I want to search for...

Permit #2025040457

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-1210
CONDITIONED SPACE: 3264 sqft
GARAGE: 572 sqft
OPENED PORCH (WITH ROOF) : 645 sqft
Total Square Footage: 4481 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-944-9546
Location Address: 612 MAHOGANY RUN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/21/2025
NOC: RECORDED
Applicant name: ANTHONY THOMAS DI NIZO JR
Owner: DGV CAPITAL LLC

Address

5563 LONDON LAKE DR W

JACKSONVILLE, FL 32258

Lot: 1210
Contracted Stated Job Value: ¤500,000.00
Job Description: Single Family Residence
Type: CN

Contractor

LUXURY BUILDERS INC.
Status Location Address State License Number Phone
ACTIVE

280 FENTRESS BLVD SUITE 2

DAYTONA BEACH, FL 32114

CGC038675 (Exp: 08/31/2026) 386-944-9546

Sub Contractors

GARY WAYNE HALL II
Status Location Address State License Number Phone
ACTIVE

837 ORANGEWOOD ROAD

ST JOHNS, FL 32259

CFC1425980 (Exp: 08/31/2026) 904-429-9747
TIMOTHY SCOTT CONLAN
Status Location Address State License Number Phone
INACTIVE

800 BELLFORT PARKWAY #200

, FL 0

CCC1334753 (Exp: 08/31/2026) 904-515-6889
RICHARD LEE VONBROCKEN
Status Location Address State License Number Phone Fax
INACTIVE

1738 STATE AVE

HOLLY HILL, FL 32117

CAC035516 (Exp: 08/31/2026) (386)672-1950 (386)672-1952
SERGEY A VORONIN
Status Location Address State License Number Phone
ACTIVE

