Permit #2025031227
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-01060-0150 |
| CONDITIONED SPACE: 2622 sqft |
| GARAGE: 1084 sqft |
| OPENED PORCH (WITH ROOF) : 432 sqft |
| Total Square Footage: 4138 sqft |
| Block: 01060 |
| Subdivision: - |
| Job Phone: 386-585-2654 |
| Location Address: 55 LOUISIANA DR |
| Type: DU - DUPLEX |
| Issue Date: 04/14/2025 |
| NOC: RECORDED |
| Applicant name: DESIDERIO CARLOS CARREIRO |
| Owner: TOP LUXURY HOMES LLC |
|
Address 16 RIVERINA DR PALM COAST, FL 32164 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
RED LINE CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
DESIDERIO CARLOS CARREIRO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/30/2026 | FINAL APPROVED | MCONTRYMAN |
| Note: 4/29/2026 - PREVIOUS INSPECTION NOTES 1. As part of unit Address please post A and B units. FBCR 319.1 Right unit......1. Seal the bottom of the liquid line wall chase. 2. Please seal around the dryer termination vent to wall. 3. Heat strip not marked for MOCP at AHU. FBCR M1303.1 4. Insulation cert needs posted near attic access. FBC EC R303.1.1.2 5. Garage door saftey devices need lowered to max 8" off floor. UL 325 Left Unit.....6. Dryer termination flapper is sealed closed by stucco (inoperable) FBC M1502.3 7. Insulation cert needs posted near attic access. FBC EC R303.1.1.2 8. Heat strip not marked for MOCP at AHU. FBCR M1303.1 9. Seal bottom of liquid line wall chase. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/30/2026 | APPROVED | TLOWE |
| BLD - BUILDING FINAL | 04/29/2026 | Disapproved - NO FEE | JSTEWART |
| Note: 1. As part of unit Address please post A and B units. FBCR 319.1 Right unit......1. Seal the bottom of the liquid line wall chase. 2. Please seal around the dryer termination vent to wall. 3. Heat strip not marked for MOCP at AHU. FBCR M1303.1 4. Insulation cert needs posted near attic access. FBC EC R303.1.1.2 5. Garage door saftey devices need lowered to max 8" off floor. UL 325 Left Unit.....6. Dryer termination flapper is sealed closed by stucco (inoperable) FBC M1502.3 7. Insulation cert needs posted near attic access. FBC EC R303.1.1.2 8. Heat strip not marked for MOCP at AHU. FBCR M1303.1 9. Seal bottom of liquid line wall chase. | |||
| U-CROSS CONNECTION | 04/29/2026 | APPROVED | BWRIGHT |
| ROW - FINAL APRON (AFTER POUR) | 04/29/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| FIREWALL FINAL | 04/29/2026 | APPROVED | JSTEWART |
| ROW - FINAL INSPECTION | 04/29/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/28/2026 | APPROVED | EMADISON |
| Note: | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/28/2026 | APPROVED | EMADISON |
| Note: ** Effective 03/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certificates for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types. ** PER P. BUCKLEY CHIEF BUILDING Inspector. ** SCHEDULE YOUR FINALS WHEN YOU ARE READY TO DO SO | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/16/2026 | Disapproved - NO FEE | PFLANAGAN |
| Note: Final Survey states that the water will impact the adjacent lot to the right of this lot please revise survey so no water will impact the adjacent lot. ----------------------------------------------------------- 3/25/26 Gabe and I went out and builder has put dirt on to adjacent lot behind this permited property. We spoke with the builder and homeowner about issue and contractor will be placing sod on all dirt on the adjacent lot. Also we are going to allow the hight point in the middle to be flat then drain to the right and left property drainage pattern. They also need to put a berm along the back so the water will not impact the adjacent lot behind this lot. Contact Gabe or Parren for any questions. ---------------------------------------------------------------------------------- 3/11/2026 - PREVIOUS INSPECTION NOTES ** 03/11/26 SURVEY SHOWS WATER DUMPING TO THE ADJACENT PROPERTY IN THE REAR 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 | |||
| ROW- PROJECT STATUS | 03/25/2026 | Status Check | PFLANAGAN |
| Note: Gabe and I went out and builder has put dirt on to adjacent lot behind this permited property. We spoke with the builder and homeowner about issue and contractor will be placing sod on all dirt on the adjacent lot. Also we are going to allow the hight point in the middle to be flat then drain to the right and left property drainage pattern. They also need to put a berm along the back so the water will not impact the adjacent lot behind this lot. Contact Gabe or Parren for any questions. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/11/2026 | Disapproved - NO FEE | EMADISON |
