Permit #2025040121

Permit Details

Status: COED

Parcel Id: 07-11-31-7030-00640-0070
CONDITIONED SPACE: 1754 sqft
GARAGE: 651 sqft
OPENED PORCH (WITH ROOF) : 182 sqft
OPENED PORCH (WITH ROOF) : 89 sqft
Total Square Footage: 2676 sqft
Block: 00640
Subdivision: -
Job Phone: 407-476-8195
Location Address: 2 RANBER PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/25/2025
NOC: RECORDED
Applicant name: CARLETTE RENE WITTE
Owner: INB BFS LLC

Address

3670 MAGUIRE BOULEVARD

ORLANDO, FL 32803

Address

SUITE 220

ORLANDO, FL 32803

Lot: 0070
Contracted Stated Job Value: ¤165,000.00
Job Description: single family residence
Type: CN

Contractor

INNOVATIVE NATIONWIDE BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD #220

,

CRC1330026 (Exp: 08/31/2026) 855-694-6634

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CAC1820196 (Exp: 08/31/2026) 407-404-4000
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 04/01/2026 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 3/27/2026 - PREVIOUS INSPECTION NOTES 03-27-26 TPOLACEK*** AS PREVIOUSLY NOTED THERE ARE WASHOUTS ALONG BOTH SIDES OF DRIVEWAY AND CULVERT IS FULL OF SEDIMENT. PLEASE MAKE CORRECTIONS TO SITE BEFORE REQUESTING REINSPECTION 03/24/06 RRicks On the both sides of the driveway above the flare there is a washout. Please add dirt to elevate sod and remove dirt from both ends of the culvert pipe. I will approve inspections up to the ROW Final.
U -UTILITY RESIDENTIAL FINAL 03/31/2026 FINAL APPROVED BHAINES
Note: 3/27/2026 - PREVIOUS INSPECTION NOTES No Power to panel. Pep tank full. Depression in the ground by cleanout cap
BLD - BUILDING FINAL 03/31/2026 APPROVED CVANSTRAHLEN
Note: 3/27/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-NEC.422.31-Disconnection of permanently connected Appliance-the brand circuit overcurrent device shall be permitted to serve as the disconnecting means where the switch or circuit breaker is within sight from the appliance or been capable of been locked in the open position in compliance with 110.25 #2-FBCR M1305.1.4.1-AC NEEDS 3' CLEARANCE FROM GROUND #3-Several electrical outlets loose on kitchen counter #4-R311.3-Floors and landings at exterior doors. There shall be a landing or floor on each side of each exterior door. The width of each landing shall be not less than the door served. Every landing shall have a dimension of not less than 36 inches (914 mm) measured in the direction of travel. The slope at exterior landings shall not exceed 1/4 unit vertical in 12 units horizontal (2 percent).
U-CROSS CONNECTION 03/27/2026 APPROVED - AS NOTED BHAINES
Note: No CC, No IRR
BLD - BUILDING FINAL 03/27/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspection #1-NEC.422.31-Disconnection of permanently connected Appliance-the brand circuit overcurrent device shall be permitted to serve as the disconnecting means where the switch or circuit breaker is within sight from the appliance or been capable of been locked in the open position in compliance with 110.25 #2-FBCR M1305.1.4.1-AC NEEDS 3' CLEARANCE FROM GROUND #3-Several electrical outlets loose on kitchen counter #4-R311.3-Floors and landings at exterior doors. There shall be a landing or floor on each side of each exterior door. The width of each landing shall be not less than the door served. Every landing shall have a dimension of not less than 36 inches (914 mm) measured in the direction of travel. The slope at exterior landings shall not exceed 1/4 unit vertical in 12 units horizontal (2 percent).
U -UTILITY RESIDENTIAL FINAL 03/27/2026 Disapproved - NO FEE BHAINES
Note: No Power to panel. Pep tank full. Depression in the ground by cleanout cap
ROW - STORMWATER FINAL 03/27/2026 Disapproved - NO FEE TPOLACEK
