Permit #2025040381
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00150-0170 |
| CONDITIONED SPACE: 1809 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 33 sqft |
| Total Square Footage: 2248 sqft |
| Block: 00150 |
| Subdivision: - |
| Job Phone: 239-571-5325 |
| Location Address: 108 PRINCE ERIC LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/16/2025 |
| NOC: RECORDED |
| Applicant name: RYAN SCOTT DAVIS |
| Owner: SYNERGY HOMES, LLC |
|
Address 581 NW MERCANTILE PL, 106 PORT SAINT LUCIE, FL 34986 |
| Lot: 0170 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SYNERGY HOMES, LLC
| Status | Location Address | State License Number |
| ACTIVE |
1 HARGROVE GRADE, SUITE B1 PALM COAST, FL 32137 |
CBC1254289 (Exp: 08/31/2026) |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/15/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 9/12/2025 - PREVIOUS INSPECTION NOTES 9/12/25: 1). Master bedroom: Smoke detector is not interconnected as required. FBC-R314.4 2). Range anti-tip device is not installed as required. FBCR M1901.2 | |||
| BLD - BUILDING FINAL | 09/15/2025 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/15/2025 12:15:38 PM *** New inspection due to canceled inspection 9/12/2025 - PREVIOUS INSPECTION NOTES 9/12/25: 1). Master bedroom: Smoke detector is not interconnected as required. FBC-R314.4 2). Range anti-tip device is not installed as required. FBCR M1901.2 | |||
| ROW - FINAL APRON (AFTER POUR) | 09/12/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| BLD - BUILDING FINAL | 09/12/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/12/2025 12:22:46 PM *** 9/12/25: 1). Master bedroom: Smoke detector is not interconnected as required. FBC-R314.4 2). Range anti-tip device is not installed as required. FBCR M1901.2 | |||
| ROW - STORMWATER FINAL | 09/12/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 09/12/2025 | FINAL APPROVED | BHAINES |
| Note: Inspector Notes from Inspection 9035 no irr-no cc | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/11/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/11/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - DRAINAGE | 08/22/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 8/15/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ELECTRIC - EARLY POWER | 08/22/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/22/2025 11:12:03 AM *** 8/22/25: FPL emailed to release power. 8/21/2025 - PREVIOUS INSPECTION NOTES 8/21/25: 1). Exterior outlet at front entry is fully covered with plastic and tape with no access due to freshly poured concrete at entry. Could not verify if it is safed off as required. NEC-110.27 | |||
| ELECTRIC - EARLY POWER | 08/21/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/21/2025 12:42:40 PM *** 8/21/25: 1). Exterior outlet at front entry is fully covered with plastic and tape with no access due to freshly poured concrete at entry. Could not verify if it is safed off as required. NEC-110.27 | |||
| ROW- PRE-APRON (PRE-POUR) | 08/20/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. | |||
| ROW - DRAINAGE | 08/15/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| SEWER TIE IN | 08/11/2025 | APPROVED | MGIBSON |
| Note: 8/8/2025 - PREVIOUS INSPECTION NOTES 8/7/2025 - PREVIOUS INSPECTION NOTES 8/7/25: 1). Tie-in connection is covered with dirt and hole is filled with water. Need exposed for inspection. FBC-[A} 110. EXPOSE TAP | |||
| GRAVITY SEWER TEST | 08/11/2025 | APPROVED | MGIBSON |
| Note: 8/8/2025 - PREVIOUS INSPECTION NOTES 8/7/2025 - PREVIOUS INSPECTION NOTES 8/7/25: 1). Trench is filled with dirt. Need pipe exposed for inspection. FBC-[A} 110.1 NOTHING DONE | |||
| GRAVITY SEWER TEST | 08/08/2025 | Disapproved - NO FEE | MGIBSON |
| Note: 8/7/2025 - PREVIOUS INSPECTION NOTES 8/7/25: 1). Trench is filled with dirt. Need pipe exposed for inspection. FBC-[A} 110.1 NOTHING DONE | |||
| SEWER TIE IN | 08/08/2025 | Disapproved - NO FEE | MGIBSON |
| Note: 8/7/2025 - PREVIOUS INSPECTION NOTES 8/7/25: 1). Tie-in connection is covered with dirt and hole is filled with water. Need exposed for inspection. FBC-[A} 110. EXPOSE TAP | |||
| INSULATION | 08/08/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/8/2025 12:01:34 PM *** 8/7/2025 - PREVIOUS INSPECTION NOTES 8/7/25: 1). Firefoam at dryer exhaust is incomplete. FSI written on the stud below (during All Rough inspection). FBC-302.11 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 8/5/2025 1:28:15 PM *** 8/5/25: Please repair silt fence on right side as previously noted. FBC 3307.1 8/1/2025 - PREVIOUS INSPECTION NOTES 8/1/25: 1). Silt fence needs to be repaired and maintained. FBC 3307.1 2). windows and rear SGD are not installed as of today's inspection. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 7/28/2025 12:42:45 PM *** 7/28/25: MUST BE COMPLETE PRIOR TO NEXT INSPECTION. 1). Silt fence needs to be repaired and maintained. FBC 3307.1 Inspector Notes from Inspection 2340 trusses are been delivery on the job side before the inspection , not barrier betwen the soil and the trusses | |||
