I want to search for...
Permit #2025030900
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00280-0180 |
| GARAGE: 542 sqft |
| CONDITIONED SPACE: 1311 sqft |
| CONDITIONED SPACE: 1311 sqft |
| GARAGE: 542 sqft |
| OPENED PORCH (WITH ROOF) : 158 sqft |
| OPENED PORCH (WITH ROOF) : 158 sqft |
| OPENED PORCH (WITH ROOF) : 58 sqft |
| OPENED PORCH (WITH ROOF) : 58 sqft |
| Total Square Footage: 4138 sqft |
| Block: 00280 |
| Subdivision: - |
| Job Phone: 386-585-2654 |
| Location Address: 35 FRENEAU LN |
| Type: DU - DUPLEX |
| Issue Date: 05/05/2025 |
| NOC: RECORDED |
| Applicant name: DESIDERIO CARLOS CARREIRO |
| Owner: REMEDIOS CARLOS & TERESA H&W |
|
Address 24 BUBENKO LANE GARNERVILLE, NY 10923 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
RED LINE CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
Sub Contractors
DESIDERIO CARLOS CARREIRO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
FERNANDO M FARIA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
23 FREELAND LANE PALM COAST, FL 32137 |
RF11067823 (Exp: 08/31/2027) | 386-569-4336 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/15/2026 | FINAL APPROVED | MCONTRYMAN |
| Note: 4/10/2026 - PREVIOUS INSPECTION NOTES 4/10/26 1. Garage lights need a proper box extension and sealed FBC EC TABLE R402.4.1.1 2. All soffit vents require solid soffit 6' from center of vent M1506.3 3. Seal up lv wire penetration by meter/main FBC 402.5.1.1 Both side: 4. Fridge required to be GFCi or ARc Fault protected NEC 210.12 5. Float switch on drain pan missing 6. Insulation for AH lines needs to be taped to wrap completely around the piping FBCR M1411.6 7. Heat Strips not labeled for AH units FBCR M1303.1 8. Missing termite sticker on panel boxes FBC R105.11 Side A: 9. Light not working above master bath sink FBC(A) 110.1 Side b: 10. Front exterior outlet box loose from wall 11. Right side frame of SGD loose from wall | |||
| SEWER TIE IN | 04/10/2026 | APPROVED | MCONTRYMAN |
| Note: 4/9/2026 - PREVIOUS INSPECTION NOTES Cancelled via text at 1059am 4/2/2026 - PREVIOUS INSPECTION NOTES 4/2/26 1. Will need to dig up sewer tie-in for inspection or have it scoped. If scoped, try to schedule for inspection to be completed at the same time | |||
| BLD - BUILDING FINAL | 04/10/2026 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 4/10/26 1. Garage lights need a proper box extension and sealed FBC EC TABLE R402.4.1.1 2. All soffit vents require solid soffit 6' from center of vent M1506.3 3. Seal up lv wire penetration by meter/main FBC 402.5.1.1 Both side: 4. Fridge required to be GFCi or ARc Fault protected NEC 210.12 5. Float switch on drain pan missing 6. Insulation for AH lines needs to be taped to wrap completely around the piping FBCR M1411.6 7. Heat Strips not labeled for AH units FBCR M1303.1 8. Missing termite sticker on panel boxes FBC R105.11 Side A: 9. Light not working above master bath sink FBC(A) 110.1 Side b: 10. Front exterior outlet box loose from wall 11. Right side frame of SGD loose from wall | |||
| SEWER TIE IN | 04/09/2026 | CANCELLED BY APPLICANT | MCONTRYMAN |
| Note: Cancelled via text at 1059am 4/2/2026 - PREVIOUS INSPECTION NOTES 4/2/26 1. Will need to dig up sewer tie-in for inspection or have it scoped. If scoped, try to schedule for inspection to be completed at the same time | |||
| ROW - FINAL INSPECTION | 04/06/2026 | APPROVED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 04/02/2026 | APPROVED | BVEIGA |
| Note: Inspector Notes from Inspection 9035 no/cc no/ irrigation | |||
| U-CROSS CONNECTION | 04/02/2026 | APPROVED - AS NOTED | BVEIGA |
| Note: no/cc no/ irrigation | |||
| ROW - FINAL APRON (AFTER POUR) | 04/02/2026 | APPROVED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| FIREWALL FINAL | 04/02/2026 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 4/2/26 1. House is locked up so no access for an inspection FBC[A] 110.5 | |||
| FIREWALL FINAL | 04/02/2026 | APPROVED | MCONTRYMAN |
| Note: 4/2/2026 - PREVIOUS INSPECTION NOTES 4/2/26 1. House is locked up so no access for an inspection FBC[A] 110.5 | |||
| ROW - FINAL INSPECTION | 04/02/2026 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 04/02/26 CANCELLED ON-SITE BY BUILDER | |||
