I want to search for...

Permit #2025040141

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-1780
CONDITIONED SPACE: 3196 sqft
GARAGE: 597 sqft
OPENED PORCH (WITH ROOF) : 518 sqft
Total Square Footage: 4311 sqft
Block: 00000
Subdivision: -
Job Phone: 386-236-4133
Location Address: 413 BOURGANVILLE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/16/2025
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: VOLUSIA RESIDENTIAL CONSTRUCTION LLC

Address

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

Lot: 1780
Contracted Stated Job Value: ¤353,893.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1262114 (Exp: 08/31/2026) 386-236-4133

Sub Contractors

HUGH MACDONALD
Status Location Address State License Number Phone
ACTIVE

10825 TOM FOLSOM ROAD, SUITE A

THONOTOSASSA, FL 33592

CCC1329562 (Exp: 08/31/2026) 813-986-4968
STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
TIMUR ISPARYAN
Status Location Address State License Number Phone Fax
ACTIVE

3665 SPRINK PARK ROAD

JACKSONVILLE , FL 32207

CMC1249968 (Exp: 08/31/2026) 904-245-1818 904-337-1910

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/17/2025 FINAL APPROVED HCAMACHO
Note: 10/16/2025 - PREVIOUS INSPECTION NOTES 1. Both AH #1 & #2 need to have 30 amp breakers.NEC 440.4 2. WH needs a locking breaker or service disconnect.NEC 422.31 &110.25
BLD - BUILDING FINAL 10/16/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Both AH #1 & #2 need to have 30 amp breakers.NEC 440.4 2. WH needs a locking breaker or service disconnect.NEC 422.31 &110.25
U-CROSS CONNECTION 10/16/2025 APPROVED - AS NOTED BHAINES
Note: No CC, Pond fed
ROW - FINAL APRON (AFTER POUR) 10/16/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 10/16/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 10/16/2025 FINAL APPROVED BHAINES
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/15/2025 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 10/15/2025 APPROVED - AS NOTED EMADISON
Note: ** 10/15/25 BEFORE THE ROW STORMWATER FINAL IS APPROVED BUILDER IS REQUIRED TO INSTALL SOD FROM THE BACK SIDE OF CURB AND GUTTER 5 FT ACROSS THE VACANTS SEE PINK PAINT FOR HIGH LIGHTED AREA CAN NOT BE SEED AND STRAW ** IN REAR BOTH SIDE OF VACANTS NEED TO INSTALL SOD ON SLOPE TO PREVENT WASH-OUTS AND EROSION CAN NOT BE SEED AND STRAW ** ALL POP-UP DRAINS ARE REQUIRED TO BE ONTOP OF THE SOD TO PREVENT EROSION FROM OCCURING FROM UNDERNEATH THE SOD ** LEFT SIDE NEED TO ENSURE SOD AROUND THE UTILITY BOX AT PROPERTY LINE
ELECTRIC - EARLY POWER 09/08/2025 APPROVED MCONTRYMAN
ROW- PRE-APRON (PRE-POUR) 08/18/2025 APPROVED - AS NOTED EMADISON
Note: ** 08/18/25 READY TO SET PAVERS _______________________________________________________________________________________________________________ 8/12/2025 - PREVIOUS INSPECTION NOTES ** 08/12/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________
ROW- PAVER RESTRAINTS 08/12/2025 APPROVED EMADISON
Note: ** 08/12/25 READY TO POUR PAVER RESTRAINTS AND APRON ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ____________________________________________________________________________________________________________________
ROW- PRE-APRON (PRE-POUR) 08/12/2025 PARTIALLY APPROVED EMADISON
Note: ** 08/12/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________
LATH/BRICK/ WATER BARRIER 07/31/2025 APPROVED HCAMACHO
GRAVITY SEWER TEST 07/30/2025 APPROVED MGIBSON
SEWER TIE IN 07/30/2025 APPROVED MGIBSON
INSULATION 07/30/2025 APPROVED HCAMACHO
ELECTRIC-TUG 07/28/2025 APPROVED HCAMACHO
GRAVITY SEWER TEST 07/28/2025 CANCELLED BY APPLICANT WEB
ALL ROUGH 07/25/2025 APPROVED JSTEWART
WINDOW NAILING 07/24/2025 APPROVED JSTEWART
Note: 7/18/2025 - PREVIOUS INSPECTION NOTES 1. All the Arch windows are missing anchors, including the 1st floor and 2nd floor. 2. No product Approval sheet or installations instructions onsite to verify windows. 3. The bottom sill anchors on the slidding glass doors are all covered up or missing, can not verify.
WINDOW NAILING 07/18/2025 Disapproved - NO FEE HCAMACHO
Note: 1. All the Arch windows are missing anchors, including the 1st floor and 2nd floor. 2. No product Approval sheet or installations instructions onsite to verify windows. 3. The bottom sill anchors on the slidding glass doors are all covered up or missing, can not verify.
ROOF VALLEY & METAL 07/10/2025 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 2460 Note- Designate an attic access on the second floor.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/08/2025 APPROVED - AS NOTED HCAMACHO
Note: Note- Designate an attic access on the second floor.
WALL SHEATHING 07/03/2025 APPROVED HCAMACHO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/03/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Missing Engineering on F11,F8,F9,F5T,F6T, F7. 2. 1st Floor Bearing wall missing Attachemnts, See Plan Marked. 3. 1st Floor Detail E on Truss, See Plan Marked. 4. 1st Floor Detai 1 Post missing attachements, See Plan Marked. 5. 1st Floor Trusses See DETAIL B/FR2 OPTION 1. Marked on Plan. 6. 2nd Floor Slider Header and King posts, Missing attachemnts. See Plan Marked.
TIE BEAM / LINTEL 06/16/2025 APPROVED JSTEWART
MONOLITHIC SLAB 06/05/2025 APPROVED JSTEWART
Note: 6/2/2025 - PREVIOUS INSPECTION NOTES Form board survey needs to be submitted and approved prior to Monolithic slab approval. Re inspection is required.
FORMBOARD SURVEY (OFFICE USE ONLY) 06/04/2025 APPROVED RRICKS
MONOLITHIC SLAB 06/02/2025 Disapproved - NO FEE JSTEWART
Note: Form board survey needs to be submitted and approved prior to Monolithic slab approval. Re inspection is required.
PLUMBING 1ST ROUGH UNDERGROUND 05/29/2025 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 05/29/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 09/16/2025 09/17/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 07/15/2025 07/15/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/17/2025 06/17/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 06/17/2025 06/17/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/03/2025 06/04/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 06/03/2025 06/04/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 05/23/2025 05/27/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 05/05/2025 05/09/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 04/30/2025 05/05/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 04/30/2025 04/30/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 04/30/2025 05/05/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 04/30/2025 05/05/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM All structural plans need to be digitally signed, sealed, and verifiable. 2nd Request
SW1 HOLD 04/16/2025 04/16/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Disregard previous hold comments: After conversations with engineering, we will be reviewing these lots as infill lots. New comments: 1 - On site benchmark shall be referenced in NAVD 1988. 2- Proposed and existing elevations shall be depicted every 20'. 3- Lot drainage features should be clearly depicted with proposed elevations and flow arrows. Please feel free to call or email me if you have any further questions.
URB COMPLETE 04/03/2025 04/09/2025
Note: Released By: MATTHEW SIERRA - (386)286-2002 - MSIERRA@PALMCOASTGOV.COM
BADMIN COMPLETE 04/02/2025 04/08/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 04/02/2025 04/08/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM All structural plans need to be digitally signed, sealed, and verifiable.
CUSVC COMPLETE 04/02/2025 04/09/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 04/02/2025 04/07/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical load calcs.
ENGIN1 COMPLETE 04/02/2025 04/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 04/02/2025 04/04/2025
LOCATE COMPLETE 04/02/2025 04/08/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 04/02/2025 04/08/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 04/02/2025 04/15/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Site plan does not agree with master plan on file. Please attach City modification letter or match approved master plan.
ZON HOLD 04/02/2025 04/03/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Garage depth cannot exceed 30ft

