Permit #2025030715

Permit Details

Status: COED

Parcel Id: 07-11-31-7065-00150-0040
CONDITIONED SPACE: 1809 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 2248 sqft
Block: 00150
Subdivision: -
Job Phone: 239-571-5325
Location Address: 22 KASHMIR TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/27/2025
NOC: RECORDED
Applicant name: RYAN SCOTT DAVIS
Owner: SYNERGY HOMES LLC

Address

581 NW MERCANTILE PLACE

PORT SAINT LUCIE, FL 34986

Address

SUITE 106

PORT SAINT LUCIE, FL 34986

Lot: 0040
Contracted Stated Job Value: ¤200,000.00
Job Description: Single Family Residence
Type: CN

Contractor

SYNERGY HOMES, LLC
Status Location Address State License Number
ACTIVE

1 HARGROVE GRADE, SUITE B1

PALM COAST, FL 32137

CBC1254289 (Exp: 08/31/2026)

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 07/30/2025 APPROVED - AS NOTED FSLADISH
Note: 7/30/25 SOD HAS BEEN LAID IN AREAS REQUIRED. IT HAS BEEN DRY FOR A FEW DAYS SO IT IS HARD TO DETERMINE IF THE DRAINAGE WILL HAVE POSITIVE FORWARD FLOW,, BUT AT THE TIME OF THIS INSPECTIONS THE AFFECTED AREAS NOTED PREVIOUSLY HAVE BEEN RAKED AND RESODDE. I AM PASSING THIS AS NOTED THAT AT THE TIME OF THIS INSPECTION NO ADVERSE CONDITIONS ARE PRESENT, BUILDER ACCEPTS RESPONSIBILITY THAT DUE TO NUMEROUS LEFT SIDE REQUIRED CORRECTIONS THAT THEY ARE RESPONSIBLE FOR ANY CHANGES AFTER THIS INSPECTION. PHOTO FOR REFERENCE. *** INSPECTORS NOTE. YOU WILL BE RESPONSIBLE TO REPAIR MEDIAN BEFORE 20 KASHMIR ROW FINAL WILL BE ISSUED. *** 7/29/2025 - PREVIOUS INSPECTION NOTES 7/29/25 GRAYSON COMMUNICATED TO ME THAT THE REQUIRED REGRADING AND RESODDING WAS COMPLETED ON THE LEFT SIDE AND REAR. I DO NOT SEE ANY EVIDENCE THAT ANY REPAIR/REGRADE/RESOD WAS COMPLETED ON THE LEFT SIDE OR REAR AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE. 7/28/2025 - PREVIOUS INSPECTION NOTES 7/28/25 GRAYSON ASKED TO CANCEL THIS INSPECTION VIA TEXT. _______________________________________________________________________________________________________________________ 7/22/25 ***INSPECTORS NOTE. WALKED PROPERTY AFTER IT STOPPED RAINING TODAY AND THE DRAINAGE IS STILL NOT WORKING INTHE REAR LEFT CORNER AND LEFT SIDE PROPERTY LINE DRAINAGE CONVEYANCE. A COUPLE OF THE AREAS YOU ADDED DIDT TO APPEAR TO HAVE WASHED OUT. IN THE REAR THAT WATER IS STILL POOLING AND NOT MOVING FORWARD POSITIVELY. YOU WILL NEED TO REGRADE THIS AREA AND MAKE SURE IT MEETS COPC STANDARDS. ***
ROW - STORMWATER FINAL 07/29/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 7/29/25 GRAYSON COMMUNICATED TO ME THAT THE REQUIRED REGRADING AND RESODDING WAS COMPLETED ON THE LEFT SIDE AND REAR. I DO NOT SEE ANY EVIDENCE THAT ANY REPAIR/REGRADE/RESOD WAS COMPLETED ON THE LEFT SIDE OR REAR AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE. 7/28/2025 - PREVIOUS INSPECTION NOTES 7/28/25 GRAYSON ASKED TO CANCEL THIS INSPECTION VIA TEXT. _______________________________________________________________________________________________________________________ 7/22/25 ***INSPECTORS NOTE. WALKED PROPERTY AFTER IT STOPPED RAINING TODAY AND THE DRAINAGE IS STILL NOT WORKING INTHE REAR LEFT CORNER AND LEFT SIDE PROPERTY LINE DRAINAGE CONVEYANCE. A COUPLE OF THE AREAS YOU ADDED DIDT TO APPEAR TO HAVE WASHED OUT. IN THE REAR THAT WATER IS STILL POOLING AND NOT MOVING FORWARD POSITIVELY. YOU WILL NEED TO REGRADE THIS AREA AND MAKE SURE IT MEETS COPC STANDARDS. ***
