I want to search for...

Permit #2025030464

Permit Details

Status: INSPECT

Parcel Id: 05-12-31-2755-00000-1490
CONDITIONED SPACE: 2372 sqft
GARAGE: 475 sqft
OPENED PORCH (WITH ROOF) : 266 sqft
Total Square Footage: 3113 sqft
Subdivision: 2313 - THE GABLES SUBDIVISION AT TOWN CENTER
Job Phone: 904-541-2326
Location Address: 200 THORNBERRY WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/03/2025
NOC: RECORDED
Applicant name: KENNETH LLOYD SMITH
Owner: RICHMOND AMERICAN HOMES OF FLORIDA LP

Address

10255 FORTUNE PARKWAY

JACKSONVILLE, FL 32256

Address

SUITE 150

JACKSONVILLE, FL 32256

Lot: 149
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

RICHMOND AMERICAN HOMES OF FLORIDA LP
Status Location Address State License Number Phone
ACTIVE

10255 FORTUNE PARKWAY, STE 150

JACKSONVILLE, FL 32256

CGC1519936 (Exp: 08/31/2026) 904-541-2326

Sub Contractors

COREY MICHAEL TENNANT
Status Location Address State License Number Phone
ACTIVE

3370 AGRICULTURAL CNETER DR

ST AUGUSTINE, FL 32092

CAC1819063 (Exp: 08/31/2026) 904-829-8898
JAMES E LINTON
Status Location Address State License Number Phone
ACTIVE

200 COLLEGE DR

ORANGE PARK, FL 32065

EC0001152 (Exp: 08/31/2026) 904-272-0272
PAUL ERIC FORSTER
Status Location Address State License Number Phone
ACTIVE

6114 GOODMAN RD

JACKSONVILLE, FL 32244

CFC1429261 (Exp: 08/31/2026) 904-647-1820
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629

