Permit #2025030366
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00410-0190 |
| GARAGE: 396 sqft |
| OPENED PORCH (WITH ROOF) : 119 sqft |
| CONDITIONED SPACE: 1504 sqft |
| Total Square Footage: 2019 sqft |
| Block: 00410 |
| Subdivision: - |
| Job Phone: 407-476-8195 |
| Location Address: 40 BUTTERMILK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/02/2025 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: INB BFS LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
|
Address SUITE 220 ORLANDO, FL 32803 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Sub Contractors
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
JOSEPH H PETERMAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
EC13013085 (Exp: 08/31/2026) | 407-333-2665 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/24/2026 | FINAL APPROVED | KSANDOE |
| Note: 2/19/2026 - PREVIOUS INSPECTION NOTES 1. Clean and remove trash from garage and rebar in yard 2. W/P cover required for ufer access 3. 2" conduit above meter main needs to be secured 4. ODU must be a min of 3'' off grade 5. Spare bathroom vanity sink p-trap leaking | |||
| ROW - STORMWATER FINAL | 02/24/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 2/19/2026 - PREVIOUS INSPECTION NOTES 02-19-26 TPOLACEK*** PREVIOUS NOTES STATED BUILDER NEEDED TO GRADE OUT AREA IN BACK LEFT CORNER AND SOD BARE GROUND. THIS WAS NOT COMPLETED AT THE TIME OF THIS INSPECTION. Inspector Notes from Inspection 9465 02-18-26 TPOLACEK*** IN BACK LEFT CORNER BY GRADE STAKE BARE GROUND MUST BE GRADED AND SODDED WHERE DISTURBED. GRADE STAKES SHOULD BE REMOVED BEFORE FINAL ROW INSPECTION APPROVING AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 02/19/2026 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 No IRR, No CC | |||
| ROW - FINAL APRON (AFTER POUR) | 02/19/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 02-18-26 TPOLACEK*** IN BACK LEFT CORNER BY GRADE STAKE BARE GROUND MUST BE GRADED AND SODDED WHERE DISTURBED. GRADE STAKES SHOULD BE REMOVED BEFORE FINAL ROW INSPECTION APPROVING AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 02/19/2026 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 02-19-26 TPOLACEK*** PREVIOUS NOTES STATED BUILDER NEEDED TO GRADE OUT AREA IN BACK LEFT CORNER AND SOD BARE GROUND. THIS WAS NOT COMPLETED AT THE TIME OF THIS INSPECTION. Inspector Notes from Inspection 9465 02-18-26 TPOLACEK*** IN BACK LEFT CORNER BY GRADE STAKE BARE GROUND MUST BE GRADED AND SODDED WHERE DISTURBED. GRADE STAKES SHOULD BE REMOVED BEFORE FINAL ROW INSPECTION APPROVING AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| BLD - BUILDING FINAL | 02/19/2026 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Clean and remove trash from garage and rebar in yard 2. W/P cover required for ufer access 3. 2" conduit above meter main needs to be secured 4. ODU must be a min of 3'' off grade 5. Spare bathroom vanity sink p-trap leaking | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/18/2026 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/18/2026 | APPROVED - AS NOTED | TPOLACEK |
| Note: 02-18-26 TPOLACEK*** IN BACK LEFT CORNER BY GRADE STAKE BARE GROUND MUST BE GRADED AND SODDED WHERE DISTURBED. GRADE STAKES SHOULD BE REMOVED BEFORE FINAL ROW INSPECTION APPROVING AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U-CROSS CONNECTION | 01/28/2026 | APPROVED - AS NOTED | BWRIGHT |
| Note: No IRR, No CC | |||
| ROW- PRE-APRON (PRE-POUR) | 01/05/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. | |||
| ELECTRIC - EARLY POWER | 12/22/2025 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2200 authorize release of email. 10/31/2025 - PREVIOUS INSPECTION NOTES 2" service conduit PVC requires schedule 80, 40 is installed....NEC 300.5(D)(4). | |||
| GRAVITY SEWER TEST | 12/11/2025 | APPROVED | JSTEWART |
| Note: 12/10/2025 - PREVIOUS INSPECTION NOTES 12/10/25 1. Sewer line has hump in the center, changing pitch. Please fix | |||
| SEWER TIE IN | 12/10/2025 | APPROVED | MCONTRYMAN |
| GRAVITY SEWER TEST | 12/10/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 12/10/25 1. Sewer line has hump in the center, changing pitch. Please fix | |||
| PEP TANK INSTALLATION REQUEST | 12/02/2025 | APPROVED | CBOWERMASTER |
| INSULATION | 11/25/2025 | APPROVED | JSTEWART |
| LATH/BRICK/ WATER BARRIER | 11/21/2025 | APPROVED | MKRASKI |
