I want to search for...
Permit #2025030827
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00520-0150 |
| CONDITIONED SPACE: 1809 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 33 sqft |
| Total Square Footage: 2248 sqft |
| Block: 00520 |
| Subdivision: - |
| Job Phone: 239-571-5325 |
| Location Address: 2 PINE BUSH LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/26/2025 |
| NOC: RECORDED |
| Applicant name: RYAN SCOTT DAVIS |
| Owner: SYNERGY HOMES, LLC |
|
Address 581 NW MERCANTILE PL PORT ST LUCIE, FL 34986 |
|
Address STE 106 PORT ST LUCIE, FL 34986 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SYNERGY HOMES, LLC
| Status | Location Address | State License Number |
| ACTIVE |
1 HARGROVE GRADE, SUITE B1 PALM COAST, FL 32137 |
CBC1254289 (Exp: 08/31/2026) |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 08/18/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 no irr-no cc | |||
| ROW - FINAL APRON (AFTER POUR) | 08/15/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/15/2025 | APPROVED | TPOLACEK |
| Note: 8/1/2025 - PREVIOUS INSPECTION NOTES PLEASE SEE SNIP OF FINAL SURVEY ATTACHED TO PERMIT. THERE IS A ELELVATION ALONG BACK RIGHT LOWER THAN THE BOTTOM OF SWALE AND THE CULVERT IS OUT OF TOLERANCE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/15/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 08/15/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| BLD - BUILDING FINAL | 08/12/2025 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/12/2025 8:26:31 AM *** 8/12/25: This inspection was checked yesterday after door code was received. > Approved. 8/11/2025 - PREVIOUS INSPECTION NOTES 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25: 1). Guest bathroom: right side sink is leaking. (water in cabinet). FBC-P2705.1(4) 2). Front Entry GFCI outlet: Cover is sealed shut with stucco/paint. Could not test GFCI for exterior outlets. FBC-[A] 110.1 / NEC 210.8(A)(3). 8/6/2025 - PREVIOUS INSPECTION NOTES 8/6/25: House is locked up tight with no key or keybox code available. Could only check roof, locking caps and exterior. 1). Need access for inspection. FBC[A] 110.5 | |||
| BLD - BUILDING FINAL | 08/11/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/11/2025 10:50:44 AM *** 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25: 1). Guest bathroom: right side sink is leaking. (water in cabinet). FBC-P2705.1(4) 2). Front Entry GFCI outlet: Cover is sealed shut with stucco/paint. Could not test GFCI for exterior outlets. FBC-[A] 110.1 / NEC 210.8(A)(3). 8/6/2025 - PREVIOUS INSPECTION NOTES 8/6/25: House is locked up tight with no key or keybox code available. Could only check roof, locking caps and exterior. 1). Need access for inspection. FBC[A] 110.5 | |||
| BLD - BUILDING FINAL | 08/08/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/8/2025 12:53:01 PM *** 8/8/25: 1). Guest bathroom: right side sink is leaking. (water in cabinet). FBC-P2705.1(4) 2). Front Entry GFCI outlet: Cover is sealed shut with stucco/paint. Could not test GFCI for exterior outlets. FBC-[A] 110.1 / NEC 210.8(A)(3). 8/6/2025 - PREVIOUS INSPECTION NOTES 8/6/25: House is locked up tight with no key or keybox code available. Could only check roof, locking caps and exterior. 1). Need access for inspection. FBC[A] 110.5 | |||
| BLD - BUILDING FINAL | 08/06/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/6/2025 9:59:13 AM *** 8/6/25: House is locked up tight with no key or keybox code available. Could only check roof, locking caps and exterior. 1). Need access for inspection. FBC[A] 110.5 | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/01/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: PLEASE SEE SNIP OF FINAL SURVEY ATTACHED TO PERMIT. THERE IS A ELELVATION ALONG BACK RIGHT LOWER THAN THE BOTTOM OF SWALE AND THE CULVERT IS OUT OF TOLERANCE | |||
| ROW - DRAINAGE | 07/24/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 07/24/25 TPOLACEK*** GRADER IS ON SITE COMPLETING FINLAL GRADE AND REMOVING ALL DEBRIS. APPROVING AS NOTED ++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** ALL CONCRETE MUST BE REMOVED TO PREVENT ILLICIT DISCHARGE, SILT FENCE MUST BE REESTABLISHED AND WRAPPED AROUND FRONT LEAVING ONLY CONSTRUCTION ENTRANCE, SWALE MUST BE REGRADED TO ALLOW DRAINAGE. SEE ATTCHED PHOTOS 7 DAYS TILL RE-INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 07/21/2025 | APPROVED | TPOLACEK |
| Note: 07/21/25 TPOLACEK*** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK***CULVERT IS OUT OF TOLERENCE, THERE IS NOT 5" OVER THE CULVERT AT DRIVEWAY EDGE, THERE IS NOT 2" OVER MITERED OPEN END AS REQUIRED. THERE IS NO ADDRESS POSTED ON HOUSE OR JOB BOX. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/14/2025 - PREVIOUS INSPECTION NOTES 07/14/25 TPOLACEK*** RECIEVED TEXT FROM CM ASKING TO CANCEL INSPECTION FOR TODAY | |||