ROW - STORMWATER FINAL 07/28/2025 CANCELLED BY APPLICANT FSLADISH
Note: 7/28/25 GRAYSON ASKED TO CANCEL THIS INSPECTION VIA TEXT. _______________________________________________________________________________________________________________________ 7/22/25 ***INSPECTORS NOTE. WALKED PROPERTY AFTER IT STOPPED RAINING TODAY AND THE DRAINAGE IS STILL NOT WORKING INTHE REAR LEFT CORNER AND LEFT SIDE PROPERTY LINE DRAINAGE CONVEYANCE. A COUPLE OF THE AREAS YOU ADDED DIDT TO APPEAR TO HAVE WASHED OUT. IN THE REAR THAT WATER IS STILL POOLING AND NOT MOVING FORWARD POSITIVELY. YOU WILL NEED TO REGRADE THIS AREA AND MAKE SURE IT MEETS COPC STANDARDS. ***
U -UTILITY RESIDENTIAL FINAL 07/22/2025 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 No IRR. No CC
ROW - FINAL APRON (AFTER POUR) 07/22/2025 APPROVED FSLADISH
Note: Inspector Notes from Inspection 9465 7/22/25 . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. __________________________________________________________________________________________________________________________ 7/21/25 SPOKE WITH GRAYSON CM HE HAD ASKED ME TO TAKE A LOOK AT THE LEFT SIDE DRAINAGE CONVEYANCE CORRECTION BEFORE SOD IS LAID. UPON WALKING PROPERTY DETERMINED THAT GRADE IS SHOWING FALL BY EYE. LET HIM KNOW I WILL PASS FIELD SURVEY AS NOTED THAT HE WILL RESET SOD, SHOOT FALL AND WE WILL GO FORWARD FROM THERE. ______________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU HAVE A LOW AREA IN THE BACK LEFT THAT NEEDS TO BE RAISED TO ALLOW POSITIVE FORWARD DRAINAGE. YOU ALSO HAVE A LOW/HIGH SPOT ON THE LEFT SIDE NEAR THE PEP TANK THAT IS NOT ALLOWING THE DRAINAGE CONVEYANCE TO FLOW. THESE AREAS WILL NEED TO BE CORRECTED BEFORE RESUBMITTING FOR REINSPECTION. PHOTO FOR REFERENCE. _______________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES 07/14/25 TPOLACEK*** ENTIRE LEFT SIDE DRANAGE CONVEYANCE IS HOLDING WATER AND NOT FLOWING AS INDICATED ON FIANL SURVEY. BACK LEFT CORNER IS HOLDING A LARGE AMOUNT OF WATER AND WILL NEED TO BA RAISED UP AS TO FLOW DRAINAGE TO FRONT. I HAVE ATTACHED SOME PHOTOS AS WELL.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/21/2025 APPROVED - AS NOTED FSLADISH
Note: 7/21/25 SPOKE WITH GRAYSON CM HE HAD ASKED ME TO TAKE A LOOK AT THE LEFT SIDE DRAINAGE CONVEYANCE CORRECTION BEFORE SOD IS LAID. UPON WALKING PROPERTY DETERMINED THAT GRADE IS SHOWING FALL BY EYE. LET HIM KNOW I WILL PASS FIELD SURVEY AS NOTED THAT HE WILL RESET SOD, SHOOT FALL AND WE WILL GO FORWARD FROM THERE. ______________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU HAVE A LOW AREA IN THE BACK LEFT THAT NEEDS TO BE RAISED TO ALLOW POSITIVE FORWARD DRAINAGE. YOU ALSO HAVE A LOW/HIGH SPOT ON THE LEFT SIDE NEAR THE PEP TANK THAT IS NOT ALLOWING THE DRAINAGE CONVEYANCE TO FLOW. THESE AREAS WILL NEED TO BE CORRECTED BEFORE RESUBMITTING FOR REINSPECTION. PHOTO FOR REFERENCE. _______________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES 07/14/25 TPOLACEK*** ENTIRE LEFT SIDE DRANAGE CONVEYANCE IS HOLDING WATER AND NOT FLOWING AS INDICATED ON FIANL SURVEY. BACK LEFT CORNER IS HOLDING A LARGE AMOUNT OF WATER AND WILL NEED TO BA RAISED UP AS TO FLOW DRAINAGE TO FRONT. I HAVE ATTACHED SOME PHOTOS AS WELL.