Permit #2025030422
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00490-0190 |
| CONDITIONED SPACE: 1654 sqft |
| GARAGE: 396 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2162 sqft |
| Block: 00490 |
| Subdivision: 7026 - |
| Job Phone: 407-476-8195 |
| Location Address: 37 PIERCE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/07/2025 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: INB BFS LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
|
Address SUITE 220 ORLANDO, FL 32803 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤165,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/29/2026 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/29/2026 11:01:21 AM *** 1/27/2026 - PREVIOUS INSPECTION NOTES Please fix item before next inspection #1-NEC 408.4-LABEL ALL BREAKER IN PANEL Breaker #7 is mark Garage door and control wall outlets Breaker #18 have not mark and control garage door Please double check breakers make sure they mark as required | |||
| BLD - BUILDING FINAL | 01/27/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: *** NOTES ADDED BY CVANSTRAHLEN 1/27/2026 10:48:28 AM *** #2-Please seal exterior wall , low voltage wire opening on wall by exterior maeter base #3-FBCR M1305.1.4.1-AC NEEDS 3' CLEARANCE FROM GROUND Please fix item before next inspection #1-NEC 408.4-LABEL ALL BREAKER IN PANEL Breaker #7 is mark Garage door and control wall outlets Breaker #18 have not mark and control garage door Please double check breakers make sure they mark as required | |||
| ROW - FINAL APRON (AFTER POUR) | 01/21/2026 | APPROVED | FSLADISH |
| Note: 1/21/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 01/21/2026 | APPROVED | FSLADISH |
| Note: 1/21/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/21/2026 | FINAL APPROVED | BHAINES |
| Note: Inspector Notes from Inspection 9035 No CC, No IRR. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/20/2026 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/20/2026 | APPROVED | FSLADISH |
| Note: 1/20/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U-CROSS CONNECTION | 01/20/2026 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, No IRR. | |||
| DRYWALL NAILING | 12/30/2025 | CANCELLED BY INSPECTOR | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/30/2025 8:34:57 AM *** 12/29/25: This inspection was added in error as it was meant for a different location of a duplex. This inspection added for Fire Drywall nailing. Must be complete prior to finishing any drywall. If screws are used for installation of the 5/8" type X drywall throughout both units, the spacing much match the OC spacing for nails as required by UL requirements. Also, 5/8" type X drywall installed at exterior locations such as the lanai areas and front entry areas must be moisture rated & fire rated type. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/26/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 12-26-25 TPOLACEK*** PLEASE MAKE SURE TO DIG OUT FOOTERS TO 6"X6" BEFORE POURING CONCRETE AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. | |||
| ELECTRIC - EARLY POWER | 12/17/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/17/2025 1:29:52 PM *** 12/17/25: FPL emailed to release power. Inspector Notes from Inspection 2200 *** NOTES ADDED BY RSIMS 11/3/2025 11:51:19 AM *** 11/3/25: FPL emailed approved for TUG. | |||
| GRAVITY SEWER TEST | 12/04/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 fbc-3303.5 swale blocked | |||
| SEWER TIE IN | 12/04/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 fbc-3303.5 swale blocked | |||
| PEP TANK INSTALLATION REQUEST | 11/18/2025 | APPROVED | CBOWERMASTER |
| INSULATION | 11/18/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/18/2025 9:27:29 AM *** Drywall Nailing Inspection added to permit to inspect anchoring of 5/8" type X drywall as required. *** NOTES ADDED BY RSIMS 11/18/2025 9:05:56 AM *** 11/14/2025 - PREVIOUS INSPECTION NOTES 11/14/25: Cancelled by Applicant via phone call at @ 1300. 11/12/2025 - PREVIOUS INSPECTION NOTES 11/12/25: PREVIOUSLY LISTED ITEMS 2 AND 4 REMAIN UNRESOLVED. PLEASE COMPLETE ALL ITEMS BEFORE SCHEDULING RE-INSPECTION. ALSO, CARDBOARD BAFFLES NEED TO BE RE-CHECKED. 11/7/2025 - PREVIOUS INSPECTION NOTES 11/7/25: Previously noted items 2, 3 and 4 remain unresolved. ALSO, SEE PREVIOUS NOTE PERTAINING TO CARDBOARD BAFFLES. 