| ALL ROUGH | 11/19/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 11/19/25 1. Each bathroom vent fans are missing its secondary form of connection. Only taped at the moment FBCR M1604.4.1 | |||
| ELECTRIC-TUG | 11/04/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: authorize release of email. 10/31/2025 - PREVIOUS INSPECTION NOTES 2" service conduit PVC requires schedule 80, 40 is installed....NEC 300.5(D)(4). | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/31/2025 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 10/31/2025 | Disapproved - NO FEE | JSTEWART |
| Note: 2" service conduit PVC requires schedule 80, 40 is installed....NEC 300.5(D)(4). | |||
| ROOF VALLEY & METAL | 10/31/2025 | APPROVED | FWILLIS |
| ROOF SHEATHING | 10/28/2025 | APPROVED | FWILLIS |
| WALL SHEATHING | 10/28/2025 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 10/22/2025 | APPROVED | JSTEWART |
| Note: 10/21/2025 - PREVIOUS INSPECTION NOTES | |||
| TIE BEAM / LINTEL | 10/21/2025 | CANCELLED BY APPLICANT | MCONTRYMAN |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 10/21/2025 | APPROVED | RRICKS |
| MONOLITHIC SLAB | 10/09/2025 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/06/2025 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 10/03/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 09/10/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 10/21/2025 | 10/21/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/21/2025 | 10/21/2025 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/03/2025 | 10/03/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/17/2025 | 03/17/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/17/2025 | 03/19/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/17/2025 | 03/17/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/17/2025 | 03/17/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/11/2025 | 03/28/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/10/2025 | 03/17/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/10/2025 | 03/17/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Plan sheet S3.0 under Opening Pressures - please clarify it is illegible. | |||
| CUSVC | COMPLETE | 03/10/2025 | 03/11/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/10/2025 | 03/12/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/10/2025 | 03/11/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/10/2025 | 03/12/2025 |
| LOCATE | COMPLETE | 03/10/2025 | 03/12/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/10/2025 | 03/13/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/10/2025 | 03/17/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Front right property is lower than EP. Berm is recommended so adjacent lot is not impacted. Missing proposed elevations on the back property line. | |||
| ZON | COMPLETE | 03/10/2025 | 03/12/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 02/20/2026 |
| SURCHARGE FS 533.721 | ¤9.36 | 09/02/2025 |
| SURCHARGE - FS 468.631 | ¤14.04 | 09/02/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/02/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/02/2025 |
| SW ENG PRE APRON | ¤30.00 | 09/02/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/02/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/02/2025 |
| SEWER CREDIT | (¤850.00) | 09/02/2025 |
| SEWER INSPECTION | ¤25.00 | 09/02/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 09/02/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 09/02/2025 |
| SITE PLAN 30 | ¤30.00 | 09/02/2025 |
| WATER- TURN ON | ¤25.00 | 09/02/2025 |
| ADJUSTMENT 10% | (¤103.96) | 09/02/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/02/2025 |
| INSPECTION - RESIDENTIAL | ¤786.50 | 09/02/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤223.08 | 09/02/2025 |
| CONNECTION FEES | ¤1,187.26 | 09/02/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 09/02/2025 |
| IMPACT FEE FIRE | ¤434.51 | 09/02/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 09/02/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 09/02/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 09/02/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 09/02/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 09/02/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/02/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,434.46 |