Permit #2025040094

Permit Details

Status: COED

Parcel Id: 07-11-31-7065-00150-0050
CONDITIONED SPACE: 1809 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 2248 sqft
Block: 00150
Subdivision: -
Job Phone: 239-571-5325
Location Address: 20 KASHMIR TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/21/2025
NOC: RECORDED
Applicant name: RYAN SCOTT DAVIS
Owner: SYNERGY HOMES, LLC

Address

581 NW MERCANTILE PL

PORT ST LUCIE, FL 34986

Address

STE 106

PORT ST LUCIE, FL 34986

Lot: 0050
Contracted Stated Job Value: ¤200,000.00
Job Description: Single Family Residence
Type: CN

Contractor

SYNERGY HOMES, LLC
Status Location Address State License Number
ACTIVE

1 HARGROVE GRADE, SUITE B1

PALM COAST, FL 32137

CBC1254289 (Exp: 08/31/2026)

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 08/29/2025 APPROVED FSLADISH
Note: 8/29/25 ALL REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. _______________________________________________________________________________________________________________________ 8/28/2025 - PREVIOUS INSPECTION NOTES 8/28/25 RECEIEVED TEXT FROM GRAYSON TO CANCEL THIS INSPECTION Inspector Notes from Inspection 9465 8/27/25 SPOKE WITH GRAYSON CM AND WITH THE CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION I AM GOING TO APPROVE THE FIELD SURVEY AS NOTED. *** INSPECTORS NOTE. MEDIAN WILL NEED TO BE RETURNED TO AS GOOD OR BETTER CONDITION BEFORE ROW FINAL PASSAGE.*** 8/26/2025 - PREVIOUS INSPECTION NOTES 8/26/25 UPON WALKING PROPERTY DETERMINED THAT YOU HAVE DUG A SMALL TRENCH IN THE FRONT SWALE AS YOUR REGRADE TO 19.45 FLAT. THIS WILL NOT BE ACCEPTABLE AS THE FRONT SWALE DOES NOT CONFORM TO THE COPC SWALE DESIGN STANDARDS. YOU WILL NEED TO CREATE A COPC STANDARD SWALE. AS PREVIOUSLY STATED BASED ON YOUR ELEVATION NUMBERS THIS SWALE SHOULD BE RUN 19.30 FLAT TO JUST PAST THE LEFT PROPERTY ELEVATION OF 19.45 ( WHICH IS YOUR PROPERTY AS WELL) TILL IT HAS POSITIVE FLOW. YOU HAVE A LOW SPOT IN THE LEFT SIDE REAR PROPERTY CORNER AREA THAN NEEDS TO BE BROUGHT UP TO ALLOW POSITIVE FORWARD DRAINAGE. YOU HAV A COUPLE OF SMALL LOW SPOTS OUTLINED IN PAINT BY YOUR SEWER CLEANOUT. YOU WILL NEED TO SOD TO GRADE THE BARE DIRT AREA JUST PAST THE RIGHT SIDE PROPERTY LINE. Inspector Notes from Inspection 9463 8/26/25 YOUR SWALE IS STILL SHOWING HIGHER THAN THE PREVIOUSLY RECOMMENDED 19.30 FLAT TO OVER THE LEFT SIDE PROPERTY LINE. THESE ARE BOTH YOUR PROPERTIES SO I WILL DETERMINE ON FIELD SURVEY IF THIS WILL HAVE THE REQUIRED POSITVE DRAINAGE FLOW. APPROVING THIS AS NOTED. ________________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. YOUR FRONT SWALE ELEVATIONS DO NOT SHOW POSITIVE FLOW. YOU SHOULD RUN THE SWALE AT 19.30 FLAT ALL THE WAY TO AND PAST THE LEFT SIDE PROPERTY LINE. THIS SWALE WILL NOT DRAIN AS AS. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow . Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
U -UTILITY RESIDENTIAL FINAL 08/28/2025 APPROVED BHAINES
ROW - STORMWATER FINAL 08/28/2025 CANCELLED BY APPLICANT RRICKS
