Permit #2025031239

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7025-00500-0300
CONDITIONED SPACE: 1247 sqft
GARAGE: 473 sqft
OPENED PORCH (WITH ROOF) : 152 sqft
Total Square Footage: 1872 sqft
Block: 00500
Subdivision: -
Job Phone: 844-885-8913
Location Address: 66 PARKVIEW DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/08/2025
NOC: RECORDED
Applicant name: SIMON DALE VANWAGENEN
Owner: LGI HOMES-FLORIDA LLC

Address

1450 LAKE ROBBINS DRIVE

THE WOODLANDS, TX 77380

Address

SUITE 430

THE WOODLANDS, TX 77380

Lot: 0300
Contracted Stated Job Value: ¤300,000.00
Job Description: Single family residence
Type: CN

Contractor

LGI HOMES-FLORIDA LLC
Status Location Address State License Number Phone
ACTIVE

2304 SPRING HILL CT

TAMPA, FL 33602

CBC1257972 (Exp: 08/31/2026) 904-451-8258

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
BRETT CHRISTIAN GIBSON
Status Location Address State License Number Phone
ACTIVE

250 SEGOVIA RD

ST AUGUSTINE, FL 32086

CAC1818423 (Exp: 08/31/2026) 904-229-8131
PAUL ERIC FORSTER
Status Location Address State License Number Phone
ACTIVE

6114 GOODMAN RD

JACKSONVILLE, FL 32244

CFC1429261 (Exp: 08/31/2026) 904-647-1820
CHRISTOPHER DENNIS O'CONNER
Status Location Address State License Number Phone
ACTIVE

240 N LAKE CUNNINGHAM AVE

JACKSONVILLE, FL 32257

ER13015361 (Exp: 08/31/2026) 904-540-0858

Inspection History

Type Request Date Result Inspector
MONOLITHIC SLAB 06/12/2026 RSIMS
PLUMBING 1ST ROUGH UNDERGROUND 06/10/2026 APPROVED HCAMACHO
ROW - DRAINAGE 08/15/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTCHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR ENTIRE RESIDENTIAL CONSTION EMTRANCE DIAGRAM. https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf The entire lot must be surrounded by a Silt Fence and installed correctly. All canal waterways and ditches must have a minimum of 2 rows of silt fencing at a minimum of 5 ft apart. Silt fence on ditches will also be doubled and installed at the (TOB) top of Bank. All Silt fencing must be maintained throughout the entire construction project. The road must be kept clean throughout the whole project. During the installation of the construction entrance an area of the interior lot may be cleared, as needed, for the installation. NOTE: A silt fence will not be required until the interior lot is cleared. Technical Manual Chapter 5, Section 1200.01. LDC. Sec.24-162. (c),(d)
ROW - DRAINAGE 08/08/2025 Disapproved - NO FEE TPOLACEK
Note: TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTCHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR ENTIRE RESIDENTIAL CONSTION EMTRANCE DIAGRAM. https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf The entire lot must be surrounded by a Silt Fence and installed correctly. All canal waterways and ditches must have a minimum of 2 rows of silt fencing at a minimum of 5 ft apart. Silt fence on ditches will also be doubled and installed at the (TOB) top of Bank. All Silt fencing must be maintained throughout the entire construction project. The road must be kept clean throughout the whole project. During the installation of the construction entrance an area of the interior lot may be cleared, as needed, for the installation. NOTE: A silt fence will not be required until the interior lot is cleared. Technical Manual Chapter 5, Section 1200.01. LDC. Sec.24-162. (c),(d)
WATER METER INSTALLATION REQUEST 05/22/2025 APPROVED CBOWERMASTER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 05/21/2025 APPROVED JMUNSON
FORMBOARD SURVEY (OFFICE USE ONLY)
ROW - STORMWATER FINAL
U -UTILITY RESIDENTIAL FINAL
PEP TANK INSTALLATION REQUEST
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW FIELD SURVEY /GRADING CERTIFICATION
GRAVITY SEWER TEST
SEWER TIE IN
ELECTRIC - EARLY POWER
LATH/BRICK/ WATER BARRIER
TIE BEAM / LINTEL
ALL ROUGH
WALL SHEATHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL
ROOF VALLEY & METAL
INSULATION
BLD - BUILDING FINAL

