Permit #2025040429
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-4940-00040-0020 |
| Block: 00040 |
| Subdivision: 1152 - P.C. SEC 7D REPLAT RP A, B, C |
| Job Phone: 786-512-4421 |
| Location Address: 206 FRONTIER DR |
| Type: DR - DRIVEWAY |
| Issue Date: 04/08/2025 |
| NOC: RECORDED |
| Applicant name: ABEL MENENDEZ |
| Owner: PIOTROWICZ JERZY & BOZENA ANNA H&W |
|
Address 206 FRONTIER DRIVE PALM COAST, FL 32137 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤7,500.00 |
| Job Description: REF 2022031387 CIRCULAR CONCRETE DRIVEWAY |
| Type: CN |
| Original Permit #: 2022031387 |
Contractor
ROYAL TILE & PAVERS INC
| Status | Location Address | Phone |
| ACTIVE |
69 FLEETWOOD DR PALM COAST, FL 32137 |
786-512-4421 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 04/11/2025 | APPROVED | FSLADISH |
| Note: 4/11/25 BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL INSPECTION | 04/11/2025 | APPROVED | FSLADISH |
| Note: 4/11/25 BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/16/2022 | FINAL APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 04/21/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION Culvert tilted in the wrong direction. Material too soft to pour from last nights rain. 4/21/22 - READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 04/18/2022 | Disapproved - NO FEE | RGROSS |
| Note: Culvert tilted in the wrong direction. Material too soft to pour from last nights rain. |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 03/31/2022 | 04/01/2022 |
| Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/31/2022 | 04/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 03/31/2022 | 03/31/2022 |
| Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/30/2022 | 03/31/2022 |
| Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Please provide the distance from the arc of the circular driveway to the front property line and the distance from the circular driveway to the left property line. | |||
| PLFM | CANCEL | 03/28/2022 | 03/28/2022 |
| ENGIN1 | COMPLETE | 03/25/2022 | 03/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 03/25/2022 | 03/29/2022 |
| Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/25/2022 | 03/28/2022 |
| Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM The site plan submitted was for a different property. Please use the correct survey I will email to you for this project. Please provide the width of the proposed circular driveway along with the setback to the left property line and from the arc of the circular driveway to the front of the property line on the survey. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤3.00) | 04/08/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/08/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 04/08/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤67.00 |