I want to search for...
Permit #2025030438
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00570-0340 |
| CONDITIONED SPACE: 2870 sqft |
| GARAGE: 894 sqft |
| SCREEN PORCH (SOLID ROOF) : 192 sqft |
| OPENED PORCH (WITH ROOF) : 154 sqft |
| Total Square Footage: 4110 sqft |
| Block: 00570 |
| Subdivision: 7027 - |
| Job Phone: 530-308-7323 |
| Location Address: 8 WOOD ACRE LN |
| Type: DU - DUPLEX |
| Issue Date: 03/28/2025 |
| NOC: RECORDED |
| Applicant name: DONALD CABRAL |
| Owner: ENDURANCE PROPERTY HOLDING LLC |
|
Address PO BOX 121 EAST SCHODACK, NY 12063 |
| Lot: 0340 |
| Contracted Stated Job Value: ¤500,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
DC CONSTRUCTION PALM COAST LLC
| Status | Location Address | State License Number |
| ACTIVE |
109 UNIVERSAL TRAIL , |
CGC1531039 (Exp: 08/31/2026) |
Sub Contractors
SCOTT R WOODARD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
51 PINEAPPLE DRIVE PALM COAST, FL 32164 |
ES12000383 (Exp: 08/31/2026) | 386-264-4964 |
ROBERT EDWIN BERRONG
| Status | Location Address | State License Number | Phone |
| ACTIVE |
800 BELLE TERRE PKWY STE 200-114 FLAGLER BEACH, FL 32136 |
CCC1336183 (Exp: 08/31/2026) | 386-266-9879 |
DENNIS BRAXTON BRAGG
| Status | Location Address | State License Number | Phone |
| ACTIVE |
363 FIR STREET ORMOND BEACH, FL 32174 |
CFC1433357 (Exp: 08/31/2026) | 386-882-7971 |
JUAN EUGENIO CAMPELO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
114 ALLGOOD CIRCLE SUITE #101 ST AUGUSTINE, FL 32086 |
CAC1813797 (Exp: 08/31/2026) | 904-824-4275 | 904-824-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 11/14/2025 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 8/15/2025 - PREVIOUS INSPECTION NOTES see note on #6 IRR WITH POTABLE WATER METER. | |||
| ROW - FINAL INSPECTION | 11/13/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 11/13/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/13/2025 | APPROVED | TPOLACEK |
| Note: 11/10/2025 - PREVIOUS INSPECTION NOTES 11-10-25 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE RUNS FLAT. DRAINAGE IS REQUIRED TO HAVE A MINIMM OF .10 FALL EVERY 20' Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/13/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| BLD - BUILDING FINAL | 11/13/2025 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 11/10/2025 | CANCELLED BY APPLICANT | MKRASKI |
| Note: 11/3/2025 - PREVIOUS INSPECTION NOTES | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/10/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 11-10-25 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE RUNS FLAT. DRAINAGE IS REQUIRED TO HAVE A MINIMM OF .10 FALL EVERY 20' Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 | |||
| U-CROSS CONNECTION | 11/03/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: 8/15/2025 - PREVIOUS INSPECTION NOTES see note on #6 IRR WITH POTABLE WATER METER. | |||
| BLD - BUILDING FINAL | 11/03/2025 | CANCELLED BY APPLICANT | MKRASKI |
| ROW- PRE-APRON (PRE-POUR) | 09/16/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 9/15/2025 - PREVIOUS INSPECTION NOTES SPOKE WITH CM DRIVEWAY NEEDS ANOTHER DAY TO DRY OUT. WILL CANCEL TILL TOMORROW. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/15/2025 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: SPOKE WITH CM DRIVEWAY NEEDS ANOTHER DAY TO DRY OUT. WILL CANCEL TILL TOMORROW. | |||
| ELECTRIC - EARLY POWER | 09/03/2025 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2170 Emailed FPL @ 2:45pm | |||
| ROW - DRAINAGE | 09/02/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 8/25/2025 - PREVIOUS INSPECTION NOTES 08/25/25/ TPOLACEK*** BUILDER IS GOING TO BE FORMING DRIVEWAY AND FINAL GRADE THIS WEEK. I WILL GIVE BUILDER AN ADDITIONAL WEEK TO GET GRADING DONE. 8/18/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 08/25/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 08/25/25/ TPOLACEK*** BUILDER IS GOING TO BE FORMING DRIVEWAY AND FINAL GRADE THIS WEEK. I WILL GIVE BUILDER AN ADDITIONAL WEEK TO GET GRADING DONE. 8/18/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 08/18/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| GRAVITY SEWER TEST | 08/15/2025 | APPROVED | MGIBSON |
| SEWER TIE IN | 08/15/2025 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 08/15/2025 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: see note on #6 | |||
| FIREWALL FINAL | 08/01/2025 | APPROVED | MKRASKI |
| INSULATION | 07/29/2025 | APPROVED | MKRASKI |
| Note: | |||
| LATH/BRICK/ WATER BARRIER | 07/29/2025 | APPROVED | MKRASKI |
| Note: | |||
| ELECTRIC TEMP POLE | 07/23/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 2:45pm | |||
| ELECTRIC - EARLY POWER | 07/22/2025 | CANCELLED BY APPLICANT | MKRASKI |
| Note: Via phone call from super | |||
| ALL ROUGH | 07/22/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Dryer duct requires proper nail plates at top plate FBCR M1308.2 2. Electrical wiring needs ro be properly phased in panel NEC 210.5(C)(1) 3. A/c registers require seals FBC EC R402.4.1.1 4. Damagaed supply duct on left side unit FBC M1301.3 Check at insulation | |||
