Permit #2025030421

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00060-0240
CONDITIONED SPACE: 1801 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
OPENED PORCH (WITH ROOF) : 58 sqft
Total Square Footage: 2281 sqft
Block: 00060
Subdivision: 7028 -
Job Phone: 407-476-8195
Location Address: 77 PHEASANT DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/07/2025
NOC: RECORDED
Applicant name: CARLETTE RENE WITTE
Owner: INB BFS LLC

Address

3670 MAGUIRE BOULEVARD

ORLANDO, FL 32803

Address

SUITE 220

ORLANDO, FL 32803

Lot: 0240
Contracted Stated Job Value: ¤175,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INNOVATIVE NATIONWIDE BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD #220

,

CRC1330026 (Exp: 08/31/2026) 855-694-6634

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
ANTHONY OKEITH FENNELL
Status Location Address State License Number Phone
ACTIVE

217 N. WESTMONTE DR, SUITE 1007

ALTAMONTE SPRINGS, FL 32714

EC13011194 (Exp: 08/31/2026) 407-404-4000
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/11/2026 FINAL APPROVED MCONTRYMAN
Note: 11/19/25: NOTE: Engineer's letter for change of Engineer related to revised ledger board detail submitted on 11/13/25 is only Accepted at the time of this inspection.
ROW - FINAL APRON (AFTER POUR) 02/06/2026 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL APRON (AFTER POUR) 02/05/2026 Disapproved -FEE REQUIRED FSLADISH
Note: 2/5/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 02/05/2026 APPROVED FSLADISH
Note: 2/5/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 02/05/2026 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 No CC, No IRR.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/03/2026 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 02/03/2026 APPROVED FSLADISH
Note: 2/3/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U-CROSS CONNECTION 01/30/2026 APPROVED - AS NOTED BHAINES
Note: No CC, No IRR.
ROW- PRE-APRON (PRE-POUR) 01/09/2026 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. Inspector Notes from Inspection 9470 10/31/25 SPOKE WITH BILL CM ON SITE AND HE IS IN THE PROCESS OF CLEANING THE TEMP PIPE. SILT FENCE IS RESET AROUND THE SITE AND SWALE IS OPEN AND CLEAR AT THE TIME OF THIS INSPECTION. I AM REMOVING PERMIT HOLD, IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN SITE THROUGHOUT THE CONSTRUCTION PROCESS. WILL MNITOR THE SITE FOR CONTINUED COMPLIANCE. _________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ 10/30/2025 - PREVIOUS INSPECTION NOTES 10-30-25 TPOLACEK*** TEMPORARY PIPE IS STILL 100% CLOGGED, SILT FENCE IS STILL FAILING AND NEEDS TO BE REESTABLISHED PERMIT IS PLACED ON HOLD AND INSPECTIONS ARE DAILY UNTIL CORRECTIONS HAVE BEEN COMPLETED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/27/2025 - PREVIOUS INSPECTION NOTES 10-27-25 TPOLACEK*** NO IMPROVMENTS HAVE BEEN MADE. THE STORM LAST NIGHT WASHED OUT MORE SEDIMENT INTO SWALE AND BACK CANAL. BUILDER HAS 3 DAYS TO MAKE IMPROVMENTS BEFORE PERMIT IS PLACED ON HOLD. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/23/2025 - PREVIOUS INSPECTION NOTES 10-23-25 TPOLACEK*** THE TEMPORARY PIPE IS 100% CLOGGED AND SWALE HAS BEEN WASHED OUT IMPEEDING THE FLOW OF THE DRAINAGE SYSTEM. SILT FENCE ALL AROUND NEEDS TO BE REESTABLISHED AND ANY SEDIMENT WASHED OFF SITE INTO COPC DITCH MUST BE REMOVED. NEXT INSPECTION MONDAY 10-27-25 WHERE IF CONDITIONS ARE NOT CORRECTED PERMIT WILL BE PLACED ON HOLD 10/17/2025 - PREVIOUS INSPECTION NOTES 10/17/25=THE TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALE, AND NEEDS TO BE OPENED. IT IS NECESSARY TO REMOVE THE PORTA POTTY FROM THE CITY ROAD AND PLACE IT ON YOUR PROPERTY. THE SILT FENCE ALONG THE DITCH LINE NEEDS ATTENTION. SILT FENCE IS NOT BURIED, LETTING WATER RUN UNDER THE SILT FENCE DIG 4" WIDE AND 4" DEEP TRENCH, BURRY BOTTON OF THE FABRIC Inspector be back on 10/23/25 Pictures attached