| ROW- PRE-APRON (PRE-POUR) | 07/17/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 07/17/25 TPOLACEK***CULVERT IS OUT OF TOLERENCE, THERE IS NOT 5" OVER THE CULVERT AT DRIVEWAY EDGE, THERE IS NOT 2" OVER MITERED OPEN END AS REQUIRED. THERE IS NO ADDRESS POSTED ON HOUSE OR JOB BOX. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/14/2025 - PREVIOUS INSPECTION NOTES 07/14/25 TPOLACEK*** RECIEVED TEXT FROM CM ASKING TO CANCEL INSPECTION FOR TODAY | |||
| ROW - DRAINAGE | 07/17/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 07/17/25 TPOLACEK*** ALL CONCRETE MUST BE REMOVED TO PREVENT ILLICIT DISCHARGE, SILT FENCE MUST BE REESTABLISHED AND WRAPPED AROUND FRONT LEAVING ONLY CONSTRUCTION ENTRANCE, SWALE MUST BE REGRADED TO ALLOW DRAINAGE. SEE ATTCHED PHOTOS 7 DAYS TILL RE-INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 07/14/2025 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 07/14/25 TPOLACEK*** RECIEVED TEXT FROM CM ASKING TO CANCEL INSPECTION FOR TODAY | |||
| ELECTRIC - EARLY POWER | 07/14/2025 | APPROVED | CVANSTRAHLEN |
| GRAVITY SEWER TEST | 07/09/2025 | APPROVED | MGIBSON |
| SEWER TIE IN | 07/09/2025 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 06/26/2025 | APPROVED | CBOWERMASTER |
| INSULATION | 06/24/2025 | APPROVED | RSIMS |
| LATH/BRICK/ WATER BARRIER | 06/24/2025 | APPROVED | RSIMS |
| Note: 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25: PREVIOUSLY LISTED ITEM 2 IS NOT RESOLVED AS REQUIRED. WIRE LATH ALONE IS NOT SUFFICIENT TO MEET STRUCTURAL REQUIREMENT. AS STATED MUST BE REPAIRED WITH A CEMENT BASED PRODUCT (similar to a down cell). 2). Large area of CMU wall cut out at back left plumbing needs to be repaired with a cement based material. FBC [A]107.4 __________________________________________________________ 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25: NOT READY! 1). Holes for electrical, holes at hose bibbs need to be sealed with lath along with electrical boxes being taped at perimeter. FBC [A]107.4 2). Large area of CMU wall cut out at back left plumbing needs to be repaired with a cement based material. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 6/9/2025 1:04:45 PM *** 6/9/25: Approved as noted. Must be resolved prior to next inspection. 1). Silt Fence needs to be FBC 3307.1 2). Truss B1 needs to be plumbed and please check truss B2. FBC [A]107.4 3). Truss D1 is not connected as required on MiTek plan. Marked on MiTek. | |||
| LATH/BRICK/ WATER BARRIER | 06/20/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/20/2025 2:14:11 PM *** 6/20/25: PREVIOUSLY LISTED ITEM 2 IS NOT RESOLVED AS REQUIRED. WIRE LATH ALONE IS NOT SUFFICIENT TO MEET STRUCTURAL REQUIREMENT. AS STATED MUST BE REPAIRED WITH A CEMENT BASED PRODUCT (similar to a down cell). 2). Large area of CMU wall cut out at back left plumbing needs to be repaired with a cement based material. FBC [A]107.4 __________________________________________________________ 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25: NOT READY! 1). Holes for electrical, holes at hose bibbs need to be sealed with lath along with electrical boxes being taped at perimeter. FBC [A]107.4 2). Large area of CMU wall cut out at back left plumbing needs to be repaired with a cement based material. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 6/9/2025 1:04:45 PM *** 6/9/25: Approved as noted. Must be resolved prior to next inspection. 1). Silt Fence needs to be FBC 3307.1 2). Truss B1 needs to be plumbed and please check truss B2. FBC [A]107.4 3). Truss D1 is not connected as required on MiTek plan. Marked on MiTek. | |||
| ALL ROUGH | 06/20/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/20/2025 2:07:39 PM *** 6/9/25: Approved as noted. Must be resolved prior to next inspection. 1). Silt Fence needs to be FBC 3307.1 2). Truss B1 needs to be plumbed and please check truss B2. FBC [A]107.4 3). Truss D1 is not connected as required on MiTek plan. Marked on MiTek. | |||
| LATH/BRICK/ WATER BARRIER | 06/18/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/18/2025 11:09:38 AM *** 6/18/25: NOT READY! 1). Holes for electrical, holes at hose bibbs need to be sealed with lath along with electrical boxes being taped at perimeter. FBC [A]107.4 2). Large area of CMU wall cut out at back left plumbing needs to be repaired with a cement based material. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 6/9/2025 1:04:45 PM *** 6/9/25: Approved as noted. Must be resolved prior to next inspection. 1). Silt Fence needs to be FBC 3307.1 2). Truss B1 needs to be plumbed and please check truss B2. FBC [A]107.4 3). Truss D1 is not connected as required on MiTek plan. Marked on MiTek. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/10/2025 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 06/10/2025 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 06/09/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/9/2025 12:51:18 PM *** 6/9/25: 1). SILT FENCE needs to be repaired. FBC 3307.1 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/09/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/9/2025 1:04:45 PM *** 6/9/25: Approved as noted. Must be resolved prior to next inspection. 1). Silt Fence needs to be FBC 3307.1 2). Truss B1 needs to be plumbed and please check truss B2. FBC [A]107.4 3). Truss D1 is not connected as required on MiTek plan. Marked on MiTek. | |||
