I want to search for...
Permit #2025031111
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00640-0050 |
| CONDITIONED SPACE: 2392 sqft |
| GARAGE: 550 sqft |
| OPENED PORCH (WITH ROOF) : 363 sqft |
| Total Square Footage: 3305 sqft |
| Block: 00640 |
| Subdivision: - |
| Job Phone: 386-283-2035 |
| Location Address: 2 SLATE WOOD CT |
| Type: DU - DUPLEX |
| Issue Date: 04/23/2025 |
| NOC: RECORDED |
| Applicant name: OLEG BELINSKIY |
| Owner: YEMELYANOV ALEXANDER M & ALLA A H&W |
|
Address 208 HOOKS MILL ROAD AMERICUS, GA 31709 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
FLORIDAS BEST BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE PALM COAST, FL 32164 |
CBC1264760 (Exp: 08/31/2026) | 386-283-2035 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
SERGEY A VORONIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7631 SEVERN JACKSONVILLE, FL 32224 |
EC13011326 (Exp: 08/31/2026) | 360-798-2819 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 04/09/2026 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, No IRR | |||
| BLD - BUILDING FINAL | 04/08/2026 | APPROVED | CVANSTRAHLEN |
| Note: 4/6/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBCR M1305.1.4.1-AC NEEDS 3' CLEARANCE FROM GROUND ( Unit A & B ) #2-5. Seal up soffit penetrations for electrical mast #3-M1502.4.7 Exhaust duct required. Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked “future use.” (Unit A) #4-Insulation certificated Signature required #5-FBC-R . 302.6 seal all garage penetration , wall and ceiling ( low voltage wire AHU Plenum conduit )( Unit A) #6-Smoke detector minimun distantce for a bedroom (10' Unit A & B ) | |||
| BLD - BUILDING FINAL | 04/06/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-FBCR M1305.1.4.1-AC NEEDS 3' CLEARANCE FROM GROUND ( Unit A & B ) #2-5. Seal up soffit penetrations for electrical mast #3-M1502.4.7 Exhaust duct required. Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked “future use.” (Unit A) #4-Insulation certificated Signature required #5-FBC-R . 302.6 seal all garage penetration , wall and ceiling ( low voltage wire AHU Plenum conduit )( Unit A) #6-Smoke detector minimun distantce for a bedroom (10' Unit A & B ) | |||
| ROW - FINAL APRON (AFTER POUR) | 04/06/2026 | APPROVED | RRICKS |
| Note: At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL INSPECTION | 04/06/2026 | APPROVED | RRICKS |
| Note: At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/06/2026 | FINAL APPROVED | BHAINES |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/23/2026 | APPROVED | FSLADISH |
| Note: 2/23/26 FINAL SURVEY MEETS COPC MINIMUM STANDARDS AT THE TIME OF THIS INSPECTION. 2/17/2026 - PREVIOUS INSPECTION NOTES 2/17/26 YOU ARE REQUIRED TO PROVIDE 10 FT OFFSET ELEVATION SHOTS ON ALL ADJOINING PROPERTIES SEE PHOTO FOR REFERENCE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/23/2026 | APPROVED | FSLADISH |
| Note: 2/23/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/17/2026 | Disapproved - NO FEE | FSLADISH |
| Note: 2/17/26 YOU ARE REQUIRED TO PROVIDE 10 FT OFFSET ELEVATION SHOTS ON ALL ADJOINING PROPERTIES SEE PHOTO FOR REFERENCE. | |||
| ELECTRIC - EARLY POWER | 01/28/2026 | APPROVED - AS NOTED | BTAYLOR |
| Note: 1-28-26 1. Emailed FPL at 12:34. 1/26/2026 - PREVIOUS INSPECTION NOTES 1-26-26 1. Outlets in unit A kitchen are not safed off. | |||
| ELECTRIC - EARLY POWER | 01/26/2026 | Disapproved - NO FEE | BTAYLOR |
| Note: 1-26-26 1. Outlets in unit A kitchen are not safed off. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/23/2025 | APPROVED | FSLADISH |
