Permit #2025030827

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00520-0150
CONDITIONED SPACE: 1809 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 2248 sqft
Block: 00520
Subdivision: -
Job Phone: 239-571-5325
Location Address: 2 PINE BUSH LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/26/2025
NOC: RECORDED
Applicant name: RYAN SCOTT DAVIS
Owner: SYNERGY HOMES, LLC

Address

581 NW MERCANTILE PL

PORT ST LUCIE, FL 34986

Address

STE 106

PORT ST LUCIE, FL 34986

Lot: 0150
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SYNERGY HOMES, LLC
Status Location Address State License Number
ACTIVE

1 HARGROVE GRADE, SUITE B1

PALM COAST, FL 32137

CBC1254289 (Exp: 08/31/2026)

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 08/18/2025 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 no irr-no cc
ROW - FINAL APRON (AFTER POUR) 08/15/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/15/2025 APPROVED TPOLACEK
Note: 8/1/2025 - PREVIOUS INSPECTION NOTES PLEASE SEE SNIP OF FINAL SURVEY ATTACHED TO PERMIT. THERE IS A ELELVATION ALONG BACK RIGHT LOWER THAN THE BOTTOM OF SWALE AND THE CULVERT IS OUT OF TOLERANCE
ROW FIELD SURVEY /GRADING CERTIFICATION 08/15/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 08/15/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
BLD - BUILDING FINAL 08/12/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 8/12/2025 8:26:31 AM *** 8/12/25: This inspection was checked yesterday after door code was received. > Approved. 8/11/2025 - PREVIOUS INSPECTION NOTES 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25: 1). Guest bathroom: right side sink is leaking. (water in cabinet). FBC-P2705.1(4) 2). Front Entry GFCI outlet: Cover is sealed shut with stucco/paint. Could not test GFCI for exterior outlets. FBC-[A] 110.1 / NEC 210.8(A)(3). 8/6/2025 - PREVIOUS INSPECTION NOTES 8/6/25: House is locked up tight with no key or keybox code available. Could only check roof, locking caps and exterior. 1). Need access for inspection. FBC[A] 110.5
BLD - BUILDING FINAL 08/11/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 8/11/2025 10:50:44 AM *** 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25: 1). Guest bathroom: right side sink is leaking. (water in cabinet). FBC-P2705.1(4) 2). Front Entry GFCI outlet: Cover is sealed shut with stucco/paint. Could not test GFCI for exterior outlets. FBC-[A] 110.1 / NEC 210.8(A)(3). 8/6/2025 - PREVIOUS INSPECTION NOTES 8/6/25: House is locked up tight with no key or keybox code available. Could only check roof, locking caps and exterior. 1). Need access for inspection. FBC[A] 110.5
BLD - BUILDING FINAL 08/08/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 8/8/2025 12:53:01 PM *** 8/8/25: 1). Guest bathroom: right side sink is leaking. (water in cabinet). FBC-P2705.1(4) 2). Front Entry GFCI outlet: Cover is sealed shut with stucco/paint. Could not test GFCI for exterior outlets. FBC-[A] 110.1 / NEC 210.8(A)(3). 8/6/2025 - PREVIOUS INSPECTION NOTES 8/6/25: House is locked up tight with no key or keybox code available. Could only check roof, locking caps and exterior. 1). Need access for inspection. FBC[A] 110.5
BLD - BUILDING FINAL 08/06/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 8/6/2025 9:59:13 AM *** 8/6/25: House is locked up tight with no key or keybox code available. Could only check roof, locking caps and exterior. 1). Need access for inspection. FBC[A] 110.5
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/01/2025 Disapproved - NO FEE TPOLACEK
Note: PLEASE SEE SNIP OF FINAL SURVEY ATTACHED TO PERMIT. THERE IS A ELELVATION ALONG BACK RIGHT LOWER THAN THE BOTTOM OF SWALE AND THE CULVERT IS OUT OF TOLERANCE
ROW - DRAINAGE 07/24/2025 APPROVED - AS NOTED TPOLACEK