| WALL SHEATHING | 06/02/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/2/2025 11:20:29 AM *** Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 5/27/2025 11:39:06 AM *** 5/27/25: TieBeam/Lintel approved. NOTE: Trusses on site have a delivery date of 4/28/25. A revised delivery ticket showing actual delivery date will be required or it may require Engineer's letter of visual, inspection/verification of truss condition due to trusses laying directly in the dirt/mud. | |||
| U-CROSS CONNECTION | 06/02/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cc | |||
| TIE BEAM / LINTEL | 05/27/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/27/2025 11:39:06 AM *** 5/27/25: TieBeam/Lintel approved. NOTE: Trusses on site have a delivery date of 4/28/25. A revised delivery ticket showing actual delivery date will be required or it may require Engineer's letter of visual, inspection/verification of truss condition due to trusses laying directly in the dirt/mud. | |||
| MONOLITHIC SLAB | 05/19/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/19/2025 11:51:47 AM *** 5/15/2025 - PREVIOUS INSPECTION NOTES 5/15/25: Cancelled by Applicant via text at @ 08:37. 5/14/2025 - PREVIOUS INSPECTION NOTES 5/14/25: *** Site still has numerous areas with dirt wash in and item 2 below remains unresolved. 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/12/2025 - PREVIOUS INSPECTION NOTES 5/12/25: *** Rain has caused dirt cave-in at numerous areas throughout the footers. 5/9/2025 - PREVIOUS INSPECTION NOTES 5/9/25: 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/8/2025 - PREVIOUS INSPECTION NOTES 5/8/25: 1). Cave in at back right side needs to be removed. FBC-R404.1.3.3.7.4 2). Tape 6mil plastic where torn or separated. Marked on plans. FBC [A]107.4 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 4). Back right area of footer > remove root. FBC [A]107.4 5). Need silt fence completed on Pine Brook side of site (3 sides minimum). FBC 3307.1 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS. | |||
| MONOLITHIC SLAB | 05/15/2025 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/15/2025 8:43:09 AM *** 5/15/25: Cancelled by Applicant via text at @ 08:37. 5/14/2025 - PREVIOUS INSPECTION NOTES 5/14/25: *** Site still has numerous areas with dirt wash in and item 2 below remains unresolved. 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/12/2025 - PREVIOUS INSPECTION NOTES 5/12/25: *** Rain has caused dirt cave-in at numerous areas throughout the footers. 5/9/2025 - PREVIOUS INSPECTION NOTES 5/9/25: 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/8/2025 - PREVIOUS INSPECTION NOTES 5/8/25: 1). Cave in at back right side needs to be removed. FBC-R404.1.3.3.7.4 2). Tape 6mil plastic where torn or separated. Marked on plans. FBC [A]107.4 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 4). Back right area of footer > remove root. FBC [A]107.4 5). Need silt fence completed on Pine Brook side of site (3 sides minimum). FBC 3307.1 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS. | |||
| MONOLITHIC SLAB | 05/14/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/14/2025 1:56:04 PM *** 5/14/25: *** Site still has numerous areas with dirt wash in and item 2 below remains unresolved. 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/12/2025 - PREVIOUS INSPECTION NOTES 5/12/25: *** Rain has caused dirt cave-in at numerous areas throughout the footers. 5/9/2025 - PREVIOUS INSPECTION NOTES 5/9/25: 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/8/2025 - PREVIOUS INSPECTION NOTES 5/8/25: 1). Cave in at back right side needs to be removed. FBC-R404.1.3.3.7.4 2). Tape 6mil plastic where torn or separated. Marked on plans. FBC [A]107.4 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 4). Back right area of footer > remove root. FBC [A]107.4 5). Need silt fence completed on Pine Brook side of site (3 sides minimum). FBC 3307.1 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS. | |||