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/15/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 7/15/25 NOTHING HAS CHANGED. YOU HAVE A LOW AREA IN THE BACK LEFT THAT NEEDS TO BE RAISED TO ALLOW POSITIVE FORWARD DRAINAGE. YOU ALSO HAVE A LOW/HIGH SPOT ON THE LEFT SIDE NEAR THE PEP TANK THAT IS NOT ALLOWING THE DRAINAGE CONVEYANCE TO FLOW. THESE AREAS WILL NEED TO BE CORRECTED BEFORE RESUBMITTING FOR REINSPECTION. PHOTO FOR REFERENCE. _______________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES 07/14/25 TPOLACEK*** ENTIRE LEFT SIDE DRANAGE CONVEYANCE IS HOLDING WATER AND NOT FLOWING AS INDICATED ON FIANL SURVEY. BACK LEFT CORNER IS HOLDING A LARGE AMOUNT OF WATER AND WILL NEED TO BA RAISED UP AS TO FLOW DRAINAGE TO FRONT. I HAVE ATTACHED SOME PHOTOS AS WELL.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/14/2025 APPROVED TPOLACEK
Note: Inspector Notes from Inspection 9270 6/20/25 AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVER DETAIL. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 YOUR APRON WING SLOPES ON BOTH SIDES EXCEED THE COPC 8% ALLOWABLE STANDARD AT THE TIME OF THIS INSPECTION. YOU HAVE CONCRETE CHUNKS NOT 57 STONE ALONG AND AROUND YOUR CULVERT PIPE. THIESE ARE TOO BIG INCONSISTENT AND NOT ALLOWED AS CULVERT PIPE STABILIZER. YOU WILL NEED TO CLEAN OUT ALL CHUNKS BIGGER THAN 3.5". PIPE ELEVATION WAS GOOD AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE. _______________________________________________________________________________________________________________________ New inspection due to canceled inspection 6/2/2025 - PREVIOUS INSPECTION NOTES 6/2/25 THIS SITE IS NOT READY FOR A PREPOUR INSPECTION. PLEASE RESUBMIT WHEN IT IS READY. SEE PHOTO FOR REFERENCE. 5/29/2025 - PREVIOUS INSPECTION NOTES 5/29/25 RECEIVED TEXT FROM GRAYSON CM TO PLEASE CANCEL THIS INSPECTION FOR TODAY. ________________________________________________________________________________________________________________________ 5/28/2025 - PREVIOUS INSPECTION NOTES ** 05/28/25 TOO MUCH WATER IN (ROW) APRON AREA OF POUR FOOT SINKS IN MUD IN APRON AND AROUND CULVERT PUSHING OUT WATER. CULVERT FULL OF WATER ** NEED TO EITHER ADD ADDITIONAL FORM BOARDS OR BACK FILL FORM BOARDS TO CONTAIN THE CONCRETE WITHIN THE POUR AREA ** ENSURE YOU HAVE 4 INCHES IN ENTIRE DRIVEWAY POUR AREA ABOVE THE ROW AND 6 INCHES IN APRON ** SEE ATTACHED POTOS
ROW FIELD SURVEY /GRADING CERTIFICATION 07/14/2025 Disapproved - NO FEE TPOLACEK
Note: 07/14/25 TPOLACEK*** ENTIRE LEFT SIDE DRANAGE CONVEYANCE IS HOLDING WATER AND NOT FLOWING AS INDICATED ON FIANL SURVEY. BACK LEFT CORNER IS HOLDING A LARGE AMOUNT OF WATER AND WILL NEED TO BA RAISED UP AS TO FLOW DRAINAGE TO FRONT. I HAVE ATTACHED SOME PHOTOS AS WELL.
BLD - BUILDING FINAL 07/07/2025 FINAL APPROVED BTAYLOR
Note: 7/3/2025 - PREVIOUS INSPECTION NOTES 7-3-25 1. No water at Kitchen sink fixture. FBCR P2705.1 – 4 7/2/2025 - PREVIOUS INSPECTION NOTES 1. Please have garage door opener powered up for test of devices (uncover devices). R309.4 / UL 325 2. Please install AC Thermostat, and have AC cycling. Per plan 3. Master exhaust fan Not functioning. FBC M1507 4. Spare bath exhaust fan Not functioning. FBC M1507 5. No water at Kitchen sink fixture. FBCR P2705.1 – 4