| INSULATION | 08/07/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/7/2025 11:15:49 AM *** 8/7/25: 1). Firefoam at dryer exhaust is incomplete. FSI written on the stud below (during All Rough inspection). FBC-302.11 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 8/5/2025 1:28:15 PM *** 8/5/25: Please repair silt fence on right side as previously noted. FBC 3307.1 8/1/2025 - PREVIOUS INSPECTION NOTES 8/1/25: 1). Silt fence needs to be repaired and maintained. FBC 3307.1 2). windows and rear SGD are not installed as of today's inspection. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 7/28/2025 12:42:45 PM *** 7/28/25: MUST BE COMPLETE PRIOR TO NEXT INSPECTION. 1). Silt fence needs to be repaired and maintained. FBC 3307.1 Inspector Notes from Inspection 2340 trusses are been delivery on the job side before the inspection , not barrier betwen the soil and the trusses | |||
| SEWER TIE IN | 08/07/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/7/2025 11:18:23 AM *** 8/7/25: 1). Tie-in connection is covered with dirt and hole is filled with water. Need exposed for inspection. FBC-[A} 110.1 | |||
| GRAVITY SEWER TEST | 08/07/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/7/2025 11:17:04 AM *** 8/7/25: 1). Trench is filled with dirt. Need pipe exposed for inspection. FBC-[A} 110.1 | |||
| LATH/BRICK/ WATER BARRIER | 08/06/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/6/2025 11:00:56 AM *** Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 8/5/2025 1:28:15 PM *** 8/5/25: Please repair silt fence on right side as previously noted. FBC 3307.1 8/1/2025 - PREVIOUS INSPECTION NOTES 8/1/25: 1). Silt fence needs to be repaired and maintained. FBC 3307.1 2). windows and rear SGD are not installed as of today's inspection. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 7/28/2025 12:42:45 PM *** 7/28/25: MUST BE COMPLETE PRIOR TO NEXT INSPECTION. 1). Silt fence needs to be repaired and maintained. FBC 3307.1 Inspector Notes from Inspection 2340 trusses are been delivery on the job side before the inspection , not barrier betwen the soil and the trusses | |||
| U-CROSS CONNECTION | 08/06/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cc | |||
| ALL ROUGH | 08/05/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/5/2025 1:28:15 PM *** 8/5/25: Please repair silt fence on right side as previously noted. FBC 3307.1 8/1/2025 - PREVIOUS INSPECTION NOTES 8/1/25: 1). Silt fence needs to be repaired and maintained. FBC 3307.1 2). windows and rear SGD are not installed as of today's inspection. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 7/28/2025 12:42:45 PM *** 7/28/25: MUST BE COMPLETE PRIOR TO NEXT INSPECTION. 1). Silt fence needs to be repaired and maintained. FBC 3307.1 Inspector Notes from Inspection 2340 trusses are been delivery on the job side before the inspection , not barrier betwen the soil and the trusses | |||
| ALL ROUGH | 08/01/2025 | PARTIALLY APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/1/2025 9:46:07 AM *** 8/1/25: 1). Silt fence needs to be repaired and maintained. FBC 3307.1 2). windows and rear SGD are not installed as of today's inspection. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 7/28/2025 12:42:45 PM *** 7/28/25: MUST BE COMPLETE PRIOR TO NEXT INSPECTION. 1). Silt fence needs to be repaired and maintained. FBC 3307.1 Inspector Notes from Inspection 2340 trusses are been delivery on the job side before the inspection , not barrier betwen the soil and the trusses | |||
| WALL SHEATHING | 07/28/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 7/28/2025 12:41:17 PM *** Inspector Notes from Inspection 2340 trusses are been delivery on the job side before the inspection , not barrier betwen the soil and the trusses | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/28/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 7/28/2025 12:42:45 PM *** 7/28/25: MUST BE COMPLETE PRIOR TO NEXT INSPECTION. 1). Silt fence needs to be repaired and maintained. FBC 3307.1 Inspector Notes from Inspection 2340 trusses are been delivery on the job side before the inspection , not barrier betwen the soil and the trusses | |||
| ROOF VALLEY & METAL | 07/28/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 7/28/2025 12:41:04 PM *** Inspector Notes from Inspection 2340 trusses are been delivery on the job side before the inspection , not barrier betwen the soil and the trusses | |||
| TIE BEAM / LINTEL | 07/14/2025 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: trusses are been delivery on the job side before the inspection , not barrier betwen the soil and the trusses | |||