| Note: 12/23/25 YOU ARE APPROVED TO LAY PAVERS AS OF THIS INSPECTION. ___________________________________________________________________________________________________________________________ 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 CANCELLING THIS INSPECTION AS A COURTESY. Inspector Notes from Inspection 9271 12/18/25 SPOKE WITH BUILDER ABOUT THIS INSPECTION. THEY HAVE INDICATED 2 CONCRETE DRIVEWAYS ON THEIR SITE PLAN BUT ARE SET UP FOR PAVER DRIVEWAYS. CHECKED PIPES AND SITES AND THEY ARE MEETING COPC STANDARDS FOR PAVER DRIVEWAY AT THE TIME OF THIS INSPECTION. AS A COURTESY TO BE ABLE TO POUR I LET HER KNOW THAT SHE WOULD NEED TO UPLOAD A REVISED SITE PLAN INDICATING PAVER DRIVEWAYS AND ALSO UPLOAD THE PROPER PAVER DETAIL SHEET OPTION. I AM APPROVING THIS INSPECTION AS NOTED IN ACCORDANCE WITH OUR PAVER DRIVEWAY INSPECTIONS. AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR DRIVEWAY PAVER RESTRAINTS. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/22/2025 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 12/22/25 CANCELLING THIS INSPECTION AS A COURTESY. Inspector Notes from Inspection 9271 12/18/25 SPOKE WITH BUILDER ABOUT THIS INSPECTION. THEY HAVE INDICATED 2 CONCRETE DRIVEWAYS ON THEIR SITE PLAN BUT ARE SET UP FOR PAVER DRIVEWAYS. CHECKED PIPES AND SITES AND THEY ARE MEETING COPC STANDARDS FOR PAVER DRIVEWAY AT THE TIME OF THIS INSPECTION. AS A COURTESY TO BE ABLE TO POUR I LET HER KNOW THAT SHE WOULD NEED TO UPLOAD A REVISED SITE PLAN INDICATING PAVER DRIVEWAYS AND ALSO UPLOAD THE PROPER PAVER DETAIL SHEET OPTION. I AM APPROVING THIS INSPECTION AS NOTED IN ACCORDANCE WITH OUR PAVER DRIVEWAY INSPECTIONS. AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR DRIVEWAY PAVER RESTRAINTS. | |||
| ROW- PAVER RESTRAINTS | 12/18/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 12/18/25 SPOKE WITH BUILDER ABOUT THIS INSPECTION. THEY HAVE INDICATED 2 CONCRETE DRIVEWAYS ON THEIR SITE PLAN BUT ARE SET UP FOR PAVER DRIVEWAYS. CHECKED PIPES AND SITES AND THEY ARE MEETING COPC STANDARDS FOR PAVER DRIVEWAY AT THE TIME OF THIS INSPECTION. AS A COURTESY TO BE ABLE TO POUR I LET HER KNOW THAT SHE WOULD NEED TO UPLOAD A REVISED SITE PLAN INDICATING PAVER DRIVEWAYS AND ALSO UPLOAD THE PROPER PAVER DETAIL SHEET OPTION. I AM APPROVING THIS INSPECTION AS NOTED IN ACCORDANCE WITH OUR PAVER DRIVEWAY INSPECTIONS. AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR DRIVEWAY PAVER RESTRAINTS. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/18/2025 | PARTIALLY APPROVED | FSLADISH |
| Note: 12/18/25 SPOKE WITH BUILDER ABOUT THIS INSPECTION. THEY HAVE INDICATED 2 CONCRETE DRIVEWAYS ON THEIR SITE PLAN BUT ARE SET UP FOR PAVER DRIVEWAYS. CHECKED PIPES AND SITES AND THEY ARE MEETING COPC STANDARDS FOR PAVER DRIVEWAY AT THE TIME OF THIS INSPECTION. AS A COURTESY TO BE ABLE TO POUR I LET HER KNOW THAT SHE WOULD NEED TO UPLOAD A REVISED SITE PLAN INDICATING PAVER DRIVEWAYS AND ALSO UPLOAD THE PROPER PAVER DETAIL SHEET OPTION. I AM PARTIALLY APPROVING THIS INSPECTION IN ACCORDANCE WITH OUT PAVER DRIVEWAY INSPECTIONS. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| GRAVITY SEWER TEST | 12/15/2025 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2060 WATERVSERVICE NOT RAN YET | |||
| SEWER TIE IN | 12/15/2025 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2060 WATERVSERVICE NOT RAN YET | |||
| PEP TANK INSTALLATION REQUEST | 11/04/2025 | APPROVED | CBOWERMASTER |
| INSULATION | 10/21/2025 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 10/20/2025 | APPROVED | BTAYLOR |
| ALL ROUGH | 10/16/2025 | APPROVED | BTAYLOR |
| Note: 10/14/2025 - PREVIOUS INSPECTION NOTES 10/14/25: UNIT A: 1).No water pressure. FBCR P2503.7 2). CO/SD outside of Master Bedroom is not within 10ft of a sleeping room as required. FBC-R315.1 3). Slab Penetration: Bathtub > Slab at bathtub drain needs to be fully repaired with a cement type product as required for termite protection (FBC-P2603.3.1) and to meet original & minimum slab depth ( FBC [A]107.4 / FBC R506.1). 4). Door to lanai: Top jamb requires solid blocking and right side jamb (from inside) solid blocking needs to be continuous. FBCR 609.1 UNIT B: 5). Front entry door needs solid blocking where shim space exceeds 1/4" max as required. FBCR 609.1 MAIN METER BOX: 6). Ground wire needs to be in a raceway/plastic pipe to protect from damage/corrosion. NEC 250-92 | |||