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 10/15/2025
PLAN REVIEW - REVISION ¤32.50 10/15/2025
CONTRACTOR CHANGE ¤20.00 10/15/2025
FC IMPACT FEE EMS ¤62.00 05/16/2025
IMPACT FEE FIRE ¤434.51 05/16/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/16/2025
FC IMPACT FEE LIBRARY ¤268.00 05/16/2025
IMPACT FEE PARKS ¤1,828.01 05/16/2025
IMPACT FEE SCHOOL ¤5,450.00 05/16/2025
IMPACT FEE TRANSPORTATION ¤3,502.00 05/16/2025
WATER METER W/OUT TAP ¤965.03 05/16/2025
SURCHARGE FS 533.721 ¤19.59 05/16/2025
SURCHARGE - FS 468.631 ¤29.38 05/16/2025
SW ENG - FOUNDATION SURVEY ¤20.00 05/16/2025
SW ENG INSPECTION 80 ¤80.00 05/16/2025
SW ENG PRE APRON ¤30.00 05/16/2025
SW ENG - REVIEW 20 ¤20.00 05/16/2025
SW ENG RES REVIEW 200 ¤200.00 05/16/2025
WASTEWATER PERM INSPECTION ¤40.00 05/16/2025
WATER PERMIT REVIEW ¤40.00 05/16/2025
SITE PLAN 30 ¤30.00 05/16/2025
WATER- TURN ON ¤50.00 05/16/2025
ADJUSTMENT 10% (¤217.62) 05/16/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/16/2025
INSPECTION - RESIDENTIAL ¤1,672.00 05/16/2025
PLAN REVIEW - RESIDENTIAL ¤474.24 05/16/2025
Fees Total Due: ¤0.00 Total Paid: ¤15,330.14