I want to search for...
Permit #2025031239
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7025-00500-0300 |
| CONDITIONED SPACE: 1247 sqft |
| GARAGE: 473 sqft |
| OPENED PORCH (WITH ROOF) : 152 sqft |
| Total Square Footage: 1872 sqft |
| Block: 00500 |
| Subdivision: - |
| Job Phone: 844-885-8913 |
| Location Address: 66 PARKVIEW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/08/2025 |
| NOC: RECORDED |
| Applicant name: SIMON DALE VANWAGENEN |
| Owner: LGI HOMES-FLORIDA LLC |
|
Address 1450 LAKE ROBBINS DRIVE THE WOODLANDS, TX 77380 |
|
Address SUITE 430 THE WOODLANDS, TX 77380 |
| Lot: 0300 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Single family residence |
| Type: CN |
Contractor
LGI HOMES-FLORIDA LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2304 SPRING HILL CT TAMPA, FL 33602 |
CBC1257972 (Exp: 08/31/2026) | 904-451-8258 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
CHRISTOPHER DENNIS O'CONNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
240 N LAKE CUNNINGHAM AVE JACKSONVILLE, FL 32257 |
ER13015361 (Exp: 08/31/2026) | 904-540-0858 |
Inspection History
| Type | Request Date | Result | Inspector |
| MONOLITHIC SLAB | 06/12/2026 | RSIMS | |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/10/2026 | APPROVED | HCAMACHO |
| ROW - DRAINAGE | 08/15/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTCHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR ENTIRE RESIDENTIAL CONSTION EMTRANCE DIAGRAM. https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf The entire lot must be surrounded by a Silt Fence and installed correctly. All canal waterways and ditches must have a minimum of 2 rows of silt fencing at a minimum of 5 ft apart. Silt fence on ditches will also be doubled and installed at the (TOB) top of Bank. All Silt fencing must be maintained throughout the entire construction project. The road must be kept clean throughout the whole project. During the installation of the construction entrance an area of the interior lot may be cleared, as needed, for the installation. NOTE: A silt fence will not be required until the interior lot is cleared. Technical Manual Chapter 5, Section 1200.01. LDC. Sec.24-162. (c),(d) | |||
| ROW - DRAINAGE | 08/08/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTCHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR ENTIRE RESIDENTIAL CONSTION EMTRANCE DIAGRAM. https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf The entire lot must be surrounded by a Silt Fence and installed correctly. All canal waterways and ditches must have a minimum of 2 rows of silt fencing at a minimum of 5 ft apart. Silt fence on ditches will also be doubled and installed at the (TOB) top of Bank. All Silt fencing must be maintained throughout the entire construction project. The road must be kept clean throughout the whole project. During the installation of the construction entrance an area of the interior lot may be cleared, as needed, for the installation. NOTE: A silt fence will not be required until the interior lot is cleared. Technical Manual Chapter 5, Section 1200.01. LDC. Sec.24-162. (c),(d) | |||
| WATER METER INSTALLATION REQUEST | 05/22/2025 | APPROVED | CBOWERMASTER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 05/21/2025 | APPROVED | JMUNSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | |||
| ROW - STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| GRAVITY SEWER TEST | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER | |||
| LATH/BRICK/ WATER BARRIER | |||
| TIE BEAM / LINTEL | |||
| ALL ROUGH | |||
| WALL SHEATHING | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | |||
| ROOF VALLEY & METAL | |||
| INSULATION | |||
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/21/2026 | 05/26/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/21/2026 | 05/25/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/18/2026 | 05/18/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/15/2026 | 05/20/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Lot 30 block 500 on plans. lot 30 block 50 on site plan | |||
| ELEC | COMPLETE | 05/15/2026 | 05/19/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/30/2025 | 09/30/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/20/2025 | 06/25/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved contingent on final survey. | |||
| ENGIN1 | COMPLETE | 06/20/2025 | 06/25/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/20/2025 | 06/20/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/13/2025 | 06/17/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Please revise drainage swale on the back right of home. There shall be positive fall ( 0.1') every 20'. | |||
| ENGIN1 | COMPLETE | 06/13/2025 | 06/17/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/13/2025 | 06/13/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/30/2025 | 06/03/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/30/2025 | 06/02/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/30/2025 | 05/30/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/30/2025 | 05/30/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/30/2025 | 06/03/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM This lot is negatively impacting lot 29 towards the back. Possibly create a berm to keep water retained to this lot. | |||
| BLD | COMPLETE | 05/21/2025 | 05/21/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/19/2025 | 05/19/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Can not schedule Geo Tech inspection due to NOC | |||
| BADMIN | INFORMATION | 05/16/2025 | 05/16/2025 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM NOC needs to be recorded at Flagler Clerk of Courts. | |||