| FIREWALL FRAMING | 07/18/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Must seal penitrations for SER and low voltage, check at insulation | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/18/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Must seal penitrations for SER and low voltage, check at insulation | |||
| ELECTRIC - EARLY POWER | 07/02/2025 | CANCELLED BY APPLICANT | MKRASKI |
| Note: Via phone call from super | |||
| ROOF VALLEY & METAL | 07/01/2025 | Disapproved - NO FEE | JSTEWART |
| Note: Roof sheathing/ties inspection required approval prior to Roof Valley metal. NOTE TO BUILDER: Shingles are being installed at visit. 6/30/2025 - PREVIOUS INSPECTION NOTES | |||
| ROOF VALLEY & METAL | 07/01/2025 | APPROVED | JSTEWART |
| Note: 7/1/2025 - PREVIOUS INSPECTION NOTES Roof sheathing/ties inspection required approval prior to Roof Valley metal. NOTE TO BUILDER: Shingles are being installed at visit. 6/30/2025 - PREVIOUS INSPECTION NOTES | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/01/2025 | CANCELLED BY APPLICANT | JSTEWART |
| Note: 6/30/2025 - PREVIOUS INSPECTION NOTES 1. Front entry pony wall not per detail FBC (A)107.4 2. Ferring strips are not cont. from top to bottom for fire blocking FBC-302.11/FBC 302.11.1 3. Truss A02 missing 8 10d nails in truss strap FBC (A)107.4 (right side) 4. 2x4 kitchen wall is installed over ferring strips, must be framed to cmu wall 5. Off ridge vents have not been framed per plans FBC (A)107.4 6. Clean all truss's off of debris per MiTek packet FBC (A)107.4 7. Truss B01 missing 2nd wet set strap per MiTek packet FBC (A)107.4 (left side) 8. Truss A12 missing engineering both units | |||
| ROOF VALLEY & METAL | 06/30/2025 | CANCELLED BY APPLICANT | MKRASKI |
| FIREWALL DRYWALL NAILING | 06/30/2025 | APPROVED | MKRASKI |
| Note: Draft stop approved | |||
| WALL SHEATHING | 06/30/2025 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/30/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Front entry pony wall not per detail FBC (A)107.4 2. Ferring strips are not cont. from top to bottom for fire blocking FBC-302.11/FBC 302.11.1 3. Truss A02 missing 8 10d nails in truss strap FBC (A)107.4 (right side) 4. 2x4 kitchen wall is installed over ferring strips, must be framed to cmu wall 5. Off ridge vents have not been framed per plans FBC (A)107.4 6. Clean all truss's off of debris per MiTek packet FBC (A)107.4 7. Truss B01 missing 2nd wet set strap per MiTek packet FBC (A)107.4 (left side) 8. Truss A12 missing engineering both units | |||
| FIREWALL FRAMING | 06/30/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. 2x4 kitchen wall is installed over ferring strips, must be framed to cmu wall | |||
| LATH/BRICK/ WATER BARRIER | 06/30/2025 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 05/28/2025 | APPROVED | MKRASKI |
| TIE BEAM / LINTEL | 05/27/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Please have a full set of plans on site with Building Dept. stamp of approval for inspector, No lintel plan in box. FBC 107.3.1 | |||
| MONOLITHIC SLAB | 05/12/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 5/12/25 1. Watch out for any wash in with the rain before pouring concrete | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/08/2025 | APPROVED | MGIBSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/30/2025 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/22/2025 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 04/11/2025 | APPROVED | CBOWERMASTER |
| WATER METER INSTALLATION REQUEST | 04/01/2025 | CANCELLED BY APPLICANT | WEB |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/07/2025 | 11/10/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/04/2025 | 08/04/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/30/2025 | 07/30/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Mechanical subcontractor certification is inactive. Please correct | |||
| MECH | COMPLETE | 07/16/2025 | 07/17/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/02/2025 | 07/09/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/30/2025 | 04/30/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/30/2025 | 04/30/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/22/2025 | 04/22/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/28/2025 | 03/28/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/28/2025 | 03/28/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech report has wrong address. 2nd Request | |||
| BLD | COMPLETE | 03/28/2025 | 03/28/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/28/2025 | 03/28/2025 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/28/2025 | 03/28/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/28/2025 | 03/28/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/24/2025 | 03/26/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/24/2025 | 03/26/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/24/2025 | 03/24/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 03/24/2025 | 03/28/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Lien law missing. 2nd request | |||