BLD - BUILDING FINAL 07/03/2025 Disapproved - NO FEE BTAYLOR
Note: 7-3-25 1. No water at Kitchen sink fixture. FBCR P2705.1 – 4 7/2/2025 - PREVIOUS INSPECTION NOTES 1. Please have garage door opener powered up for test of devices (uncover devices). R309.4 / UL 325 2. Please install AC Thermostat, and have AC cycling. Per plan 3. Master exhaust fan Not functioning. FBC M1507 4. Spare bath exhaust fan Not functioning. FBC M1507 5. No water at Kitchen sink fixture. FBCR P2705.1 – 4
BLD - BUILDING FINAL 07/02/2025 Disapproved -FEE REQUIRED JSTEWART
Note: 1. Please have garage door opener powered up for test of devices (uncover devices). R309.4 / UL 325 2. Please install AC Thermostat, and have AC cycling. Per plan 3. Master exhaust fan Not functioning. FBC M1507 4. Spare bath exhaust fan Not functioning. FBC M1507 5. No water at Kitchen sink fixture. FBCR P2705.1 – 4
GRAVITY SEWER TEST 06/23/2025 APPROVED MGIBSON
SEWER TIE IN 06/23/2025 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 06/20/2025 APPROVED - AS NOTED RRICKS
Note: 6/20/25 AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVER DETAIL. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 YOUR APRON WING SLOPES ON BOTH SIDES EXCEED THE COPC 8% ALLOWABLE STANDARD AT THE TIME OF THIS INSPECTION. YOU HAVE CONCRETE CHUNKS NOT 57 STONE ALONG AND AROUND YOUR CULVERT PIPE. THIESE ARE TOO BIG INCONSISTENT AND NOT ALLOWED AS CULVERT PIPE STABILIZER. YOU WILL NEED TO CLEAN OUT ALL CHUNKS BIGGER THAN 3.5". PIPE ELEVATION WAS GOOD AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE. _______________________________________________________________________________________________________________________ New inspection due to canceled inspection 6/2/2025 - PREVIOUS INSPECTION NOTES 6/2/25 THIS SITE IS NOT READY FOR A PREPOUR INSPECTION. PLEASE RESUBMIT WHEN IT IS READY. SEE PHOTO FOR REFERENCE. 5/29/2025 - PREVIOUS INSPECTION NOTES 5/29/25 RECEIVED TEXT FROM GRAYSON CM TO PLEASE CANCEL THIS INSPECTION FOR TODAY. ________________________________________________________________________________________________________________________ 5/28/2025 - PREVIOUS INSPECTION NOTES ** 05/28/25 TOO MUCH WATER IN (ROW) APRON AREA OF POUR FOOT SINKS IN MUD IN APRON AND AROUND CULVERT PUSHING OUT WATER. CULVERT FULL OF WATER ** NEED TO EITHER ADD ADDITIONAL FORM BOARDS OR BACK FILL FORM BOARDS TO CONTAIN THE CONCRETE WITHIN THE POUR AREA ** ENSURE YOU HAVE 4 INCHES IN ENTIRE DRIVEWAY POUR AREA ABOVE THE ROW AND 6 INCHES IN APRON ** SEE ATTACHED POTOS
ELECTRIC - EARLY POWER 06/12/2025 APPROVED KSANDOE
ROW- PRE-APRON (PRE-POUR) 06/10/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 6/10/25 YOUR APRON WING SLOPES ON BOTH SIDES EXCEED THE COPC 8% ALLOWABLE STANDARD AT THE TIME OF THIS INSPECTION. YOU HAVE CONCRETE CHUNKS NOT 57 STONE ALONG AND AROUND YOUR CULVERT PIPE. THIESE ARE TOO BIG INCONSISTENT AND NOT ALLOWED AS CULVERT PIPE STABILIZER. YOU WILL NEED TO CLEAN OUT ALL CHUNKS BIGGER THAN 3.5". PIPE ELEVATION WAS GOOD AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE. _______________________________________________________________________________________________________________________ New inspection due to canceled inspection 6/2/2025 - PREVIOUS INSPECTION NOTES 6/2/25 THIS SITE IS NOT READY FOR A PREPOUR INSPECTION. PLEASE RESUBMIT WHEN IT IS READY. SEE PHOTO FOR REFERENCE. 