| ALL ROUGH | 10/14/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 10/14/2025 10:43:54 AM *** 10/14/25: UNIT A: 1).No water pressure. FBCR P2503.7 2). CO/SD outside of Master Bedroom is not within 10ft of a sleeping room as required. FBC-R315.1 3). Slab Penetration: Bathtub > Slab at bathtub drain needs to be fully repaired with a cement type product as required for termite protection (FBC-P2603.3.1) and to meet original & minimum slab depth ( FBC [A]107.4 / FBC R506.1). 4). Door to lanai: Top jamb requires solid blocking and right side jamb (from inside) solid blocking needs to be continuous. FBCR 609.1 UNIT B: 5). Front entry door needs solid blocking where shim space exceeds 1/4" max as required. FBCR 609.1 MAIN METER BOX: 6). Ground wire needs to be in a raceway/plastic pipe to protect from damage/corrosion. NEC 250-92 | |||
| FIREWALL FINAL | 10/09/2025 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 10/06/2025 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 9-30-25 1. Missing MGT on bearing point in garage. | |||
| FIREWALL DRYWALL NAILING | 10/06/2025 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 9-30-25 1. Missing MGT on bearing point in garage. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/30/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 9-30-25 1. Missing MGT on bearing point in garage. | |||
| WALL SHEATHING | 09/30/2025 | APPROVED | BTAYLOR |
| FIREWALL FRAMING | 09/30/2025 | APPROVED | BTAYLOR |
| WALL SHEATHING | 09/26/2025 | CANCELLED BY APPLICANT | WEB |
| FIREWALL FRAMING | 09/26/2025 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/26/2025 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 09/16/2025 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 08/28/2025 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/22/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: WATERVSERVICE NOT RAN YET | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 08/21/2025 | APPROVED | PFLANAGAN |
| WATER METER INSTALLATION REQUEST | 08/14/2025 | APPROVED | CBOWERMASTER |
| Note: 8/6/2025 7:51:53 AM- PREVIOUS INSPECTION NOTES NCL CLEARING | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 08/13/2025 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 08/04/2025 | Disapproved -FEE REQUIRED | BVITALE |
| Note: NCL CLEARING |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 12/19/2025 | 12/19/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/18/2025 | 12/22/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/18/2025 | 12/22/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/18/2025 | 12/18/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right-of-Way Utilization Agreement for Paver Driveway. | |||
| SW1 | COMPLETE | 09/04/2025 | 09/05/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/04/2025 | 09/04/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/21/2025 | 08/21/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/21/2025 | 08/21/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/13/2025 | 08/13/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/10/2025 | 04/10/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/09/2025 | 04/09/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Landscape plan: Please add 8 shrubs on each front and four on each corner side wrapping the corner YOU MUST UPDATE THE LANDSCAPE PLAN WITH THE CORRECT SITE PLAN THAT HAS THE APPROVED DRIVEWAY WIDTH | |||
| ZON | HOLD | 04/02/2025 | 04/03/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM REPEAT COMMENT: Landscape plan: Please add 8 shrubs on each front and four on each corner side wrapping the corner | |||