ELECTRIC - EARLY POWER 12/26/2025 APPROVED - AS NOTED RMARTIN
Note: 12/26/25 Check pantry on final 2 gang cover/blank is missing *** NOTES ADDED BY RSIMS 11/10/2025 11:44:06 AM *** 11/10/25: FPL emailed approved for TUG. 11/3/2025 - PREVIOUS INSPECTION NOTES 11/3/25: PREVIOUS DEFICIENCY REMAINS UNRESOVED. RE-INSPECTION FEE APPLIED. 11/3/2025 - PREVIOUS INSPECTION NOTES 11/3/25: PREVIOUS DEFICIENCY REMAINS UNRESOVED. 10/30/2025 - PREVIOUS INSPECTION NOTES 10/30/25: 1). Bare copper ground needs to be run through a conduit from ground to the Meter Panel continuous. NEC 250.64(A)(2)
GRAVITY SEWER TEST 12/22/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 12/22/2025 2:09:44 PM *** Inspector Notes from Inspection 2060 *** NOTES ADDED BY RSIMS 9/25/2025 9:42:53 AM *** 9/25/25: Must be resolved before any additional inspections will be approved. 1). Silt fence needs to be fixed immedietly to protect neighboring properties along with canal in the back. FBC 3307.1 2). Portable toilet needs to be moved out of swale and onto site to allow free flow of water through the swale. FBC 3303.5
SEWER TIE IN 12/22/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 12/22/2025 2:09:21 PM *** Inspector Notes from Inspection 2060 *** NOTES ADDED BY RSIMS 9/25/2025 9:42:53 AM *** 9/25/25: Must be resolved before any additional inspections will be approved. 1). Silt fence needs to be fixed immedietly to protect neighboring properties along with canal in the back. FBC 3307.1 2). Portable toilet needs to be moved out of swale and onto site to allow free flow of water through the swale. FBC 3303.5
PEP TANK INSTALLATION REQUEST 12/10/2025 APPROVED CBOWERMASTER
Note: 12/8/2025 7:56:01 AM- PREVIOUS INSPECTION NOTES dumpster needs to move
PEP TANK INSTALLATION REQUEST 12/02/2025 Disapproved -FEE REQUIRED CBOWERMASTER
Note: dumpster needs to move
INSULATION 11/25/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/25/2025 11:47:33 AM *** 11/21/2025 - PREVIOUS INSPECTION NOTES 11/21/25: PREVIOUSLY LISTED ITEM 1 REMAINS UNRESOLVED. 1). Guest bathroom: Fireblocking at top plate of bathtub pack out wall needs to be 1-1/2" minimum or other approved material as required. FBC-R302.11.1. 11/19/2025 - PREVIOUS INSPECTION NOTES 11/19/25: Previously listed items below remain unresolved. 1). Guest bathroom: Fireblocking at top plate of bathtub pack out wall needs to be 1-1/2" minimum or other approved material as required. FBC-R302.11.1. 2). Firestop missing where wires and/or piping penetrate into the attic space at the following locations: FBC-R302.11 c). Master Bathroom: piping for shower head supply (x 2 areas). Still missing the area above the shower valve. 11/14/2025 - PREVIOUS INSPECTION NOTES 11/14/25: NOTE: Engineer's letter submitted on 11/13/25 that is only Accepted at the time of this inspection. 1). Guest bathroom: Fireblocking at top plate of bathtub pack out wall needs to be 1-1/2" minimum or other approved material as required. FBC-R302.11.1. 2). Firestop missing where wires and/or piping penetrate into the attic space at the following locations: FBC-R302.11 a). Guest bathroom plumbing vent. b). Guest Bathroom: Ends of the fireblocking at top plate of bathtub pack out wall. c). Master Bathroom: piping for shower head supply (x 2 areas). d). Thermostat wires. FS written on studs below areas. 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25: Cancelled by Applicant via text at @ 0744. Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 11/10/2025 11:45:08 AM *** 11/10/25: Approved as noted to keep project moving. Previously listed items need to be resolved prior to any more inspections. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4
