Permit #2025031352
Permit Details
Status: COED
| Parcel Id: 06-12-31-5180-00000-0380 |
| CONDITIONED SPACE: 2355 sqft |
| GARAGE: 424 sqft |
| OPENED PORCH (WITH ROOF) : 160 sqft |
| Total Square Footage: 2939 sqft |
| Subdivision: 2322 - RETREAT AT TOWN CENTER PHASE 1 |
| Job Phone: 904-669-7000 |
| Location Address: 42 MAHOGANY WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/30/2025 |
| NOC: RECORDED |
| Applicant name: PAUL GILBERT AXTELL |
| Owner: TOLL SOUTHEAST LP CO INC |
|
Address 1140 VIRGINIA DRIVE FORT WASHINGTON, PA 19034 |
| Lot: 38 |
| Contracted Stated Job Value: ¤432,028.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
TOLL BROS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
40 EVEREST LN, STE 5 ST JOHNS, FL 32259 |
CGC60445 (Exp: 08/31/2026) | 904-217-3852 |
Sub Contractors
JAMES F QUINN III
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3210 SW 40TH BLVD STE F GAINESVILLE, FL 32608 |
EC13010994 (Exp: 08/31/2026) | 352-378-9274 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
HARLEY M BRYAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
5223 EDGEWOOD CT ORMOND BEACH, FL 32174 |
LI26657 (Exp: 08/31/2028) | 386-463-2700 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/18/2025 | FINAL APPROVED | JSTEWART |
| Note: 9/12/2025 - PREVIOUS INSPECTION NOTES 9/12/25 1. Vent through soffit requires solid soffit 6' around it M1502.3 2. Upstairs tub/shower missing grout by door trim 3. Stair spindles need to be secured in place | |||
| BLD - BUILDING FINAL | 09/12/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 9/12/25 1. Vent through soffit requires solid soffit 6' around it M1502.3 2. Upstairs tub/shower missing grout by door trim 3. Stair spindles need to be secured in place | |||
| U -UTILITY RESIDENTIAL FINAL | 09/09/2025 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 reclaim irr-no cc | |||
| ROW - FINAL APRON (AFTER POUR) | 09/05/2025 | APPROVED | FSLADISH |
| Note: 9/5/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/05/2025 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/05/2025 | APPROVED | FSLADISH |
| Note: 9/5/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 09/05/2025 | APPROVED | FSLADISH |
| Note: 9/5/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U-CROSS CONNECTION | 08/27/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim irr-no cc | |||
| ROW- PRE-APRON (PRE-POUR) | 08/20/2025 | APPROVED | FSLADISH |
| Note: 8/20/25 BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ELECTRIC - EARLY POWER | 08/15/2025 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2200 7/16/25 Okay to send email to FPL | |||
| WATER METER INSTALLATION REQUEST | 07/31/2025 | APPROVED | CBOWERMASTER |
| ELECTRIC-TUG | 07/16/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 7/16/25 Okay to send email to FPL | |||
| INSULATION | 07/10/2025 | APPROVED | MCONTRYMAN |
| Note: 7/9/2025 - PREVIOUS INSPECTION NOTES 7/9/25 1. Missing foam sealant around 2nd floor bedroom window FBCR 302.11 | |||
| INSULATION | 07/09/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 7/9/25 1. Missing foam sealant around 2nd floor bedroom window FBCR 302.11 | |||
| GRAVITY SEWER TEST | 07/07/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 FBCR NEED ADDRESS POSTED FOR 9-1-1 THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 07/07/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 FBCR NEED ADDRESS POSTED FOR 9-1-1 THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 07/03/2025 | APPROVED | CVANSTRAHLEN |
| Note: Items from previous inspections will be check at insulation inspection Inspector Notes from Inspection 2420 Please fix items before next inspection #1-FBC [A]107.4-DUCT LAYOUT DOES NOT MATCH ENERGY CALCS ( please resummit e-cals for revision and approval second floor main flex is call for 14" instal is a 16" , first floor 2 plenum have different quantity of flex #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( front door , slidding door top , master bedroom window left side top and right side ) #3-Need pipe pvc support front bedroom 4" pipe #4-Smoke tetector combination on second floor , plans call for 2 CO Combination , instal is only 1 | |||
| ALL ROUGH | 07/02/2025 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-FBC [A]107.4-DUCT LAYOUT DOES NOT MATCH ENERGY CALCS ( please resummit e-cals for revision and approval second floor main flex is call for 14" instal is a 16" , first floor 2 plenum have different quantity of flex #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( front door , slidding door top , master bedroom window left side top and right side ) #3-Need pipe pvc support front bedroom 4" pipe #4-Smoke tetector combination on second floor , plans call for 2 CO Combination , instal is only 1 | |||
| LATH/BRICK/ WATER BARRIER | 07/01/2025 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1- all penetrations need to be seal on exterior walls , mark with red market ( circle ), drainer , AC wires and pipe , electrical wire , low voltage wire , etc Items from previous inspection still need to be check Inspector Notes from Inspection 2460 6/23/25 1. Truss KO2, marked on plans, still needs repair 6/9/2025 - PREVIOUS INSPECTION NOTES 6/9/25 All below areas are highlighted on the plans 1. Truss' FG01, FG02, FG03, A01 and K02 all need engineers letter of proper repair, and repair completed, before proceeding 2. Missing 2nd engineering on truss FG03 3. Missing screws for lvl on stairway per 9/S02 on page S1.2 4. Missing (3) 2x6 post by truss FGO3 per plans FBC(A) 107.4 5. Missing HUC2-10 hanger for porch beam. What is installed in not correct 6. Missing SDWC15600's on garage header per detail 7/S02 6/5/2025 - PREVIOUS INSPECTION NOTES 6/5/25 No stairs installed