Note: 8/28/25 RECEIEVED TEXT FROM GRAYSON TO CANCEL THIS INSPECTION Inspector Notes from Inspection 9465 8/27/25 SPOKE WITH GRAYSON CM AND WITH THE CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION I AM GOING TO APPROVE THE FIELD SURVEY AS NOTED. *** INSPECTORS NOTE. MEDIAN WILL NEED TO BE RETURNED TO AS GOOD OR BETTER CONDITION BEFORE ROW FINAL PASSAGE.*** 8/26/2025 - PREVIOUS INSPECTION NOTES 8/26/25 UPON WALKING PROPERTY DETERMINED THAT YOU HAVE DUG A SMALL TRENCH IN THE FRONT SWALE AS YOUR REGRADE TO 19.45 FLAT. THIS WILL NOT BE ACCEPTABLE AS THE FRONT SWALE DOES NOT CONFORM TO THE COPC SWALE DESIGN STANDARDS. YOU WILL NEED TO CREATE A COPC STANDARD SWALE. AS PREVIOUSLY STATED BASED ON YOUR ELEVATION NUMBERS THIS SWALE SHOULD BE RUN 19.30 FLAT TO JUST PAST THE LEFT PROPERTY ELEVATION OF 19.45 ( WHICH IS YOUR PROPERTY AS WELL) TILL IT HAS POSITIVE FLOW. YOU HAVE A LOW SPOT IN THE LEFT SIDE REAR PROPERTY CORNER AREA THAN NEEDS TO BE BROUGHT UP TO ALLOW POSITIVE FORWARD DRAINAGE. YOU HAV A COUPLE OF SMALL LOW SPOTS OUTLINED IN PAINT BY YOUR SEWER CLEANOUT. YOU WILL NEED TO SOD TO GRADE THE BARE DIRT AREA JUST PAST THE RIGHT SIDE PROPERTY LINE. Inspector Notes from Inspection 9463 8/26/25 YOUR SWALE IS STILL SHOWING HIGHER THAN THE PREVIOUSLY RECOMMENDED 19.30 FLAT TO OVER THE LEFT SIDE PROPERTY LINE. THESE ARE BOTH YOUR PROPERTIES SO I WILL DETERMINE ON FIELD SURVEY IF THIS WILL HAVE THE REQUIRED POSITVE DRAINAGE FLOW. APPROVING THIS AS NOTED. ________________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. YOUR FRONT SWALE ELEVATIONS DO NOT SHOW POSITIVE FLOW. YOU SHOULD RUN THE SWALE AT 19.30 FLAT ALL THE WAY TO AND PAST THE LEFT SIDE PROPERTY LINE. THIS SWALE WILL NOT DRAIN AS AS. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow . Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
ROW - FINAL APRON (AFTER POUR) 08/28/2025 APPROVED RRICKS
Note: 8/28/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 8/27/25 SPOKE WITH GRAYSON CM AND WITH THE CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION I AM GOING TO APPROVE THE FIELD SURVEY AS NOTED. *** INSPECTORS NOTE. MEDIAN WILL NEED TO BE RETURNED TO AS GOOD OR BETTER CONDITION BEFORE ROW FINAL PASSAGE.*** 8/26/2025 - PREVIOUS INSPECTION NOTES 8/26/25 UPON WALKING PROPERTY DETERMINED THAT YOU HAVE DUG A SMALL TRENCH IN THE FRONT SWALE AS YOUR REGRADE TO 19.45 FLAT. THIS WILL NOT BE ACCEPTABLE AS THE FRONT SWALE DOES NOT CONFORM TO THE COPC SWALE DESIGN STANDARDS. YOU WILL NEED TO CREATE A COPC STANDARD SWALE. AS PREVIOUSLY STATED BASED ON YOUR ELEVATION NUMBERS THIS SWALE SHOULD BE RUN 19.30 FLAT TO JUST PAST THE LEFT PROPERTY ELEVATION OF 19.45 ( WHICH IS YOUR PROPERTY AS WELL) TILL IT HAS POSITIVE FLOW. YOU HAVE A LOW SPOT IN THE LEFT SIDE REAR PROPERTY CORNER AREA THAN NEEDS TO BE BROUGHT UP TO ALLOW POSITIVE FORWARD DRAINAGE. YOU HAV A COUPLE OF SMALL LOW SPOTS OUTLINED IN PAINT BY YOUR SEWER CLEANOUT. YOU WILL NEED TO SOD TO GRADE THE BARE DIRT AREA JUST PAST THE RIGHT SIDE PROPERTY LINE. Inspector Notes from Inspection 9463 8/26/25 YOUR SWALE IS STILL SHOWING HIGHER THAN THE PREVIOUSLY RECOMMENDED 19.30 FLAT TO OVER THE LEFT SIDE PROPERTY LINE. THESE ARE BOTH YOUR PROPERTIES SO I WILL DETERMINE ON FIELD SURVEY IF THIS WILL HAVE THE REQUIRED POSITVE DRAINAGE FLOW. APPROVING THIS AS NOTED. ________________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. YOUR FRONT SWALE ELEVATIONS DO NOT SHOW POSITIVE FLOW. YOU SHOULD RUN THE SWALE AT 19.30 FLAT ALL THE WAY TO AND PAST THE LEFT SIDE PROPERTY LINE. THIS SWALE WILL NOT DRAIN AS AS. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow . Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