INSULATION 11/21/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/21/2025 3:09:37 PM *** 11/21/25: PREVIOUSLY LISTED ITEM 1 REMAINS UNRESOLVED. 1). Guest bathroom: Fireblocking at top plate of bathtub pack out wall needs to be 1-1/2" minimum or other approved material as required. FBC-R302.11.1. 11/19/2025 - PREVIOUS INSPECTION NOTES 11/19/25: Previously listed items below remain unresolved. 1). Guest bathroom: Fireblocking at top plate of bathtub pack out wall needs to be 1-1/2" minimum or other approved material as required. FBC-R302.11.1. 2). Firestop missing where wires and/or piping penetrate into the attic space at the following locations: FBC-R302.11 c). Master Bathroom: piping for shower head supply (x 2 areas). Still missing the area above the shower valve. 11/14/2025 - PREVIOUS INSPECTION NOTES 11/14/25: NOTE: Engineer's letter submitted on 11/13/25 that is only Accepted at the time of this inspection. 1). Guest bathroom: Fireblocking at top plate of bathtub pack out wall needs to be 1-1/2" minimum or other approved material as required. FBC-R302.11.1. 2). Firestop missing where wires and/or piping penetrate into the attic space at the following locations: FBC-R302.11 a). Guest bathroom plumbing vent. b). Guest Bathroom: Ends of the fireblocking at top plate of bathtub pack out wall. c). Master Bathroom: piping for shower head supply (x 2 areas). d). Thermostat wires. FS written on studs below areas. 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25: Cancelled by Applicant via text at @ 0744. Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 11/10/2025 11:45:08 AM *** 11/10/25: Approved as noted to keep project moving. Previously listed items need to be resolved prior to any more inspections. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4
INSULATION 11/19/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/19/2025 9:37:02 AM *** 11/19/25: Previously listed items below remain unresolved. 1). Guest bathroom: Fireblocking at top plate of bathtub pack out wall needs to be 1-1/2" minimum or other approved material as required. FBC-R302.11.1. 2). Firestop missing where wires and/or piping penetrate into the attic space at the following locations: FBC-R302.11 c). Master Bathroom: piping for shower head supply (x 2 areas). Still missing the area above the shower valve. 11/14/2025 - PREVIOUS INSPECTION NOTES 11/14/25: NOTE: Engineer's letter submitted on 11/13/25 that is only Accepted at the time of this inspection. 1). Guest bathroom: Fireblocking at top plate of bathtub pack out wall needs to be 1-1/2" minimum or other approved material as required. FBC-R302.11.1. 2). Firestop missing where wires and/or piping penetrate into the attic space at the following locations: FBC-R302.11 a). Guest bathroom plumbing vent. b). Guest Bathroom: Ends of the fireblocking at top plate of bathtub pack out wall. c). Master Bathroom: piping for shower head supply (x 2 areas). d). Thermostat wires. FS written on studs below areas. 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25: Cancelled by Applicant via text at @ 0744. Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 11/10/2025 11:45:08 AM *** 11/10/25: Approved as noted to keep project moving. Previously listed items need to be resolved prior to any more inspections. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4
LATH/BRICK/ WATER BARRIER 11/17/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/17/2025 8:58:46 AM ***
