I want to search for...

Permit #2025040348

Permit Details

Status: COED

CONDITIONED SPACE: 2443 sqft
GARAGE: 641 sqft
OPENED PORCH (WITH ROOF) : 179 sqft
OPENED PORCH (WITH ROOF) : 168 sqft
Total Square Footage: 3431 sqft
Subdivision: 2334 - EVOLVE PALM COAST - SANDLAKE SUBDIVISION LOT 4
Job Phone: 813-917-1689
Location Address: 48 GRECO DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/16/2025
NOC: RECORDED
Applicant name: SCOTT EVAN KEUNING
Owner: TAYLOR MORRISON OF FLORIDA INC

Address

7785 BAYMEADOWS WAY

JACKSONVILLE, FL 32258

Address

SUITE 105

JACKSONVILLE, FL 32258

Contracted Stated Job Value: ¤190,391.00
Job Description: single family residence
Type: CN

Contractor

TAYLOR MORRISON OF FLORIDA INC
Status Location Address State License Number Phone
ACTIVE

7785 BAY MEADOWS WAY, SUITE 105

JACKSONVILLE, FL 32256

CBC1265083 (Exp: 08/31/2026) 813-917-1689

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
BENJAMIN MICHAEL RAY
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

6310 MABLETON PKWY

JACKSONVILLE, FL 32216

SUITE 1000

MABLETON, GA 30126

CFC1428415 (Exp: 08/31/2026) 904-861-5421 904-861-5426
CHASE RANDOLPH MASSEY
Status Location Address State License Number Phone
ACTIVE