Note: 07/24/25 TPOLACEK*** GRADER IS ON SITE COMPLETING FINLAL GRADE AND REMOVING ALL DEBRIS. APPROVING AS NOTED ++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** ALL CONCRETE MUST BE REMOVED TO PREVENT ILLICIT DISCHARGE, SILT FENCE MUST BE REESTABLISHED AND WRAPPED AROUND FRONT LEAVING ONLY CONSTRUCTION ENTRANCE, SWALE MUST BE REGRADED TO ALLOW DRAINAGE. SEE ATTCHED PHOTOS 7 DAYS TILL RE-INSPECTION
ROW- PRE-APRON (PRE-POUR) 07/21/2025 APPROVED TPOLACEK
Note: 07/21/25 TPOLACEK*** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK***CULVERT IS OUT OF TOLERENCE, THERE IS NOT 5" OVER THE CULVERT AT DRIVEWAY EDGE, THERE IS NOT 2" OVER MITERED OPEN END AS REQUIRED. THERE IS NO ADDRESS POSTED ON HOUSE OR JOB BOX. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/14/2025 - PREVIOUS INSPECTION NOTES 07/14/25 TPOLACEK*** RECIEVED TEXT FROM CM ASKING TO CANCEL INSPECTION FOR TODAY
ROW- PRE-APRON (PRE-POUR) 07/17/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 07/17/25 TPOLACEK***CULVERT IS OUT OF TOLERENCE, THERE IS NOT 5" OVER THE CULVERT AT DRIVEWAY EDGE, THERE IS NOT 2" OVER MITERED OPEN END AS REQUIRED. THERE IS NO ADDRESS POSTED ON HOUSE OR JOB BOX. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/14/2025 - PREVIOUS INSPECTION NOTES 07/14/25 TPOLACEK*** RECIEVED TEXT FROM CM ASKING TO CANCEL INSPECTION FOR TODAY
ROW - DRAINAGE 07/17/2025 Disapproved - NO FEE TPOLACEK
Note: 07/17/25 TPOLACEK*** ALL CONCRETE MUST BE REMOVED TO PREVENT ILLICIT DISCHARGE, SILT FENCE MUST BE REESTABLISHED AND WRAPPED AROUND FRONT LEAVING ONLY CONSTRUCTION ENTRANCE, SWALE MUST BE REGRADED TO ALLOW DRAINAGE. SEE ATTCHED PHOTOS 7 DAYS TILL RE-INSPECTION
ROW- PRE-APRON (PRE-POUR) 07/14/2025 CANCELLED BY APPLICANT TPOLACEK
Note: 07/14/25 TPOLACEK*** RECIEVED TEXT FROM CM ASKING TO CANCEL INSPECTION FOR TODAY
ELECTRIC - EARLY POWER 07/14/2025 APPROVED CVANSTRAHLEN
GRAVITY SEWER TEST 07/09/2025 APPROVED MGIBSON
SEWER TIE IN 07/09/2025 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 06/26/2025 APPROVED CBOWERMASTER
INSULATION 06/24/2025 APPROVED RSIMS
LATH/BRICK/ WATER BARRIER 06/24/2025 APPROVED RSIMS
Note: 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25: PREVIOUSLY LISTED ITEM 2 IS NOT RESOLVED AS REQUIRED. WIRE LATH ALONE IS NOT SUFFICIENT TO MEET STRUCTURAL REQUIREMENT. AS STATED MUST BE REPAIRED WITH A CEMENT BASED PRODUCT (similar to a down cell). 2). Large area of CMU wall cut out at back left plumbing needs to be repaired with a cement based material. FBC [A]107.4 __________________________________________________________ 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25: NOT READY! 1). Holes for electrical, holes at hose bibbs need to be sealed with lath along with electrical boxes being taped at perimeter. FBC [A]107.4 2). Large area of CMU wall cut out at back left plumbing needs to be repaired with a cement based material. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 6/9/2025 1:04:45 PM *** 6/9/25: Approved as noted. Must be resolved prior to next inspection. 1). Silt Fence needs to be FBC 3307.1 2). Truss B1 needs to be plumbed and please check truss B2. FBC [A]107.4 3). Truss D1 is not connected as required on MiTek plan. Marked on MiTek.