5/29/2025 - PREVIOUS INSPECTION NOTES 5/29/25 RECEIVED TEXT FROM GRAYSON CM TO PLEASE CANCEL THIS INSPECTION FOR TODAY. ________________________________________________________________________________________________________________________ 5/28/2025 - PREVIOUS INSPECTION NOTES ** 05/28/25 TOO MUCH WATER IN (ROW) APRON AREA OF POUR FOOT SINKS IN MUD IN APRON AND AROUND CULVERT PUSHING OUT WATER. CULVERT FULL OF WATER ** NEED TO EITHER ADD ADDITIONAL FORM BOARDS OR BACK FILL FORM BOARDS TO CONTAIN THE CONCRETE WITHIN THE POUR AREA ** ENSURE YOU HAVE 4 INCHES IN ENTIRE DRIVEWAY POUR AREA ABOVE THE ROW AND 6 INCHES IN APRON ** SEE ATTACHED POTOS
ROW- PRE-APRON (PRE-POUR) 06/04/2025 CANCELLED BY APPLICANT WEB
Note: 6/2/2025 - PREVIOUS INSPECTION NOTES 6/2/25 THIS SITE IS NOT READY FOR A PREPOUR INSPECTION. PLEASE RESUBMIT WHEN IT IS READY. SEE PHOTO FOR REFERENCE. 5/29/2025 - PREVIOUS INSPECTION NOTES 5/29/25 RECEIVED TEXT FROM GRAYSON CM TO PLEASE CANCEL THIS INSPECTION FOR TODAY. ________________________________________________________________________________________________________________________ 5/28/2025 - PREVIOUS INSPECTION NOTES ** 05/28/25 TOO MUCH WATER IN (ROW) APRON AREA OF POUR FOOT SINKS IN MUD IN APRON AND AROUND CULVERT PUSHING OUT WATER. CULVERT FULL OF WATER ** NEED TO EITHER ADD ADDITIONAL FORM BOARDS OR BACK FILL FORM BOARDS TO CONTAIN THE CONCRETE WITHIN THE POUR AREA ** ENSURE YOU HAVE 4 INCHES IN ENTIRE DRIVEWAY POUR AREA ABOVE THE ROW AND 6 INCHES IN APRON ** SEE ATTACHED POTOS
ROW- PRE-APRON (PRE-POUR) 06/02/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 6/2/25 THIS SITE IS NOT READY FOR A PREPOUR INSPECTION. PLEASE RESUBMIT WHEN IT IS READY. SEE PHOTO FOR REFERENCE. 5/29/2025 - PREVIOUS INSPECTION NOTES 5/29/25 RECEIVED TEXT FROM GRAYSON CM TO PLEASE CANCEL THIS INSPECTION FOR TODAY. ________________________________________________________________________________________________________________________ 5/28/2025 - PREVIOUS INSPECTION NOTES ** 05/28/25 TOO MUCH WATER IN (ROW) APRON AREA OF POUR FOOT SINKS IN MUD IN APRON AND AROUND CULVERT PUSHING OUT WATER. CULVERT FULL OF WATER ** NEED TO EITHER ADD ADDITIONAL FORM BOARDS OR BACK FILL FORM BOARDS TO CONTAIN THE CONCRETE WITHIN THE POUR AREA ** ENSURE YOU HAVE 4 INCHES IN ENTIRE DRIVEWAY POUR AREA ABOVE THE ROW AND 6 INCHES IN APRON ** SEE ATTACHED POTOS
PEP TANK INSTALLATION REQUEST 05/30/2025 APPROVED CBOWERMASTER
Note: 5/29/2025 2:55:43 PM- PREVIOUS INSPECTION NOTES stucco needs to be done
PEP TANK INSTALLATION REQUEST 05/29/2025 Disapproved -FEE REQUIRED CBOWERMASTER
Note: stucco needs to be done
INSULATION 05/29/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/29/2025 10:52:24 AM *** Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 5/27/2025 2:34:33 PM *** 5/27/25: Check at Insulation!!! 1). 5ft head pressure not holding. 2). Bathtub needs to be filled to the overflow. 3). Missing nail plates at top plate wire penetration in garage. Studs marked NP. 5/23/2025 - PREVIOUS INSPECTION NOTES Not ready. Crews still working
ROW- PRE-APRON (PRE-POUR) 05/29/2025 CANCELLED BY APPLICANT FSLADISH