10048 103RD ST

JACKSONVILLE, FL 32210

CCC1332486 (Exp: 08/31/2026) 904-248-1133

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/27/2025 FINAL APPROVED BTAYLOR
Note: 8/22/2025 - PREVIOUS INSPECTION NOTES Via text message at 810am 8/20/2025 - PREVIOUS INSPECTION NOTES 8/20/25 1. Seal up hole in wall in AH closet, where wires comes through 2. Seal up around bottom of AH closet FBCR 302.11 3. Dryer vent box needs trim or to be sealed up around edges FBC EC TABLE R402.4.1.1 4. Dryer vent in box needs to be capped FBC-M1502.4.7 5. Seal up all wall and ceiling penetrations in garage FBC 402.5.1.1 6. SGD needs to be sealed around top left side and bottom (can see daylight. Mositure and rodent access way) FBC 402.5.1.1
BLD - BUILDING FINAL 08/22/2025 CANCELLED BY APPLICANT MCONTRYMAN
Note: Via text message at 810am 8/20/2025 - PREVIOUS INSPECTION NOTES 8/20/25 1. Seal up hole in wall in AH closet, where wires comes through 2. Seal up around bottom of AH closet FBCR 302.11 3. Dryer vent box needs trim or to be sealed up around edges FBC EC TABLE R402.4.1.1 4. Dryer vent in box needs to be capped FBC-M1502.4.7 5. Seal up all wall and ceiling penetrations in garage FBC 402.5.1.1 6. SGD needs to be sealed around top left side and bottom (can see daylight. Mositure and rodent access way) FBC 402.5.1.1
ROW - STORMWATER FINAL 08/20/2025 APPROVED FSLADISH
Note: 8/20/25 AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
BLD - BUILDING FINAL 08/20/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 8/20/25 1. Seal up hole in wall in AH closet, where wires comes through 2. Seal up around bottom of AH closet FBCR 302.11 3. Dryer vent box needs trim or to be sealed up around edges FBC EC TABLE R402.4.1.1 4. Dryer vent in box needs to be capped FBC-M1502.4.7 5. Seal up all wall and ceiling penetrations in garage FBC 402.5.1.1 6. SGD needs to be sealed around top left side and bottom (can see daylight. Mositure and rodent access way) FBC 402.5.1.1
BLD - BUILDING FINAL 08/19/2025 CANCELLED BY APPLICANT WEB
U -UTILITY RESIDENTIAL FINAL 08/15/2025 FINAL APPROVED BWRIGHT
ROW - FINAL APRON (AFTER POUR) 08/15/2025 APPROVED FSLADISH
Note: 8/15/25 . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U-CROSS CONNECTION 08/15/2025 APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/13/2025 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 08/13/2025 APPROVED FSLADISH
Note: 8/13/25 UPON WALKING THE PROPERTY DETERMINED DRAINAGE WILL WORK AS DISCUSSED ON OUR PROJECT STAUS VISIT AND RECOMMENDATIONS. ***INSPECTORS NOTE. BUILDER WILL BE REQUIRED TO LAY SILT FENCE OR 5' SOD BUFFER ON BOTH PROPERTY LINES AND CLEAN OFF STORM INLET BEFORE ROW FINAL PASSAGE. ***
ELECTRIC - EARLY POWER 07/21/2025 APPROVED CVANSTRAHLEN
Note:
ROW - DRAINAGE 07/14/2025 APPROVED EMADISON
Note: ** 07/14/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/7/2025 - PREVIOUS INSPECTION NOTES 7/7/25 YOU ARE REQUIRED TO CLEAN OFF AND MAINTAIN INLET PROTECTION ON STORM DRAINS TO ALLOW WATER DRAINAGE TO FLOW INTO YOUR STORMWATER SYSTEMS. BOTH SIDE AT THE TIME OF THIS INSPECTION ARE HOLDING SILT AND DIRT. THE INLET IN FROT OF 48 APPEARS THAT THE INLET PROTECTION DEVICE IS ON THE ADJACENT PROPERTY NOT IN THE INLET. PLEASE MAKE REQUIRED CORRECTIONS. WILL BE BACK FOR COMPLIANCE REINSPECTION 7/14/25. PHOTOS FOR REFERENCE. _________________________________________________________________________________________________________________________ PLEASE CHECK CURB INLETS NEXT TO CONSTRUCTION AND ACROSS THE STREET. JM
ROW - DRAINAGE 07/07/2025 Disapproved - NO FEE FSLADISH
Note: 7/7/25 YOU ARE REQUIRED TO CLEAN OFF AND MAINTAIN INLET PROTECTION ON STORM DRAINS TO ALLOW WATER DRAINAGE TO FLOW INTO YOUR STORMWATER SYSTEMS. BOTH SIDE AT THE TIME OF THIS INSPECTION ARE HOLDING SILT AND DIRT. THE INLET IN FROT OF 48 APPEARS THAT THE INLET PROTECTION DEVICE IS ON THE ADJACENT PROPERTY NOT IN THE INLET. PLEASE MAKE REQUIRED CORRECTIONS. WILL BE BACK FOR COMPLIANCE REINSPECTION 7/14/25. PHOTOS FOR REFERENCE. _________________________________________________________________________________________________________________________ PLEASE CHECK CURB INLETS NEXT TO CONSTRUCTION AND ACROSS THE STREET. JM
ROW- PRE-APRON (PRE-POUR) 07/02/2025 APPROVED - AS NOTED FSLADISH
