Permit #2025030438

Permit Details

Status: COED

Parcel Id: 07-11-31-7027-00570-0340
CONDITIONED SPACE: 2870 sqft
GARAGE: 894 sqft
SCREEN PORCH (SOLID ROOF) : 192 sqft
OPENED PORCH (WITH ROOF) : 154 sqft
Total Square Footage: 4110 sqft
Block: 00570
Subdivision: 7027 -
Job Phone: 530-308-7323
Location Address: 8 WOOD ACRE LN
Type: DU - DUPLEX
Issue Date: 03/28/2025
NOC: RECORDED
Applicant name: DONALD CABRAL
Owner: ENDURANCE PROPERTY HOLDING LLC

Address

PO BOX 121

EAST SCHODACK, NY 12063

Lot: 0340
Contracted Stated Job Value: ¤500,000.00
Job Description: Duplex
Type: CN

Contractor

DC CONSTRUCTION PALM COAST LLC
Status Location Address State License Number
ACTIVE

109 UNIVERSAL TRAIL

,

CGC1531039 (Exp: 08/31/2026)

Sub Contractors

SCOTT R WOODARD
Status Location Address State License Number Phone
ACTIVE

51 PINEAPPLE DRIVE

PALM COAST, FL 32164

ES12000383 (Exp: 08/31/2026) 386-264-4964
ROBERT EDWIN BERRONG
Status Location Address State License Number Phone
ACTIVE

800 BELLE TERRE PKWY STE 200-114

FLAGLER BEACH, FL 32136

CCC1336183 (Exp: 08/31/2026) 386-266-9879
DENNIS BRAXTON BRAGG
Status Location Address State License Number Phone
ACTIVE

363 FIR STREET

ORMOND BEACH, FL 32174

CFC1433357 (Exp: 08/31/2026) 386-882-7971
JUAN EUGENIO CAMPELO
Status Location Address State License Number Phone Fax
INACTIVE