INSULATION 11/14/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 11/14/2025 1:45:18 PM *** 11/14/25: NOTE: Engineer's letter submitted on 11/13/25 that is only Accepted at the time of this inspection. 1). Guest bathroom: Fireblocking at top plate of bathtub pack out wall needs to be 1-1/2" minimum or other approved material as required. FBC-R302.11.1. 2). Firestop missing where wires and/or piping penetrate into the attic space at the following locations: FBC-R302.11 a). Guest bathroom plumbing vent. b). Guest Bathroom: Ends of the fireblocking at top plate of bathtub pack out wall. c). Master Bathroom: piping for shower head supply (x 2 areas). d). Thermostat wires. FS written on studs below areas. 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25: Cancelled by Applicant via text at @ 0744. Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 11/10/2025 11:45:08 AM *** 11/10/25: Approved as noted to keep project moving. Previously listed items need to be resolved prior to any more inspections. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4
INSULATION 11/13/2025 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 11/13/2025 9:13:03 AM *** 11/13/25: Cancelled by Applicant via text at @ 0744. Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 11/10/2025 11:45:08 AM *** 11/10/25: Approved as noted to keep project moving. Previously listed items need to be resolved prior to any more inspections. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4
ELECTRIC-TUG 11/10/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/10/2025 11:44:06 AM *** 11/10/25: FPL emailed approved for TUG. 11/3/2025 - PREVIOUS INSPECTION NOTES 11/3/25: PREVIOUS DEFICIENCY REMAINS UNRESOVED. RE-INSPECTION FEE APPLIED. 11/3/2025 - PREVIOUS INSPECTION NOTES 11/3/25: PREVIOUS DEFICIENCY REMAINS UNRESOVED. 10/30/2025 - PREVIOUS INSPECTION NOTES 10/30/25: 1). Bare copper ground needs to be run through a conduit from ground to the Meter Panel continuous. NEC 250.64(A)(2)
ALL ROUGH 11/10/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/10/2025 11:45:08 AM *** 11/10/25: Approved as noted to keep project moving. Previously listed items need to be resolved prior to any more inspections. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/07/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/7/2025 11:03:09 AM *** 11/7/25: Approved as noted to keep project moving. 1). Trusses (front) T20, T07 and T06 will require additional cleaning to remove foreign unknown substance along bottom cords and webs. 2). Garage ledger board is still missing solid blocking as required on plans. Highlighted. FBC [A]107.4 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4
ELECTRIC-TUG 11/03/2025 Disapproved - NO FEE RSIMS
Note: 11/3/25: PREVIOUS DEFICIENCY REMAINS UNRESOVED. 10/30/2025 - PREVIOUS INSPECTION NOTES 10/30/25: 1). Bare copper ground needs to be run through a conduit from ground to the Meter Panel continuous. NEC 250.64(A)(2)
ELECTRIC-TUG 11/03/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/3/2025 1:43:07 PM *** 11/3/25: PREVIOUS DEFICIENCY REMAINS UNRESOVED. RE-INSPECTION FEE APPLIED. 11/3/2025 - PREVIOUS INSPECTION NOTES 11/3/25: PREVIOUS DEFICIENCY REMAINS UNRESOVED. 10/30/2025 - PREVIOUS INSPECTION NOTES 10/30/25: 1). Bare copper ground needs to be run through a conduit from ground to the Meter Panel continuous. NEC 250.64(A)(2)
ROW - DRAINAGE 10/31/2025 APPROVED - AS NOTED FSLADISH