Inspection History

Type Request Date Result Inspector
FORMBOARD SURVEY (OFFICE USE ONLY)
PLUMBING 1ST ROUGH UNDERGROUND
GRAVITY SEWER TEST
SEWER TIE IN
ELECTRIC - EARLY POWER
MONOLITHIC SLAB
LATH/BRICK/ WATER BARRIER
ALL ROUGH
WALL SHEATHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL
ROOF VALLEY & METAL
INSULATION
BLD - BUILDING FINAL
WATER METER INSTALLATION REQUEST
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW FIELD SURVEY /GRADING CERTIFICATION
ROW - STORMWATER FINAL
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
ZON COMPLETE 11/24/2025 11/24/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/24/2025 11/25/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 COMPLETE 11/24/2025 12/03/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON HOLD 11/07/2025 11/07/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Patio dimensions dont match what was approved
SW1 COMPLETE 11/07/2025 11/12/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/07/2025 11/10/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON HOLD 10/22/2025 10/22/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM New site plan missing rear setback and front setback from garage to front property line
SW1 HOLD 10/22/2025 10/23/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading Comments: - Based on the elevation in the back yard (30.4'), water is flowing towards the home. There shall be a fall of 5% in the first 10 for the home. - When factoring in Florida Building Code R401.3, that side lot lines are too high and will not allow water to flow to the front of the home as designed when the elevations in back yard changes.
ENGIN1 COMPLETE 10/22/2025 10/23/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 HOLD 10/22/2025 10/23/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading Comments: - Based on the elevation in the back yard (30.4'), water is flowing towards the home. There shall be a fall of 5% in the first 10 for the home. - When factoring in Florida Building Code R401.3, that side lot lines are too high and will not allow water to flow to the front of the home as designed when the elevations in back yard changes.
ZON HOLD 10/22/2025 10/23/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment sent back 2 times please provide front and rear setbacks
SW1 HOLD 07/29/2025 07/29/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Please submit an engineer letter by a licensed engineer explaining why the benchmark and other elevations are changing for this subdivision. - There shall be a minimum of 0.5' fall in the first 10' from the house. Based on the information provided water is flowing back towards the home and the drainage type pattern does not match approved drainage type. - There shall also be 10' elevation shots on adjacent lot, also on a 20' grid. Please feel free call or email if there are any questions or concerns this will help mitigate any delays or further holds.
ENGIN1 COMPLETE 07/29/2025 07/29/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON HOLD 07/29/2025 07/29/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM New site plan missing rear setback and front setback from garage to front property line
SW1 HOLD 05/07/2025 05/13/2025
Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM As discussed in meeting, per the City Modification Letter for The Gables, both existing and proposed grades must be clearly shown at 20-foot intervals. Please ensure that additional existing and proposed elevation points are included along both side property lines and the rear property line to better illustrate site drainage patterns, additionally there shall be 10' elevation shots outside the property lines. If you have any questions or need clarification regarding the approved City Modification Letter and its requirements, please don’t hesitate to reach out via phone or email. This will help avoid any potential delays or holds moving forward.
ENGIN1 COMPLETE 05/07/2025 05/08/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 05/07/2025 05/07/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 04/29/2025 05/02/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Per COPC modification letter proposed and existing elevations shall be depicted on a 20' grid. Note: I have attached the city's modification letter for your review. Please feel free to call or email if there are any questions or concerns.
ENGIN1 COMPLETE 04/29/2025 04/29/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 04/29/2025 04/29/2025
Note: Released By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM
SW1 HOLD 04/21/2025 04/22/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Per COPC modification letter grades shall be depicted every 20'
ENGIN1 COMPLETE 04/21/2025 04/21/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 04/21/2025 04/21/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 04/08/2025 04/14/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Please confirm benchmark. CL and Nail (benchnark in the CL) is a 5' difference
ENGIN1 COMPLETE 04/08/2025 04/08/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 04/08/2025 04/08/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 04/01/2025 04/02/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM The proposed elevation 29.90' at the back of the property and the 29.5' at the front-right of the property doesn't allow for postive fall every 20'. Per COPC Technical Manual 300.01D.4, positive fall is considered 0.1' for every 20' minimum.
ENGIN1 COMPLETE 04/01/2025 04/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 04/01/2025 04/01/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 03/20/2025 03/21/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Iron rod is not an acceptable benchmark per COPC Technical Manual Section 300.01 A.1b(9). See below for the accepted benchmarks: -fire hydrant -nail in power pole (1 nail per power pole) -man covers -pavement nails (nail in disk) will be accepted if the above locations are not available on site. The acceptable benchmark utilized shall also be indicated on site plan to be easily identifiable. Note: With pavement nails, we recommend them being place in center line of the road to eliminate them being torn out, disturbed or covered during construction.
DSD CANCEL 03/20/2025 03/25/2025
Note: Per my conversation with Mr Dennis Leap no DSD review needed.
URB COMPLETE 03/14/2025 03/17/2025
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
ZON COMPLETE 03/14/2025 03/14/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN COMPLETE 03/12/2025 03/19/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 03/12/2025 03/19/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 03/12/2025 03/12/2025
Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM
ELEC COMPLETE 03/12/2025 03/14/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/12/2025 03/12/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 03/12/2025 03/17/2025
LOCATE COMPLETE 03/12/2025 03/17/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 03/12/2025 03/17/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 03/12/2025 03/14/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM As discussed, according to the city's modification letter the revised site plan will need additional information: -There shall be an on-site dedicated benchmark utilized and maintained throughout the build. This should depicted on the site plan. - Existing and proposed elevations shall be provided on a 20' grid as well as 10' onto adjacent properties. This shall also include a 6" fall within the first 10' of the house.
ZON HOLD 03/12/2025 03/14/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Row agreement: please bring in Original

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - RESIDENTIAL ¤347.88 12/03/2025
CONNECTION FEES ¤25.00 12/03/2025
FC IMPACT FEE EMS ¤62.00 12/03/2025
IMPACT FEE FIRE ¤434.51 12/03/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/03/2025
FC IMPACT FEE LIBRARY ¤268.00 12/03/2025
IMPACT FEE PARKS ¤1,828.01 12/03/2025
IMPACT FEE SCHOOL ¤5,450.00 12/03/2025
RECORDING FEE REIMBURSE DOC ¤44.00 12/03/2025
IMPACT FEE TRANSPORTATION ¤3,502.00 12/03/2025
WATER -IRRIGATION INSPECTION ¤25.00 12/03/2025
SURCHARGE FS 533.721 ¤3.40 12/03/2025
SURCHARGE - FS 468.631 ¤5.10 12/03/2025
SW ENG - FOUNDATION SURVEY ¤20.00 12/03/2025
SW ENG INSPECTION 80 ¤80.00 12/03/2025
SW ENG PRE APRON ¤30.00 12/03/2025
SW ENG - REVIEW 20 ¤20.00 12/03/2025
SEWER INSPECTION ¤25.00 12/03/2025
SITE PLAN 30 ¤30.00 12/03/2025
WATER-METER ¤514.49 12/03/2025
WATER-METER ¤427.42 12/03/2025
ADJUSTMENT 10% (¤37.79) 12/03/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/03/2025
EXTENSION ¤40.00
Fees Total Due: ¤40.00 Total Paid: ¤13,352.02