114 ALLGOOD CIRCLE SUITE #101

ST AUGUSTINE, FL 32086

CAC1813797 (Exp: 08/31/2026) 904-824-4275 904-824-4614

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 11/14/2025 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 8/15/2025 - PREVIOUS INSPECTION NOTES see note on #6 IRR WITH POTABLE WATER METER.
ROW - FINAL INSPECTION 11/13/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL APRON (AFTER POUR) 11/13/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/13/2025 APPROVED TPOLACEK
Note: 11/10/2025 - PREVIOUS INSPECTION NOTES 11-10-25 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE RUNS FLAT. DRAINAGE IS REQUIRED TO HAVE A MINIMM OF .10 FALL EVERY 20' Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17
ROW FIELD SURVEY /GRADING CERTIFICATION 11/13/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
BLD - BUILDING FINAL 11/13/2025 FINAL APPROVED MKRASKI
BLD - BUILDING FINAL 11/10/2025 CANCELLED BY APPLICANT MKRASKI
Note: 11/3/2025 - PREVIOUS INSPECTION NOTES
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/10/2025 Disapproved - NO FEE TPOLACEK
Note: 11-10-25 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE RUNS FLAT. DRAINAGE IS REQUIRED TO HAVE A MINIMM OF .10 FALL EVERY 20' Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17
U-CROSS CONNECTION 11/03/2025 APPROVED - AS NOTED BWRIGHT
Note: 8/15/2025 - PREVIOUS INSPECTION NOTES see note on #6 IRR WITH POTABLE WATER METER.
BLD - BUILDING FINAL 11/03/2025 CANCELLED BY APPLICANT MKRASKI
ROW- PRE-APRON (PRE-POUR) 09/16/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 9/15/2025 - PREVIOUS INSPECTION NOTES SPOKE WITH CM DRIVEWAY NEEDS ANOTHER DAY TO DRY OUT. WILL CANCEL TILL TOMORROW.
ROW- PRE-APRON (PRE-POUR) 09/15/2025 CANCELLED BY APPLICANT TPOLACEK
Note: SPOKE WITH CM DRIVEWAY NEEDS ANOTHER DAY TO DRY OUT. WILL CANCEL TILL TOMORROW.
ELECTRIC - EARLY POWER 09/03/2025 APPROVED JSTEWART
Note: Inspector Notes from Inspection 2170 Emailed FPL @ 2:45pm
ROW - DRAINAGE 09/02/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 8/25/2025 - PREVIOUS INSPECTION NOTES 08/25/25/ TPOLACEK*** BUILDER IS GOING TO BE FORMING DRIVEWAY AND FINAL GRADE THIS WEEK. I WILL GIVE BUILDER AN ADDITIONAL WEEK TO GET GRADING DONE. 8/18/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
ROW - DRAINAGE 08/25/2025 Disapproved - NO FEE TPOLACEK
Note: 08/25/25/ TPOLACEK*** BUILDER IS GOING TO BE FORMING DRIVEWAY AND FINAL GRADE THIS WEEK. I WILL GIVE BUILDER AN ADDITIONAL WEEK TO GET GRADING DONE. 8/18/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
ROW - DRAINAGE 08/18/2025 Disapproved - NO FEE TPOLACEK
Note: TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
GRAVITY SEWER TEST 08/15/2025 APPROVED MGIBSON
SEWER TIE IN 08/15/2025 APPROVED MGIBSON
U-CROSS CONNECTION 08/15/2025 CANCELLED BY APPLICANT LFITZGERALD
Note: see note on #6
FIREWALL FINAL 08/01/2025 APPROVED MKRASKI
INSULATION 07/29/2025 APPROVED MKRASKI
Note:
LATH/BRICK/ WATER BARRIER 07/29/2025 APPROVED MKRASKI
Note:
ELECTRIC TEMP POLE 07/23/2025 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 2:45pm
ELECTRIC - EARLY POWER 07/22/2025 CANCELLED BY APPLICANT MKRASKI
Note: Via phone call from super
ALL ROUGH 07/22/2025 APPROVED - AS NOTED MKRASKI
Note: 1. Dryer duct requires proper nail plates at top plate FBCR M1308.2 2. Electrical wiring needs ro be properly phased in panel NEC 210.5(C)(1) 3. A/c registers require seals FBC EC R402.4.1.1 4. Damagaed supply duct on left side unit FBC M1301.3 Check at insulation