| BLD | HOLD | 03/24/2025 | 03/26/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech report has wrong address. | |||
| SW1 | COMPLETE | 03/24/2025 | 03/24/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 03/24/2025 | 03/24/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Wrong site plan uploaded. Note: When revising site plan for this property please ensure that the proposed common swale between lot 33 (12 Wood Acre - Same Builder) and this lot agree to prevent any holds. | |||
| SW1 | HOLD | 03/24/2025 | 03/24/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Wrong site plan uploaded. Note: When revising site plan for this property please ensure that the proposed common swale between lot 33 (12 Wood Acre - Same Builder) and this lot agree to prevent any holds. | |||
| SW1 | HOLD | 03/24/2025 | 03/25/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Previous comments not addressed: Note: When revising site plan for this property please ensure that the proposed common swale between lot 33 (12 Wood Acre - Same Builder) and this lot agree to prevent any holds. New Comments: 12 Wood Acre (lot 33) was approved prior to this lot(34). The proposed common swale for this lot needs to come down 0.1' on the entire left side to agree with lot 33 that was recently approved. | |||
| ENGIN1 | COMPLETE | 03/24/2025 | 03/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/24/2025 | 03/24/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/17/2025 | 03/17/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM DISREGARD PREVIOUS NOTES. REVIEW WAS NOT COMPLETE. ACTUAL REVIEW BELOW: 1.Geotech report is not digitally verifiable. 2.Plans need to have allowable soil bearing pressure note. 3. Plans need code criteria. | |||
| SWALE | COMPLETE | 03/12/2025 | 03/24/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 03/11/2025 | 03/17/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech not digitally verifiable. | |||
| BLD | HOLD | 03/11/2025 | 03/17/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1.Geotech report is not digitally verifiable. 2.Plans need to have allowable soil bearing pressure note. | |||
| CUSVC | COMPLETE | 03/11/2025 | 03/12/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 03/11/2025 | 03/12/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Bed 2 Needs correct outlet spacing NEC 2020 210.52 2. Dryer and Range need to be GFCI protected. NEC 2020 210.8 | |||
| ENGIN1 | COMPLETE | 03/11/2025 | 03/12/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/11/2025 | 03/13/2025 |
| LOCATE | COMPLETE | 03/11/2025 | 03/13/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/11/2025 | 03/13/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on heatload needs to be daytona Beach 2. Energy Calcs and State Card need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition 3. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition | |||
| SW1 | HOLD | 03/11/2025 | 03/19/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM No site benchmark | |||
| ZON | HOLD | 03/11/2025 | 03/13/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM COLOR SHEET: color for garage does not meet the pastel LRV of 80% | |||
| BADMIN | HOLD | 03/11/2025 | 03/11/2025 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Lien law missing. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 11/24/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/14/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/14/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/14/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/08/2025 |
| CONNECTION FEES | ¤2,374.52 | 03/28/2025 |
| FC IMPACT FEE EMS | ¤124.00 | 03/28/2025 |
| IMPACT FEE FIRE | ¤869.02 | 03/28/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 03/28/2025 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 03/28/2025 |
| IMPACT FEE PARKS | ¤3,656.02 | 03/28/2025 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 03/28/2025 |
| IMPACT FEE TRANSPORTATION | ¤2,974.00 | 03/28/2025 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 03/28/2025 |
| SURCHARGE FS 533.721 | ¤18.09 | 03/28/2025 |
| SURCHARGE - FS 468.631 | ¤27.14 | 03/28/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/28/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/28/2025 |
| SW ENG PRE APRON | ¤30.00 | 03/28/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/28/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/28/2025 |
| SEWER CREDIT | (¤2,016.00) | 03/28/2025 |
| SEWER INSPECTION | ¤25.00 | 03/28/2025 |
| SEWER CAPITAL FACILITY | ¤12,241.04 | 03/28/2025 |
| WATER CAPITAL FACILITY FEE | ¤8,702.28 | 03/28/2025 |
| SITE PLAN 30 | ¤30.00 | 03/28/2025 |
| WATER- TURN ON | ¤50.00 | 03/28/2025 |
| ADJUSTMENT 10% | (¤201.03) | 03/28/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/28/2025 |
| INSPECTION - RESIDENTIAL | ¤1,542.75 | 03/28/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤437.58 | 03/28/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤43,288.91 |