LATH/BRICK/ WATER BARRIER 06/20/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/20/2025 2:14:11 PM *** 6/20/25: PREVIOUSLY LISTED ITEM 2 IS NOT RESOLVED AS REQUIRED. WIRE LATH ALONE IS NOT SUFFICIENT TO MEET STRUCTURAL REQUIREMENT. AS STATED MUST BE REPAIRED WITH A CEMENT BASED PRODUCT (similar to a down cell). 2). Large area of CMU wall cut out at back left plumbing needs to be repaired with a cement based material. FBC [A]107.4 __________________________________________________________ 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25: NOT READY! 1). Holes for electrical, holes at hose bibbs need to be sealed with lath along with electrical boxes being taped at perimeter. FBC [A]107.4 2). Large area of CMU wall cut out at back left plumbing needs to be repaired with a cement based material. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 6/9/2025 1:04:45 PM *** 6/9/25: Approved as noted. Must be resolved prior to next inspection. 1). Silt Fence needs to be FBC 3307.1 2). Truss B1 needs to be plumbed and please check truss B2. FBC [A]107.4 3). Truss D1 is not connected as required on MiTek plan. Marked on MiTek.
ALL ROUGH 06/20/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/20/2025 2:07:39 PM *** 6/9/25: Approved as noted. Must be resolved prior to next inspection. 1). Silt Fence needs to be FBC 3307.1 2). Truss B1 needs to be plumbed and please check truss B2. FBC [A]107.4 3). Truss D1 is not connected as required on MiTek plan. Marked on MiTek.
LATH/BRICK/ WATER BARRIER 06/18/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/18/2025 11:09:38 AM *** 6/18/25: NOT READY! 1). Holes for electrical, holes at hose bibbs need to be sealed with lath along with electrical boxes being taped at perimeter. FBC [A]107.4 2). Large area of CMU wall cut out at back left plumbing needs to be repaired with a cement based material. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 6/9/2025 1:04:45 PM *** 6/9/25: Approved as noted. Must be resolved prior to next inspection. 1). Silt Fence needs to be FBC 3307.1 2). Truss B1 needs to be plumbed and please check truss B2. FBC [A]107.4 3). Truss D1 is not connected as required on MiTek plan. Marked on MiTek.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/10/2025 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 06/10/2025 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 06/09/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/9/2025 12:51:18 PM *** 6/9/25: 1). SILT FENCE needs to be repaired. FBC 3307.1
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/09/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/9/2025 1:04:45 PM *** 6/9/25: Approved as noted. Must be resolved prior to next inspection. 1). Silt Fence needs to be FBC 3307.1 2). Truss B1 needs to be plumbed and please check truss B2. FBC [A]107.4 3). Truss D1 is not connected as required on MiTek plan. Marked on MiTek.
WALL SHEATHING 06/02/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/2/2025 11:20:29 AM *** Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 5/27/2025 11:39:06 AM *** 5/27/25: TieBeam/Lintel approved. NOTE: Trusses on site have a delivery date of 4/28/25. A revised delivery ticket showing actual delivery date will be required or it may require Engineer's letter of visual, inspection/verification of truss condition due to trusses laying directly in the dirt/mud.
U-CROSS CONNECTION 06/02/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cc
TIE BEAM / LINTEL 05/27/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/27/2025 11:39:06 AM *** 5/27/25: TieBeam/Lintel approved. NOTE: Trusses on site have a delivery date of 4/28/25. A revised delivery ticket showing actual delivery date will be required or it may require Engineer's letter of visual, inspection/verification of truss condition due to trusses laying directly in the dirt/mud.