7631 SEVERN

JACKSONVILLE, FL 32224

EC13011326 (Exp: 08/31/2026) 360-798-2819

Inspection History

Type Request Date Result Inspector
SEWER TIE IN 06/03/2026 APPROVED BWRIGHT
U-CROSS CONNECTION 06/03/2026 APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9500 Potable Water pit needs be raised 6 inches
ROW - FINAL APRON (AFTER POUR) 06/03/2026 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 06/03/2026 APPROVED - AS NOTED TPOLACEK
Note: SPOKE WITH BUILDER THEY ARING THE VACANT TOMORROW APPROVING AS NOTED AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 06/03/2026 APPROVED - AS NOTED BWRIGHT
Note: Potable Water pit needs be raised 6 inches
BLD - BUILDING FINAL 05/29/2026 Approval - Private Provider PPROVIDER
ROW- PROJECT STATUS 05/22/2026 Status Check PFLANAGAN
Note: Grade meeting 11:15 Please read notes on final survey
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/22/2026 APPROVED - AS NOTED PFLANAGAN
Note: No Berm on site and made a inside swale due to match grade to the adjacent. ------------------------------------------------------------------------------- 5/18/2026 - PREVIOUS INSPECTION NOTES 05-18-26 TPOLACEK*** AS PREVIOUSLY STATED IN LAST INSPECTION THE FINAL SURVEY DOES NOT MATCH THE APPROVED LOT GRADING PLAN. THERE MUST BE A COMMON SWALE ALONG THE RIGHT SIDE WITH NO BERM. THE CREATION OF THE BERM WAS NOT APPROVED AND WILL NOT MEET COPC REQUIREMENTS. THE UPLOADED SURVEY FOR TODAYS INSPECTION IS THE SAME SURVEY THAT WAS FAILED PREVIOUSLY. 5/7/2026 - PREVIOUS INSPECTION NOTES ** YOUR PROPOSED SITE PLAN FOR LOT DRAINAGE CALLS FOR A COMMON DRAINAGE FEATURE ALONG THE RIGHT SIDE PROPERTY LINE (NO BERM) ** ON RIGHT SIDE NEAR PROPERTY LINE BY THE A/C PADS YOUR DRAINAGE SHOWS IT WILL FLOW ONTO THE ADJACENT PROPERTY CREATING A NEGATIVE IMPACT **"Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16
ROW FIELD SURVEY /GRADING CERTIFICATION 05/22/2026 APPROVED PFLANAGAN
Note: Went out and look at site. Please read notes on final survey
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/18/2026 Disapproved -FEE REQUIRED TPOLACEK
Note: 05-18-26 TPOLACEK*** AS PREVIOUSLY STATED IN LAST INSPECTION THE FINAL SURVEY DOES NOT MATCH THE APPROVED LOT GRADING PLAN. THERE MUST BE A COMMON SWALE ALONG THE RIGHT SIDE WITH NO BERM. THE CREATION OF THE BERM WAS NOT APPROVED AND WILL NOT MEET COPC REQUIREMENTS. THE UPLOADED SURVEY FOR TODAYS INSPECTION IS THE SAME SURVEY THAT WAS FAILED PREVIOUSLY. 5/7/2026 - PREVIOUS INSPECTION NOTES ** YOUR PROPOSED SITE PLAN FOR LOT DRAINAGE CALLS FOR A COMMON DRAINAGE FEATURE ALONG THE RIGHT SIDE PROPERTY LINE (NO BERM) ** ON RIGHT SIDE NEAR PROPERTY LINE BY THE A/C PADS YOUR DRAINAGE SHOWS IT WILL FLOW ONTO THE ADJACENT PROPERTY CREATING A NEGATIVE IMPACT **"Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/07/2026 Disapproved - NO FEE EMADISON
Note: ** YOUR PROPOSED SITE PLAN FOR LOT DRAINAGE CALLS FOR A COMMON DRAINAGE FEATURE ALONG THE RIGHT SIDE PROPERTY LINE (NO BERM) ** ON RIGHT SIDE NEAR PROPERTY LINE BY THE A/C PADS YOUR DRAINAGE SHOWS IT WILL FLOW ONTO THE ADJACENT PROPERTY CREATING A NEGATIVE IMPACT **"Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16
ROW- PRE-APRON (PRE-POUR) 05/01/2026 APPROVED TPOLACEK
Note: 05-01-26 TPOLACEK*** MAKE SURE TO GET MORE COMPACTION BEFORE LAYING PAVERS. READY TO LAY PAVERS, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 4/29/2026 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 4/28/2026 - PREVIOUS INSPECTION NOTES ** 04/28/26 YOUR APRON FLARE THAT BEGINS AT THE 5 FOOT MARK ARE TO BE FORMED UP AS A STRAIGHT EDGE NOT A SWOOPING CURVE IF UNSURE, REFER TO THE CITY OF PALM COASTS TECHNIQUAL MANUAL DRAWING # 300.H WHICH WILL SHOW HOW TO FORM FOR THE PAVER DRIVEWAY AND FLARE __________________________________________________________________________________________________________________________ 4/15/2026 - PREVIOUS INSPECTION NOTES 04-15-26 TPOLACEK** BUILDER AQUIRED PERMITS THROUGH 3RD PARTY AND THERE WAS NEVER A PRE POUR INSPECTION ADDED TO PERMIT. I WENT OVER ALL THE REQUIREMENTS AS PAVER DRIVEWAY WAS COMPLETED WITHOUT THE INSECTIONS. BUILDER WILL REMOVE THE FIRST 10' OF DRIVEWAY AS WELL AS THE OUTSIDE PAVERS, THEY WILL DIG OUT THE RESTRAINTS AND DIG OUT THE APRON TO ACHIEVE THE 5" CONCRET PLUS PAVER BASE AND 2 3/8 PAVERS. THE APRON FLARE WILL BE 5' BY 3' AS DESIGNED IN THE COPC TECH MANUAL. IT WAS ALSO NOTED THAT THE POP UP DRAINAS WILL NEED TO BE MOVED BACK TO THE ROW (10'). AFTER THE 1ST INSPECTION BUILDER WILL BE APPROVED TO POUR CONCRETE ONLY AND NOT LAY ANY PAVERS UNTIL THE 2ND PORTION OF THE PRE POUR IS COMPLETED. THIS MUST ALL BE COMPLETED BEFORE THE FINAL SURVEY WILL BE APPROVED.
ROW- PRE-APRON (PRE-POUR) 04/29/2026 PARTIALLY APPROVED TPOLACEK
Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 4/28/2026 - PREVIOUS INSPECTION NOTES ** 04/28/26 YOUR APRON FLARE THAT BEGINS AT THE 5 FOOT MARK ARE TO BE FORMED UP AS A STRAIGHT EDGE NOT A SWOOPING CURVE IF UNSURE, REFER TO THE CITY OF PALM COASTS TECHNIQUAL MANUAL DRAWING # 300.H WHICH WILL SHOW HOW TO FORM FOR THE PAVER DRIVEWAY AND FLARE __________________________________________________________________________________________________________________________ 4/15/2026 - PREVIOUS INSPECTION NOTES 04-15-26 TPOLACEK** BUILDER AQUIRED PERMITS THROUGH 3RD PARTY AND THERE WAS NEVER A PRE POUR INSPECTION ADDED TO PERMIT. I WENT OVER ALL THE REQUIREMENTS AS PAVER DRIVEWAY WAS COMPLETED WITHOUT THE INSECTIONS. BUILDER WILL REMOVE THE FIRST 10' OF DRIVEWAY AS WELL AS THE OUTSIDE PAVERS, THEY WILL DIG OUT THE RESTRAINTS AND DIG OUT THE APRON TO ACHIEVE THE 5" CONCRET PLUS PAVER BASE AND 2 3/8 PAVERS. THE APRON FLARE WILL BE 5' BY 3' AS DESIGNED IN THE COPC TECH MANUAL. IT WAS ALSO NOTED THAT THE POP UP DRAINAS WILL NEED TO BE MOVED BACK TO THE ROW (10'). AFTER THE 1ST INSPECTION BUILDER WILL BE APPROVED TO POUR CONCRETE ONLY AND NOT LAY ANY PAVERS UNTIL THE 2ND PORTION OF THE PRE POUR IS COMPLETED. THIS MUST ALL BE COMPLETED BEFORE THE FINAL SURVEY WILL BE APPROVED.