Note: 7/2/25 DUE TO SITE SPECIFIC CONDITIONS we are allowing only a roughly 10" apron wing on the right side. BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS CLEAR OUT ANY WATER AND MAKE SURE CONCRETE IS 3000 PSI FIBER MESH. BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 7/1/2025 - PREVIOUS INSPECTION NOTES 7/1/25 YOU WILL NEED TO HAVE THE POUR AREA CLEAR OF DEBRIS AND TRASH BEFORE PASSAGE. WHILE YOUR PLOT/SITE PLAN SHOWS THE DRIVEWAY LAYOUT CLOSE TO THE FORMED DRIVEWAY, THIS DOES NOT MEET THE COPC STANDARDS. YOU ARE REQUIRED TO HAVE A 5' APRON WITH A 36" WING. THE DRIVEWAY SHOULD COME STRAIGHT DOWN AND THEN FLAIR OUT. IF THE WATER METER WHIP IS IN THE WAY OF ALLOWING YOU TO HAVE A STRAIGHT LINE FORM YOU WILL NEED TO REQUEST TO UTILITIES TO HAVE IT RELOCATED. I SPOKE TO GABE ABOUT THIS AND WE ARE IN AGREEMENT THAT UNLESS WE DETERMINE SPECIFIC SITE CONDITIONS REQUIRE A DEVIATION FROM ACCEPTED COPC STANDARDS AND REQUIREMENTS WE WILL REQUIRE YOU TO MAINTAIN COPC PREPOUR STANDARDS. PLEASE FEEL FREE TO CONTACT GABE OR MYSELF WITH ANY QUESTIONS, COMMENTS OR PERTINENT INFORMATION. I WILL NOT FEE YOU TODAY EVEN THOUGH YOUR SITE IS NOT READY FOR POURING DUE TO CONSTRUCTION DEBRIS AND TRASH IN POUR AREA, I ASK THAT YOU CONFER WITH US AS TO WHY THIS DRIVEWAY WAS PROPOSED AS IS AND HOW TO MOVE FORWARD. PHOTOS FOR RFERENCE. New inspection due to canceled inspection 6/27/2025 - PREVIOUS INSPECTION NOTES 6/27/25 RECEIVED CALL FROM BOBBY CM TO PLEASE CANCEL INSPECTION FOR TODAY.
ROW- PROJECT STATUS 07/01/2025 APPROVED GBERTOLA
Note: Meeting with the builder at 8:30 am. this is the wrong day. It's supposed to be for tomorrow7/2/25
ROW- PRE-APRON (PRE-POUR) 07/01/2025 Disapproved - NO FEE FSLADISH
Note: 7/1/25 YOU WILL NEED TO HAVE THE POUR AREA CLEAR OF DEBRIS AND TRASH BEFORE PASSAGE. WHILE YOUR PLOT/SITE PLAN SHOWS THE DRIVEWAY LAYOUT CLOSE TO THE FORMED DRIVEWAY, THIS DOES NOT MEET THE COPC STANDARDS. YOU ARE REQUIRED TO HAVE A 5' APRON WITH A 36" WING. THE DRIVEWAY SHOULD COME STRAIGHT DOWN AND THEN FLAIR OUT. IF THE WATER METER WHIP IS IN THE WAY OF ALLOWING YOU TO HAVE A STRAIGHT LINE FORM YOU WILL NEED TO REQUEST TO UTILITIES TO HAVE IT RELOCATED. I SPOKE TO GABE ABOUT THIS AND WE ARE IN AGREEMENT THAT UNLESS WE DETERMINE SPECIFIC SITE CONDITIONS REQUIRE A DEVIATION FROM ACCEPTED COPC STANDARDS AND REQUIREMENTS WE WILL REQUIRE YOU TO MAINTAIN COPC PREPOUR STANDARDS. PLEASE FEEL FREE TO CONTACT GABE OR MYSELF WITH ANY QUESTIONS, COMMENTS OR PERTINENT INFORMATION. I WILL NOT FEE YOU TODAY EVEN THOUGH YOUR SITE IS NOT READY FOR POURING DUE TO CONSTRUCTION DEBRIS AND TRASH IN POUR AREA, I ASK THAT YOU CONFER WITH US AS TO WHY THIS DRIVEWAY WAS PROPOSED AS IS AND HOW TO MOVE FORWARD. PHOTOS FOR RFERENCE. New inspection due to canceled inspection 6/27/2025 - PREVIOUS INSPECTION NOTES 6/27/25 RECEIVED CALL FROM BOBBY CM TO PLEASE CANCEL INSPECTION FOR TODAY.
ROW- PRE-APRON (PRE-POUR) 06/30/2025 CANCELLED BY APPLICANT WEB
Note: 6/27/2025 - PREVIOUS INSPECTION NOTES 6/27/25 RECEIVED CALL FROM BOBBY CM TO PLEASE CANCEL INSPECTION FOR TODAY.
WATER METER INSTALLATION REQUEST 06/30/2025 APPROVED CBOWERMASTER
Note: 5/1/2025 1:40:12 PM- PREVIOUS INSPECTION NOTES system has not been accepted yet
LATH/BRICK/ WATER BARRIER 06/30/2025 APPROVED KSANDOE
ROW- PRE-APRON (PRE-POUR) 06/27/2025 CANCELLED BY APPLICANT FSLADISH
Note: 6/27/25 RECEIVED CALL FROM BOBBY CM TO PLEASE CANCEL INSPECTION FOR TODAY.
GRAVITY SEWER TEST 06/23/2025 APPROVED MGIBSON
SEWER TIE IN 06/23/2025 APPROVED MGIBSON
INSULATION 06/06/2025 APPROVED BTAYLOR
Note: 6/5/2025 - PREVIOUS INSPECTION NOTES
INSULATION 06/05/2025 CANCELLED BY APPLICANT BTAYLOR
ALL ROUGH 05/30/2025 APPROVED BTAYLOR
ELECTRIC-TUG 05/23/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 5/23/25 Okay to release e-mail to FPL
LATH/BRICK/ WATER BARRIER 05/21/2025 APPROVED BTAYLOR
ROOF VALLEY & METAL 05/20/2025 APPROVED BTAYLOR
WALL SHEATHING 05/15/2025 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/15/2025 APPROVED BTAYLOR
FORMBOARD SURVEY (OFFICE USE ONLY) 05/14/2025 APPROVED RRICKS
MONOLITHIC SLAB 05/02/2025 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 04/30/2025 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 04/30/2025 Disapproved - NO FEE CBOWERMASTER
Note: system has not been accepted yet