Note: 10/31/25 SPOKE WITH BILL CM ON SITE AND HE IS IN THE PROCESS OF CLEANING THE TEMP PIPE. SILT FENCE IS RESET AROUND THE SITE AND SWALE IS OPEN AND CLEAR AT THE TIME OF THIS INSPECTION. I AM REMOVING PERMIT HOLD, IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN SITE THROUGHOUT THE CONSTRUCTION PROCESS. WILL MNITOR THE SITE FOR CONTINUED COMPLIANCE. _________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ 10/30/2025 - PREVIOUS INSPECTION NOTES 10-30-25 TPOLACEK*** TEMPORARY PIPE IS STILL 100% CLOGGED, SILT FENCE IS STILL FAILING AND NEEDS TO BE REESTABLISHED PERMIT IS PLACED ON HOLD AND INSPECTIONS ARE DAILY UNTIL CORRECTIONS HAVE BEEN COMPLETED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/27/2025 - PREVIOUS INSPECTION NOTES 10-27-25 TPOLACEK*** NO IMPROVMENTS HAVE BEEN MADE. THE STORM LAST NIGHT WASHED OUT MORE SEDIMENT INTO SWALE AND BACK CANAL. BUILDER HAS 3 DAYS TO MAKE IMPROVMENTS BEFORE PERMIT IS PLACED ON HOLD. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/23/2025 - PREVIOUS INSPECTION NOTES 10-23-25 TPOLACEK*** THE TEMPORARY PIPE IS 100% CLOGGED AND SWALE HAS BEEN WASHED OUT IMPEEDING THE FLOW OF THE DRAINAGE SYSTEM. SILT FENCE ALL AROUND NEEDS TO BE REESTABLISHED AND ANY SEDIMENT WASHED OFF SITE INTO COPC DITCH MUST BE REMOVED. NEXT INSPECTION MONDAY 10-27-25 WHERE IF CONDITIONS ARE NOT CORRECTED PERMIT WILL BE PLACED ON HOLD 10/17/2025 - PREVIOUS INSPECTION NOTES 10/17/25=THE TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALE, AND NEEDS TO BE OPENED. IT IS NECESSARY TO REMOVE THE PORTA POTTY FROM THE CITY ROAD AND PLACE IT ON YOUR PROPERTY. THE SILT FENCE ALONG THE DITCH LINE NEEDS ATTENTION. SILT FENCE IS NOT BURIED, LETTING WATER RUN UNDER THE SILT FENCE DIG 4" WIDE AND 4" DEEP TRENCH, BURRY BOTTON OF THE FABRIC Inspector be back on 10/23/25 Pictures attached
ROW - DRAINAGE 10/30/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 10-30-25 TPOLACEK*** TEMPORARY PIPE IS STILL 100% CLOGGED, SILT FENCE IS STILL FAILING AND NEEDS TO BE REESTABLISHED PERMIT IS PLACED ON HOLD AND INSPECTIONS ARE DAILY UNTIL CORRECTIONS HAVE BEEN COMPLETED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/27/2025 - PREVIOUS INSPECTION NOTES 10-27-25 TPOLACEK*** NO IMPROVMENTS HAVE BEEN MADE. THE STORM LAST NIGHT WASHED OUT MORE SEDIMENT INTO SWALE AND BACK CANAL. BUILDER HAS 3 DAYS TO MAKE IMPROVMENTS BEFORE PERMIT IS PLACED ON HOLD. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/23/2025 - PREVIOUS INSPECTION NOTES 10-23-25 TPOLACEK*** THE TEMPORARY PIPE IS 100% CLOGGED AND SWALE HAS BEEN WASHED OUT IMPEEDING THE FLOW OF THE DRAINAGE SYSTEM. SILT FENCE ALL AROUND NEEDS TO BE REESTABLISHED AND ANY SEDIMENT WASHED OFF SITE INTO COPC DITCH MUST BE REMOVED. NEXT INSPECTION MONDAY 10-27-25 WHERE IF CONDITIONS ARE NOT CORRECTED PERMIT WILL BE PLACED ON HOLD 10/17/2025 - PREVIOUS INSPECTION NOTES 10/17/25=THE TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALE, AND NEEDS TO BE OPENED. IT IS NECESSARY TO REMOVE THE PORTA POTTY FROM THE CITY ROAD AND PLACE IT ON YOUR PROPERTY. THE SILT FENCE ALONG THE DITCH LINE NEEDS ATTENTION. SILT FENCE IS NOT BURIED, LETTING WATER RUN UNDER THE SILT FENCE DIG 4" WIDE AND 4" DEEP TRENCH, BURRY BOTTON OF THE FABRIC Inspector be back on 10/23/25 Pictures attached
ELECTRIC-TUG 10/30/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 10/30/2025 10:35:17 AM *** 10/30/25: 1). Bare copper ground needs to be run through a conduit from ground to the Meter Panel continuous. NEC 250.64(A)(2)
ROOF VALLEY & METAL 10/28/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 10/28/2025 9:37:43 AM ***