Note: 03-27-26 TPOLACEK*** AS PREVIOUSLY NOTED THERE ARE WASHOUTS ALONG BOTH SIDES OF DRIVEWAY AND CULVERT IS FULL OF SEDIMENT. PLEASE MAKE CORRECTIONS TO SITE BEFORE REQUESTING REINSPECTION 03/24/06 RRicks On the both sides of the driveway above the flare there is a washout. Please add dirt to elevate sod and remove dirt from both ends of the culvert pipe. I will approve inspections up to the ROW Final.
ROW - FINAL APRON (AFTER POUR) 03/24/2026 APPROVED RRICKS
Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/24/2026 APPROVED RRICKS
ROW FIELD SURVEY /GRADING CERTIFICATION 03/24/2026 APPROVED - AS NOTED RRICKS
Note: On the both sides of the driveway above the flare there is a washout. Please add dirt to elevate sod and remove dirt from both ends of the culvert pipe. I will approve inspections up to the ROW Final. At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 02/19/2026 APPROVED FSLADISH
Note: 2/19/26 PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR,IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
ELECTRIC - EARLY POWER 02/12/2026 APPROVED CVANSTRAHLEN
GRAVITY SEWER TEST 02/05/2026 APPROVED CVANSTRAHLEN
Note: 11/14/2025 - PREVIOUS INSPECTION NOTES NOT RAN YET
SEWER TIE IN 02/05/2026 APPROVED CVANSTRAHLEN
Note: 11/14/2025 - PREVIOUS INSPECTION NOTES PEP TANK NOT INSTALLED
PEP TANK INSTALLATION REQUEST 01/20/2026 APPROVED CBOWERMASTER
INSULATION 01/14/2026 APPROVED CVANSTRAHLEN
Note: 1/9/2026 - PREVIOUS INSPECTION NOTES Items from previous inspection not resolved #1- Dryers duct pipe need to be seal , all sims need to be seal , removed duct tape and white insulation foam from dryer pipe vent and add fire foam rate insulation #2-electrical framing for panel , need to have solid blocking on the back top pasing ceiling level #3- annular penetrqation need to be field with fire rate foam #4- garage left side wall need fire rate foam on electrical conduit Inspector Notes from Inspection 2420 Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-Seal all sims for dryer duct pipe
INSULATION 01/09/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Items from previous inspection not resolved #1- Dryers duct pipe need to be seal , all sims need to be seal , removed duct tape and white insulation foam from dryer pipe vent and add fire foam rate insulation #2-electrical framing for panel , need to have solid blocking on the back top pasing ceiling level #3- annular penetrqation need to be field with fire rate foam #4- garage left side wall need fire rate foam on electrical conduit Inspector Notes from Inspection 2420 Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-Seal all sims for dryer duct pipe
LATH/BRICK/ WATER BARRIER 01/06/2026 APPROVED CVANSTRAHLEN
ALL ROUGH 01/06/2026 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-Seal all sims for dryer duct pipe
ROOF VALLEY & METAL 12/19/2025 APPROVED MCONTRYMAN
Note: Inspector Notes from Inspection 2460 Please fix item before next inspection Frame block on wall , garage back wall to support ceiling roof truss
WALL SHEATHING 12/16/2025 APPROVED CVANSTRAHLEN
Note:
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/16/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please fix item before next inspection Frame block on wall , garage back wall to support ceiling roof truss
ELECTRIC-TUG 12/16/2025 APPROVED CVANSTRAHLEN
ROOF SHEATHING 12/11/2025 APPROVED CVANSTRAHLEN
WALL SHEATHING 12/11/2025 Disapproved - NO FEE CVANSTRAHLEN
Note: Sheathing need to be nail down on studs , openingon front entrance gabel
FORMBOARD SURVEY (OFFICE USE ONLY) 12/03/2025 APPROVED RRICKS
TIE BEAM / LINTEL 12/01/2025 APPROVED CVANSTRAHLEN
Note:
TIE BEAM / LINTEL 11/26/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspection #1-FBCR 608.5.4.1-CLEARANCE OF REBAR 3" TO SOIL, 1.5" TO REMOVEABLE FORM EXPOSED TO EARTH 2" #6 AND LARGER- FBCR 606.3.4- ( mark on building with orange spray paint ) #2-please install permit box on a accessible location , thank you