ROW- PAVER RESTRAINTS 04/29/2026 APPROVED TPOLACEK
Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 4/28/2026 - PREVIOUS INSPECTION NOTES ** 04/28/26 BUIDER IS REQUIRED TO REMOVE ALL PAVERS ALONG THE LEFT SIDE EDGE AND DIG PAVER RESTRAINT THE ENTIRE EDGE UP TO THE FRONT OF THE GARAGE. ** RIGHT SIDE ENSURE PAVER RESTRAINT MAKES THE 90 AND ABUTTS UP AGAINST THE GARAGE AS WELL
ROW- PAVER RESTRAINTS 04/28/2026 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/28/26 BUIDER IS REQUIRED TO REMOVE ALL PAVERS ALONG THE LEFT SIDE EDGE AND DIG PAVER RESTRAINT THE ENTIRE EDGE UP TO THE FRONT OF THE GARAGE. ** RIGHT SIDE ENSURE PAVER RESTRAINT MAKES THE 90 AND ABUTTS UP AGAINST THE GARAGE AS WELL
ROW- PRE-APRON (PRE-POUR) 04/28/2026 Disapproved - NO FEE EMADISON
Note: ** 04/28/26 YOUR APRON FLARE THAT BEGINS AT THE 5 FOOT MARK ARE TO BE FORMED UP AS A STRAIGHT EDGE NOT A SWOOPING CURVE IF UNSURE, REFER TO THE CITY OF PALM COASTS TECHNIQUAL MANUAL DRAWING # 300.H WHICH WILL SHOW HOW TO FORM FOR THE PAVER DRIVEWAY AND FLARE __________________________________________________________________________________________________________________________ 4/15/2026 - PREVIOUS INSPECTION NOTES 04-15-26 TPOLACEK** BUILDER AQUIRED PERMITS THROUGH 3RD PARTY AND THERE WAS NEVER A PRE POUR INSPECTION ADDED TO PERMIT. I WENT OVER ALL THE REQUIREMENTS AS PAVER DRIVEWAY WAS COMPLETED WITHOUT THE INSECTIONS. BUILDER WILL REMOVE THE FIRST 10' OF DRIVEWAY AS WELL AS THE OUTSIDE PAVERS, THEY WILL DIG OUT THE RESTRAINTS AND DIG OUT THE APRON TO ACHIEVE THE 5" CONCRET PLUS PAVER BASE AND 2 3/8 PAVERS. THE APRON FLARE WILL BE 5' BY 3' AS DESIGNED IN THE COPC TECH MANUAL. IT WAS ALSO NOTED THAT THE POP UP DRAINAS WILL NEED TO BE MOVED BACK TO THE ROW (10'). AFTER THE 1ST INSPECTION BUILDER WILL BE APPROVED TO POUR CONCRETE ONLY AND NOT LAY ANY PAVERS UNTIL THE 2ND PORTION OF THE PRE POUR IS COMPLETED. THIS MUST ALL BE COMPLETED BEFORE THE FINAL SURVEY WILL BE APPROVED.
ROW- PRE-APRON (PRE-POUR) 04/15/2026 Disapproved - NO FEE TPOLACEK
Note: 04-15-26 TPOLACEK** BUILDER AQUIRED PERMITS THROUGH 3RD PARTY AND THERE WAS NEVER A PRE POUR INSPECTION ADDED TO PERMIT. I WENT OVER ALL THE REQUIREMENTS AS PAVER DRIVEWAY WAS COMPLETED WITHOUT THE INSECTIONS. BUILDER WILL REMOVE THE FIRST 10' OF DRIVEWAY AS WELL AS THE OUTSIDE PAVERS, THEY WILL DIG OUT THE RESTRAINTS AND DIG OUT THE APRON TO ACHIEVE THE 5" CONCRET PLUS PAVER BASE AND 2 3/8 PAVERS. THE APRON FLARE WILL BE 5' BY 3' AS DESIGNED IN THE COPC TECH MANUAL. IT WAS ALSO NOTED THAT THE POP UP DRAINAS WILL NEED TO BE MOVED BACK TO THE ROW (10'). AFTER THE 1ST INSPECTION BUILDER WILL BE APPROVED TO POUR CONCRETE ONLY AND NOT LAY ANY PAVERS UNTIL THE 2ND PORTION OF THE PRE POUR IS COMPLETED. THIS MUST ALL BE COMPLETED BEFORE THE FINAL SURVEY WILL BE APPROVED.
ELECTRIC - EARLY POWER 02/19/2026 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 12/23/2025 Approval - Private Provider PPROVIDER
INSULATION 12/03/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 11/18/2025 Approval - Private Provider PPROVIDER
Note: 11/12/2025 8:00:06 AM- PREVIOUS INSPECTION NOTES
ALL ROUGH 11/12/2025 Disapproved- Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 10/21/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/10/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 10/10/2025 Approval - Private Provider PPROVIDER
WALL SHEATHING 10/06/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/06/2025 Approval - Private Provider PPROVIDER
FORMBOARD SURVEY (OFFICE USE ONLY) 10/03/2025 APPROVED RRICKS
TIE BEAM / LINTEL 09/11/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 09/05/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 07/01/2025 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 06/17/2025 Approval - Private Provider PPROVIDER
Note: New inspection due to canceled inspection 6/12/2025 12:06:51 PM- PREVIOUS INSPECTION NOTES
MONOLITHIC SLAB 06/13/2025 CANCELLED BY APPLICANT WEB
Note: 6/12/2025 12:06:51 PM- PREVIOUS INSPECTION NOTES
MONOLITHIC SLAB 06/12/2025 Disapproved- Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 06/09/2025 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 05/29/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BADMIN INFORMATION 04/14/2026 04/14/2026
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM FINAL SURVEY CAN NOT BE SCHEDULED UNTIL PRE-APRON INSPECTION HAS BEEN RESOLVED
SW1 COMPLETE 10/03/2025 10/03/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 10/03/2025 10/03/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 10/01/2025 10/01/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Dimensions on the left side of the formboards are off by 20'. - The back formbaords appear to be off as well. There were no dimensions on site plan, but the configuration looks different. Please submit a formboard survey matches the approved site plan. If the formboard survey has the correct dimensions, submit a revised site plan that agrees with the formboard survey.