Note: 5/29/25 RECEIVED TEXT FROM GRAYSON CM TO PLEASE CANCEL THIS INSPECTION FOR TODAY. ________________________________________________________________________________________________________________________ 5/28/2025 - PREVIOUS INSPECTION NOTES ** 05/28/25 TOO MUCH WATER IN (ROW) APRON AREA OF POUR FOOT SINKS IN MUD IN APRON AND AROUND CULVERT PUSHING OUT WATER. CULVERT FULL OF WATER ** NEED TO EITHER ADD ADDITIONAL FORM BOARDS OR BACK FILL FORM BOARDS TO CONTAIN THE CONCRETE WITHIN THE POUR AREA ** ENSURE YOU HAVE 4 INCHES IN ENTIRE DRIVEWAY POUR AREA ABOVE THE ROW AND 6 INCHES IN APRON ** SEE ATTACHED POTOS
ROW- PRE-APRON (PRE-POUR) 05/28/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/28/25 TOO MUCH WATER IN (ROW) APRON AREA OF POUR FOOT SINKS IN MUD IN APRON AND AROUND CULVERT PUSHING OUT WATER. CULVERT FULL OF WATER ** NEED TO EITHER ADD ADDITIONAL FORM BOARDS OR BACK FILL FORM BOARDS TO CONTAIN THE CONCRETE WITHIN THE POUR AREA ** ENSURE YOU HAVE 4 INCHES IN ENTIRE DRIVEWAY POUR AREA ABOVE THE ROW AND 6 INCHES IN APRON ** SEE ATTACHED POTOS
LATH/BRICK/ WATER BARRIER 05/27/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/27/2025 2:32:56 PM *** 5/23/2025 - PREVIOUS INSPECTION NOTES Not ready. Crews still working
ALL ROUGH 05/27/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/27/2025 2:34:33 PM *** 5/27/25: Check at Insulation!!! 1). 5ft head pressure not holding. 2). Bathtub needs to be filled to the overflow. 3). Missing nail plates at top plate wire penetration in garage. Studs marked NP. 5/23/2025 - PREVIOUS INSPECTION NOTES Not ready. Crews still working
ALL ROUGH 05/23/2025 Disapproved -FEE REQUIRED KSANDOE
Note: Not ready. Crews still working
LATH/BRICK/ WATER BARRIER 05/23/2025 Disapproved -FEE REQUIRED KSANDOE
Note: Not ready. Crews still working
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/22/2025 APPROVED CVANSTRAHLEN
Note:
ROOF VALLEY & METAL 05/19/2025 APPROVED CVANSTRAHLEN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/19/2025 Disapproved - NO FEE CVANSTRAHLEN
Note: Please fix items before next inspection #1- Multiples shiners over garage roof area and arouns lets bedroom and leavinf room roof deck #2- H clips need to be install correctly 5/16/2025 - PREVIOUS INSPECTION NOTES 5/16/25: Partial Approval due to Roof Sheathing. 2). Roof sheathing is missing 'H' clips in numerous areas along with gaps between sheathing panels not meeting code requirements for expansion. FBC-R904.5.3 / FBC [A]107.4
WALL SHEATHING 05/16/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/16/2025 2:02:22 PM ***
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/16/2025 PARTIALLY APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/16/2025 2:19:26 PM *** 5/16/25: Partial Approval due to Roof Sheathing. 1). Roof Sheathing has a great deal of shiners that need to be fully removed and re-nail where removed if necessary. 2). Roof sheathing is missing 'H' clips in numerous areas along with gaps between sheathing panels not meeting code requirements for expansion. FBC-R904.5.3 / FBC [A]107.4
U-CROSS CONNECTION 05/16/2025 APPROVED - AS NOTED BWRIGHT
Note: No IRR. No CC
TIE BEAM / LINTEL 05/06/2025 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2250 4/28/25 Please move port-jon to center of both sites for access