ROW FIELD SURVEY /GRADING CERTIFICATION 08/27/2025 APPROVED - AS NOTED FSLADISH
Note: 8/27/25 SPOKE WITH GRAYSON CM AND WITH THE CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION I AM GOING TO APPROVE THE FIELD SURVEY AS NOTED. *** INSPECTORS NOTE. MEDIAN WILL NEED TO BE RETURNED TO AS GOOD OR BETTER CONDITION BEFORE ROW FINAL PASSAGE.*** 8/26/2025 - PREVIOUS INSPECTION NOTES 8/26/25 UPON WALKING PROPERTY DETERMINED THAT YOU HAVE DUG A SMALL TRENCH IN THE FRONT SWALE AS YOUR REGRADE TO 19.45 FLAT. THIS WILL NOT BE ACCEPTABLE AS THE FRONT SWALE DOES NOT CONFORM TO THE COPC SWALE DESIGN STANDARDS. YOU WILL NEED TO CREATE A COPC STANDARD SWALE. AS PREVIOUSLY STATED BASED ON YOUR ELEVATION NUMBERS THIS SWALE SHOULD BE RUN 19.30 FLAT TO JUST PAST THE LEFT PROPERTY ELEVATION OF 19.45 ( WHICH IS YOUR PROPERTY AS WELL) TILL IT HAS POSITIVE FLOW. YOU HAVE A LOW SPOT IN THE LEFT SIDE REAR PROPERTY CORNER AREA THAN NEEDS TO BE BROUGHT UP TO ALLOW POSITIVE FORWARD DRAINAGE. YOU HAV A COUPLE OF SMALL LOW SPOTS OUTLINED IN PAINT BY YOUR SEWER CLEANOUT. YOU WILL NEED TO SOD TO GRADE THE BARE DIRT AREA JUST PAST THE RIGHT SIDE PROPERTY LINE. Inspector Notes from Inspection 9463 8/26/25 YOUR SWALE IS STILL SHOWING HIGHER THAN THE PREVIOUSLY RECOMMENDED 19.30 FLAT TO OVER THE LEFT SIDE PROPERTY LINE. THESE ARE BOTH YOUR PROPERTIES SO I WILL DETERMINE ON FIELD SURVEY IF THIS WILL HAVE THE REQUIRED POSITVE DRAINAGE FLOW. APPROVING THIS AS NOTED. ________________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. YOUR FRONT SWALE ELEVATIONS DO NOT SHOW POSITIVE FLOW. YOU SHOULD RUN THE SWALE AT 19.30 FLAT ALL THE WAY TO AND PAST THE LEFT SIDE PROPERTY LINE. THIS SWALE WILL NOT DRAIN AS AS. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow . Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/26/2025 APPROVED - AS NOTED FSLADISH
Note: 8/26/25 YOUR SWALE IS STILL SHOWING HIGHER THAN THE PREVIOUSLY RECOMMENDED 19.30 FLAT TO OVER THE LEFT SIDE PROPERTY LINE. THESE ARE BOTH YOUR PROPERTIES SO I WILL DETERMINE ON FIELD SURVEY IF THIS WILL HAVE THE REQUIRED POSITVE DRAINAGE FLOW. APPROVING THIS AS NOTED. ________________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. YOUR FRONT SWALE ELEVATIONS DO NOT SHOW POSITIVE FLOW. YOU SHOULD RUN THE SWALE AT 19.30 FLAT ALL THE WAY TO AND PAST THE LEFT SIDE PROPERTY LINE. THIS SWALE WILL NOT DRAIN AS AS. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow . Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
ROW FIELD SURVEY /GRADING CERTIFICATION 08/26/2025 Disapproved - NO FEE FSLADISH
Note: 8/26/25 UPON WALKING PROPERTY DETERMINED THAT YOU HAVE DUG A SMALL TRENCH IN THE FRONT SWALE AS YOUR REGRADE TO 19.45 FLAT. THIS WILL NOT BE ACCEPTABLE AS THE FRONT SWALE DOES NOT CONFORM TO THE COPC SWALE DESIGN STANDARDS. YOU WILL NEED TO CREATE A COPC STANDARD SWALE. AS PREVIOUSLY STATED BASED ON YOUR ELEVATION NUMBERS THIS SWALE SHOULD BE RUN 19.30 FLAT TO JUST PAST THE LEFT PROPERTY ELEVATION OF 19.45 ( WHICH IS YOUR PROPERTY AS WELL) TILL IT HAS POSITIVE FLOW. YOU HAVE A LOW SPOT IN THE LEFT SIDE REAR PROPERTY CORNER AREA THAN NEEDS TO BE BROUGHT UP TO ALLOW POSITIVE