I want to search for...

Permit #2025040433

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7060-00300-0070
PATIO/DECK (NO ROOF) : 1092 sqft
Total Square Footage: 1092 sqft
Block: 00300
Subdivision: -
Job Phone: 386-225-1722
Location Address: 78 SLOGANEER TRL
Type: PO - POOL
Issue Date: 04/21/2025
NOC: RECORDED
Applicant name: MICHAEL MARINO HANSEN
Owner: JM PROPERTIES X LLC

Address

PO BOX 1347

FLAGLER BEACH, FL 32136

Lot: 0070
Contracted Stated Job Value: ¤80,000.00
Job Description: Pool and Enclosure
Type: CN

Contractor

PALM COAST POOLS, LLC
Status Location Address State License Number Phone
ACTIVE

29 COLUMBUS CT

PALM COAST, FL 32137

RP252555609 (Exp: 08/31/2027) 386-225-1722

Sub Contractors

BENJAMIN D DEWITT
Status Location Address State License Number Phone
ACTIVE

356 UNDERWOOD TRAIL

PALM COAST, FL 32164

ER13016065 (Exp: 08/31/2026) 321-262-4104
WESLEY KIRKLAND CORDELL
Status Location Address State License Number Phone
ACTIVE

873 HULL RD UNIT 20

ORMOND BEACH, FL 32174

SCC131151505 (Exp: 08/31/2026) 386-852-2209

Inspection History

Type Request Date Result Inspector
POOL FINAL 10/24/2025 FINAL APPROVED BTAYLOR
U -UTILITY RESIDENTIAL FINAL 10/23/2025 FINAL APPROVED BHAINES
ROW - FINAL INSPECTION 10/22/2025 APPROVED FSLADISH
Note: 10/22/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/22/2025 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 10/22/2025 APPROVED FSLADISH
Note: 10/22/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ELECTRIC AND ALARM 09/23/2025 APPROVED MCONTRYMAN
POOL DECK 08/14/2025 APPROVED BTAYLOR
ROW - DRAINAGE 07/24/2025 APPROVED FSLADISH
Note: 7/24/25 ALL CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR STANDARDS COMPLIANCE THROUGHOUT CONSTUCTION PROCESS. ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 7/17/25 AS OF THIS INSPECTION THE DRAINAGE PIPE HAS BEEN REMOVED. WILL MONITOR SITE FOR COMPLIANCE DURING CONSTRUCTION. YOU ARE REQUIRED TO KEEP POSITIVE SWALE DRAINAGE FLOW. TEMPORARY PIPE IS 1/2 FULL OF DIRT/SILT AND NEEDS TO BE CLEANED OUT. PARTIALLY APPROVING. YOU WILL HAVE A COMPLIANCE REINSPECTION ON 7/24/25. 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO REMOVE DRAINAGE PIPE OUT OF THE ROAD SIDE SWALE, AS YOU ARE DUMPING SEDIMENT DIRECTLY INTO THE STORMWATER DRAINAGE SYSTEM WHICH IS AN ILLICIT DISCHARGE. ** FOLLOW UP INSPECTION ON 07/17/25
ROW - DRAINAGE 07/17/2025 PARTIALLY APPROVED FSLADISH
Note: 7/17/25 AS OF THIS INSPECTION THE DRAINAGE PIPE HAS BEEN REMOVED. WILL MONITOR SITE FOR COMPLIANCE DURING CONSTRUCTION. YOU ARE REQUIRED TO KEEP POSITIVE SWALE DRAINAGE FLOW. TEMPORARY PIPE IS 1/2 FULL OF DIRT/SILT AND NEEDS TO BE CLEANED OUT. PARTIALLY APPROVING. YOU WILL HAVE A COMPLIANCE REINSPECTION ON 7/24/25. 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO REMOVE DRAINAGE PIPE OUT OF THE ROAD SIDE SWALE, AS YOU ARE DUMPING SEDIMENT DIRECTLY INTO THE STORMWATER DRAINAGE SYSTEM WHICH IS AN ILLICIT DISCHARGE. ** FOLLOW UP INSPECTION ON 07/17/25
ROW - DRAINAGE 07/14/2025 Disapproved - NO FEE EMADISON
Note: . _____________________________________________________________________________________________________________________ ** 07/14/25 BUILDER NEEDS TO REMOVE DRAINAGE PIPE OUT OF THE ROAD SIDE SWALE, AS YOU ARE DUMPING SEDIMENT DIRECTLY INTO THE STORMWATER DRAINAGE SYSTEM WHICH IS AN ILLICIT DISCHARGE. ** FOLLOW UP INSPECTION ON 07/17/25
STEEL AND GROUND 07/10/2025 APPROVED BTAYLOR

Review History

Department Status Date In Date Out
BLD COMPLETE 04/15/2025 04/15/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BFLOOD COMPLETE 04/08/2025 04/14/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 04/08/2025 04/14/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide note on plan that any glazing 60 inches or less from water’s edge measured in a straight line and with bottom exposed edge of glazing less than 60 inches vertically above any standing or walking surface will be tempered glass before pool final inspection per R308.4.5. 
ELEC COMPLETE 04/08/2025 04/15/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 04/08/2025 04/10/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 04/08/2025 04/14/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM IT IS THE CONTRCTORS RESPONSIBILITY TO MAKE SURE ALL DRAINAGE WILL MEET ALL CITY STANDARDS AFTER POOL IS COMPLETED
ZON COMPLETE 04/08/2025 04/08/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - INSPECTION 20 ¤20.00 10/22/2025
SW ENG - INSPECTION 20 ¤20.00 10/22/2025
SW ENG - INSPECTION 20 ¤20.00 10/22/2025
SW ENG INSPECTION 40 ¤40.00 04/21/2025
SW ENG - REVIEW 20 ¤20.00 04/21/2025
SITE PLAN 30 ¤30.00 04/21/2025
ADJUSTMENT 10% (¤25.50) 04/21/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/21/2025
INSPECTION- POOL ¤160.00 04/21/2025
PLAN REVIEW - RESIDENTIAL ¤65.00 04/21/2025
SURCHARGE FS 533.721 ¤2.30 04/21/2025
SURCHARGE - FS 468.631 ¤3.44 04/21/2025
Fees Total Due: ¤0.00 Total Paid: ¤385.24