| SEWER TIE IN | 04/02/2026 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 4/2/26 1. Will need to dig up sewer tie-in for inspection or have it scoped. If scoped, try to schedule for inspection to be completed at the same time | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/01/2026 | APPROVED - AS NOTED | TPOLACEK |
| Note: 04-01-26 TPOLACEK*** AS PER PREVIOUS NOTES I WILL BE APPROVING THE FINAL SURVEY AS NOTED. 3/25/26 Gabe and I met with contractor about the final survey and the grading of this lot. We are going to allow the grading to be flat in the middle of the lot the drain to the right and the left drainage pattern. Any questions please contact Gabe or Parren -------------------------------------------------------------------------------------------- 2/25/2026 - PREVIOUS INSPECTION NOTES 02-25-26 TPOLACEK*** THERE IS NOT THE REQUIRED 6" OF FALL IN THE FIRST 10' OFF THE STRUCTURE IN THE REAR. THERE MUST BE POSITIVE FLOW FROM THE REAR TO FRONT SWALE. 1 Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3" Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 2/23/2026 - PREVIOUS INSPECTION NOTES ** 02/23/26 INSPECTOR IS REQUESTING MORE ELEVATION SHOTS IN REAR | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/01/2026 | CANCELLED BY INSPECTOR | TPOLACEK |
| Note: Effective 03-25-26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certificates for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types Inspector Notes from Inspection 9463 04-01-26 TPOLACEK*** AS PER PREVIOUS NOTES I WILL BE APPROVING THE FINAL SURVEY AS NOTED. 3/25/26 Gabe and I met with contractor about the final survey and the grading of this lot. We are going to allow the grading to be flat in the middle of the lot the drain to the right and the left drainage pattern. Any questions please contact Gabe or Parren -------------------------------------------------------------------------------------------- 2/25/2026 - PREVIOUS INSPECTION NOTES 02-25-26 TPOLACEK*** THERE IS NOT THE REQUIRED 6" OF FALL IN THE FIRST 10' OFF THE STRUCTURE IN THE REAR. THERE MUST BE POSITIVE FLOW FROM THE REAR TO FRONT SWALE. 1 Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3" Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 2/23/2026 - PREVIOUS INSPECTION NOTES ** 02/23/26 INSPECTOR IS REQUESTING MORE ELEVATION SHOTS IN REAR | |||
| ROW- PROJECT STATUS | 03/25/2026 | Status Check | PFLANAGAN |
| Note: Gabe and I met with contractor about the final survey and the grading of this lot. We are going to allow the grading to be flat in the middle of the lot the drain to the right and the left drainage pattern. Any questions please contact Gabe or Parren | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/25/2026 | Disapproved - NO FEE | TPOLACEK |
| Note: 02-25-26 TPOLACEK*** THERE IS NOT THE REQUIRED 6" OF FALL IN THE FIRST 10' OFF THE STRUCTURE IN THE REAR. THERE MUST BE POSITIVE FLOW FROM THE REAR TO FRONT SWALE. 1 Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3" Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 2/23/2026 - PREVIOUS INSPECTION NOTES ** 02/23/26 INSPECTOR IS REQUESTING MORE ELEVATION SHOTS IN REAR | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/23/2026 | Disapproved - NO FEE | EMADISON |
| Note: ** 02/23/26 INSPECTOR IS REQUESTING MORE ELEVATION SHOTS IN REAR | |||
| ELECTRIC - EARLY POWER | 02/11/2026 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 9:50am | |||
| ELECTRIC - EARLY POWER | 02/10/2026 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Missing 2 front portch outlets | |||
| ROW- PRE-APRON (PRE-POUR) | 01/07/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR 1/6/2026 - PREVIOUS INSPECTION NOTES 01-06-26 TPOLACEK*** CULVERT PIPES ARE BOTH OUT OF TOLERENCE. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- PRE-APRON (PRE-POUR) | 01/06/2026 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 01-06-26 TPOLACEK*** CULVERT PIPES ARE BOTH OUT OF TOLERENCE. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| U - SEWER TIE IN | 12/22/2025 | APPROVED | HCAMACHO |
| GRAVITY SEWER TEST | 12/22/2025 | APPROVED | HCAMACHO |
| FIREWALL DRYWALL NAILING | 10/24/2025 | APPROVED | MCONTRYMAN |