to go to second floor. Please schedule inspection once this is completed | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/23/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 6/23/25 1. Truss KO2, marked on plans, still needs repair 6/9/2025 - PREVIOUS INSPECTION NOTES 6/9/25 All below areas are highlighted on the plans 1. Truss' FG01, FG02, FG03, A01 and K02 all need engineers letter of proper repair, and repair completed, before proceeding 2. Missing 2nd engineering on truss FG03 3. Missing screws for lvl on stairway per 9/S02 on page S1.2 4. Missing (3) 2x6 post by truss FGO3 per plans FBC(A) 107.4 5. Missing HUC2-10 hanger for porch beam. What is installed in not correct 6. Missing SDWC15600's on garage header per detail 7/S02 6/5/2025 - PREVIOUS INSPECTION NOTES 6/5/25 No stairs installed to go to second floor. Please schedule inspection once this is completed | |||
| ROOF VALLEY & METAL | 06/16/2025 | APPROVED | MKRASKI |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 06/11/2025 | APPROVED | RRICKS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/09/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 6/9/25 All below areas are highlighted on the plans 1. Truss' FG01, FG02, FG03, A01 and K02 all need engineers letter of proper repair, and repair completed, before proceeding 2. Missing 2nd engineering on truss FG03 3. Missing screws for lvl on stairway per 9/S02 on page S1.2 4. Missing (3) 2x6 post by truss FGO3 per plans FBC(A) 107.4 5. Missing HUC2-10 hanger for porch beam. What is installed in not correct 6. Missing SDWC15600's on garage header per detail 7/S02 6/5/2025 - PREVIOUS INSPECTION NOTES 6/5/25 No stairs installed to go to second floor. Please schedule inspection once this is completed | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/05/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 6/5/25 No stairs installed to go to second floor. Please schedule inspection once this is completed | |||
| WALL SHEATHING | 06/04/2025 | APPROVED | MCONTRYMAN |
| MONOLITHIC SLAB | 05/07/2025 | APPROVED | MCONTRYMAN |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/05/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: FBCR NEED ADDRESS POSTED FOR 9-1-1 |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 08/15/2025 | 08/18/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/03/2025 | 07/03/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/11/2025 | 06/11/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/11/2025 | 06/11/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/01/2025 | 05/02/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/01/2025 | 05/06/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/01/2025 | 05/01/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/28/2025 | 04/28/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/28/2025 | 04/30/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/28/2025 | 04/29/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/31/2025 | 04/04/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/31/2025 | 04/04/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Please provide stair and hand rail details as per R311.7 through R311.7.8 | |||
| CUSVC | COMPLETE | 03/31/2025 | 04/07/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/31/2025 | 04/04/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/31/2025 | 04/01/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 03/31/2025 | 04/01/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/31/2025 | 04/02/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/31/2025 | 04/02/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/31/2025 | 04/02/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/31/2025 | 03/31/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Pitched roofs. 1.All single-family and duplex buildings shall have a pitched roof covering a minimum of 65 percent of the overall floor area under the roof. 2.Pitched roofs shall have a minimum slope of 5:12 (five inches vertical rise for every 12 inches horizontal run) and shall have an overhang beyond the building wall; however, the overhang shall not encroach into an easement. 3.Flat roofed areas including, but not limited to, porches are permissible in the remaining 35 percent of floor area under roof. Please show that the 4/12 roofed area does not exceed the maximum 35% allowed for roof under 5/12 | |||
| URB | COMPLETE | 03/31/2025 | 03/31/2025 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/09/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 04/30/2025 |
| IMPACT FEE FIRE | ¤434.51 | 04/30/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/30/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/30/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 04/30/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/30/2025 |
| IMPACT FEE TRANSPORTATION | ¤3,502.00 | 04/30/2025 |
| WATER METER W/OUT TAP | ¤965.03 | 04/30/2025 |
| SURCHARGE FS 533.721 | ¤14.03 | 04/30/2025 |
| SURCHARGE - FS 468.631 | ¤21.04 | 04/30/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/30/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/30/2025 |
| SW ENG PRE APRON | ¤30.00 | 04/30/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/30/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/30/2025 |
| WATER PERMIT INSPECTION | ¤40.00 | 04/30/2025 |
| SITE PLAN 30 | ¤30.00 | 04/30/2025 |
| WATER-METER | ¤874.47 | 04/30/2025 |
| WATER- TURN ON | ¤50.00 | 04/30/2025 |
| ADJUSTMENT 10% | (¤155.85) | 04/30/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/30/2025 |
| INSPECTION - RESIDENTIAL | ¤1,190.75 | 04/30/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤337.74 | 04/30/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,549.73 |