ZON COMPLETE 10/01/2025 10/01/2025
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
BLD COMPLETE 07/22/2025 07/28/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON COMPLETE 05/20/2025 05/20/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 05/14/2025 05/19/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ELEC COMPLETE 05/14/2025 05/19/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
URB COMPLETE 05/14/2025 05/14/2025
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/14/2025 05/19/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 COMPLETE 05/14/2025 05/16/2025
Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM
ZON HOLD 05/14/2025 05/14/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Floor plan please rename office as not allowed in Single family residence.
ZON COMPLETE 05/05/2025 05/05/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC HOLD 05/05/2025 05/12/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 3 and bed 4. NEC 2020 210.52 2. Need kitchen island outlets. NEC 2020 210.52 3. Need correct outlet spacing in bonus room. NEC 2020 210.52
BLD HOLD 05/05/2025 05/09/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Structural Plan pages need to be uploaded separately and be digitally signed, sealed and verifiable. 3rd REQUEST
URB HOLD 05/05/2025 05/12/2025
Note: Held By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM 5/12/25 (JB) The Arboricola plant symbol on the plan was changed but the type and location of the Arboricola shrubbery remains and Must also be changed with an approved type.
ENGIN1 COMPLETE 05/05/2025 05/05/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 COMPLETE 05/05/2025 05/08/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
URB HOLD 04/23/2025 04/30/2025
Note: Held By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM 4/30/25 (JB) Need to trade Schefflera (Arboricola ) foundation shrubbery with approved type
ZON HOLD 04/23/2025 04/23/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: For the 20 feet of the driveway that is closest to the garage, driveways for one and two-car garages shall have a minimum width of 16 feet. Please show this on site plan Total lot square footage on site plan/survey incorrect Front entry walkway missing on site plan/survey. Must show walkway material and width
MECH COMPLETE 04/23/2025 04/25/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC HOLD 04/23/2025 04/28/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in kitchen, laundry, bathroom and garage need to be GFCI protected. NEC 2020 210.8 2. DW outlet can not be located behind the DW. NEC 2020 422.16 4. Submit a riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85 5. Need to show all switch loactions for lighting.NEC 2020 210.70 6. Need smoke alarms outside of all bedrooms. FRC 2023 314, 315
BLD HOLD 04/23/2025 04/28/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Structural Plan pages need to be uploaded separately and be digitally signed, sealed and verifiable. 2nd REQUEST
ENGIN1 COMPLETE 04/23/2025 04/24/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 COMPLETE 04/23/2025 04/30/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
SW1 COMPLETE 04/16/2025 04/16/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Disregard hold comments: After conversations with engineering, we are allowing these lots to deviate from the master plan due to datum discrepancies.
BADMIN COMPLETE 04/08/2025 04/15/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 04/08/2025 04/15/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Structural Plan pages need to be uploaded separately and be digitally signed, sealed and verifiable. Product Approval 1. FL# 20800-R0 out of cycle. We are in the 2023 code cycle. 2. FL# 5167-R41 out of cycle.
CUSVC COMPLETE 04/08/2025 04/15/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 04/08/2025 04/15/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in kitchen, laundry, bathroom and garage need to be GFCI protected. NEC 2020 210.8 2. DW outlet can not be located behind the DW. NEC 2020 422.16 3. Submit Electrical load calculations 4. Submit a riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85 5. Need to show all switch loactions for lighting.NEC 2020 210.70 6. Need smoke alarms outside of all bedrooms. FRC 2023 314, 315
ENGIN1 COMPLETE 04/08/2025 04/08/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 04/08/2025 04/10/2025
LOCATE COMPLETE 04/08/2025 04/11/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 04/08/2025 04/10/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct layout signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition
SW1 HOLD 04/08/2025 04/15/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Site plan does not agree with master on file. Please submit a city modification letter or match the approved master plan.
ZON HOLD 04/08/2025 04/09/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM For the 20 feet of the driveway that is closest to the garage, driveways for one and two-car garages shall have a minimum width of 16 feet. Please show this on site plan Total lot square footage on site plan/survey incorrect Front entry walkway missing on site plan/survey. Must show walkway material and width

