Permit #2025040048

Permit Details

Status: COED

Parcel Id: 07-11-31-7017-00020-0220
CONDITIONED SPACE: 1809 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 2248 sqft
Block: 00020
Subdivision: -
Job Phone: 239-571-5325
Location Address: 46 BOLLING LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/10/2025
NOC: RECORDED
Applicant name: RYAN SCOTT DAVIS
Owner: SYNERGY HOMES, LLC

Address

581 NW MERCANTILE PL

PORT ST LUCIE, FL 34986

Address

106

PORT ST LUCIE, FL 34986

Lot: 0220
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SYNERGY HOMES, LLC
Status Location Address State License Number
ACTIVE

1 HARGROVE GRADE, SUITE B1

PALM COAST, FL 32137

CBC1254289 (Exp: 08/31/2026)

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 08/28/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 08/28/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 08/28/2025 FINAL APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/27/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW FIELD SURVEY /GRADING CERTIFICATION 08/27/2025 APPROVED - AS NOTED EMADISON
Note: ** 08/27/25 BUILDER ADDING SOD INTO LOW AREAS HOLDING WATER IN SWALE ALONG BOULDER ROCK
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/26/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/26/25 RIGHT SIDE AT PROPERTY LINE FINAL SURVEY SHOWS YOU ARE .35 HIGHER WHICH WILL HOLD BACK WATER. ** LEFT SIDE FROM CORNER OF BOLLING DOWN BOULDER ROCK IS TO FLAT NEED TO HAVE POSITIVE FALL TO MOVE WATER ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 _____________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES ** 08/06/25 RIGHT SIDE ROADSIDE SWALE ELEVATIONS ARE INCONSISTANT YOU DO NOT HAVE POSITIVE FALL TO MOVE THE STORMWATER FROM RIGHT TO LEFT ** YOU NEED TO MATCH THE EXITING GRADE AT THE PROPERTY LINE WITH POSITIVE FALL TO MOVE THE WATER ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 __________________________________________________________________________________________________________________ 7/30/2025 - PREVIOUS INSPECTION NOTES RIGHT SIDE ROADSIDE SWALE THE FINAL SURVEY STATES THAT THE WATER WILL NOT FLOW CORRECTLY NEED TO FIX SO WATER WILL FLOW
BLD - BUILDING FINAL 08/08/2025 APPROVED CVANSTRAHLEN
Note:
BLD - BUILDING FINAL 08/06/2025 Disapproved - NO FEE JSTEWART
Note: 1. Spare Bath mixing valve is reversed, flow of Hot water as by indicator. FBC P2722.2 2. Master shower not complete. Tile removed, Concrete floor removed, earth exposed. FBCR P2705.1 – 4
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/06/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/06/25 RIGHT SIDE ROADSIDE SWALE ELEVATIONS ARE INCONSISTANT YOU DO NOT HAVE POSITIVE FALL TO MOVE THE STORMWATER FROM RIGHT TO LEFT ** YOU NEED TO MATCH THE EXITING GRADE AT THE PROPERTY LINE WITH POSITIVE FALL TO MOVE THE WATER ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 __________________________________________________________________________________________________________________ 7/30/2025 - PREVIOUS INSPECTION NOTES RIGHT SIDE ROADSIDE SWALE THE FINAL SURVEY STATES THAT THE WATER WILL NOT FLOW CORRECTLY NEED TO FIX SO WATER WILL FLOW
BLD - BUILDING FINAL 08/05/2025 CANCELLED BY APPLICANT WEB
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/30/2025 Disapproved - NO FEE PFLANAGAN
Note: RIGHT SIDE ROADSIDE SWALE THE FINAL SURVEY STATES THAT THE WATER WILL NOT FLOW CORRECTLY NEED TO FIX SO WATER WILL FLOW
ELECTRIC - EARLY POWER 07/14/2025 APPROVED - AS NOTED JSTEWART
Note: Authorize release of email to FPL.
ROW- PRE-APRON (PRE-POUR) 07/11/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
PEP TANK INSTALLATION REQUEST 07/11/2025 CANCELLED BY APPLICANT WEB
U-CROSS CONNECTION 06/26/2025 APPROVED DHANEY
INSULATION 06/26/2025 APPROVED FWILLIS
GRAVITY SEWER TEST 06/26/2025 APPROVED - AS NOTED MGIBSON
Note: 6/25/2025 - PREVIOUS INSPECTION NOTES THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 06/26/2025 APPROVED FWILLIS