FORWARD DRAINAGE. YOU HAV A COUPLE OF SMALL LOW SPOTS OUTLINED IN PAINT BY YOUR SEWER CLEANOUT. YOU WILL NEED TO SOD TO GRADE THE BARE DIRT AREA JUST PAST THE RIGHT SIDE PROPERTY LINE. DRAWING 300.F COPC TECHNICAL MANUAL. Inspector Notes from Inspection 9463 8/26/25 YOUR SWALE IS STILL SHOWING HIGHER THAN THE PREVIOUSLY RECOMMENDED 19.30 FLAT TO OVER THE LEFT SIDE PROPERTY LINE. THESE ARE BOTH YOUR PROPERTIES SO I WILL DETERMINE ON FIELD SURVEY IF THIS WILL HAVE THE REQUIRED POSITVE DRAINAGE FLOW. APPROVING THIS AS NOTED. ________________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. YOUR FRONT SWALE ELEVATIONS DO NOT SHOW POSITIVE FLOW. YOU SHOULD RUN THE SWALE AT 19.30 FLAT ALL THE WAY TO AND PAST THE LEFT SIDE PROPERTY LINE. THIS SWALE WILL NOT DRAIN AS AS. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow . Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
BLD - BUILDING FINAL 08/12/2025 CANCELLED BY APPLICANT WEB
Note: 8/8/2025 - PREVIOUS INSPECTION NOTES 8-8-25 1. Toilets still are not caulked at the bottom. 2. Front bedroom light will not turn off by the switch. 8/5/2025 - PREVIOUS INSPECTION NOTES 8/5/25: Partial Inspection due to site not being ready for Final Inspection. Please confirm that house is ready for Final Inspection. NOTE: Checked and approved smokes and roof only. Examples only: disconnect for ODU > blade pulled out & laying in disconnect / Tub & shower not sealed along apron and/or sill / toilets not sealed at base & lids tapoed shut and marked do not use / garage door opener not working / tub & shower both have excess construction debris - could not test / outlet in mirror of Master bathroom has a cracked plate at the screw / etc. 8/1/2025 - PREVIOUS INSPECTION NOTES 8-1-25 1. House is locked.
BLD - BUILDING FINAL 08/12/2025 FINAL APPROVED MCONTRYMAN
Note: New inspection due to canceled inspection 8/8/2025 - PREVIOUS INSPECTION NOTES 8-8-25 1. Toilets still are not caulked at the bottom. 2. Front bedroom light will not turn off by the switch. 8/5/2025 - PREVIOUS INSPECTION NOTES 8/5/25: Partial Inspection due to site not being ready for Final Inspection. Please confirm that house is ready for Final Inspection. NOTE: Checked and approved smokes and roof only. Examples only: disconnect for ODU > blade pulled out & laying in disconnect / Tub & shower not sealed along apron and/or sill / toilets not sealed at base & lids tapoed shut and marked do not use / garage door opener not working / tub & shower both have excess construction debris - could not test / outlet in mirror of Master bathroom has a cracked plate at the screw / etc. 8/1/2025 - PREVIOUS INSPECTION NOTES 8-1-25 1. House is locked.
BLD - BUILDING FINAL 08/08/2025 Disapproved - NO FEE BTAYLOR
Note: 8-8-25 1. Toilets still are not caulked at the bottom. 2. Front bedroom light will not turn off by the switch. 8/5/2025 - PREVIOUS INSPECTION NOTES 8/5/25: Partial Inspection due to site not being ready for Final Inspection. Please confirm that house is ready for Final Inspection. NOTE: Checked and approved smokes and roof only. Examples only: disconnect for ODU > blade pulled out & laying in disconnect / Tub & shower not sealed along apron and/or sill / toilets not sealed at base & lids tapoed shut and marked do not use / garage door opener not working / tub & shower both have excess construction debris - could not test / outlet in mirror of Master bathroom has a cracked plate at the screw / etc. 8/1/2025 - PREVIOUS INSPECTION NOTES 8-1-25 1. House is locked.