| Note: 10/15/2025 - PREVIOUS INSPECTION NOTES Covered porches need to be covered with 5/8 Type X Per Plan. Do not tape. 8/21/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBC-R702.3.5-wall 1/2 " gypsum board 24"space framing , 12"space for screws center to center on panels GYPSUM BOARD PANELS NEED TO BE PROPER INSTALL PLEASE SEE FLORIDA BUILDINGCODE FOR INSTRUCCTIONS #2-FBC 3303.5-SWALE CLEAR 9 REMOVED PORTA POTTY ) #3-FBCR 319.1-NEEDS ADDRESS POSTED #4- PERMIT BOX NEED TO BE ON CONSTRUCTION PROPERTY #5-FBC 3307.1 -NEEDS SILT FENCE PROPERLY INSTALLED | |||
| FIREWALL DRYWALL NAILING | 10/15/2025 | PARTIALLY APPROVED | HCAMACHO |
| Note: Covered porches need to be covered with 5/8 Type X Per Plan. Do not tape. 8/21/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBC-R702.3.5-wall 1/2 " gypsum board 24"space framing , 12"space for screws center to center on panels GYPSUM BOARD PANELS NEED TO BE PROPER INSTALL PLEASE SEE FLORIDA BUILDINGCODE FOR INSTRUCCTIONS #2-FBC 3303.5-SWALE CLEAR 9 REMOVED PORTA POTTY ) #3-FBCR 319.1-NEEDS ADDRESS POSTED #4- PERMIT BOX NEED TO BE ON CONSTRUCTION PROPERTY #5-FBC 3307.1 -NEEDS SILT FENCE PROPERLY INSTALLED | |||
| INSULATION | 10/06/2025 | APPROVED | HCAMACHO |
| Note: 10/3/2025 - PREVIOUS INSPECTION NOTES side A: 1. Please seal steel sleeve at end. 2. Master bath exhaust fan assembly is not wired. side B: 1. Please seal steel sleeve at end. 2. Added Light fixture in spare bath is not secured to truss members, and is not wired. 3. Missing Insulation at fire wall, by SGD. Inspector Notes from Inspection 2440 The ceiling is the fire wall/ framing. The center wall is just a draft stop, wich has 1/2 drywall installed front to back. Inspector Notes from Inspection 2420 1. Please revise the Product approval for the windows amd slider. 2. Please submitt letter for the wall overhanging. 9/23/2025 - PREVIOUS INSPECTION NOTES 9/23/25 Make all repairs before calling in re-inspection, items 2, 3, 4, and 5 not complete, Also missing pancake boxes on front of garages for lights as well as load bearing wall in garage is over hanging slab which requires a proper repair. Please make all repairs before calling in re-inspection 8/26/25 1. The location of the A/C appliance in the attic does not meet code. FBCR M1305.1.3 SERVICE PLATFORM IN ATTIC 2. A/C contractor still running the copper lines and electric on the left side. FBC [A]107.4 3. Need fire blocking on the wall where the fireplace sits.FBC R302.11.1 4. No paper work on the windows and doors for inspection.FBC [A]107.4 5. The draft stop wall is not finished. Missing framing, nailing, and it needs to go all the way to the front porch.FBCR 302.12 6. Missing house to garage door. 8/21/2025 - PREVIOUS INSPECTION NOTES Please fix item before next inspection #1- firewall framing need to add studs , see firewall plans for details | |||
| INSULATION | 10/03/2025 | Disapproved - NO FEE | JSTEWART |
| Note: side A: 1. Please seal steel sleeve at end. 2. Master bath exhaust fan assembly is not wired. side B: 1. Please seal steel sleeve at end. 2. Added Light fixture in spare bath is not secured to truss members, and is not wired. 3. Missing Insulation at fire wall, by SGD. Inspector Notes from Inspection 2440 The ceiling is the fire wall/ framing. The center wall is just a draft stop, wich has 1/2 drywall installed front to back. Inspector Notes from Inspection 2420 1. Please revise the Product approval for the windows amd slider. 2. Please submitt letter for the wall overhanging. 9/23/2025 - PREVIOUS INSPECTION NOTES 9/23/25 Make all repairs before calling in re-inspection, items 2, 3, 4, and 5 not complete, Also missing pancake boxes on front of garages for lights as well as load bearing wall in garage is over hanging slab which requires a proper repair. Please make all repairs before calling in re-inspection 8/26/25 1. The location of the A/C appliance in the attic does not meet code. FBCR M1305.1.3 SERVICE PLATFORM IN ATTIC 2. A/C contractor still running the copper lines and electric on the left side. FBC [A]107.4 3. Need fire blocking on the wall where the fireplace sits.FBC R302.11.1 4. No paper work on the windows and doors for inspection.FBC [A]107.4 5. The draft stop wall is not finished. Missing framing, nailing, and it needs to go all the way to the front porch.FBCR 302.12 6. Missing house to garage door. 8/21/2025 - PREVIOUS INSPECTION NOTES Please fix item before next inspection #1- firewall framing need to add studs , see firewall plans for details | |||
