I want to search for...
Permit #2025031335
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7015-00030-1860 |
| CONDITIONED SPACE: 908 sqft |
| OPENED PORCH (WITH ROOF) : 250 sqft |
| Total Square Footage: 1158 sqft |
| Block: 00030 |
| Subdivision: 7015 - |
| Job Phone: 954-646-3082 |
| Location Address: 31 CHEYENNE CT |
| Type: BA - BUILDING ADDITION |
| Issue Date: 05/29/2025 |
| NOC: RECORDED |
| Applicant name: MARK RANDALL SLORP |
| Owner: SLORP MARK R & MICHELE BLAKEMAN TRUSTEES |
|
Address 31 CHEYENNE COURT PALM COAST, FL 32137 |
| Lot: 1860 |
| Contracted Stated Job Value: ¤275,000.00 |
| Job Description: ADDITION AND INTERIOR RENOVATION |
| Type: CN |
Contractor
SLORP CONSTRUCTION CO INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3931 SW 47TH AVE, SUITE 105 DAVIE, FL 33314 |
CGC033924 (Exp: 08/31/2026) | 954-646-3082 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF VALLEY & METAL | 03/27/2026 | APPROVED | MCONTRYMAN |
| WALL SHEATHING | 01/30/2026 | APPROVED | HCAMACHO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/19/2025 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2340 1.Please revise section of the house where it shows exhisting garage to stay, and now it has all new walls with double lintel and dowels every 4'. Ok to Pour. 2. Also inspected the pool retaining walls. Ok to pour. Inspector Notes from Inspection 2270 8-27-25 1. Inspection was done on 8-7-25. This day i looked at the stem wall footers for the pool wall. All was to plan and good to pour. | |||
| TIE BEAM / LINTEL | 09/05/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1.Please revise section of the house where it shows exhisting garage to stay, and now it has all new walls with double lintel and dowels every 4'. Ok to Pour. 2. Also inspected the pool retaining walls. Ok to pour. Inspector Notes from Inspection 2270 8-27-25 1. Inspection was done on 8-7-25. This day i looked at the stem wall footers for the pool wall. All was to plan and good to pour. | |||
| FOOTER | 08/27/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 8-27-25 1. Inspection was done on 8-7-25. This day i looked at the stem wall footers for the pool wall. All was to plan and good to pour. | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 08/15/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/15/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 8/11/2025 - PREVIOUS INSPECTION NOTES NEED TO RE-ESTABLISH FAILING SILT FENCE ROUND THE PROPERTY LINE. YOU WILL HAVE 5DAYS TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 08/11/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO RE-ESTABLISH FAILING SILT FENCE ROUND THE PROPERTY LINE. YOU WILL HAVE 5DAYS TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT | |||
| MONOLITHIC SLAB | 08/07/2025 | APPROVED | BTAYLOR |
| STEM WALL FOUNDATION | 08/07/2025 | APPROVED | BTAYLOR |
| Note: 7/15/2025 - PREVIOUS INSPECTION NOTES 1. Rear section of the house where the slider is, needs to be revised. New steel and curb was added but there's not detail for it. Do not pour with Stem Wall. 2. Front left where footer attaches to the garage needs to be verifyed. Currently it calls for a new footing and it is not installed. *Ok to pour s inspected sections and column footers.* | |||
| DOWN CELL | 08/07/2025 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/30/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: WATER DISTRIBUTION LINES WILL BE RAN OVER HEAD, THIS WAS A REMODELED HOME | |||
| ELECTRIC 1ST ROUGH UNDERGROUND | 07/15/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: The only thing inspected was the Ufer Ground on the stem wall steel. | |||
| STEM WALL FOUNDATION | 07/15/2025 | PARTIALLY APPROVED | HCAMACHO |
| Note: 1. Rear section of the house where the slider is, needs to be revised. New steel and curb was added but there's not detail for it. Do not pour with Stem Wall. 2. Front left where footer attaches to the garage needs to be verifyed. Currently it calls for a new footing and it is not installed. *Ok to pour s inspected sections and column footers.* | |||
| ELECTRIC TEMP POLE | 06/12/2025 | APPROVED - AS NOTED | KSANDOE |
| Note: Release Power | |||
| LATH/BRICK/ WATER BARRIER | |||
| ALL ROUGH | |||
| INSULATION | |||
| BLD - BUILDING FINAL | |||
| LDSC-LANDSCAPE/IRRIGATION FINAL | |||
| Note: 4/30/25 (JB) THE OWNER REQUESTED REPLACING THE TREES NEEDED FOR DENSITY REQUIREMENT AT THE BUILDING FINAL INSPECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/20/2025 | 10/23/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/06/2025 | 10/08/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Plan sheet S3.0 in table on left missing C - there is only a link. please revise. | |||
| SW1 | COMPLETE | 09/02/2025 | 09/02/2025 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM Existing construction. New slab areas match elevation of existing. Foundation Survey not necessary for SW review. | |||
| SW1 | HOLD | 08/27/2025 | 08/28/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) NEED TO HAVE FFE OF THE OLD SLAB OF THE HOUSE. 2) NEED TO GET THE FFES OF THE ADJACENT LOTS TO THE RIGHT AND LEFT OF THIS LOT. | |||