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/08/2025 Disapproved - NO FEE FSLADISH
Note: 8/8/25 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. YOUR FRONT SWALE ELEVATIONS DO NOT SHOW POSITIVE FLOW. YOU SHOULD RUN THE SWALE AT 19.30 FLAT ALL THE WAY TO AND PAST THE LEFT SIDE PROPERTY LINE. THIS SWALE WILL NOT DRAIN AS AS. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow . Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. SEE PHOTO FOR REFERENCE
BLD - BUILDING FINAL 08/05/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 8/5/2025 10:15:47 AM *** 8/5/25: Partial Inspection due to site not being ready for Final Inspection. Please confirm that house is ready for Final Inspection. NOTE: Checked and approved smokes and roof only. Examples only: disconnect for ODU > blade pulled out & laying in disconnect / Tub & shower not sealed along apron and/or sill / toilets not sealed at base & lids tapoed shut and marked do not use / garage door opener not working / tub & shower both have excess construction debris - could not test / outlet in mirror of Master bathroom has a cracked plate at the screw / etc. 8/1/2025 - PREVIOUS INSPECTION NOTES 8-1-25 1. House is locked.
BLD - BUILDING FINAL 08/01/2025 Disapproved - NO FEE BTAYLOR
Note: 8-1-25 1. House is locked.
GRAVITY SEWER TEST 07/31/2025 APPROVED - AS NOTED MGIBSON
Note: 7/30/2025 - PREVIOUS INSPECTION NOTES STILL WORKING THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 07/31/2025 APPROVED - AS NOTED MGIBSON
Note: 7/30/2025 - PREVIOUS INSPECTION NOTES THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 07/30/2025 Disapproved - NO FEE MGIBSON
GRAVITY SEWER TEST 07/30/2025 Disapproved -FEE REQUIRED MGIBSON
Note: STILL WORKING
ROW- PRE-APRON (PRE-POUR) 07/18/2025 APPROVED FSLADISH
Note: 7/18/25 BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR 7/17/2025 - PREVIOUS INSPECTION NOTES 7/17/25 TALKED WITH CONCRETE SUB ON SITE AT NOONTIME, WASHOUTS ONTO PIPE, STILL TO SOFT TO POUR. CANCELING AS A COURTESY. ___________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** CANCELLED VIA TEXT MESSAGE BY GRAYSON
ROW- PRE-APRON (PRE-POUR) 07/17/2025 CANCELLED BY APPLICANT FSLADISH
Note: 7/17/25 TALKED WITH CONCRETE SUB ON SITE AT NOONTIME, WASHOUTS ONTO PIPE, STILL TO SOFT TO POUR. CANCELING AS A COURTESY. ___________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** CANCELLED VIA TEXT MESSAGE BY GRAYSON
ROW- PRE-APRON (PRE-POUR) 07/14/2025 CANCELLED BY APPLICANT EMADISON
Note: ** CANCELLED VIA TEXT MESSAGE BY GRAYSON
PEP TANK INSTALLATION REQUEST 07/14/2025 APPROVED CBOWERMASTER
Note: 7/9/2025 7:47:30 AM- PREVIOUS INSPECTION NOTES 7/2/2025 12:14:48 PM- PREVIOUS INSPECTION NOTES stucco needs to be done dumpster needs to move Dumpster needs to move
ELECTRIC - EARLY POWER 07/14/2025 APPROVED - AS NOTED JSTEWART
Note: Authorize release of email to FPL
PEP TANK INSTALLATION REQUEST 07/08/2025 Disapproved -FEE REQUIRED CBOWERMASTER
Note: 7/2/2025 12:14:48 PM- PREVIOUS INSPECTION NOTES stucco needs to be done dumpster needs to move Dumpster needs to move