| LATH/BRICK/ WATER BARRIER | 10/02/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: Inspector Notes from Inspection 2440 The ceiling is the fire wall/ framing. The center wall is just a draft stop, wich has 1/2 drywall installed front to back. Inspector Notes from Inspection 2420 1. Please revise the Product approval for the windows amd slider. 2. Please submitt letter for the wall overhanging. 9/23/2025 - PREVIOUS INSPECTION NOTES 9/23/25 Make all repairs before calling in re-inspection, items 2, 3, 4, and 5 not complete, Also missing pancake boxes on front of garages for lights as well as load bearing wall in garage is over hanging slab which requires a proper repair. Please make all repairs before calling in re-inspection 8/26/25 1. The location of the A/C appliance in the attic does not meet code. FBCR M1305.1.3 SERVICE PLATFORM IN ATTIC 2. A/C contractor still running the copper lines and electric on the left side. FBC [A]107.4 3. Need fire blocking on the wall where the fireplace sits.FBC R302.11.1 4. No paper work on the windows and doors for inspection.FBC [A]107.4 5. The draft stop wall is not finished. Missing framing, nailing, and it needs to go all the way to the front porch.FBCR 302.12 6. Missing house to garage door. 8/21/2025 - PREVIOUS INSPECTION NOTES Please fix item before next inspection #1- firewall framing need to add studs , see firewall plans for details | |||
| ALL ROUGH | 09/29/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Please revise the Product approval for the windows amd slider. 2. Please submitt letter for the wall overhanging. 9/23/2025 - PREVIOUS INSPECTION NOTES 9/23/25 Make all repairs before calling in re-inspection, items 2, 3, 4, and 5 not complete, Also missing pancake boxes on front of garages for lights as well as load bearing wall in garage is over hanging slab which requires a proper repair. Please make all repairs before calling in re-inspection 8/26/25 1. The location of the A/C appliance in the attic does not meet code. FBCR M1305.1.3 SERVICE PLATFORM IN ATTIC 2. A/C contractor still running the copper lines and electric on the left side. FBC [A]107.4 3. Need fire blocking on the wall where the fireplace sits.FBC R302.11.1 4. No paper work on the windows and doors for inspection.FBC [A]107.4 5. The draft stop wall is not finished. Missing framing, nailing, and it needs to go all the way to the front porch.FBCR 302.12 6. Missing house to garage door. | |||
| FIREWALL FRAMING | 09/29/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: The ceiling is the fire wall/ framing. The center wall is just a draft stop, wich has 1/2 drywall installed front to back. Inspector Notes from Inspection 2420 1. Please revise the Product approval for the windows amd slider. 2. Please submitt letter for the wall overhanging. 9/23/2025 - PREVIOUS INSPECTION NOTES 9/23/25 Make all repairs before calling in re-inspection, items 2, 3, 4, and 5 not complete, Also missing pancake boxes on front of garages for lights as well as load bearing wall in garage is over hanging slab which requires a proper repair. Please make all repairs before calling in re-inspection 8/26/25 1. The location of the A/C appliance in the attic does not meet code. FBCR M1305.1.3 SERVICE PLATFORM IN ATTIC 2. A/C contractor still running the copper lines and electric on the left side. FBC [A]107.4 3. Need fire blocking on the wall where the fireplace sits.FBC R302.11.1 4. No paper work on the windows and doors for inspection.FBC [A]107.4 5. The draft stop wall is not finished. Missing framing, nailing, and it needs to go all the way to the front porch.FBCR 302.12 6. Missing house to garage door. 8/21/2025 - PREVIOUS INSPECTION NOTES Please fix item before next inspection #1- firewall framing need to add studs , see firewall plans for details | |||
| ALL ROUGH | 09/23/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 9/23/25 Make all repairs before calling in re-inspection, items 2, 3, 4, and 5 not complete, Also missing pancake boxes on front of garages for lights as well as load bearing wall in garage is over hanging slab which requires a proper repair. Please make all repairs before calling in re-inspection 8/26/25 1. The location of the A/C appliance in the attic does not meet code. FBCR M1305.1.3 SERVICE PLATFORM IN ATTIC 2. A/C contractor still running the copper lines and electric on the left side. FBC [A]107.4 3. Need fire blocking on the wall where the fireplace sits.FBC R302.11.1 4. No paper work on the windows and doors for inspection.FBC [A]107.4 5. The draft stop wall is not finished. Missing framing, nailing, and it needs to go all the way to the front porch.FBCR 302.12 6. Missing house to garage door. | |||