MONOLITHIC SLAB 05/19/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/19/2025 11:51:47 AM *** 5/15/2025 - PREVIOUS INSPECTION NOTES 5/15/25: Cancelled by Applicant via text at @ 08:37. 5/14/2025 - PREVIOUS INSPECTION NOTES 5/14/25: *** Site still has numerous areas with dirt wash in and item 2 below remains unresolved. 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/12/2025 - PREVIOUS INSPECTION NOTES 5/12/25: *** Rain has caused dirt cave-in at numerous areas throughout the footers. 5/9/2025 - PREVIOUS INSPECTION NOTES 5/9/25: 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/8/2025 - PREVIOUS INSPECTION NOTES 5/8/25: 1). Cave in at back right side needs to be removed. FBC-R404.1.3.3.7.4 2). Tape 6mil plastic where torn or separated. Marked on plans. FBC [A]107.4 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 4). Back right area of footer > remove root. FBC [A]107.4 5). Need silt fence completed on Pine Brook side of site (3 sides minimum). FBC 3307.1 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS.
MONOLITHIC SLAB 05/15/2025 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 5/15/2025 8:43:09 AM *** 5/15/25: Cancelled by Applicant via text at @ 08:37. 5/14/2025 - PREVIOUS INSPECTION NOTES 5/14/25: *** Site still has numerous areas with dirt wash in and item 2 below remains unresolved. 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/12/2025 - PREVIOUS INSPECTION NOTES 5/12/25: *** Rain has caused dirt cave-in at numerous areas throughout the footers. 5/9/2025 - PREVIOUS INSPECTION NOTES 5/9/25: 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/8/2025 - PREVIOUS INSPECTION NOTES 5/8/25: 1). Cave in at back right side needs to be removed. FBC-R404.1.3.3.7.4 2). Tape 6mil plastic where torn or separated. Marked on plans. FBC [A]107.4 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 4). Back right area of footer > remove root. FBC [A]107.4 5). Need silt fence completed on Pine Brook side of site (3 sides minimum). FBC 3307.1 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS.
MONOLITHIC SLAB 05/14/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/14/2025 1:56:04 PM *** 5/14/25: *** Site still has numerous areas with dirt wash in and item 2 below remains unresolved. 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/12/2025 - PREVIOUS INSPECTION NOTES 5/12/25: *** Rain has caused dirt cave-in at numerous areas throughout the footers. 5/9/2025 - PREVIOUS INSPECTION NOTES 5/9/25: 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/8/2025 - PREVIOUS INSPECTION NOTES 5/8/25: 1). Cave in at back right side needs to be removed. FBC-R404.1.3.3.7.4 2). Tape 6mil plastic where torn or separated. Marked on plans. FBC [A]107.4 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 4). Back right area of footer > remove root. FBC [A]107.4 5). Need silt fence completed on Pine Brook side of site (3 sides minimum). FBC 3307.1 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS.
MONOLITHIC SLAB 05/12/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 5/12/2025 11:10:53 AM *** 5/12/25: *** Rain has caused dirt cave-in at numerous areas throughout the footers. 5/9/2025 - PREVIOUS INSPECTION NOTES 5/9/25: 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/8/2025 - PREVIOUS INSPECTION NOTES 5/8/25: 1). Cave in at back right side needs to be removed. FBC-R404.1.3.3.7.4 2). Tape 6mil plastic where torn or separated. Marked on plans. FBC [A]107.4 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 4). Back right area of footer > remove root. FBC [A]107.4 5). Need silt fence completed on Pine Brook side of site (3 sides minimum). FBC 3307.1 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS.
MONOLITHIC SLAB 05/09/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 5/9/2025 11:15:42 AM *** 5/9/25: 1). Multiple areas of minor dirt cave-in at footers. All footers will need to be checked and cleaned out to maintain width, depth and rebar clearance. FBC [A]107.4 / FBC-R404.1.3.3.7.4 2). Previously listed item 3 remains unresolved. --->>> 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 5/8/2025 - PREVIOUS INSPECTION NOTES 5/8/25: 1). Cave in at back right side needs to be removed. FBC-R404.1.3.3.7.4 2). Tape 6mil plastic where torn or separated. Marked on plans. FBC [A]107.4 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 4). Back right area of footer > remove root. FBC [A]107.4 5). Need silt fence completed on Pine Brook side of site (3 sides minimum). FBC 3307.1 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS.
