNTIL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 09/03/25 _________________________________________________________________________________________________________________ Please check the front swale. I just received a complaint that the front swale is being blocked.per Gbertola | |||
| ROW- PRE-APRON (PRE-POUR) | 08/29/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THIS IS NOT READY FOR INSPECTION THERE ARE NO FORMS AT THIS TIME OF THE INSPECTION AT 9:06AM AND AREA IS WAY TO WET SEE PHOTO OF TODAYS INSPECTION | |||
| ELECTRIC - EARLY POWER | 08/27/2025 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 08/12/2025 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 08/12/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: No IRR, No CC | |||
| U - SEWER TIE IN | 08/12/2025 | APPROVED | MGIBSON |
| ROW - DRAINAGE | 07/30/2025 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE ----------------------------------------------------------------------------- 7/22/2025 - PREVIOUS INSPECTION NOTES ** 07/22/25 BUILDER NEEDS TO OPEN THE ROADSIDE SWALE EITHER INSTALL A TEMPORARY CULVERT PIPE A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN SWALE AND ENSURE IT IS UN-OBSTRUCTED ALLOWING THE STORMWATER TO FLOW TO THE OUTLET ** REMOVE PORT-A-JOHN FROM THE (ROW) SWALE AND PUT ONTO JOB SITE ** RE-ESTABLISH ALL SILT FENCE AROUND JOB SITE ** BUILDER WILL HAVE 7 DAYS TO MAKE ALL NOTED CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE AT THE TIME OF THE NEXT INSOPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD, INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/30/25 ____________________________________________________________________________________________________________________ Please, Check the Drainage in the front swale, Talk to the homeowner on 5 Luther dr | |||
| PEP TANK INSTALLATION REQUEST | 07/24/2025 | APPROVED | CBOWERMASTER |
| ALL ROUGH | 07/22/2025 | Approval - Private Provider | PPROVIDER |
| INSULATION | 07/22/2025 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 07/22/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 07/22/25 BUILDER NEEDS TO OPEN THE ROADSIDE SWALE EITHER INSTALL A TEMPORARY CULVERT PIPE A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN SWALE AND ENSURE IT IS UN-OBSTRUCTED ALLOWING THE STORMWATER TO FLOW TO THE OUTLET ** REMOVE PORT-A-JOHN FROM THE (ROW) SWALE AND PUT ONTO JOB SITE ** RE-ESTABLISH ALL SILT FENCE AROUND JOB SITE ** BUILDER WILL HAVE 7 DAYS TO MAKE ALL NOTED CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE AT THE TIME OF THE NEXT INSOPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD, INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/30/25 ____________________________________________________________________________________________________________________ Please, Check the Drainage in the front swale, Talk to the homeowner on 5 Luther dr | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/17/2025 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 07/17/2025 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 07/17/2025 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 07/17/2025 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 07/15/2025 | Approval - Private Provider | PPROVIDER |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 07/10/2025 | APPROVED | RRICKS |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/11/2025 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 06/11/2025 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/09/2025 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 04/08/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 10/30/2025 | 10/30/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM REMOVE '5 LUTHER' FROM FILE NAME | |||
| ZON | COMPLETE | 07/09/2025 | 07/09/2025 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/09/2025 | 07/10/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/09/2025 | 06/09/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/28/2025 | 05/29/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Please provide missing preliminary Geotech report. | |||
| SW1 | COMPLETE | 03/13/2025 | 03/19/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/13/2025 | 03/13/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/13/2025 | 03/13/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM no zoning changes only for stormwater | |||
| SWALE | COMPLETE | 03/07/2025 | 03/20/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/06/2025 | 03/12/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/06/2025 | 03/07/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/06/2025 | 03/07/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/06/2025 | 03/12/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/06/2025 | 03/10/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Random elevation of 30.5 at the back of the house on the right that doesn't agree with the lot's drainage. | |||
| ZON | COMPLETE | 03/06/2025 | 03/07/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/06/2025 | 03/10/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/03/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/03/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/03/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/03/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/03/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/03/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/03/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/03/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/19/2025 |
| SW ENG PRE APRON | ¤30.00 | 03/19/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/19/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/19/2025 |
| SEWER CREDIT | (¤850.00) | 03/19/2025 |
| SEWER INSPECTION | ¤25.00 | 03/19/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 03/19/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 03/19/2025 |
| SITE PLAN 30 | ¤30.00 | 03/19/2025 |
| WATER- TURN ON | ¤25.00 | 03/19/2025 |
| ADJUSTMENT 10% | (¤68.52) | 03/19/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/19/2025 |
| INSPECTION - RESIDENTIAL | ¤572.00 | 03/19/2025 |
| PLAN REVIEW - APPROVED MASTER | ¤83.20 | 03/19/2025 |
| CONNECTION FEES | ¤1,187.26 | 03/19/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 03/19/2025 |
| IMPACT FEE FIRE | ¤434.51 | 03/19/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/19/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/19/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 03/19/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/19/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 03/19/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/19/2025 |
| SURCHARGE FS 533.721 | ¤6.17 | 03/19/2025 |
| SURCHARGE - FS 468.631 | ¤9.25 | 03/19/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/19/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,262.54 |