| MECH | COMPLETE | 04/02/2025 | 04/04/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/02/2025 | 04/07/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/02/2025 | 04/07/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/02/2025 | 04/07/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/02/2025 | 04/03/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/02/2025 | 04/08/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 03/25/2025 | 03/31/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Truss plan packet cover sheet or first page needs include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| BLD | HOLD | 03/25/2025 | 03/31/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Product Approval 1. FL# 41886.1 Not a fixed window. 2. FL# 31116.1 Manufacturer does not correspond to product. 3. FL# 11473-R$ Out of code cycle. We arre in the 2023 code cycle. 4. FL# 158-R12 Out of cycle. 5. FL# 10860-R4 Out od cycle. | |||
| CUSVC | COMPLETE | 03/25/2025 | 03/25/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 03/25/2025 | 03/31/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in kitchen and garage need to be GFCI protected. NEC 2020 210.8 2. Bathrooms need to have correct outlets by sink. NEC 2020 210.52 (D) | |||
| ENGIN1 | COMPLETE | 03/25/2025 | 03/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/25/2025 | 03/28/2025 |
| LOCATE | COMPLETE | 03/25/2025 | 03/28/2025 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/25/2025 | 03/28/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide size of returns on duct layout | |||
| SW1 | COMPLETE | 03/25/2025 | 03/28/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/25/2025 | 03/26/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: The drive way has to have a minimum 10’ wide driveway in the flag pole area of the lot. Also, please provide for the setbacks of the driveway once they adjust the width of the driveway. Driveways for one or two car garages shall have a minimum width of 16 feet, and driveways for three car or larger garages shall have a minimum width of 24 feet. Please make changes to the driveway Landscape plan: Please add 8 shrubs on each front and four on each corner side wrapping the corner | |||
| SWALE | COMPLETE | 03/25/2025 | 04/15/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/08/2026 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 04/03/2026 |
| RECORDING FEE REIMBURSE DOC | ¤8.50 | 04/03/2026 |
| REINSPECTION FEE | ¤40.00 | 04/03/2026 |
| SURCHARGE FS 533.721 | ¤14.88 | 04/23/2025 |
| SURCHARGE - FS 468.631 | ¤22.33 | 04/23/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/23/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/23/2025 |
| SW ENG PRE APRON | ¤30.00 | 04/23/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/23/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/23/2025 |
| SEWER CREDIT | (¤1,806.00) | 04/23/2025 |
| SEWER INSPECTION | ¤25.00 | 04/23/2025 |
| SEWER CAPITAL FACILITY | ¤12,241.04 | 04/23/2025 |
| WATER CAPITAL FACILITY FEE | ¤8,702.28 | 04/23/2025 |
| SITE PLAN 30 | ¤30.00 | 04/23/2025 |
| IMPACT FEE TRANSPORTATION | ¤2,974.00 | 04/23/2025 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 04/23/2025 |
| WATER- TURN ON | ¤50.00 | 04/23/2025 |
| ADJUSTMENT 10% | (¤165.38) | 04/23/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/23/2025 |
| INSPECTION - RESIDENTIAL | ¤1,265.00 | 04/23/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤358.80 | 04/23/2025 |
| CONNECTION FEES | ¤2,374.52 | 04/23/2025 |
| FC IMPACT FEE EMS | ¤124.00 | 04/23/2025 |
| IMPACT FEE FIRE | ¤869.02 | 04/23/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 04/23/2025 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 04/23/2025 |
| IMPACT FEE PARKS | ¤3,656.02 | 04/23/2025 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 04/23/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤43,170.01 |