FIREWALL FRAMING 07/18/2025 APPROVED - AS NOTED MKRASKI
Note: Must seal penitrations for SER and low voltage, check at insulation
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/18/2025 APPROVED - AS NOTED MKRASKI
Note: Must seal penitrations for SER and low voltage, check at insulation
ELECTRIC - EARLY POWER 07/02/2025 CANCELLED BY APPLICANT MKRASKI
Note: Via phone call from super
ROOF VALLEY & METAL 07/01/2025 Disapproved - NO FEE JSTEWART
Note: Roof sheathing/ties inspection required approval prior to Roof Valley metal. NOTE TO BUILDER: Shingles are being installed at visit. 6/30/2025 - PREVIOUS INSPECTION NOTES
ROOF VALLEY & METAL 07/01/2025 APPROVED JSTEWART
Note: 7/1/2025 - PREVIOUS INSPECTION NOTES Roof sheathing/ties inspection required approval prior to Roof Valley metal. NOTE TO BUILDER: Shingles are being installed at visit. 6/30/2025 - PREVIOUS INSPECTION NOTES
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/01/2025 CANCELLED BY APPLICANT JSTEWART
Note: 6/30/2025 - PREVIOUS INSPECTION NOTES 1. Front entry pony wall not per detail FBC (A)107.4 2. Ferring strips are not cont. from top to bottom for fire blocking FBC-302.11/FBC 302.11.1 3. Truss A02 missing 8 10d nails in truss strap FBC (A)107.4 (right side) 4. 2x4 kitchen wall is installed over ferring strips, must be framed to cmu wall 5. Off ridge vents have not been framed per plans FBC (A)107.4 6. Clean all truss's off of debris per MiTek packet FBC (A)107.4 7. Truss B01 missing 2nd wet set strap per MiTek packet FBC (A)107.4 (left side) 8. Truss A12 missing engineering both units
ROOF VALLEY & METAL 06/30/2025 CANCELLED BY APPLICANT MKRASKI
FIREWALL DRYWALL NAILING 06/30/2025 APPROVED MKRASKI
Note: Draft stop approved
WALL SHEATHING 06/30/2025 APPROVED MKRASKI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/30/2025 Disapproved -FEE REQUIRED MKRASKI
Note: 1. Front entry pony wall not per detail FBC (A)107.4 2. Ferring strips are not cont. from top to bottom for fire blocking FBC-302.11/FBC 302.11.1 3. Truss A02 missing 8 10d nails in truss strap FBC (A)107.4 (right side) 4. 2x4 kitchen wall is installed over ferring strips, must be framed to cmu wall 5. Off ridge vents have not been framed per plans FBC (A)107.4 6. Clean all truss's off of debris per MiTek packet FBC (A)107.4 7. Truss B01 missing 2nd wet set strap per MiTek packet FBC (A)107.4 (left side) 8. Truss A12 missing engineering both units
FIREWALL FRAMING 06/30/2025 Disapproved - NO FEE MKRASKI
Note: 1. 2x4 kitchen wall is installed over ferring strips, must be framed to cmu wall
LATH/BRICK/ WATER BARRIER 06/30/2025 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 05/28/2025 APPROVED MKRASKI
TIE BEAM / LINTEL 05/27/2025 Disapproved - NO FEE MKRASKI
Note: 1. Please have a full set of plans on site with Building Dept. stamp of approval for inspector, No lintel plan in box. FBC 107.3.1
MONOLITHIC SLAB 05/12/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 5/12/25 1. Watch out for any wash in with the rain before pouring concrete
PLUMBING 1ST ROUGH UNDERGROUND 05/08/2025 APPROVED MGIBSON
FORMBOARD SURVEY (OFFICE USE ONLY) 04/30/2025 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 04/22/2025 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 04/11/2025 APPROVED CBOWERMASTER
WATER METER INSTALLATION REQUEST 04/01/2025 CANCELLED BY APPLICANT WEB