| Note: ** 03/11/26 SURVEY SHOWS WATER DUMPING TO THE ADJACENT PROPERTY IN THE REAR 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 | |||
| ROW- PRE-APRON (PRE-POUR) | 12/17/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 12-17-25 TPOLACEK*** BOTH DRIVEWAYS ROADSIDE APRON FORM BOARDS MUST BE MOVED TO MATCH EXISTING EDGE OF ROAD AND BE AT LEAST 1" ABOVE THE EXISTING EDGE OF ROAD BUT NO MORE THAN 2". WHEN HOT PATCH IS COMPLETED ASPHALT MUST MATCH CONCRETE ELEVATION . APPROVING AS NOTED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. ** 11/13/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY AND WATERWAYS AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ____________________________________________________________________________________________________________________ 11/12/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO INSTALL SILT FENCE OR USE OTHER BMP FOR STOPING SEDIMENT FROM GETTING INTO THE FRONT ROADSIDE SWALE. NEXT INSPECTION WILL BE FRIDAY 11/14/25 TO SEE IF CORRECTION MADE ------------------------------------------------------------------------------------------- 11/10/2025 - PREVIOUS INSPECTION NOTES 11-10-25 TPOLACEK*** BUILDER STILL NEEDS TO OPEN SWALE AND CLEAN OUT TEMPORARY PIPE AS WELL AS REPAIR ALL SILT FENCE AND INSTALL CONSTRUCTION ENTRANCE AS REQUIRED BY COPC. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/4/2025 - PREVIOUS INSPECTION NOTES 11-04-2025 TPOLACEK*** BUILDER MUST REMOVE PALLET AND STACK OF CONCRETE BAGS FROM ROW, OPEN SWALE TO ALLOW DRAINAGE TO FLOW, REESTABLISH TEMPORARY PIPE, REESTABLISH ALL SILT FENCE AND INSTALL CONSTRUCTION ENTRANCE IN FRONT. BUILDER HAS 5 DAYS TO COMPLY | |||
| GRAVITY SEWER TEST | 12/10/2025 | APPROVED | JSTEWART |
| Note: 12/8/2025 - PREVIOUS INSPECTION NOTES No 5ft Head test. FBCP 312.6 Gravity sewer test. | |||
| ELECTRIC - EARLY POWER | 12/08/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Authorize release of email | |||
| ELECTRIC - EARLY POWER | 12/08/2025 | CANCELLED BY APPLICANT | WEB |
| SEWER TIE IN | 12/08/2025 | APPROVED | JSTEWART |
| GRAVITY SEWER TEST | 12/08/2025 | Disapproved - NO FEE | JSTEWART |
| Note: No 5ft Head test. FBCP 312.6 Gravity sewer test. | |||
| ROW - DRAINAGE | 11/14/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 11/13/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY AND WATERWAYS AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ____________________________________________________________________________________________________________________ 11/12/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO INSTALL SILT FENCE OR USE OTHER BMP FOR STOPING SEDIMENT FROM GETTING INTO THE FRONT ROADSIDE SWALE. NEXT INSPECTION WILL BE FRIDAY 11/14/25 TO SEE IF CORRECTION MADE ------------------------------------------------------------------------------------------- 11/10/2025 - PREVIOUS INSPECTION NOTES 11-10-25 TPOLACEK*** BUILDER STILL NEEDS TO OPEN SWALE AND CLEAN OUT TEMPORARY PIPE AS WELL AS REPAIR ALL SILT FENCE AND INSTALL CONSTRUCTION ENTRANCE AS REQUIRED BY COPC. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/4/2025 - PREVIOUS INSPECTION NOTES 11-04-2025 TPOLACEK*** BUILDER MUST REMOVE PALLET AND STACK OF CONCRETE BAGS FROM ROW, OPEN SWALE TO ALLOW DRAINAGE TO FLOW, REESTABLISH TEMPORARY PIPE, REESTABLISH ALL SILT FENCE AND INSTALL CONSTRUCTION ENTRANCE IN FRONT. BUILDER HAS 5 DAYS TO COMPLY | |||
| PEP TANK INSTALLATION REQUEST | 11/13/2025 | APPROVED | CBOWERMASTER |
| ROW - DRAINAGE | 11/12/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO INSTALL SILT FENCE OR USE OTHER BMP FOR STOPING SEDIMENT FROM GETTING INTO THE FRONT ROADSIDE SWALE. NEXT INSPECTION WILL BE FRIDAY 11/14/25 TO SEE IF CORRECTION MADE ------------------------------------------------------------------------------------------- 11/10/2025 - PREVIOUS INSPECTION NOTES 11-10-25 TPOLACEK*** BUILDER STILL NEEDS TO OPEN SWALE AND CLEAN OUT TEMPORARY PIPE AS WELL AS REPAIR ALL SILT FENCE AND INSTALL CONSTRUCTION ENTRANCE AS REQUIRED BY COPC. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/4/2025 - PREVIOUS INSPECTION NOTES 11-04-2025 TPOLACEK*** BUILDER MUST REMOVE PALLET AND STACK OF CONCRETE BAGS FROM ROW, OPEN SWALE TO ALLOW DRAINAGE TO FLOW, REESTABLISH TEMPORARY PIPE, REESTABLISH ALL SILT FENCE AND INSTALL CONSTRUCTION ENTRANCE IN FRONT. BUILDER HAS 5 DAYS TO COMPLY | |||
