I want to search for...
Permit #2025030411
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7022-00060-0080 |
| Block: 00060 |
| Subdivision: - |
| Job Phone: (386)627-0927 |
| Location Address: 30 WESTCLIFFE LN |
| Type: PO - POOL |
| Issue Date: 03/26/2025 |
| NOC: RECORDED |
| Applicant name: JASON BRET PAVLOW |
| Owner: DEFRANCO CINDY & MICHAEL DEFRANCO W&H |
|
Address 30 WESTCLIFF LANE PALM COAST, FL 32164 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤91,400.00 |
| Job Description: POOL/EXISTING FENCE |
| Type: CN |
Contractor
WATERSIDE POOLS INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST , FL 32137 |
#3K PALM COAST , FL 32137 |
CPC1457358 (Exp: 08/31/2026) | (386)447-3390 | (386)447-3391 |
Sub Contractors
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 2413 Bunnell, FL 32110 |
EC13002161 (Exp: 08/31/2028) | (386) 437-2966 | 386-437-5042 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 10/14/2025 | FINAL APPROVED | MKRASKI |
| U -UTILITY RESIDENTIAL FINAL | 10/10/2025 | FINAL APPROVED | BHAINES |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/09/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 10-09-25 TPOLACEK*** FINAL SURVEY IS BEING APPROVED AS IS. BUILDER MADE CORRECTIONS TO RIGHT SIDE BY AC UNIT THAT WILL ALLOW ALL DRAINAGE TO MOVE FORWARD TO THE ROADSIDE SWALE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/9/2025 - PREVIOUS INSPECTION NOTES 09-09-25 TPOLACEK*** FINAL SURVEY STILL DOES NOT MEET THE COPC MINIMUM REQUIREMENTS. THE ELEVATIONS SHOWN DO NOT MEET THE CODE BELOW. BUILDER SUBM,ITTED A SITE PLAN SHOWING DRAINAGE WOULD MOVE TO THE FRONT SWALE. THE SITE PLAN WAS APPROVED WITH THE EXPECTAION THAT THE BUILDER WOULD CREATE A DRAINAGE PATTERN MOVING THE DRAINAGE TO THE FRONT SWALE. 19 Top of the slope Sec 300.02.C(6) Sec 300.02.C(6)=The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 9/3/2025 - PREVIOUS INSPECTION NOTES 09-03-25 TPOLACEK*** THE FINAL SURVEY INDICATES THE DRAINAGE SYSTEM DOES NOT MEET COPC MINIMUM STANDARDS. PLEASE READ CODES BELOW AND SEE PHOTO WITH ARROWS. THE APPROVED SITE PLAN INDICATED DRAINAGE WOULD FLOW TO THE FRONT AND NOT IMPACT THE ADJOINING PROPERTIES. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) Section 200.02 d(3) (3) Identify how the rear yard will be drained. The rear yard is required to drain per the approved Construction Plans. Section 200.01.1.b. (17) "(17) The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines • The minimum fall from the rear property line to the front is 0.50 of a foot. • The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope." | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/09/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 10-09-25 TPOLACEK*** BUILDER MADE REQUIRED CORRECTIONS IN FIELD. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9463 10-09-25 TPOLACEK*** FINAL SURVEY IS BEING APPROVED AS IS. BUILDER MADE CORRECTIONS TO RIGHT SIDE BY AC UNIT THAT WILL ALLOW ALL DRAINAGE TO MOVE FORWARD TO THE ROADSIDE SWALE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/9/2025 - PREVIOUS INSPECTION NOTES 09-09-25 TPOLACEK*** FINAL SURVEY STILL DOES NOT MEET THE COPC MINIMUM REQUIREMENTS. THE ELEVATIONS SHOWN DO NOT MEET THE CODE BELOW. BUILDER SUBM,ITTED A SITE PLAN SHOWING DRAINAGE WOULD MOVE TO THE FRONT SWALE. THE SITE PLAN WAS APPROVED WITH THE EXPECTAION THAT THE BUILDER WOULD CREATE A DRAINAGE PATTERN MOVING THE DRAINAGE TO THE FRONT SWALE. 