Permit #2025030797
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00230-0150 |
| CONDITIONED SPACE: 1809 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 33 sqft |
| Total Square Footage: 2248 sqft |
| Block: 00230 |
| Subdivision: - |
| Job Phone: 239-571-5325 |
| Location Address: 48 ROYAL OAK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/17/2025 |
| NOC: RECORDED |
| Applicant name: RYAN SCOTT DAVIS |
| Owner: SYNERGY HOMES, LLC |
|
Address 581 NW MERCANTILE PL PORT ST LUCIE, FL 34986 |
|
Address STE 106 PORT ST LUCIE, FL 34986 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SYNERGY HOMES, LLC
| Status | Location Address | State License Number |
| ACTIVE |
1 HARGROVE GRADE, SUITE B1 PALM COAST, FL 32137 |
CBC1254289 (Exp: 08/31/2026) |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 09/03/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 9/2/25 UPON WALKING PROPERTY DETERMINED OVERALL DRAINAGE WILL WORK, AS PREVIOUSLY NOTED REAR PROPERTY LINE SLOPE IS GREATER THAN 4:1. THERE IS A LOW/WASHED OUT BLOCKAGE AREA ON RIGHT SIDE AT AC UNIT THAT NEEDS REPAIR, COMPACTION AND GRADE CORRECTED. THERE ARE A FEW WET AREAS ON THE LEFT SIDE THAT ARE WET, BUT MAY BE DUE TO THE RECENT RAINS. PROPERTY AND SWALE NEED TO BE MOWED TO ACCURATELY DETERMINE IF GRADE IS CORRECT. APPROVING AS NOTED THAT CORRECTIONS AND MOWING NEED TO BE COMPLETED BEFORE ROW FINAL PASSAGE. Inspector Notes from Inspection 9463 9/2/25 PER 4/8/25 INSPECTORS NOTES SURVEY WILL WORK. WILL INVESTIGATE ON FIELD SURVEY. APPROVING AS NOTED. Per Rodney, Gabriel, and Parron the builder was instructed to move the berm to the 5' easement and will exceed the 4:1 slope going to the back property. We allowed this due to not being able to make the COPC edge of pavement requirement if berm was lowered. Pinning the sod behind the berm will be required to prevent erosion. _________________________________________________________________________________________________________________________ 4/8/2025 Per Rodney, Gabriel, and Parron the builder was instructed to move the berm to the 5' easement and will exceed the 4:1 slope going to the back property. We allowed this due to not being able to make the COPC edge of pavement requirement if berm was lowered. Pinning the sod behind the berm will be required to prevent erosion. | |||
| ROW - STORMWATER FINAL | 09/03/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED nspector Notes from Inspection 9465 9/2/25 UPON WALKING PROPERTY DETERMINED OVERALL DRAINAGE WILL WORK, AS PREVIOUSLY NOTED REAR PROPERTY LINE SLOPE IS GREATER THAN 4:1. THERE IS A LOW/WASHED OUT BLOCKAGE AREA ON RIGHT SIDE AT AC UNIT THAT NEEDS REPAIR, COMPACTION AND GRADE CORRECTED. THERE ARE A FEW WET AREAS ON THE LEFT SIDE THAT ARE WET, BUT MAY BE DUE TO THE RECENT RAINS. PROPERTY AND SWALE NEED TO BE MOWED TO ACCURATELY DETERMINE IF GRADE IS CORRECT. APPROVING AS NOTED THAT CORRECTIONS AND MOWING NEED TO BE COMPLETED BEFORE ROW FINAL PASSAGE. Inspector Notes from Inspection 9463 9/2/25 PER 4/8/25 INSPECTORS NOTES SURVEY WILL WORK. WILL INVESTIGATE ON FIELD SURVEY. APPROVING AS NOTED. Per Rodney, Gabriel, and Parron the builder was instructed to move the berm to the 5' easement and will exceed the 4:1 slope going to the back property. We allowed this due to not being able to make the COPC edge of pavement requirement if berm was lowered. Pinning the sod behind the berm will be required to prevent erosion. _________________________________________________________________________________________________________________________ 4/8/2025 Per Rodney, Gabriel, and Parron the builder was instructed to move the berm to the 5' easement and will exceed the 4:1 slope going to the back property. We allowed this due to not being able to make the COPC edge of pavement requirement if berm was lowered. Pinning the sod behind the berm will be required to prevent erosion. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/03/2025 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 no irr-no cc lower sewer clean out ,add sod so flush with C/O | |||
| U -UTILITY RESIDENTIAL FINAL | 09/03/2025 | FINAL APPROVED | LFITZGERALD |
| Note: 9/3/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9035 no irr-no cc lower sewer clean out ,add sod so flush with C/O | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/02/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 9/2/25 PER 4/8/25 INSPECTORS NOTES SURVEY WILL WORK. WILL INVESTIGATE ON FIELD SURVEY. APPROVING AS NOTED. Per Rodney, Gabriel, and Parron the builder was instructed to move the berm to the 5' easement and will exceed the 4:1 slope going to the back property. We allowed this due to not being able to make the COPC edge of pavement requirement if berm was lowered. Pinning the sod behind the berm will be required to prevent erosion. _________________________________________________________________________________________________________________________ 4/8/2025 Per Rodney, Gabriel, and Parron the builder was instructed to move the berm to the 5' easement and will exceed the 4:1 slope going to the back property. We allowed this due to not being able to make the COPC edge of pavement requirement if berm was lowered. Pinning the sod behind the berm will be required to prevent erosion. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/02/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 9/2/25 UPON WALKING PROPERTY DETERMINED OVERALL DRAINAGE WILL WORK, AS PREVIOUSLY NOTED REAR PROPERTY LINE SLOPE IS GREATER THAN 4:1. THERE IS A LOW/WASHED OUT BLOCKAGE AREA ON RIGHT SIDE AT AC UNIT THAT NEEDS REPAIR, COMPACTION AND GRADE CORRECTED. THERE ARE A FEW WET AREAS ON THE LEFT SIDE THAT ARE WET, BUT MAY BE DUE TO THE RECENT RAINS. PROPERTY AND SWALE NEED TO BE MOWED TO ACCURATELY DETERMINE IF GRADE IS CORRECT. APPROVING AS NOTED THAT CORRECTIONS AND MOWING NEED TO BE COMPLETED BEFORE ROW FINAL PASSAGE. Inspector Notes from Inspection 9463 9/2/25 PER 4/8/25 INSPECTORS NOTES SURVEY WILL WORK. WILL INVESTIGATE ON FIELD SURVEY. APPROVING AS NOTED. Per Rodney, Gabriel, and Parron the builder was instructed to move the berm to the 5' easement and will exceed the 4:1 slope going to the back property. We allowed this due to not being able to make the COPC edge of pavement requirement if berm was lowered. Pinning the sod behind the berm will be required to prevent erosion. _________________________________________________________________________________________________________________________ 4/8/2025 Per Rodney, Gabriel, and Parron the builder was instructed to move the berm to the 5' easement and will exceed the 4:1 slope going to the back property. We allowed this due to not being able to make the COPC edge of pavement requirement if berm was lowered. Pinning the sod behind the berm will be required to prevent erosion. | |||
| BLD - BUILDING FINAL | 08/29/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| BLD - BUILDING FINAL | 08/28/2025 | CANCELLED BY APPLICANT | JSTEWART |
| ROW - DRAINAGE | 08/20/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 8/13/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. Inspector Notes from Inspection 9270 08/13/25 TPOLACEK*** WORKER WAS DIGGING FOOTERS AND REPAIRING FORM BOARDS IN APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/12/2025 - PREVIOUS INSPECTION NOTES 08/12/25 TPOLACEK*** FOOTERS AND POUR AREA WASHED IN. NOT READY FOR INSPECTION. | |||
| ELECTRIC - EARLY POWER | 08/20/2025 | APPROVED | CVANSTRAHLEN |
| ROW - DRAINAGE | 08/13/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. Inspector Notes from Inspection 9270 08/13/25 TPOLACEK*** WORKER WAS DIGGING FOOTERS AND REPAIRING FORM BOARDS IN APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/12/2025 - PREVIOUS INSPECTION NOTES 08/12/25 TPOLACEK*** FOOTERS AND POUR AREA WASHED IN. NOT READY FOR INSPECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/13/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 08/13/25 TPOLACEK*** WORKER WAS DIGGING FOOTERS AND REPAIRING FORM BOARDS IN APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/12/2025 - PREVIOUS INSPECTION NOTES 08/12/25 TPOLACEK*** FOOTERS AND POUR AREA WASHED IN. NOT READY FOR INSPECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/12/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 08/12/25 TPOLACEK*** FOOTERS AND POUR AREA WASHED IN. NOT READY FOR INSPECTION. | |||
| INSULATION | 08/05/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| LATH/BRICK/ WATER BARRIER | 08/04/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| ALL ROUGH | 08/04/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| ALL ROUGH | 08/01/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: please fix items before next inspection inspection was not completed #1- insulation was install in wall , insulation is not permiting untill past all rough inspection removed wall papper insulation #2-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #3-ceiling insulation face nee to be facing inside the house ( a few areas have insulation facing dowm THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 08/01/2025 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Not ready | |||
| INSULATION | 08/01/2025 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Inspector Notes from Inspection 2420 THIS WAS A VIRTUAL INSPECTION | |||
| U-CROSS CONNECTION | 08/01/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cc | |||
| GRAVITY SEWER TEST | 07/28/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 FBC-3303.5 SWALE BLOCKED BY PORTABLE Inspector Notes from Inspection 2060 FBC-3303.5 SWALE BLOCKED BY PORTABLE Inspector Notes from Inspection 2060 FBC-3303.5 SWALE BLOCKED BY PORTABLE THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 07/28/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 Inspector Notes from Inspection 2060 FBC-3303.5 SWALE BLOCKED BY PORTABLE Inspector Notes from Inspection 2060 FBC-3303.5 SWALE BLOCKED BY PORTABLE Inspector Notes from Inspection 2060 FBC-3303.5 SWALE BLOCKED BY PORTABLE THIS WAS A VIRTUAL INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| ALL ROUGH | 07/28/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| WALL SHEATHING | 07/25/2025 | APPROVED | CVANSTRAHLEN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/25/2025 | APPROVED | CVANSTRAHLEN |
| ROOF VALLEY & METAL | 07/25/2025 | APPROVED | CVANSTRAHLEN |
| TIE BEAM / LINTEL | 07/11/2025 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2250 *** NOTES ADDED BY CVANSTRAHLEN 7/1/2025 11:17:51 AM *** #2-FBC 3303.5-moved porta potty of neighbor property to construction property zone and off swale area Please fix items before next inspection #1-FBC 3307.1 -NEEDS SILT FENCE PROPERLY INSTALLED #2-moved porta potty of neighbor property to construction property zone and off swell area | |||