PEP TANK INSTALLATION REQUEST 07/02/2025 Disapproved -FEE REQUIRED CBOWERMASTER
Note: stucco needs to be done dumpster needs to move
INSULATION 06/27/2025 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 06/27/2025 APPROVED BTAYLOR
Note: 6/26/2025 - PREVIOUS INSPECTION NOTES cancelled by text
LATH/BRICK/ WATER BARRIER 06/26/2025 CANCELLED BY APPLICANT CVANSTRAHLEN
Note: cancelled by text
ALL ROUGH 06/25/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB and 5 FT HEAD TEST TO OVERFLOW #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( front door , top )
ROOF VALLEY & METAL 06/23/2025 APPROVED BTAYLOR
Note: 6/17/2025 - PREVIOUS INSPECTION NOTES 6/17/25: 1). Both wall flashings are missing the tape seal (or roof cement) over the nails on the wall flange section of the wall flashing. FBC-R903.2 2). Right side wall flashing has an cut out section under the truss on the right side that exceeds the acceptable amount to be waterproof. FBC-R903.2 6/11/2025 - PREVIOUS INSPECTION NOTES 6/11/25 1. Missing drip edge on the front of the building
ROOF VALLEY & METAL 06/17/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 6/17/2025 2:36:59 PM *** 6/17/25: 1). Both wall flashings are missing the tape seal (or roof cement) over the nails on the wall flange section of the wall flashing. FBC-R903.2 2). Right side wall flashing has an cut out section under the truss on the right side that exceeds the acceptable amount to be waterproof. FBC-R903.2 6/11/2025 - PREVIOUS INSPECTION NOTES 6/11/25 1. Missing drip edge on the front of the building
ROOF VALLEY & METAL 06/11/2025 Disapproved - NO FEE MCONTRYMAN
Note: 6/11/25 1. Missing drip edge on the front of the building
U-CROSS CONNECTION 06/10/2025 APPROVED BWRIGHT
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/10/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 6/10/25 1. Missing MGT at truss C1, for porch area 6/6/2025 - PREVIOUS INSPECTION NOTES 6/6/25 Job not ready 1. Roof sheathing is not installed 2. Trusses are not complete/Roof not complete 3. Not all metal is not installed --Please only schedule inspections when jobs are ready to avoid failures and fees--
WALL SHEATHING 06/06/2025 APPROVED MCONTRYMAN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/06/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 6/6/25 Job not ready 1. Roof sheathing is not installed 2. Trusses are not complete/Roof not complete 3. Not all metal is not installed --Please only schedule inspections when jobs are ready to avoid failures and fees--
TIE BEAM / LINTEL 05/30/2025 APPROVED CVANSTRAHLEN
Note:
TIE BEAM / LINTEL 05/28/2025 Disapproved - NO FEE CVANSTRAHLEN
Note: Please fix item before next inspection #1-dowel need to be 5" deep on concreted slab and secured
MONOLITHIC SLAB 05/19/2025 APPROVED CVANSTRAHLEN
Note:
MONOLITHIC SLAB 05/16/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/16/2025 2:20:08 PM *** 5/16/25: NOT READY! CONTRACTORS STILL WORKING ON EARLY PROCESSES.
FORMBOARD SURVEY (OFFICE USE ONLY) 05/15/2025 APPROVED RRICKS
PLUMBING 1ST ROUGH UNDERGROUND 05/12/2025 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 05/08/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 04/22/2025 APPROVED BVITALE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 05/15/2025 05/15/2025
Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 05/15/2025 05/15/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BADMIN INFORMATION 05/12/2025 05/12/2025
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Missing attachment.
BLD COMPLETE 05/05/2025 05/08/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 HOLD 05/05/2025 05/06/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE THE GEOTEC INSPECTION BEFORE THIS INSPECTION
ZON COMPLETE 05/05/2025 05/05/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BLD HOLD 05/01/2025 05/01/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech certification needs to be digitally verifiable.
SW1 COMPLETE 04/11/2025 04/21/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/11/2025 04/14/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 04/11/2025 04/11/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN COMPLETE 04/02/2025 04/08/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 04/02/2025 04/08/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 04/02/2025 04/10/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 04/02/2025 04/07/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/02/2025 04/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 04/02/2025 04/04/2025
LOCATE COMPLETE 04/02/2025 04/07/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 04/02/2025 04/04/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 04/02/2025 04/09/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM No common swales are allowed in the back of the property. Please bring the drainage swale away from the back property line.
ZON COMPLETE 04/02/2025 04/03/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 04/02/2025 04/17/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 08/28/2025
REINSPECTION RESIDENTIAL ¤40.00 08/28/2025
REINSPECTION RESIDENTIAL ¤40.00 08/28/2025
REINSPECTION RESIDENTIAL ¤40.00 08/28/2025
UTILITY PEP REINSPECTION ¤40.00 08/28/2025
UTILITY PEP REINSPECTION ¤40.00 08/28/2025
SEWER CREDIT (¤1,466.00) 04/21/2025
WASTEWATER PERM INSPECTION ¤40.00 04/21/2025
SEWER CAPITAL FACILITY ¤3,930.70 04/21/2025
WATER CAPITAL FACILITY FEE ¤3,496.74 04/21/2025
WATER PERMIT INSPECTION ¤40.00 04/21/2025
WATER MAIN EXTENSION IMPACT ¤854.40 04/21/2025
SITE PLAN 30 ¤30.00 04/21/2025
WATER- TURN ON ¤50.00 04/21/2025
ADJUSTMENT 10% (¤120.20) 04/21/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/21/2025
INSPECTION - RESIDENTIAL ¤913.00 04/21/2025
PLAN REVIEW - RESIDENTIAL ¤258.96 04/21/2025
FC IMPACT FEE EMS ¤62.00 04/21/2025
IMPACT FEE FIRE ¤434.51 04/21/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/21/2025
FC IMPACT FEE LIBRARY ¤268.00 04/21/2025
IMPACT FEE PARKS ¤1,828.01 04/21/2025
IMPACT FEE SCHOOL ¤5,450.00 04/21/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 04/21/2025
PEP TANK INSTALL ¤756.74 04/21/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,189.82 04/21/2025
SURCHARGE FS 533.721 ¤10.82 04/21/2025
SURCHARGE - FS 468.631 ¤16.23 04/21/2025
SW ENG - FOUNDATION SURVEY ¤20.00 04/21/2025
SW ENG INSPECTION 80 ¤80.00 04/21/2025
SW ENG PRE APRON ¤30.00 04/21/2025
SW ENG - REVIEW 20 ¤20.00 04/21/2025
SW ENG RES REVIEW 200 ¤200.00 04/21/2025
WATER METER W/ TAP ¤2,326.93 04/21/2025
Fees Total Due: ¤0.00 Total Paid: ¤24,124.66