MONOLITHIC SLAB 04/29/2025 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 04/28/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 4/28/25 Please move port-jon to center of both sites for access
PLUMBING 1ST ROUGH UNDERGROUND 04/22/2025 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 04/21/2025 APPROVED JMUNSON
FORMBOARD SURVEY (OFFICE USE ONLY) 04/16/2025 APPROVED RRICKS
WATER METER INSTALLATION REQUEST 04/04/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 04/16/2025 04/21/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/15/2025 04/16/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/15/2025 04/15/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 03/26/2025 03/26/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/26/2025 03/26/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 03/26/2025 03/26/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM No zoning chnages only stormwater
SWALE COMPLETE 03/18/2025 04/14/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 03/17/2025 03/20/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 03/17/2025 03/20/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 03/17/2025 03/18/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 03/17/2025 03/18/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/17/2025 03/18/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 03/17/2025 03/19/2025
LOCATE COMPLETE 03/17/2025 03/20/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 03/17/2025 03/19/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 03/17/2025 03/20/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM 1. Missing proposed elevations on the back property line at both corners. 2. Missing 10' shots outside property line on vacant lot
ZON COMPLETE 03/17/2025 03/20/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 07/30/2025
SW ENG REINSPECTION 30 ¤30.00 07/28/2025
SW ENG REINSPECTION 30 ¤30.00 07/28/2025
SW ENG REINSPECTION 30 ¤30.00 07/28/2025
UTILITY PEP REINSPECTION ¤40.00 07/28/2025
SW ENG REINSPECTION 20 ¤20.00 07/28/2025
REINSPECTION RESIDENTIAL ¤40.00 07/28/2025
REINSPECTION RESIDENTIAL ¤40.00 07/28/2025
REINSPECTION RESIDENTIAL ¤40.00 07/28/2025
CONNECTION FEES ¤1,187.26 03/27/2025
FC IMPACT FEE EMS ¤62.00 03/27/2025
IMPACT FEE FIRE ¤434.51 03/27/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/27/2025
FC IMPACT FEE LIBRARY ¤268.00 03/27/2025
IMPACT FEE PARKS ¤1,828.01 03/27/2025
IMPACT FEE SCHOOL ¤5,450.00 03/27/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 03/27/2025
WATER -IRRIGATION INSPECTION ¤25.00 03/27/2025
SURCHARGE FS 533.721 ¤10.82 03/27/2025
SURCHARGE - FS 468.631 ¤16.23 03/27/2025
SW ENG - FOUNDATION SURVEY ¤20.00 03/27/2025
SW ENG INSPECTION 80 ¤80.00 03/27/2025
SW ENG PRE APRON ¤30.00 03/27/2025
SEWER INSPECTION ¤25.00 03/27/2025
SEWER CAPITAL FACILITY ¤6,120.52 03/27/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 03/27/2025
SITE PLAN 30 ¤30.00 03/27/2025
SW ENG - REVIEW 20 ¤20.00 03/27/2025
SW ENG RES REVIEW 200 ¤200.00 03/27/2025
WATER- TURN ON ¤25.00 03/27/2025
ADJUSTMENT 10% (¤120.20) 03/27/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/27/2025
INSPECTION - RESIDENTIAL ¤913.00 03/27/2025
PLAN REVIEW - RESIDENTIAL ¤258.96 03/27/2025
Fees Total Due: ¤0.00 Total Paid: ¤23,689.25