ROW - DRAINAGE 10/27/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 10-27-25 TPOLACEK*** NO IMPROVMENTS HAVE BEEN MADE. THE STORM LAST NIGHT WASHED OUT MORE SEDIMENT INTO SWALE AND BACK CANAL. BUILDER HAS 3 DAYS TO MAKE IMPROVMENTS BEFORE PERMIT IS PLACED ON HOLD. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/23/2025 - PREVIOUS INSPECTION NOTES 10-23-25 TPOLACEK*** THE TEMPORARY PIPE IS 100% CLOGGED AND SWALE HAS BEEN WASHED OUT IMPEEDING THE FLOW OF THE DRAINAGE SYSTEM. SILT FENCE ALL AROUND NEEDS TO BE REESTABLISHED AND ANY SEDIMENT WASHED OFF SITE INTO COPC DITCH MUST BE REMOVED. NEXT INSPECTION MONDAY 10-27-25 WHERE IF CONDITIONS ARE NOT CORRECTED PERMIT WILL BE PLACED ON HOLD 10/17/2025 - PREVIOUS INSPECTION NOTES 10/17/25=THE TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALE, AND NEEDS TO BE OPENED. IT IS NECESSARY TO REMOVE THE PORTA POTTY FROM THE CITY ROAD AND PLACE IT ON YOUR PROPERTY. THE SILT FENCE ALONG THE DITCH LINE NEEDS ATTENTION. SILT FENCE IS NOT BURIED, LETTING WATER RUN UNDER THE SILT FENCE DIG 4" WIDE AND 4" DEEP TRENCH, BURRY BOTTON OF THE FABRIC Inspector be back on 10/23/25 Pictures attached
WALL SHEATHING 10/24/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 10/24/2025 12:24:42 PM ***
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/24/2025 PARTIALLY APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 10/24/2025 12:41:17 PM *** 10/24/25: Partial approval for Roof sheathing and down cell - Checked and approved: 1). Trusses need to be cleaned from dirt and unknown foreign substance due to improper delivery and staging as noted previously on 10/14/25 during inspection 2340 > NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements. (a moisture test will be performed during re-inspection after cleaning is complete). 2). Ledger board is not attached as required on plans and is missing solid blocking also required on plans. Highlighted. FBC [A]107.4 3). 2-ply Truss T01 is not connected as required. Highlighted. FBC [A]107.4 4). Right side garage wall: bottom plate is not complete as required under Simpson DTT2Z tie-down as required by Manufacturer. FBC-R317.1 / FBC [A]107.4
ROW - DRAINAGE 10/23/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 10-23-25 TPOLACEK*** THE TEMPORARY PIPE IS 100% CLOGGED AND SWALE HAS BEEN WASHED OUT IMPEEDING THE FLOW OF THE DRAINAGE SYSTEM. SILT FENCE ALL AROUND NEEDS TO BE REESTABLISHED AND ANY SEDIMENT WASHED OFF SITE INTO COPC DITCH MUST BE REMOVED. NEXT INSPECTION MONDAY 10-27-25 WHERE IF CONDITIONS ARE NOT CORRECTED PERMIT WILL BE PLACED ON HOLD 10/17/2025 - PREVIOUS INSPECTION NOTES 10/17/25=THE TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALE, AND NEEDS TO BE OPENED. IT IS NECESSARY TO REMOVE THE PORTA POTTY FROM THE CITY ROAD AND PLACE IT ON YOUR PROPERTY. THE SILT FENCE ALONG THE DITCH LINE NEEDS ATTENTION. SILT FENCE IS NOT BURIED, LETTING WATER RUN UNDER THE SILT FENCE DIG 4" WIDE AND 4" DEEP TRENCH, BURRY BOTTON OF THE FABRIC Inspector be back on 10/23/25 Pictures attached
ROW - DRAINAGE 10/17/2025 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/17/25=THE TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALE, AND NEEDS TO BE OPENED. IT IS NECESSARY TO REMOVE THE PORTA POTTY FROM THE CITY ROAD AND PLACE IT ON YOUR PROPERTY. THE SILT FENCE ALONG THE DITCH LINE NEEDS ATTENTION. SILT FENCE IS NOT BURIED, LETTING WATER RUN UNDER THE SILT FENCE DIG 4" WIDE AND 4" DEEP TRENCH, BURRY BOTTON OF THE FABRIC Inspector be back on 10/23/25 Pictures attached
TIE BEAM / LINTEL 10/15/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 10/15/2025 11:35:11 AM *** 10/14/2025 - PREVIOUS INSPECTION NOTES 10/14/25: 1). Multiple Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) Spray painted orange. 2). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements.
TIE BEAM / LINTEL 10/14/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 10/14/2025 1:15:44 PM *** 10/14/25: 1). Multiple Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) Spray painted orange. 2). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 NOTE: Trusses have been delivered and placed directly on soil. May require cleaning and/or Engineer's letter since they do not meet the Manufacturer's delivery and staging requirements.