GRAVITY SEWER TEST 06/25/2025 PARTIALLY APPROVED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 06/25/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ALL ROUGH 06/24/2025 APPROVED MCONTRYMAN
WALL SHEATHING 06/20/2025 APPROVED MCONTRYMAN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/20/2025 APPROVED MCONTRYMAN
ROOF VALLEY & METAL 06/20/2025 APPROVED MCONTRYMAN
TIE BEAM / LINTEL 06/03/2025 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2250 5/27/25 1. REMOVE TOILET FROM SWALE. FBC3303.5 5/23/2025 - PREVIOUS INSPECTION NOTES 5/23/25 - WORKERS STILL WORKING ON SLAB, NOT READY AT THE TIME OF MY VISIT 8:30AM. REMOVE TOILET FROM SWALE. FBC3303.5 5/22/2025 - PREVIOUS INSPECTION NOTES
MONOLITHIC SLAB 05/27/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 5/27/25 1. REMOVE TOILET FROM SWALE. FBC3303.5 5/23/2025 - PREVIOUS INSPECTION NOTES 5/23/25 - WORKERS STILL WORKING ON SLAB, NOT READY AT THE TIME OF MY VISIT 8:30AM. REMOVE TOILET FROM SWALE. FBC3303.5 5/22/2025 - PREVIOUS INSPECTION NOTES
MONOLITHIC SLAB 05/23/2025 Disapproved -FEE REQUIRED FWILLIS
Note: 5/23/25 - WORKERS STILL WORKING ON SLAB, NOT READY AT THE TIME OF MY VISIT 8:30AM. REMOVE TOILET FROM SWALE. FBC3303.5 5/22/2025 - PREVIOUS INSPECTION NOTES
MONOLITHIC SLAB 05/22/2025 CANCELLED BY APPLICANT FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 05/16/2025 APPROVED MGIBSON
Note: 5/14/2025 - PREVIOUS INSPECTION NOTES FBCR-P-2503.5 5' HEAD TEST NOT HOLDING.
PLUMBING 1ST ROUGH UNDERGROUND 05/14/2025 Disapproved - NO FEE MGIBSON
Note: FBCR-P-2503.5 5' HEAD TEST NOT HOLDING.
FORMBOARD SURVEY (OFFICE USE ONLY) 05/09/2025 APPROVED PFLANAGAN
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 05/07/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 04/28/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 05/07/2025 05/07/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/07/2025 05/08/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 05/07/2025 05/07/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
ZON COMPLETE 04/02/2025 04/02/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BADMIN COMPLETE 04/01/2025 04/08/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 04/01/2025 04/08/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 04/01/2025 04/09/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 04/01/2025 04/07/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/01/2025 04/01/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 04/01/2025 04/03/2025
LOCATE COMPLETE 04/01/2025 04/07/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 04/01/2025 04/04/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 04/01/2025 04/08/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
SWALE COMPLETE 04/01/2025 04/17/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 08/28/2025
FC IMPACT FEE EMS ¤62.00 04/10/2025
IMPACT FEE FIRE ¤434.51 04/10/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/10/2025
FC IMPACT FEE LIBRARY ¤268.00 04/10/2025
IMPACT FEE PARKS ¤1,828.01 04/10/2025
IMPACT FEE SCHOOL ¤5,450.00 04/10/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 04/10/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,189.82 04/10/2025
SURCHARGE FS 533.721 ¤10.82 04/10/2025
SURCHARGE - FS 468.631 ¤16.23 04/10/2025
SW ENG - FOUNDATION SURVEY ¤20.00 04/10/2025
SW ENG INSPECTION 80 ¤80.00 04/10/2025
SW ENG PRE APRON ¤30.00 04/10/2025
SW ENG - REVIEW 20 ¤20.00 04/10/2025
SW ENG RES REVIEW 200 ¤200.00 04/10/2025
WATER METER W/ TAP ¤2,326.93 04/10/2025
SEWER CREDIT (¤1,466.00) 04/10/2025
WASTEWATER PERM INSPECTION ¤40.00 04/10/2025
SEWER CAPITAL FACILITY ¤3,930.70 04/10/2025
WATER CAPITAL FACILITY FEE ¤3,496.74 04/10/2025
WATER PERMIT REVIEW ¤40.00 04/10/2025
WATER MAIN EXTENSION IMPACT ¤854.40 04/10/2025
SITE PLAN 30 ¤30.00 04/10/2025
WATER- TURN ON ¤50.00 04/10/2025
ADJUSTMENT 10% (¤120.20) 04/10/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/10/2025
INSPECTION - RESIDENTIAL ¤913.00 04/10/2025
PLAN REVIEW - RESIDENTIAL ¤258.96 04/10/2025
Fees Total Due: ¤0.00 Total Paid: ¤23,167.92