2). Bathroom exhaust fans are missing the 2nd (mechanical) point of contact. (plastic strap or hose clamp). as required. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1 3). No 5ft. head pressure. FBC-P2503.5.1 4). Master bathroom exhaust fan pipe needs to be sealed fully at the roof deck. FBCR M1601.4.1 *** NOTE: CARDBOARD BAFFLES INSTALLED PRIOR TO THIS INSPECTION > NEED TO HAVE 1" CLEARANCE FROM ROOF DECK AS REQUIRED. FBC-R806.3 5). Numerous cardboard baffles do not have the 1" clearance required. FBC-R806.3 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 11/3/2025 12:03:14 PM *** 11/3/25: 1). No energy calcs or FPA document in permit box or on site. FBC [A]107.3.1 2). Bathroom exhaust fans are missing the 2nd (mechanical) point of contact. (plastic strap or hose clamp). as required. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1 3). No 5ft. head pressure. FBC-P2503.5.1 4). Master bathroom exhaust fan pipe needs to be sealed fully at the roof deck. FBCR M1601.4.1 *** NOTE: CARDBOARD BAFFLES INSTALLED PRIOR TO THIS INSPECTION > NEED TO HAVE 1" CLEARANCE FROM ROOF DECK AS REQUIRED. FBC-R806.3 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 10/22/2025 11:32:39 AM *** 10/22/25: Silt fence still needs to be repaired but now in multiple areas. This will need to be complete prior to any further inspection approvals. Inspector Notes from Inspection 2460 10/21/25: 1). Please have silt fence on the Pierce lane side repaired and keep it maintained. 'FBC 3307.1 | |||
| INSULATION | 11/14/2025 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/14/2025 1:02:08 PM *** 11/14/25: Cancelled by Applicant via phone call at @ 1300. 11/12/2025 - PREVIOUS INSPECTION NOTES 11/12/25: PREVIOUSLY LISTED ITEMS 2 AND 4 REMAIN UNRESOLVED. PLEASE COMPLETE ALL ITEMS BEFORE SCHEDULING RE-INSPECTION. ALSO, CARDBOARD BAFFLES NEED TO BE RE-CHECKED. 11/7/2025 - PREVIOUS INSPECTION NOTES 11/7/25: Previously noted items 2, 3 and 4 remain unresolved. ALSO, SEE PREVIOUS NOTE PERTAINING TO CARDBOARD BAFFLES. 2). Bathroom exhaust fans are missing the 2nd (mechanical) point of contact. (plastic strap or hose clamp). as required. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1 3). No 5ft. head pressure. FBC-P2503.5.1 4). Master bathroom exhaust fan pipe needs to be sealed fully at the roof deck. FBCR M1601.4.1 *** NOTE: CARDBOARD BAFFLES INSTALLED PRIOR TO THIS INSPECTION > NEED TO HAVE 1" CLEARANCE FROM ROOF DECK AS REQUIRED. FBC-R806.3 5). Numerous cardboard baffles do not have the 1" clearance required. FBC-R806.3 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 11/3/2025 12:03:14 PM *** 11/3/25: 1). No energy calcs or FPA document in permit box or on site. FBC [A]107.3.1 2). Bathroom exhaust fans are missing the 2nd (mechanical) point of contact. (plastic strap or hose clamp). as required. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1 3). No 5ft. head pressure. FBC-P2503.5.1 4). Master bathroom exhaust fan pipe needs to be sealed fully at the roof deck. FBCR M1601.4.1 *** NOTE: CARDBOARD BAFFLES INSTALLED PRIOR TO THIS INSPECTION > NEED TO HAVE 1" CLEARANCE FROM ROOF DECK AS REQUIRED. FBC-R806.3 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 10/22/2025 11:32:39 AM *** 10/22/25: Silt fence still needs to be repaired but now in multiple areas. This will need to be complete prior to any further inspection approvals. Inspector Notes from Inspection 2460 10/21/25: 1). Please have silt fence on the Pierce lane side repaired and keep it maintained. 'FBC 3307.1 | |||
| LATH/BRICK/ WATER BARRIER | 11/13/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/13/2025 2:08:13 PM *** 11/12/2025 - PREVIOUS INSPECTION NOTES 11/12/25: 1). Left side of the house has holes in CMU that require lath. FBC [A]107.4 | |||