Review History

Department Status Date In Date Out
BLD COMPLETE 05/21/2026 05/26/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 05/21/2026 05/25/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 05/18/2026 05/18/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 05/15/2026 05/20/2026
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Lot 30 block 500 on plans. lot 30 block 50 on site plan
ELEC COMPLETE 05/15/2026 05/19/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 09/30/2025 09/30/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/20/2025 06/25/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved contingent on final survey.
ENGIN1 COMPLETE 06/20/2025 06/25/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 06/20/2025 06/20/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 06/13/2025 06/17/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Please revise drainage swale on the back right of home. There shall be positive fall ( 0.1') every 20'.
ENGIN1 COMPLETE 06/13/2025 06/17/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 06/13/2025 06/13/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/30/2025 06/03/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
MECH COMPLETE 05/30/2025 06/02/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/30/2025 05/30/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 05/30/2025 05/30/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 05/30/2025 06/03/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM This lot is negatively impacting lot 29 towards the back. Possibly create a berm to keep water retained to this lot.
BLD COMPLETE 05/21/2025 05/21/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 05/19/2025 05/19/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Can not schedule Geo Tech inspection due to NOC
BADMIN INFORMATION 05/16/2025 05/16/2025
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM NOC needs to be recorded at Flagler Clerk of Courts.
SW1 COMPLETE 04/23/2025 04/30/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/23/2025 04/24/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 04/23/2025 04/23/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 04/22/2025 04/22/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Garage FFE is 2' lower than Residence FFE. Please indicate if lot 2 and 3 are vacant or improved and show FFEs if applicable. There shall be a .3' fall at the back yard easement high point down to the drainage swale. Along the property lines of adjoining properties the slope shall be no greater than 4:1. Additional comments: There is a lot of soil being removed, please revise site plan so this lot is not being built in a hole.
SW1 HOLD 04/21/2025 04/22/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Garage FFE is 2' lower than Residence FFE. Please indicate if lot 2 and 3 are vacant or improved and show FFEs if applicable. There shall be a .3' fall at the back yard easement high point down to the drainage swale. Along the property lines of adjoining properties the slope shall be no greater than 4:1.
ENGIN1 COMPLETE 04/21/2025 04/21/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 04/21/2025 04/21/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 04/17/2025 04/17/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM 1-The property is negatively impacting the lots and the back. The flow arrows do not agree with elevations. 2- Base on the elevations appears that water is flowing back towards the middle of the house in the back. Addition comments: Move breaking point or berm to the 5' easement so less water is impacting the lots in the back. Ensure slope is no greater than 4:1.
SW1 HOLD 04/11/2025 04/17/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM 1-The property is negatively impacting the lots and the back. The flow arrows do not agree with elevations. 2- Base on the elevations appears that water is flowing back towards the middle of the house in the back.
ZON COMPLETE 04/11/2025 04/11/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/11/2025 04/11/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 HOLD 04/03/2025 04/10/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Proposed FFE shall be equal to or greater than lot 29 with little tolerance when applicable.
BADMIN COMPLETE 04/03/2025 04/07/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/03/2025 04/03/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 04/03/2025 04/03/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 03/28/2025 04/16/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN HOLD 03/27/2025 04/01/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Truss layout from truss company missing.
BLD COMPLETE 03/27/2025 04/01/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 03/27/2025 03/28/2025
Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM
ELEC COMPLETE 03/27/2025 04/01/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/27/2025 03/28/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 03/27/2025 03/31/2025
LOCATE COMPLETE 03/27/2025 03/28/2025
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 03/27/2025 03/31/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 03/27/2025 04/01/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Per COPC Technical Manual 300.01A.1.c.(8), all slopes must adjoin existing property lines at no greater than a 4:1 unless it is a developable vacant lot in which the slope shall be stabalized at no greater than 2:1. 1- In the back yard the slope is greater than 4:1 going to lot 2 and 3. 2- There needs to be a minimum of 0.3' fall from the proposed eleavtions at the 5' easement to the drainage swale in back yard. 3- Proposed elevations (26.2 and 26.3) adjacent to lot 29, needs a mininum of .3' fall to ensure this lot doesn't negatively impact lot 29 Please feel free to call or email me if you have any questions or concerns.
ZON COMPLETE 03/27/2025 03/27/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤25.00 05/08/2025
ADJUSTMENT 10% (¤108.90) 05/08/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/08/2025
INSPECTION - RESIDENTIAL ¤825.00 05/08/2025
PLAN REVIEW - RESIDENTIAL ¤234.00 05/08/2025
CONNECTION FEES ¤1,187.26 05/08/2025
FC IMPACT FEE EMS ¤62.00 05/08/2025
IMPACT FEE FIRE ¤434.51 05/08/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/08/2025
FC IMPACT FEE LIBRARY ¤268.00 05/08/2025
IMPACT FEE PARKS ¤1,828.01 05/08/2025
IMPACT FEE SCHOOL ¤5,450.00 05/08/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 05/08/2025
WATER -IRRIGATION INSPECTION ¤25.00 05/08/2025
SURCHARGE FS 533.721 ¤9.80 05/08/2025
SURCHARGE - FS 468.631 ¤14.70 05/08/2025
SW ENG - FOUNDATION SURVEY ¤20.00 05/08/2025
SW ENG INSPECTION 80 ¤80.00 05/08/2025
SW ENG PRE APRON ¤30.00 05/08/2025
SW ENG - REVIEW 20 ¤20.00 05/08/2025
SW ENG RES REVIEW 200 ¤200.00 05/08/2025
SEWER INSPECTION ¤25.00 05/08/2025
SEWER CAPITAL FACILITY ¤6,120.52 05/08/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 05/08/2025
SITE PLAN 30 ¤30.00 05/08/2025
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
PLAN REVIEW - REVISION ¤130.00
PLAN REVIEW - REVISION ¤32.50
EXTENSION ¤40.00
Fees Total Due: ¤242.50 Total Paid: ¤23,295.04