I want to search for...
Permit #2025030890
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7065-00030-0120 |
| Block: 00030 |
| Subdivision: 7065 - |
| Job Phone: 386-793-6919 |
| Location Address: 7 KAFFIR LILY PL |
| Type: DR - DRIVEWAY |
| Issue Date: 04/01/2025 |
| NOC: Unknown |
| Applicant name: BRIAN A RUTHERFORD |
| Owner: DINGMAN MICHAEL S & DAINORA P AMC |
|
Address 7 KAFFIR LILY PLACE PALM COAST, FL 32164 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤2,400.00 |
| Job Description: WIDEN CONCRETE DRIVEWAY |
| Type: CN |
Contractor
CREATIVE TOUCH CONCRETE SURFACING, LLC
| Status | Location Address | Phone |
| ACTIVE |
1 CARDWELL COURT PALM COAST, FL 32137 |
386-793-6919 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 05/12/2025 | APPROVED | FSLADISH |
| Note: 5/12/25 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 04/10/25 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW - FINAL INSPECTION | 05/12/2025 | APPROVED | FSLADISH |
| Note: 5/12/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 04/10/25 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U -UTILITY RESIDENTIAL FINAL | 05/12/2025 | FINAL APPROVED | BWRIGHT |
| ROW- PRE-APRON (PRE-POUR) | 04/10/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 04/10/25 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/27/2025 | 03/27/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/27/2025 | 03/27/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/25/2025 | 03/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 03/20/2025 | 03/20/2025 |
| Note: Held By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM Include culvert material and size on site plan. 13"x17"CMP, 15"CMP, or 15"HDPE? | |||
| UTL | COMPLETE | 03/20/2025 | 03/26/2025 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/20/2025 | 03/20/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤3.00) | 04/01/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/01/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 04/01/2025 |
| SW ENG PRE APRON | ¤30.00 | 04/01/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/01/2025 |
| SITE PLAN 15 | ¤15.00 | 04/01/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤312.00 |