MONOLITHIC SLAB 05/08/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/8/2025 12:32:21 PM *** 5/8/25: 1). Cave in at back right side needs to be removed. FBC-R404.1.3.3.7.4 2). Tape 6mil plastic where torn or separated. Marked on plans. FBC [A]107.4 3). Sleeve for plumbing main drain needs to be fully through the footer. FBCRP2603.4 4). Back right area of footer > remove root. FBC [A]107.4 5). Need silt fence completed on Pine Brook side of site (3 sides minimum). FBC 3307.1 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS.
MONOLITHIC SLAB 05/07/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 5/7/2025 10:55:04 AM *** 5/7/25: NOT READY! SCHEDULED TOO EARLY. CONTRACTORS JUST STARTING TO DIG FOOTERS.
PLUMBING 1ST ROUGH UNDERGROUND 05/02/2025 APPROVED MGIBSON
FORMBOARD SURVEY (OFFICE USE ONLY) 04/30/2025 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 04/30/2025 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 04/15/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 04/29/2025 04/30/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/29/2025 04/30/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/29/2025 04/29/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN COMPLETE 03/19/2025 03/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 03/19/2025 03/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 03/19/2025 03/19/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 03/19/2025 03/25/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/19/2025 03/19/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 03/19/2025 03/24/2025
LOCATE COMPLETE 03/19/2025 03/20/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 03/19/2025 03/25/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/19/2025 03/24/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/19/2025 03/21/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 03/19/2025 04/01/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 08/15/2025
REINSPECTION RESIDENTIAL ¤40.00 08/15/2025
REINSPECTION RESIDENTIAL ¤40.00 08/15/2025
REINSPECTION RESIDENTIAL ¤40.00 08/15/2025
SW ENG - INSPECTION 20 ¤20.00 08/15/2025
SW ENG - INSPECTION 20 ¤20.00 08/15/2025
SW ENG REINSPECTION 30 ¤30.00 08/15/2025
SW ENG - REVIEW 20 ¤20.00 03/26/2025
SW ENG RES REVIEW 200 ¤200.00 03/26/2025
SEWER CREDIT (¤1,147.00) 03/26/2025
SEWER INSPECTION ¤25.00 03/26/2025
SEWER CAPITAL FACILITY ¤6,120.52 03/26/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 03/26/2025
SITE PLAN 30 ¤30.00 03/26/2025
SW ENG INSPECTION 80 ¤80.00 03/26/2025
SW ENG PRE APRON ¤30.00 03/26/2025
WATER- TURN ON ¤25.00 03/26/2025
ADJUSTMENT 10% (¤120.20) 03/26/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/26/2025
INSPECTION - RESIDENTIAL ¤913.00 03/26/2025
PLAN REVIEW - RESIDENTIAL ¤258.96 03/26/2025
CONNECTION FEES ¤1,187.26 03/26/2025
FC IMPACT FEE EMS ¤62.00 03/26/2025
IMPACT FEE FIRE ¤434.51 03/26/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/26/2025
FC IMPACT FEE LIBRARY ¤268.00 03/26/2025
IMPACT FEE PARKS ¤1,828.01 03/26/2025
IMPACT FEE SCHOOL ¤5,450.00 03/26/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 03/26/2025
WATER -IRRIGATION INSPECTION ¤25.00 03/26/2025
SURCHARGE FS 533.721 ¤10.82 03/26/2025
SURCHARGE - FS 468.631 ¤16.23 03/26/2025
SW ENG - FOUNDATION SURVEY ¤20.00 03/26/2025
Fees Total Due: ¤0.00 Total Paid: ¤22,482.25