| MONOLITHIC SLAB | 07/08/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 7/8/2025 12:28:37 PM *** 7/3/2025 - PREVIOUS INSPECTION NOTES 7/3/25: 1). Back half of the house: Slab does not meet the thickness requirements on plans. FBC [A] 107.4 Please leave a string line for re-inspection. | |||
| MONOLITHIC SLAB | 07/03/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 7/3/2025 1:15:59 PM *** 7/3/25: 1). Back half of the house: Slab does not meet the thickness requirements on plans. FBC [A] 107.4 Please leave a string line for re-inspection. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/01/2025 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 06/26/2025 | APPROVED | CBOWERMASTER |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 06/25/2025 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/16/2025 | APPROVED | PKNAPIK |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/25/2025 | 06/25/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/25/2025 | 06/25/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/16/2025 | 06/16/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/08/2025 | 05/15/2025 |
| Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/08/2025 | 05/08/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/08/2025 | 05/08/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/29/2025 | 05/05/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL DRAINAGE PATTERN TOES NEED TO HAVE THE .30 TO THE TOP OF DRAINAGE PATTERN SO NO WATER WILL IMPACT ADJACENT LOTS. PER CITY CODE 300.01 D(7) ALL ELVATIONS AT THE RIGHT OF WAY LINE OR FRONT PROPERTY LINE NEEDS TO EQUAL OR GREATER THEN THE EDGE OF PAVEMENT PER CITY CODE 300.01 C(3) | |||
| ENGIN1 | COMPLETE | 04/29/2025 | 05/02/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/29/2025 | 04/30/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/17/2025 | 04/17/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/17/2025 | 04/23/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM There shall be a minimum of .3' fall from the back property line to the drainage swale in the back consistently | |||
| ENGIN1 | COMPLETE | 04/17/2025 | 04/17/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/08/2025 | 04/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/07/2025 | 04/11/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/07/2025 | 04/11/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/07/2025 | 04/11/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/07/2025 | 04/10/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/07/2025 | 04/08/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/07/2025 | 04/09/2025 |
| LOCATE | COMPLETE | 04/07/2025 | 04/11/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/07/2025 | 04/10/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/07/2025 | 04/14/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Common swales are preferred when applicable. The berm on the left side is not needed Please call or email if you have any questions. | |||
| ZON | HOLD | 04/07/2025 | 04/08/2025 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. HOUSE FLIPPED ON SITE PLAN/LANDSCAPE PLAN |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/15/2025 |
| REINSPECTION FEE | ¤40.00 | 09/15/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/15/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/15/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/16/2025 |
| SW ENG PRE APRON | ¤30.00 | 05/16/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/16/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/16/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 05/16/2025 |
| SEWER CREDIT | (¤1,147.00) | 05/16/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 05/16/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 05/16/2025 |
| SEWER CAPITAL FACILITY | ¤3,930.70 | 05/16/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,496.74 | 05/16/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 05/16/2025 |
| WATER MAIN EXTENSION IMPACT | ¤854.40 | 05/16/2025 |
| SITE PLAN 30 | ¤30.00 | 05/16/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,189.82 | 05/16/2025 |
| SURCHARGE FS 533.721 | ¤10.82 | 05/16/2025 |
| SURCHARGE - FS 468.631 | ¤16.23 | 05/16/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/16/2025 |
| WATER- TURN ON | ¤50.00 | 05/16/2025 |
| ADJUSTMENT 10% | (¤120.20) | 05/16/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/16/2025 |
| INSPECTION - RESIDENTIAL | ¤913.00 | 05/16/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤258.96 | 05/16/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 05/16/2025 |
| IMPACT FEE FIRE | ¤434.51 | 05/16/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/16/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/16/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 05/16/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/16/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 05/16/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,616.92 |