| MONOLITHIC SLAB | 07/01/2025 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: *** NOTES ADDED BY CVANSTRAHLEN 7/1/2025 11:17:51 AM *** #2-FBC 3303.5-moved porta potty of neighbor property to construction property zone and off swale area Please fix items before next inspection #1-FBC 3307.1 -NEEDS SILT FENCE PROPERLY INSTALLED #2-moved porta potty of neighbor property to construction property zone and off swell area | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/27/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: FBC-3303.5 SWALE BLOCKED BY PORTABLE | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 06/25/2025 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/16/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 05/15/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/25/2025 | 06/25/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/25/2025 | 06/25/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/16/2025 | 06/16/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/11/2025 | 04/17/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Per Rodney, Gabriel, and Parren the builder was instructed to move the berm to the 5' easement and will exceed the 4:1 slope going to the back property. We allowed this due to not being able to make the COPC edge of pavement requirement if berm was lowered. Pinning the sod behind the berm will be required to prevent erosion. | |||
| ENGIN1 | COMPLETE | 04/11/2025 | 04/14/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/11/2025 | 04/11/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/01/2025 | 04/08/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM After reviewing this lot and talking with the inspectors. Gabriel, Parron, and I recommend moving the berm to the 5' easement. This will exceed the 4:1 slope, but will allow this lot to meet the edge of pavement requirement and push no more than 5' of stormwater to lot 10. Please call or email if you have any questions. | |||
| ENGIN1 | COMPLETE | 04/01/2025 | 04/02/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/01/2025 | 04/01/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/25/2025 | 03/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/25/2025 | 03/28/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Based on the information given the slope at the breakpoint (30.60) of the berm is more than a 4:1 slope in relation to the back property line (28.00). Per COPC Technical Manual 300.01 A.1.c(8) the proposed slopes shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than 4:1. Note: This proposed FFE for this lot can be no lower due to lot 16 FFE of 32.22' Any devitation lower will result in a hold. Please feel free to call or email if you have any questions. | |||
| ZON | COMPLETE | 03/25/2025 | 03/25/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/19/2025 | 04/09/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/18/2025 | 03/21/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/18/2025 | 03/21/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/18/2025 | 03/18/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/18/2025 | 03/25/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 03/18/2025 | 03/19/2025 |
| Note: Held By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM Please raise the FFE to be in between it's neighbors | |||
| GAS | CANCEL | 03/18/2025 | 03/20/2025 |
| LOCATE | COMPLETE | 03/18/2025 | 03/20/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/18/2025 | 03/24/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/18/2025 | 03/24/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM The proposed FFE for this lot needs to be more than ± 10"(0.83) of neighboring lots. | |||
| ZON | COMPLETE | 03/18/2025 | 03/21/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/03/2025 |
| REINSPECTION FEE | ¤40.00 | 09/03/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 09/03/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/03/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/03/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/17/2025 |
| SW ENG PRE APRON | ¤30.00 | 04/17/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/17/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/17/2025 |
| SEWER CREDIT | (¤1,466.00) | 04/17/2025 |
| SEWER INSPECTION | ¤25.00 | 04/17/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 04/17/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 04/17/2025 |
| SITE PLAN 30 | ¤30.00 | 04/17/2025 |
| SURCHARGE FS 533.721 | ¤10.82 | 04/17/2025 |
| SURCHARGE - FS 468.631 | ¤16.23 | 04/17/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/17/2025 |
| WATER- TURN ON | ¤25.00 | 04/17/2025 |
| ADJUSTMENT 10% | (¤120.20) | 04/17/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/17/2025 |
| INSPECTION - RESIDENTIAL | ¤913.00 | 04/17/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤258.96 | 04/17/2025 |
| CONNECTION FEES | ¤1,187.26 | 04/17/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 04/17/2025 |
| IMPACT FEE FIRE | ¤434.51 | 04/17/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/17/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/17/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 04/17/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/17/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 04/17/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/17/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,083.25 |