| MONOLITHIC SLAB | 05/12/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/12/2025 11:10:53 AM *** 5/12/25: *** Rain has caused dirt cave-in at numerous areas throughout the footers. 5/9/2025 - PREVIOUS INSPECTION NOTES 5/9/25: 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/8/2025 - PREVIOUS INSPECTION NOTES 5/8/25: 1). Cave in at back right side needs to be removed. FBC-R404.1.3.3.7.4 2). Tape 6mil plastic where torn or separated. Marked on plans. FBC [A]107.4 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 4). Back right area of footer > remove root. FBC [A]107.4 5). Need silt fence completed on Pine Brook side of site (3 sides minimum). FBC 3307.1 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS. | |||
| MONOLITHIC SLAB | 05/09/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/9/2025 11:15:42 AM *** 5/9/25: 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/8/2025 - PREVIOUS INSPECTION NOTES 5/8/25: 1). Cave in at back right side needs to be removed. FBC-R404.1.3.3.7.4 2). Tape 6mil plastic where torn or separated. Marked on plans. FBC [A]107.4 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 4). Back right area of footer > remove root. FBC [A]107.4 5). Need silt fence completed on Pine Brook side of site (3 sides minimum). FBC 3307.1 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS. | |||
| MONOLITHIC SLAB | 05/08/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/8/2025 12:32:21 PM *** 5/8/25: 1). Cave in at back right side needs to be removed. FBC-R404.1.3.3.7.4 2). Tape 6mil plastic where torn or separated. Marked on plans. FBC [A]107.4 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 4). Back right area of footer > remove root. FBC [A]107.4 5). Need silt fence completed on Pine Brook side of site (3 sides minimum). FBC 3307.1 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS. | |||
| MONOLITHIC SLAB | 05/07/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/7/2025 10:55:04 AM *** 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/02/2025 | APPROVED | MGIBSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/30/2025 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/30/2025 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 04/15/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/29/2025 | 04/30/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/29/2025 | 04/30/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/29/2025 | 04/29/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/19/2025 | 03/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/19/2025 | 03/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/19/2025 | 03/19/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/19/2025 | 03/25/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/19/2025 | 03/19/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/19/2025 | 03/24/2025 |
| LOCATE | COMPLETE | 03/19/2025 | 03/20/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/19/2025 | 03/25/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/19/2025 | 03/24/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/19/2025 | 03/21/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/19/2025 | 04/01/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/15/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/15/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/15/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/15/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/15/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/15/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/15/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/26/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/26/2025 |
| SEWER CREDIT | (¤1,147.00) | 03/26/2025 |
| SEWER INSPECTION | ¤25.00 | 03/26/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 03/26/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 03/26/2025 |
| SITE PLAN 30 | ¤30.00 | 03/26/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/26/2025 |
| SW ENG PRE APRON | ¤30.00 | 03/26/2025 |
| WATER- TURN ON | ¤25.00 | 03/26/2025 |
| ADJUSTMENT 10% | (¤120.20) | 03/26/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/26/2025 |
| INSPECTION - RESIDENTIAL | ¤913.00 | 03/26/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤258.96 | 03/26/2025 |
| CONNECTION FEES | ¤1,187.26 | 03/26/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 03/26/2025 |
| IMPACT FEE FIRE | ¤434.51 | 03/26/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/26/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/26/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 03/26/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/26/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 03/26/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/26/2025 |
| SURCHARGE FS 533.721 | ¤10.82 | 03/26/2025 |
| SURCHARGE - FS 468.631 | ¤16.23 | 03/26/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/26/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,482.25 |