Review History

Department Status Date In Date Out
MECH COMPLETE 11/07/2025 11/10/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 08/04/2025 08/04/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 07/30/2025 07/30/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Mechanical subcontractor certification is inactive. Please correct
MECH COMPLETE 07/16/2025 07/17/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 07/02/2025 07/09/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/30/2025 04/30/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/30/2025 04/30/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 04/22/2025 04/22/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 03/28/2025 03/28/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
BLD HOLD 03/28/2025 03/28/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech report has wrong address. 2nd Request
BLD COMPLETE 03/28/2025 03/28/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN COMPLETE 03/28/2025 03/28/2025
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/28/2025 03/28/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/28/2025 03/28/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC COMPLETE 03/24/2025 03/26/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 03/24/2025 03/26/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 03/24/2025 03/24/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BADMIN HOLD 03/24/2025 03/28/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Lien law missing. 2nd request
BLD HOLD 03/24/2025 03/26/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech report has wrong address.
SW1 COMPLETE 03/24/2025 03/24/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ENGIN1 HOLD 03/24/2025 03/24/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Wrong site plan uploaded. Note: When revising site plan for this property please ensure that the proposed common swale between lot 33 (12 Wood Acre - Same Builder) and this lot agree to prevent any holds.
SW1 HOLD 03/24/2025 03/24/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Wrong site plan uploaded. Note: When revising site plan for this property please ensure that the proposed common swale between lot 33 (12 Wood Acre - Same Builder) and this lot agree to prevent any holds.
SW1 HOLD 03/24/2025 03/25/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Previous comments not addressed: Note: When revising site plan for this property please ensure that the proposed common swale between lot 33 (12 Wood Acre - Same Builder) and this lot agree to prevent any holds. New Comments: 12 Wood Acre (lot 33) was approved prior to this lot(34). The proposed common swale for this lot needs to come down 0.1' on the entire left side to agree with lot 33 that was recently approved.
ENGIN1 COMPLETE 03/24/2025 03/25/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 03/24/2025 03/24/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD HOLD 03/17/2025 03/17/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM DISREGARD PREVIOUS NOTES. REVIEW WAS NOT COMPLETE. ACTUAL REVIEW BELOW: 1.Geotech report is not digitally verifiable. 2.Plans need to have allowable soil bearing pressure note. 3. Plans need code criteria.
SWALE COMPLETE 03/12/2025 03/24/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN HOLD 03/11/2025 03/17/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech not digitally verifiable.
BLD HOLD 03/11/2025 03/17/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1.Geotech report is not digitally verifiable. 2.Plans need to have allowable soil bearing pressure note.
CUSVC COMPLETE 03/11/2025 03/12/2025
Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM
ELEC HOLD 03/11/2025 03/12/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Bed 2 Needs correct outlet spacing NEC 2020 210.52 2. Dryer and Range need to be GFCI protected. NEC 2020 210.8
ENGIN1 COMPLETE 03/11/2025 03/12/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 03/11/2025 03/13/2025
LOCATE COMPLETE 03/11/2025 03/13/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 03/11/2025 03/13/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on heatload needs to be daytona Beach 2. Energy Calcs and State Card need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition 3. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition
SW1 HOLD 03/11/2025 03/19/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM No site benchmark
ZON HOLD 03/11/2025 03/13/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM COLOR SHEET: color for garage does not meet the pastel LRV of 80%
BADMIN HOLD 03/11/2025 03/11/2025
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Lien law missing.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 11/24/2025
SW ENG - INSPECTION 20 ¤20.00 09/14/2025
SW ENG - INSPECTION 20 ¤20.00 09/14/2025
SW ENG - INSPECTION 20 ¤20.00 09/14/2025
REINSPECTION RESIDENTIAL ¤40.00 07/08/2025
CONNECTION FEES ¤2,374.52 03/28/2025
FC IMPACT FEE EMS ¤124.00 03/28/2025
IMPACT FEE FIRE ¤869.02 03/28/2025
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 03/28/2025
FC IMPACT FEE LIBRARY ¤536.00 03/28/2025
IMPACT FEE PARKS ¤3,656.02 03/28/2025
IMPACT FEE SCHOOL ¤10,900.00 03/28/2025
IMPACT FEE TRANSPORTATION ¤2,974.00 03/28/2025
WATER -IRRIGATION INSPECTION ¤50.00 03/28/2025
SURCHARGE FS 533.721 ¤18.09 03/28/2025
SURCHARGE - FS 468.631 ¤27.14 03/28/2025
SW ENG - FOUNDATION SURVEY ¤20.00 03/28/2025
SW ENG INSPECTION 80 ¤80.00 03/28/2025
SW ENG PRE APRON ¤30.00 03/28/2025
SW ENG - REVIEW 20 ¤20.00 03/28/2025
SW ENG RES REVIEW 200 ¤200.00 03/28/2025
SEWER CREDIT (¤2,016.00) 03/28/2025
SEWER INSPECTION ¤25.00 03/28/2025
SEWER CAPITAL FACILITY ¤12,241.04 03/28/2025
WATER CAPITAL FACILITY FEE ¤8,702.28 03/28/2025
SITE PLAN 30 ¤30.00 03/28/2025
WATER- TURN ON ¤50.00 03/28/2025
ADJUSTMENT 10% (¤201.03) 03/28/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/28/2025
INSPECTION - RESIDENTIAL ¤1,542.75 03/28/2025
PLAN REVIEW - RESIDENTIAL ¤437.58 03/28/2025
Fees Total Due: ¤0.00 Total Paid: ¤43,288.91