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI GENERAL INSPECTION 32.50 ¤32.50 06/03/2026
RSI REINSPECTION 1 ¤35.00 05/18/2026
RSI REINSPECTION 1 ¤35.00 05/18/2026
CONTRACTOR CHANGE ¤20.00 10/07/2025
FC IMPACT FEE EMS ¤62.00 05/21/2025
IMPACT FEE FIRE ¤434.51 05/21/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/21/2025
FC IMPACT FEE LIBRARY ¤268.00 05/21/2025
IMPACT FEE PARKS ¤1,828.01 05/21/2025
IMPACT FEE SCHOOL ¤5,450.00 05/21/2025
IMPACT FEE TRANSPORTATION ¤3,502.00 05/21/2025
WATER METER W/OUT TAP ¤965.03 05/21/2025
SURCHARGE FS 533.721 ¤4.66 05/21/2025
SURCHARGE - FS 468.631 ¤7.00 05/21/2025
SW ENG - FOUNDATION SURVEY ¤20.00 05/21/2025
SW ENG INSPECTION 80 ¤80.00 05/21/2025
SW ENG PRE APRON ¤30.00 05/21/2025
SW ENG - REVIEW 20 ¤20.00 05/21/2025
SW ENG RES REVIEW 200 ¤200.00 05/21/2025
WASTEWATER PERM INSPECTION ¤80.00 05/21/2025
WASTEWATER PERM REVIEW ¤25.00 05/21/2025
WATER PERMIT INSPECTION ¤40.00 05/21/2025
WATER PERMIT REVIEW ¤25.00 05/21/2025
SITE PLAN 30 ¤30.00 05/21/2025
WATER-METER ¤965.03 05/21/2025
WATER- TURN ON ¤50.00 05/21/2025
WATER- TURN ON ¤50.00 05/21/2025
ADJUSTMENT 10% (¤51.83) 05/21/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/21/2025
ADMINISTRATIVE - RESID PP ¤225.00 05/21/2025
PLAN REVIEW - RESIDENTIAL ¤488.28 05/21/2025
Fees Total Due: ¤0.00 Total Paid: ¤15,168.19