| ROW - DRAINAGE | 11/10/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11-10-25 TPOLACEK*** BUILDER STILL NEEDS TO OPEN SWALE AND CLEAN OUT TEMPORARY PIPE AS WELL AS REPAIR ALL SILT FENCE AND INSTALL CONSTRUCTION ENTRANCE AS REQUIRED BY COPC. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/4/2025 - PREVIOUS INSPECTION NOTES 11-04-2025 TPOLACEK*** BUILDER MUST REMOVE PALLET AND STACK OF CONCRETE BAGS FROM ROW, OPEN SWALE TO ALLOW DRAINAGE TO FLOW, REESTABLISH TEMPORARY PIPE, REESTABLISH ALL SILT FENCE AND INSTALL CONSTRUCTION ENTRANCE IN FRONT. BUILDER HAS 5 DAYS TO COMPLY | |||
| ROW - DRAINAGE | 11/04/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11-04-2025 TPOLACEK*** BUILDER MUST REMOVE PALLET AND STACK OF CONCRETE BAGS FROM ROW, OPEN SWALE TO ALLOW DRAINAGE TO FLOW, REESTABLISH TEMPORARY PIPE, REESTABLISH ALL SILT FENCE AND INSTALL CONSTRUCTION ENTRANCE IN FRONT. BUILDER HAS 5 DAYS TO COMPLY | |||
| LATH/BRICK/ WATER BARRIER | 09/30/2025 | APPROVED | JSTEWART |
| INSULATION | 09/18/2025 | APPROVED | FWILLIS |
| Note: 9/11/2025 - PREVIOUS INSPECTION NOTES Previous notes not rectified..... 1. Please submitt a revision of windows/doors installed (product approval). FBC [A]107.4 2. Please all apropriate Trusses cleaned from dirt from improper storage (ground contact) BCSI Truss summary sheet Inspection.....1. Garage walls TP Penetrations require firestop. FBC R302.11(1.2) 2. Steel sleeve at Firewall requires fire putty at each end to seal passage. 3. Locations of walls that stud penetration exceed 10' require firestop (Romex penetration). FBC R302.11(1.2) Inspector Notes from Inspection 2443 Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 8/26/2025 11:37:30 AM *** NOTE: Please call in Firewall inspections prior to Insulation. 1. Please submitt a revision of windows/doors installed (product approval). FBC [A]107.4 2. Please all apropriate Trusses cleaned from dirt from improper storage (ground contact) BCSI Truss summary sheet 3. Please seal concrete floor at tubs. 4. Change bonding wire at service connect to #4 conductor. per plan. Will check at Insulation. | |||
| INSULATION | 09/11/2025 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: Previous notes not rectified..... 1. Please submitt a revision of windows/doors installed (product approval). FBC [A]107.4 2. Please all apropriate Trusses cleaned from dirt from improper storage (ground contact) BCSI Truss summary sheet Inspection.....1. Garage walls TP Penetrations require firestop. FBC R302.11(1.2) 2. Steel sleeve at Firewall requires fire putty at each end to seal passage. 3. Locations of walls that stud penetration exceed 10' require firestop (Romex penetration). FBC R302.11(1.2) Inspector Notes from Inspection 2443 Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 8/26/2025 11:37:30 AM *** NOTE: Please call in Firewall inspections prior to Insulation. 1. Please submitt a revision of windows/doors installed (product approval). FBC [A]107.4 2. Please all apropriate Trusses cleaned from dirt from improper storage (ground contact) BCSI Truss summary sheet 3. Please seal concrete floor at tubs. 4. Change bonding wire at service connect to #4 conductor. per plan. Will check at Insulation. | |||
| FIREWALL DRYWALL NAILING | 08/29/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 8/26/2025 11:37:30 AM *** NOTE: Please call in Firewall inspections prior to Insulation. 1. Please submitt a revision of windows/doors installed (product approval). FBC [A]107.4 2. Please all apropriate Trusses cleaned from dirt from improper storage (ground contact) BCSI Truss summary sheet 3. Please seal concrete floor at tubs. 4. Change bonding wire at service connect to #4 conductor. per plan. Will check at Insulation. | |||
| FIREWALL FRAMING | 08/29/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 8/26/2025 11:37:30 AM *** NOTE: Please call in Firewall inspections prior to Insulation. 1. Please submitt a revision of windows/doors installed (product approval). FBC [A]107.4 2. Please all apropriate Trusses cleaned from dirt from improper storage (ground contact) BCSI Truss summary sheet 3. Please seal concrete floor at tubs. 4. Change bonding wire at service connect to #4 conductor. per plan. Will check at Insulation. | |||
| ALL ROUGH | 08/26/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/26/2025 11:37:30 AM *** NOTE: Please call in Firewall inspections prior to Insulation. 1. Please submitt a revision of windows/doors installed (product approval). FBC [A]107.4 2. Please all apropriate Trusses cleaned from dirt from improper storage (ground contact) BCSI Truss summary sheet 3. Please seal concrete floor at tubs. 4. Change bonding wire at service connect to #4 conductor. per plan. Will check at Insulation. | |||