| ALL ROUGH | 08/26/2025 | Disapproved -FEE REQUIRED | HCAMACHO |
| Note: 1. The location of the A/C appliance in the attic does not meet code. FBCR M1305.1.3 SERVICE PLATFORM IN ATTIC 2. A/C contractor still running the copper lines and electric on the left side. FBC [A]107.4 3. Need fire blocking on the wall where the fireplace sits.FBC R302.11.1 4. No paper work on the windows and doors for inspection.FBC [A]107.4 5. The draft stop wall is not finished. Missing framing, nailing, and it needs to go all the way to the front porch.FBCR 302.12 6. Missing house to garage door. | |||
| FIREWALL DRYWALL NAILING | 08/21/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-FBC-R702.3.5-wall 1/2 " gypsum board 24"space framing , 12"space for screws center to center on panels GYPSUM BOARD PANELS NEED TO BE PROPER INSTALL PLEASE SEE FLORIDA BUILDINGCODE FOR INSTRUCCTIONS #2-FBC 3303.5-SWALE CLEAR 9 REMOVED PORTA POTTY ) #3-FBCR 319.1-NEEDS ADDRESS POSTED #4- PERMIT BOX NEED TO BE ON CONSTRUCTION PROPERTY #5-FBC 3307.1 -NEEDS SILT FENCE PROPERLY INSTALLED | |||
| FIREWALL FRAMING | 08/21/2025 | APPROVED | CVANSTRAHLEN |
| FIREWALL FRAMING | 08/21/2025 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Please fix item before next inspection #1- firewall framing need to add studs , see firewall plans for details | |||
| ROOF VALLEY & METAL | 08/07/2025 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/05/2025 | APPROVED | FWILLIS |
| Note: *** NOTES ADDED BY FWILLIS 8/5/2025 10:48:36 AM *** ITEMS CORRECTED 8/1/2025 - PREVIOUS INSPECTION NOTES 1. A01 truss on the block wall on side B is missing HETA20. 2. D04(4) trussboth sides is missing anchors at door frame in garage and the straps on the block wall over the front door are not anchored. 3. D03A truss both sides are missing straps on block wall at front entrance. 4. House to Garage door framing is not framed out according to plans. This is a bearing wall. See plans detail. Both sides. 5. Gable trusses over garages and front entry are missing bracing. See plans for detail. 6. Bearing wall studs and top plates are notched more then 40% by plumbing. | |||
| WALL SHEATHING | 08/01/2025 | APPROVED | HCAMACHO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/01/2025 | Disapproved -FEE REQUIRED | HCAMACHO |
| Note: 1. A01 truss on the block wall on side B is missing HETA20. 2. D04(4) trussboth sides is missing anchors at door frame in garage and the straps on the block wall over the front door are not anchored. 3. D03A truss both sides are missing straps on block wall at front entrance. 4. House to Garage door framing is not framed out according to plans. This is a bearing wall. See plans detail. Both sides. 5. Gable trusses over garages and front entry are missing bracing. See plans for detail. 6. Bearing wall studs and top plates are notched more then 40% by plumbing. | |||
| TIE BEAM / LINTEL | 07/11/2025 | APPROVED | KSANDOE |
| Note: 7/9/2025 - PREVIOUS INSPECTION NOTES 1. Missing 1 dowel in the left garage front. The dowel that is there is in the wrong place. Marked.FBC [A]107.4 2. Missing 1 dowel in the rear right bathroom window. Marked.FBC [A]107.4 | |||
| TIE BEAM / LINTEL | 07/09/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Missing 1 dowel in the left garage front. The dowel that is there is in the wrong place. Marked.FBC [A]107.4 2. Missing 1 dowel in the rear right bathroom window. Marked.FBC [A]107.4 | |||
| MONOLITHIC SLAB | 06/20/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Clean up swale, allot of garbage in the swale. FBC 3303.5 SWALE CLEAR | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/13/2025 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/12/2025 | APPROVED | JMUNSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 06/10/2025 | APPROVED | RRICKS |