19 Top of the slope Sec 300.02.C(6) Sec 300.02.C(6)=The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 9/3/2025 - PREVIOUS INSPECTION NOTES 09-03-25 TPOLACEK*** THE FINAL SURVEY INDICATES THE DRAINAGE SYSTEM DOES NOT MEET COPC MINIMUM STANDARDS. PLEASE READ CODES BELOW AND SEE PHOTO WITH ARROWS. THE APPROVED SITE PLAN INDICATED DRAINAGE WOULD FLOW TO THE FRONT AND NOT IMPACT THE ADJOINING PROPERTIES. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) Section 200.02 d(3) (3) Identify how the rear yard will be drained. The rear yard is required to drain per the approved Construction Plans. Section 200.01.1.b. (17) "(17) The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines • The minimum fall from the rear property line to the front is 0.50 of a foot. • The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope." | |||
| ROW - FINAL INSPECTION | 10/09/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 10-09-25 TPOLACEK*** BUILDER MADE REQUIRED CORRECTIONS IN FIELD. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9463 10-09-25 TPOLACEK*** FINAL SURVEY IS BEING APPROVED AS IS. BUILDER MADE CORRECTIONS TO RIGHT SIDE BY AC UNIT THAT WILL ALLOW ALL DRAINAGE TO MOVE FORWARD TO THE ROADSIDE SWALE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/9/2025 - PREVIOUS INSPECTION NOTES 09-09-25 TPOLACEK*** FINAL SURVEY STILL DOES NOT MEET THE COPC MINIMUM REQUIREMENTS. THE ELEVATIONS SHOWN DO NOT MEET THE CODE BELOW. BUILDER SUBM,ITTED A SITE PLAN SHOWING DRAINAGE WOULD MOVE TO THE FRONT SWALE. THE SITE PLAN WAS APPROVED WITH THE EXPECTAION THAT THE BUILDER WOULD CREATE A DRAINAGE PATTERN MOVING THE DRAINAGE TO THE FRONT SWALE. 19 Top of the slope Sec 300.02.C(6) Sec 300.02.C(6)=The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 9/3/2025 - PREVIOUS INSPECTION NOTES 09-03-25 TPOLACEK*** THE FINAL SURVEY INDICATES THE DRAINAGE SYSTEM DOES NOT MEET COPC MINIMUM STANDARDS. PLEASE READ CODES BELOW AND SEE PHOTO WITH ARROWS. THE APPROVED SITE PLAN INDICATED DRAINAGE WOULD FLOW TO THE FRONT AND NOT IMPACT THE ADJOINING PROPERTIES. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) Section 200.02 d(3) (3) Identify how the rear yard will be drained. The rear yard is required to drain per the approved Construction Plans. Section 200.01.1.b. (17) "(17) The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines • The minimum fall from the rear property line to the front is 0.50 of a foot. • The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope." | |||
| ROW- PROJECT STATUS | 10/01/2025 | Status Check | TPOLACEK |
| Note: 10-01-25 TPOLACEK*** BUILDER ASKED IF I COULD TAKE A LOOK AT RIGHT SIDE WHERE WORK WAS COMPLETED BEFORE LAYING SOD. AREA LOOKS GOOD I WOULD JUST REQUEST THEY MAKE SURE SOD IS CUT IN TO MATCH GRADE. | |||
| ROW- PROJECT STATUS | 09/16/2025 | Status Check | TPOLACEK |
| Note: 09-16-25 TPOLACEK*** MET WITH CAT AND INSPECTOR SLADISH TO DISCUSS FINAL SURVEY AND GRADE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/09/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 09-09-25 TPOLACEK*** FINAL SURVEY STILL DOES NOT MEET THE COPC MINIMUM REQUIREMENTS. THE ELEVATIONS SHOWN DO NOT MEET THE CODE BELOW. BUILDER SUBM,ITTED A SITE PLAN SHOWING DRAINAGE WOULD MOVE TO THE FRONT SWALE. THE SITE PLAN WAS APPROVED WITH THE EXPECTAION THAT THE BUILDER WOULD CREATE A DRAINAGE PATTERN MOVING THE DRAINAGE TO THE FRONT SWALE. 19 Top of the slope Sec 300.02.C(6) Sec 300.02.C(6)=The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 9/3/2025 - PREVIOUS INSPECTION NOTES 09-03-25 TPOLACEK*** THE FINAL SURVEY INDICATES THE DRAINAGE SYSTEM DOES NOT MEET COPC MINIMUM STANDARDS. PLEASE READ CODES BELOW AND SEE PHOTO WITH ARROWS. THE APPROVED SITE PLAN INDICATED DRAINAGE WOULD FLOW TO THE FRONT AND NOT IMPACT THE ADJOINING PROPERTIES. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) Section 200.02 d(3) (3) Identify how the rear yard will be drained. The rear yard is required to drain per the approved Construction Plans. Section 200.01.1.b. (17) "(17) The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines • The minimum fall from the rear property line to the front is 0.50 of a foot. • The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope." | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/03/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 09-03-25 TPOLACEK*** THE FINAL SURVEY INDICATES THE DRAINAGE SYSTEM DOES NOT MEET COPC MINIMUM STANDARDS. PLEASE READ CODES BELOW AND SEE PHOTO WITH ARROWS. THE APPROVED SITE PLAN INDICATED DRAINAGE WOULD FLOW TO THE FRONT AND NOT IMPACT THE ADJOINING PROPERTIES. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) Section 200.02 d(3) (3) Identify how the rear yard will be drained. The rear yard is required to drain per the approved Construction Plans. Section 200.01.1.b. (17) "(17) The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines • The minimum fall from the rear property line to the front is 0.50 of a foot. • The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope." | |||
| ELECTRIC AND ALARM | 07/02/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Both gates will need to be self closing (no cage) FBC R4501.17 2. Protection of bond wire required NEC 250.64(A)(2) Make repairs before final inspection | |||
| POOL DECK | 06/05/2025 | CANCELLED BY APPLICANT | WEB |
| POOL DECK | 06/04/2025 | APPROVED | MKRASKI |
| STEEL AND GROUND | 04/16/2025 | APPROVED | MKRASKI |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 03/19/2025 | 03/19/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/19/2025 | 03/19/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM IT IS YOUR RESPONSIBILITY TO MAKE SURE ALL DRAINAGE OF THE LOT IS UP TO THE CITY OF PALM COAST STANDARDS WHEN THE POOL IS DONE. | |||
| ENGIN1 | COMPLETE | 03/19/2025 | 03/25/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| BFLOOD | COMPLETE | 03/11/2025 | 03/17/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/11/2025 | 03/17/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/11/2025 | 03/12/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/11/2025 | 03/13/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/11/2025 | 03/12/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM need to have more flow arrows to show all drainage of the backyard | |||
| ZON | HOLD | 03/11/2025 | 03/12/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Shower pad and pool equipment pad encroaching in platted 5' utility easement. Provide setback of 2.5' walkway on right side to demonstrate it does not encroach in platted 5' utility easement. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤26.18) | 03/26/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/26/2025 |
| INSPECTION- POOL | ¤160.00 | 03/26/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤71.76 | 03/26/2025 |
| RECORDING FEE REIMBURSE DOC | ¤35.50 | 03/26/2025 |
| SURCHARGE FS 533.721 | ¤2.36 | 03/26/2025 |
| SURCHARGE - FS 468.631 | ¤3.53 | 03/26/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 03/26/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/26/2025 |
| SITE PLAN 30 | ¤30.00 | 03/26/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤366.97 |