| ROOF VALLEY & METAL | 08/07/2025 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2460 Right side unit, Please clean trusses, King hip, hip jacks from debri. Will check at all rough. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/05/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Right side unit, Please clean trusses, King hip, hip jacks from debri. Will check at all rough. | |||
| WALL SHEATHING | 08/05/2025 | APPROVED | JSTEWART |
| TIE BEAM / LINTEL | 06/30/2025 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 06/11/2025 | APPROVED | JSTEWART |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 06/10/2025 | APPROVED | RRICKS |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/30/2025 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 05/29/2025 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 05/09/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 03/09/2026 | 03/09/2026 |
| Note: Marked INFORMATION By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM NOC of file is expired. No inspections can be scheduled until new NOC is submitted. | |||
| BLD | COMPLETE | 09/11/2025 | 09/15/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/18/2025 | 08/18/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/09/2025 | 06/10/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/09/2025 | 06/09/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/29/2025 | 05/29/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/23/2025 | 05/27/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Density test needs to be accompanied with a certification from the engineer. Also, it needs to be digitally signed, sealed, and verifiable. | |||
| MECH | COMPLETE | 04/03/2025 | 04/08/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/03/2025 | 04/03/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/28/2025 | 04/16/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/28/2025 | 03/28/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan: all plans must match drive way dimensions dont match site plan | |||
| SW1 | COMPLETE | 03/27/2025 | 04/01/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/27/2025 | 03/31/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition 2. Provide Duct layout signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition | |||
| LOCATE | COMPLETE | 03/27/2025 | 03/28/2025 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/27/2025 | 03/31/2025 |
| ENGIN1 | COMPLETE | 03/27/2025 | 03/28/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/27/2025 | 04/01/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/27/2025 | 03/28/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/27/2025 | 04/02/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/27/2025 | 04/02/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI GENERAL INSPECTION 32.50 | ¤32.50 | 05/01/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 05/01/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 05/01/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 05/01/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 05/01/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/01/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/01/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 08/18/2025 |
| FC IMPACT FEE EMS | ¤124.00 | 04/14/2025 |
| IMPACT FEE FIRE | ¤434.51 | 04/14/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 04/14/2025 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 04/14/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 04/14/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/14/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 04/14/2025 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 04/14/2025 |
| CONNECTION FEES | ¤2,374.52 | 04/14/2025 |
| WATER- TURN ON | ¤50.00 | 04/14/2025 |
| ADJUSTMENT 10% | (¤192.91) | 04/14/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/14/2025 |
| INSPECTION - RESIDENTIAL | ¤1,479.50 | 04/14/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤419.64 | 04/14/2025 |
| SURCHARGE FS 533.721 | ¤17.36 | 04/14/2025 |
| SURCHARGE - FS 468.631 | ¤26.04 | 04/14/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/14/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/14/2025 |
| SW ENG PRE APRON | ¤30.00 | 04/14/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/14/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/14/2025 |
| SEWER CREDIT | (¤1,420.00) | 04/14/2025 |
| SEWER INSPECTION | ¤25.00 | 04/14/2025 |
| SEWER CAPITAL FACILITY | ¤12,241.04 | 04/14/2025 |
| WATER CAPITAL FACILITY FEE | ¤8,702.28 | 04/14/2025 |
| SITE PLAN 30 | ¤30.00 | 04/14/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤35,171.99 |