MONOLITHIC SLAB 10/01/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 10/1/2025 11:39:32 AM *** *** NOTES ADDED BY RSIMS 9/25/2025 9:42:53 AM *** 9/25/25: Must be resolved before any additional inspections will be approved. 1). Silt fence needs to be fixed immedietly to protect neighboring properties along with canal in the back. FBC 3307.1 2). Portable toilet needs to be moved out of swale and onto site to allow free flow of water through the swale. FBC 3303.5
PLUMBING 1ST ROUGH UNDERGROUND 09/25/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/25/2025 9:42:53 AM *** 9/25/25: Must be resolved before any additional inspections will be approved. 1). Silt fence needs to be fixed immedietly to protect neighboring properties along with canal in the back. FBC 3307.1 2). Portable toilet needs to be moved out of swale and onto site to allow free flow of water through the swale. FBC 3303.5
FORMBOARD SURVEY (OFFICE USE ONLY) 09/24/2025 APPROVED AMOBLEY
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 09/24/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 08/29/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 11/13/2025 11/19/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 09/24/2025 09/24/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 09/24/2025 09/24/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 09/23/2025 09/24/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SWALE COMPLETE 03/12/2025 03/31/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 03/11/2025 03/18/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 03/11/2025 03/18/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 03/11/2025 03/12/2025
Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM
ELEC COMPLETE 03/11/2025 03/12/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/11/2025 03/12/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 03/11/2025 03/13/2025
LOCATE COMPLETE 03/11/2025 03/17/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 03/11/2025 03/13/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/11/2025 03/18/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/11/2025 03/13/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 02/05/2026
REINSPECTION RESIDENTIAL ¤40.00 02/05/2026
REINSPECTION RESIDENTIAL ¤40.00 02/05/2026
RSI REINSPECTION 1 ¤35.00 02/05/2026
RSI REINSPECTION 1 ¤35.00 02/05/2026
RSI REINSPECTION 1 ¤35.00 02/05/2026
RSI REINSPECTION 1 ¤35.00 02/05/2026
RSI REINSPECTION 2 ¤75.00 02/05/2026
UTILITY PEP REINSPECTION ¤40.00 02/05/2026
SEWER CREDIT (¤650.00) 08/07/2025
SEWER INSPECTION ¤25.00 08/07/2025
SEWER CAPITAL FACILITY ¤6,120.52 08/07/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 08/07/2025
SITE PLAN 30 ¤30.00 08/07/2025
WATER- TURN ON ¤25.00 08/07/2025
ADJUSTMENT 10% (¤120.55) 08/07/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/07/2025
INSPECTION - RESIDENTIAL ¤915.75 08/07/2025
PLAN REVIEW - RESIDENTIAL ¤259.74 08/07/2025
SURCHARGE FS 533.721 ¤10.85 08/07/2025
SURCHARGE - FS 468.631 ¤16.28 08/07/2025
SW ENG - FOUNDATION SURVEY ¤20.00 08/07/2025
SW ENG INSPECTION 80 ¤80.00 08/07/2025
SW ENG PRE APRON ¤30.00 08/07/2025
SW ENG - REVIEW 20 ¤20.00 08/07/2025
SW ENG RES REVIEW 200 ¤200.00 08/07/2025
CONNECTION FEES ¤1,187.26 08/07/2025
FC IMPACT FEE EMS ¤62.00 08/07/2025
IMPACT FEE FIRE ¤434.51 08/07/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/07/2025
FC IMPACT FEE LIBRARY ¤268.00 08/07/2025
IMPACT FEE PARKS ¤1,828.01 08/07/2025
IMPACT FEE SCHOOL ¤5,450.00 08/07/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 08/07/2025
WATER -IRRIGATION INSPECTION ¤25.00 08/07/2025
Fees Total Due: ¤0.00 Total Paid: ¤23,127.51