| ZON | COMPLETE | 08/27/2025 | 08/27/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/22/2025 | 08/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/05/2025 | 08/08/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/24/2025 | 07/24/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/24/2025 | 07/31/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/22/2025 | 07/22/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 07/22/2025 | 07/22/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/22/2025 | 07/22/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM On revised site plan there are new concrete steps please provide the width. On retaining wall please provide setbacks and state that it will be finished and painted to match existing | |||
| ZON | COMPLETE | 05/21/2025 | 05/21/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/21/2025 | 05/28/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/15/2025 | 05/19/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/15/2025 | 05/19/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/15/2025 | 05/15/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Elevation plan: Windows and doors facing the right of way will require banding all around them. Rear also faces a right of way (canal) | |||
| MECH | COMPLETE | 05/15/2025 | 05/19/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/15/2025 | 05/15/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/15/2025 | 05/16/2025 |
| Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/17/2025 | 04/21/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Site Plan: Driveway turn around has a max of 9' wide x 18' in length. Floor plan: Please provide an existing floor plan and area square foot calculations of what you are adding Elevation plan; Windows and doors facing the right of way will require banding all around them. Example Garage door, windows front and rear as they both face the ROW. | |||
| SW1 | HOLD | 04/17/2025 | 04/23/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM PLEASE SHOW THE NEW ADDITION CLEAR ON SITE PLAN AND NEED SQFT OF ADDITION | |||
| MECH | HOLD | 04/17/2025 | 04/22/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 2. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition (Second Request) | |||
| ELEC | HOLD | 04/17/2025 | 04/21/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. List all sub contractors. | |||
| BLD | HOLD | 04/17/2025 | 04/21/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| BLD | HOLD | 03/28/2025 | 04/04/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| ELEC | HOLD | 03/28/2025 | 04/03/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. List all sub contractors. The paper you submitted was only for your demo. 2. Dryer needs to be GFCI protected NEC 2020 210.8 3. Need light and switch in master bedroom by slider door. NEC 2020 210.70 4. DW outlet can not be located behind the DW. NEC 2020 422.16 5. Submit Electrical load calculations NEC 2020 220.80 6. 1/0 is not rated for 400 amps NEC 2020 310.12 7. Notes on the electrical page reference the 2017 NEC Florida has adopted the 2020 NEC 8. Need service outlet by the A/C unit NEC 2020 210.63 9. Update the FBC code year listed on the electrical page. 10. 220 outlet needs to be GFCI protected. NEC 2020 210.8 | |||
| ENGIN1 | COMPLETE | 03/28/2025 | 04/01/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 03/28/2025 | 04/01/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/28/2025 | 04/03/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide manufacturers specs on range hood showing cfm's 2. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| PLUM | COMPLETE | 03/28/2025 | 04/01/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/28/2025 | 03/31/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE DEMENTIONS OF NEW ADDITION | |||
| ZON | HOLD | 03/28/2025 | 03/31/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site Plan: Driveway turn around has a max of 9' wide x 18' in length. Floor plan: Please provide an existing floor plan. Elevation plan; Provide the existing and proposed on one page for review. for example front view should have the existing view and the proposed view one page. Rear and side same. Windows and doors faing the right of way wil require banding all around them. Example Garage door, windows front and rear as they both face the ROW. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 07/24/2025 |
| ADJUSTMENT 10% | (¤100.08) | 05/29/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/29/2025 |
| INSPECTION - RESIDENTIAL | ¤756.25 | 05/29/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤214.50 | 05/29/2025 |
| SURCHARGE FS 533.721 | ¤9.01 | 05/29/2025 |
| SURCHARGE - FS 468.631 | ¤13.51 | 05/29/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/29/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/29/2025 |
| SITE PLAN 30 | ¤30.00 | 05/29/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | |
| Fees | Total Due: ¤32.50 | Total Paid: ¤1,025.69 |