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 05/13/2025 05/14/2025
Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 05/13/2025 05/13/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
URB COMPLETE 04/08/2025 04/15/2025
Note: Released By: MATTHEW SIERRA - (386)286-2002 - MSIERRA@PALMCOASTGOV.COM
BADMIN COMPLETE 04/07/2025 04/11/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 04/07/2025 04/14/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 04/07/2025 04/07/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Water/Sewer impact fees will be added at a later date after all agreements are final. Please note, a meter will not be installed until all agreements are complete.
ELEC COMPLETE 04/07/2025 04/10/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/07/2025 04/08/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 04/07/2025 04/09/2025
LOCATE COMPLETE 04/07/2025 04/14/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 04/07/2025 04/09/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 04/07/2025 04/11/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/07/2025 04/08/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 08/20/2025
SW ENG - INSPECTION 20 ¤20.00 08/20/2025
SW ENG - INSPECTION 20 ¤20.00 08/20/2025
SEWER CAPITAL FACILITY ¤3,613.92 06/26/2025
WATER CAPITAL FACILITY FEE ¤3,039.48 06/26/2025
WATER PERMIT INSPECTION ¤40.00 06/26/2025
WATER-METER ¤965.03 06/26/2025
WATER- TURN ON ¤50.00 06/26/2025
WATER- TURN ON ¤50.00 06/26/2025
WATER METER W/OUT TAP ¤965.03 06/26/2025
SURCHARGE FS 533.721 ¤15.30 04/16/2025
SURCHARGE - FS 468.631 ¤22.95 04/16/2025
SW ENG - FOUNDATION SURVEY ¤20.00 04/16/2025
ADJUSTMENT 10% (¤169.97) 04/16/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/16/2025
INSPECTION - RESIDENTIAL ¤1,300.75 04/16/2025
PLAN REVIEW - RESIDENTIAL ¤368.94 04/16/2025
FC IMPACT FEE EMS ¤62.00 04/16/2025
IMPACT FEE FIRE ¤434.51 04/16/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/16/2025
FC IMPACT FEE LIBRARY ¤268.00 04/16/2025
IMPACT FEE PARKS ¤1,828.01 04/16/2025
IMPACT FEE SCHOOL ¤5,450.00 04/16/2025
IMPACT FEE TRANSPORTATION ¤3,502.00 04/16/2025
WATER PERMIT REVIEW ¤25.00 04/16/2025
SITE PLAN 30 ¤30.00 04/16/2025
SW ENG INSPECTION 80 ¤80.00 04/16/2025
SW ENG PRE APRON ¤30.00 04/16/2025
SW ENG - REVIEW 20 ¤20.00 04/16/2025
SW ENG RES REVIEW 200 ¤200.00 04/16/2025
WASTEWATER PERM INSPECTION ¤80.00 04/16/2025
WASTEWATER PERM REVIEW ¤25.00 04/16/2025
Fees Total Due: ¤0.00 Total Paid: ¤22,643.95