Permit #2025040429

Permit Details

Status: FINAL

Parcel Id: 07-11-31-4940-00040-0020
Block: 00040
Subdivision: 1152 - P.C. SEC 7D REPLAT RP A, B, C
Job Phone: 786-512-4421
Location Address: 206 FRONTIER DR
Type: DR - DRIVEWAY
Issue Date: 04/08/2025
NOC: RECORDED
Applicant name: ABEL MENENDEZ
Owner: PIOTROWICZ JERZY & BOZENA ANNA H&W

Address

206 FRONTIER DRIVE

PALM COAST, FL 32137

Lot: 0020
Contracted Stated Job Value: ¤7,500.00
Job Description: REF 2022031387 CIRCULAR CONCRETE DRIVEWAY
Type: CN
Original Permit #: 2022031387

Contractor

ROYAL TILE & PAVERS INC
Status Location Address Phone
ACTIVE

69 FLEETWOOD DR

PALM COAST, FL 32137

786-512-4421

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 04/11/2025 APPROVED FSLADISH
Note: 4/11/25 BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL INSPECTION 04/11/2025 APPROVED FSLADISH
Note: 4/11/25 BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 06/16/2022 FINAL APPROVED DHANEY
ROW- PRE-APRON (PRE-POUR) 04/21/2022 APPROVED RGROSS
Note: THIS IS A REINSPECTION Culvert tilted in the wrong direction. Material too soft to pour from last nights rain. 4/21/22 - READY TO POUR
ROW- PRE-APRON (PRE-POUR) 04/18/2022 Disapproved - NO FEE RGROSS
Note: Culvert tilted in the wrong direction. Material too soft to pour from last nights rain.

Review History

Department Status Date In Date Out
ZON COMPLETE 03/31/2022 04/01/2022
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/31/2022 04/01/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 03/31/2022 03/31/2022
Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM
ZON HOLD 03/30/2022 03/31/2022
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Please provide the distance from the arc of the circular driveway to the front property line and the distance from the circular driveway to the left property line.
PLFM CANCEL 03/28/2022 03/28/2022
ENGIN1 COMPLETE 03/25/2022 03/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 03/25/2022 03/29/2022
Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM
ZON HOLD 03/25/2022 03/28/2022
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM The site plan submitted was for a different property. Please use the correct survey I will email to you for this project. Please provide the width of the proposed circular driveway along with the setback to the left property line and from the arc of the circular driveway to the front of the property line on the survey.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤3.00) 04/08/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/08/2025
SW ENG INSPECTION 40 ¤40.00 04/08/2025
Fees Total Due: ¤0.00 Total Paid: ¤67.00