| INSULATION | 11/12/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/12/2025 1:43:22 PM *** 11/12/25: PREVIOUSLY LISTED ITEMS 2 AND 4 REMAIN UNRESOLVED. PLEASE COMPLETE ALL ITEMS BEFORE SCHEDULING RE-INSPECTION. ALSO, CARDBOARD BAFFLES NEED TO BE RE-CHECKED. 11/7/2025 - PREVIOUS INSPECTION NOTES 11/7/25: Previously noted items 2, 3 and 4 remain unresolved. ALSO, SEE PREVIOUS NOTE PERTAINING TO CARDBOARD BAFFLES. 2). Bathroom exhaust fans are missing the 2nd (mechanical) point of contact. (plastic strap or hose clamp). as required. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1 3). No 5ft. head pressure. FBC-P2503.5.1 4). Master bathroom exhaust fan pipe needs to be sealed fully at the roof deck. FBCR M1601.4.1 *** NOTE: CARDBOARD BAFFLES INSTALLED PRIOR TO THIS INSPECTION > NEED TO HAVE 1" CLEARANCE FROM ROOF DECK AS REQUIRED. FBC-R806.3 5). Numerous cardboard baffles do not have the 1" clearance required. FBC-R806.3 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 11/3/2025 12:03:14 PM *** 11/3/25: 1). No energy calcs or FPA document in permit box or on site. FBC [A]107.3.1 2). Bathroom exhaust fans are missing the 2nd (mechanical) point of contact. (plastic strap or hose clamp). as required. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1 3). No 5ft. head pressure. FBC-P2503.5.1 4). Master bathroom exhaust fan pipe needs to be sealed fully at the roof deck. FBCR M1601.4.1 *** NOTE: CARDBOARD BAFFLES INSTALLED PRIOR TO THIS INSPECTION > NEED TO HAVE 1" CLEARANCE FROM ROOF DECK AS REQUIRED. FBC-R806.3 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 10/22/2025 11:32:39 AM *** 10/22/25: Silt fence still needs to be repaired but now in multiple areas. This will need to be complete prior to any further inspection approvals. Inspector Notes from Inspection 2460 10/21/25: 1). Please have silt fence on the Pierce lane side repaired and keep it maintained. 'FBC 3307.1 | |||
| LATH/BRICK/ WATER BARRIER | 11/12/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/12/2025 1:44:17 PM *** 11/12/25: 1). Left side of the house has holes in CMU that require lath. FBC [A]107.4 | |||
| INSULATION | 11/07/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/7/2025 11:49:36 AM *** 11/7/25: Previously noted items 2, 3 and 4 remain unresolved. ALSO, SEE PREVIOUS NOTE PERTAINING TO CARDBOARD BAFFLES. 2). Bathroom exhaust fans are missing the 2nd (mechanical) point of contact. (plastic strap or hose clamp). as required. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1 3). No 5ft. head pressure. FBC-P2503.5.1 4). Master bathroom exhaust fan pipe needs to be sealed fully at the roof deck. FBCR M1601.4.1 *** NOTE: CARDBOARD BAFFLES INSTALLED PRIOR TO THIS INSPECTION > NEED TO HAVE 1" CLEARANCE FROM ROOF DECK AS REQUIRED. FBC-R806.3 5). Numerous cardboard baffles do not have the 1" clearance required. FBC-R806.3 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 11/3/2025 12:03:14 PM *** 11/3/25: 1). No energy calcs or FPA document in permit box or on site. FBC [A]107.3.1 2). Bathroom exhaust fans are missing the 2nd (mechanical) point of contact. (plastic strap or hose clamp). as required. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1 3). No 5ft. head pressure. FBC-P2503.5.1 4). Master bathroom exhaust fan pipe needs to be sealed fully at the roof deck. FBCR M1601.4.1 *** NOTE: CARDBOARD BAFFLES INSTALLED PRIOR TO THIS INSPECTION > NEED TO HAVE 1" CLEARANCE FROM ROOF DECK AS REQUIRED. FBC-R806.3 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 10/22/2025 11:32:39 AM *** 10/22/25: Silt fence still needs to be repaired but now in multiple areas. This will need to be complete prior to any further inspection approvals. Inspector Notes from Inspection 2460 10/21/25: 1). Please have silt fence on the Pierce lane side repaired and keep it maintained. 'FBC 3307.1 | |||
| ALL ROUGH | 11/03/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/3/2025 12:03:14 PM *** 11/3/25: 1). No energy calcs or FPA document in permit box or on site. FBC [A]107.3.1 2). Bathroom exhaust fans are missing the 2nd (mechanical) point of contact. (plastic strap or hose clamp). as required. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1 3). No 5ft. head pressure. FBC-P2503.5.1 4). Master bathroom exhaust fan pipe needs to be sealed fully at the roof deck. FBCR M1601.4.1 *** NOTE: CARDBOARD BAFFLES INSTALLED PRIOR TO THIS INSPECTION > NEED TO HAVE 1" CLEARANCE FROM ROOF DECK AS REQUIRED. FBC-R806.3 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 10/22/2025 11:32:39 AM *** 10/22/25: Silt fence still needs to be repaired but now in multiple areas. This will need to be complete prior to any further inspection approvals. Inspector Notes from Inspection 2460 10/21/25: 1). Please have silt fence on the Pierce lane side repaired and keep it maintained. 'FBC 3307.1 | |||