| WATER METER INSTALLATION REQUEST | 05/09/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SWALE | COMPLETE | 12/29/2025 | 12/29/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/02/2025 | 10/07/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/18/2025 | 08/18/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/12/2025 | 06/12/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/09/2025 | 06/10/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/09/2025 | 06/09/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/09/2025 | 04/09/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/03/2025 | 04/09/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/03/2025 | 04/03/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/03/2025 | 04/08/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/03/2025 | 04/07/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/03/2025 | 04/03/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 03/25/2025 | 04/01/2025 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 04/01/2025 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| ZON | HOLD | 03/20/2025 | 03/24/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM site plan: Each side of the driveway should be a min of 16' adjust plans accordingly Elevation plan: doesnt match the site plan electric plan doesnt match any of the plans plans, provide a floor plan All plans dont match please submit the correct plans could not review properly as non of the plans match | |||
| SW1 | COMPLETE | 03/20/2025 | 03/25/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/20/2025 | 03/25/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Duct layout signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition | |||
| LOCATE | COMPLETE | 03/20/2025 | 03/25/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/20/2025 | 03/25/2025 |
| ENGIN1 | COMPLETE | 03/20/2025 | 03/20/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/20/2025 | 03/26/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/20/2025 | 03/24/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/20/2025 | 03/26/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Roofing Worksheet 1. FL# 10124-R25 out of cycle. We are in the 2023 code cycle. 2. FL# 10626-R23 out of cycle. | |||
| BADMIN | COMPLETE | 03/20/2025 | 03/26/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/20/2025 | 04/03/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/15/2026 |
| RSI GENERAL INSPECTION 32.50 | ¤32.50 | 04/01/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 04/01/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/01/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/01/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/01/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/01/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/18/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 08/18/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 08/18/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 05/05/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 05/05/2025 |
| CONNECTION FEES | ¤2,374.52 | 05/05/2025 |
| SURCHARGE FS 533.721 | ¤17.36 | 05/05/2025 |
| SURCHARGE - FS 468.631 | ¤26.04 | 05/05/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/05/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/05/2025 |
| SW ENG PRE APRON | ¤30.00 | 05/05/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/05/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/05/2025 |
| SEWER CREDIT | (¤4,782.75) | 05/05/2025 |
| SEWER INSPECTION | ¤25.00 | 05/05/2025 |
| SEWER CAPITAL FACILITY | ¤12,241.04 | 05/05/2025 |
| WATER CAPITAL FACILITY FEE | ¤8,702.28 | 05/05/2025 |
| SITE PLAN 30 | ¤30.00 | 05/05/2025 |
| FC IMPACT FEE EMS | ¤124.00 | 05/05/2025 |
| IMPACT FEE FIRE | ¤869.02 | 05/05/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 05/05/2025 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 05/05/2025 |
| IMPACT FEE PARKS | ¤3,656.02 | 05/05/2025 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 05/05/2025 |
| IMPACT FEE TRANSPORTATION | ¤7,004.00 | 05/05/2025 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 05/05/2025 |
| WATER- TURN ON | ¤50.00 | 05/05/2025 |
| ADJUSTMENT 10% | (¤192.91) | 05/05/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/05/2025 |
| INSPECTION - RESIDENTIAL | ¤1,479.50 | 05/05/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤419.64 | 05/05/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤44,724.76 |