| SW1 | COMPLETE | 04/23/2025 | 04/30/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/23/2025 | 04/24/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/23/2025 | 04/23/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/22/2025 | 04/22/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Garage FFE is 2' lower than Residence FFE. Please indicate if lot 2 and 3 are vacant or improved and show FFEs if applicable. There shall be a .3' fall at the back yard easement high point down to the drainage swale. Along the property lines of adjoining properties the slope shall be no greater than 4:1. Additional comments: There is a lot of soil being removed, please revise site plan so this lot is not being built in a hole. | |||
| SW1 | HOLD | 04/21/2025 | 04/22/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Garage FFE is 2' lower than Residence FFE. Please indicate if lot 2 and 3 are vacant or improved and show FFEs if applicable. There shall be a .3' fall at the back yard easement high point down to the drainage swale. Along the property lines of adjoining properties the slope shall be no greater than 4:1. | |||
| ENGIN1 | COMPLETE | 04/21/2025 | 04/21/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/21/2025 | 04/21/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/17/2025 | 04/17/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM 1-The property is negatively impacting the lots and the back. The flow arrows do not agree with elevations. 2- Base on the elevations appears that water is flowing back towards the middle of the house in the back. Addition comments: Move breaking point or berm to the 5' easement so less water is impacting the lots in the back. Ensure slope is no greater than 4:1. | |||
| SW1 | HOLD | 04/11/2025 | 04/17/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM 1-The property is negatively impacting the lots and the back. The flow arrows do not agree with elevations. 2- Base on the elevations appears that water is flowing back towards the middle of the house in the back. | |||
| ZON | COMPLETE | 04/11/2025 | 04/11/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/11/2025 | 04/11/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/03/2025 | 04/10/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Proposed FFE shall be equal to or greater than lot 29 with little tolerance when applicable. | |||
| BADMIN | COMPLETE | 04/03/2025 | 04/07/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/03/2025 | 04/03/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/03/2025 | 04/03/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/28/2025 | 04/16/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 03/27/2025 | 04/01/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Truss layout from truss company missing. | |||
| BLD | COMPLETE | 03/27/2025 | 04/01/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/27/2025 | 03/28/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/27/2025 | 04/01/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/27/2025 | 03/28/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/27/2025 | 03/31/2025 |
| LOCATE | COMPLETE | 03/27/2025 | 03/28/2025 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/27/2025 | 03/31/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/27/2025 | 04/01/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Per COPC Technical Manual 300.01A.1.c.(8), all slopes must adjoin existing property lines at no greater than a 4:1 unless it is a developable vacant lot in which the slope shall be stabalized at no greater than 2:1. 1- In the back yard the slope is greater than 4:1 going to lot 2 and 3. 2- There needs to be a minimum of 0.3' fall from the proposed eleavtions at the 5' easement to the drainage swale in back yard. 3- Proposed elevations (26.2 and 26.3) adjacent to lot 29, needs a mininum of .3' fall to ensure this lot doesn't negatively impact lot 29 Please feel free to call or email me if you have any questions or concerns. | |||
| ZON | COMPLETE | 03/27/2025 | 03/27/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤25.00 | 05/08/2025 |
| ADJUSTMENT 10% | (¤108.90) | 05/08/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/08/2025 |
| INSPECTION - RESIDENTIAL | ¤825.00 | 05/08/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤234.00 | 05/08/2025 |
| CONNECTION FEES | ¤1,187.26 | 05/08/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 05/08/2025 |
| IMPACT FEE FIRE | ¤434.51 | 05/08/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/08/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/08/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 05/08/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/08/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 05/08/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/08/2025 |
| SURCHARGE FS 533.721 | ¤9.80 | 05/08/2025 |
| SURCHARGE - FS 468.631 | ¤14.70 | 05/08/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/08/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/08/2025 |
| SW ENG PRE APRON | ¤30.00 | 05/08/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/08/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/08/2025 |
| SEWER INSPECTION | ¤25.00 | 05/08/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 05/08/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 05/08/2025 |
| SITE PLAN 30 | ¤30.00 | 05/08/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| PLAN REVIEW - REVISION | ¤130.00 | |
| PLAN REVIEW - REVISION | ¤32.50 | |
| EXTENSION | ¤40.00 | |
| Fees | Total Due: ¤242.50 | Total Paid: ¤23,295.04 |