| ELECTRIC-TUG | 11/03/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/3/2025 11:51:19 AM *** 11/3/25: FPL emailed approved for TUG. | |||
| ROOF VALLEY & METAL | 10/22/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 10/22/2025 11:32:39 AM *** 10/22/25: Silt fence still needs to be repaired but now in multiple areas. This will need to be complete prior to any further inspection approvals. Inspector Notes from Inspection 2460 10/21/25: 1). Please have silt fence on the Pierce lane side repaired and keep it maintained. 'FBC 3307.1 | |||
| WALL SHEATHING | 10/21/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 10/21/2025 10:06:22 AM *** | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/21/2025 | APPROVED - AS NOTED | RSIMS |
| Note: 10/21/25: 1). Please have silt fence on the Pierce lane side repaired and keep it maintained. 'FBC 3307.1 | |||
| TIE BEAM / LINTEL | 10/09/2025 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/1/2025 12:49:15 PM *** At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and in accordance with FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. | |||
| MONOLITHIC SLAB | 10/01/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 10/1/2025 12:49:15 PM *** At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and in accordance with FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 09/24/2025 | APPROVED | AMOBLEY |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/22/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: fbc-3303.5 swale blocked | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 09/09/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 08/21/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/24/2025 | 09/24/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/24/2025 | 09/24/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/09/2025 | 09/09/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/20/2025 | 03/20/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/12/2025 | 03/31/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/11/2025 | 03/18/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/11/2025 | 03/18/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/11/2025 | 03/12/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/11/2025 | 03/12/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/11/2025 | 03/12/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/11/2025 | 03/13/2025 |
| LOCATE | COMPLETE | 03/11/2025 | 03/17/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/11/2025 | 03/13/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/11/2025 | 03/18/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Missing proposed elevation on front right property line. This elevation should be equal to or higher than EP. | |||
| ZON | COMPLETE | 03/11/2025 | 03/13/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/28/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/19/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/19/2026 |
| WATER- TURN ON | ¤25.00 | 08/07/2025 |
| ADJUSTMENT 10% | (¤112.43) | 08/07/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/07/2025 |
| INSPECTION - RESIDENTIAL | ¤852.50 | 08/07/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤241.80 | 08/07/2025 |
| CONNECTION FEES | ¤1,187.26 | 08/07/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 08/07/2025 |
| IMPACT FEE FIRE | ¤434.51 | 08/07/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/07/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/07/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 08/07/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/07/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 08/07/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/07/2025 |
| SURCHARGE FS 533.721 | ¤10.12 | 08/07/2025 |
| SURCHARGE - FS 468.631 | ¤15.18 | 08/07/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/07/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/07/2025 |
| SW ENG PRE APRON | ¤30.00 | 08/07/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/07/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/07/2025 |
| SEWER CREDIT | (¤2,465.75) | 08/07/2025 |
| SEWER INSPECTION | ¤25.00 | 08/07/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 08/07/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 08/07/2025 |
| SITE PLAN 30 | ¤30.00 | 08/07/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,981.86 |