MONOLITHIC SLAB 11/20/2025 APPROVED CVANSTRAHLEN
SEWER TIE IN 11/14/2025 Disapproved - NO FEE MGIBSON
Note: PEP TANK NOT INSTALLED
PLUMBING 1ST ROUGH UNDERGROUND 11/14/2025 APPROVED MGIBSON
GRAVITY SEWER TEST 11/14/2025 Disapproved - NO FEE MGIBSON
Note: NOT RAN YET
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 11/06/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 10/31/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BADMIN INFORMATION 03/23/2026 03/23/2026
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Remove the address from the front of the file name.
BADMIN INFORMATION 03/20/2026 03/20/2026
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM The Final drainage and grading survey must be submitted with the certificate and uploaded all in one file.
SW1 COMPLETE 11/18/2025 11/18/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 11/18/2025 11/18/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 11/14/2025 11/14/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM FORMBOARD SURVEY BENCHMARK DOESN'T MATCH THE SITE PLAN PROVIDED TO THE CITY
ZON COMPLETE 11/14/2025 11/14/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 11/05/2025 11/06/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
MECH COMPLETE 10/21/2025 10/22/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 10/08/2025 10/09/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on the energy calcs and heatload need to be Daytona Beach
SWALE COMPLETE 04/17/2025 04/17/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 04/02/2025 04/08/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 04/02/2025 04/08/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 04/02/2025 04/10/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 04/02/2025 04/07/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/02/2025 04/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 04/02/2025 04/04/2025
LOCATE COMPLETE 04/02/2025 04/08/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 04/02/2025 04/04/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 04/02/2025 04/09/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Final PEP location to be provided by COPC. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lid/cover.
ZON COMPLETE 04/02/2025 04/02/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 03/30/2026
CONTRACTOR CHANGE ¤20.00 03/24/2026
CONTRACTOR CHANGE ¤20.00 03/24/2026
PLAN REVIEW - REVISION ¤32.50 03/24/2026
REINSPECTION RESIDENTIAL ¤40.00 03/24/2026
REINSPECTION RESIDENTIAL ¤40.00 03/24/2026
WATER- TURN ON ¤50.00 09/25/2025
ADJUSTMENT 10% (¤127.96) 09/25/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/25/2025
INSPECTION - RESIDENTIAL ¤973.50 09/25/2025
PLAN REVIEW - RESIDENTIAL ¤276.12 09/25/2025
FC IMPACT FEE EMS ¤62.00 09/25/2025
IMPACT FEE FIRE ¤434.51 09/25/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/25/2025
FC IMPACT FEE LIBRARY ¤268.00 09/25/2025
IMPACT FEE PARKS ¤1,828.01 09/25/2025
IMPACT FEE SCHOOL ¤5,450.00 09/25/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 09/25/2025
PEP TANK INSTALL ¤756.74 09/25/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,189.82 09/25/2025
SURCHARGE FS 533.721 ¤11.52 09/25/2025
SURCHARGE - FS 468.631 ¤17.28 09/25/2025
SW ENG - FOUNDATION SURVEY ¤20.00 09/25/2025
SW ENG INSPECTION 80 ¤80.00 09/25/2025
SW ENG PRE APRON ¤30.00 09/25/2025
SW ENG - REVIEW 20 ¤20.00 09/25/2025
SW ENG RES REVIEW 200 ¤200.00 09/25/2025
WATER METER W/ TAP ¤2,326.93 09/25/2025
SEWER CREDIT (¤2,465.75) 09/25/2025
WASTEWATER PERM REVIEW ¤40.00 09/25/2025
SEWER CAPITAL FACILITY ¤3,930.70 09/25/2025
WATER CAPITAL FACILITY FEE ¤3,496.74 09/25/2025
WATER PERMIT REVIEW ¤40.00 09/25/2025
WATER MAIN EXTENSION IMPACT ¤854.40 09/25/2025
SITE PLAN 30 ¤30.00 09/25/2025
Fees Total Due: ¤0.00 Total Paid: ¤23,149.06