I want to search for...
Permit #2025040530
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00170-0270 |
| CONDITIONED SPACE: 1504 sqft |
| GARAGE: 396 sqft |
| OPENED PORCH (WITH ROOF) : 119 sqft |
| Total Square Footage: 2019 sqft |
| Block: 00170 |
| Subdivision: - |
| Job Phone: 407-476-8195 |
| Location Address: 17 FAIRBANK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/17/2025 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: INB BFS LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
|
Address SUITE 220 ORLANDO, FL 32803 |
| Lot: 0270 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Sub Contractors
GREGORY WILLIAM FARIS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC1822274 (Exp: 08/31/2026) | 407-333-2665 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/23/2026 | FINAL APPROVED | MCONTRYMAN |
| Note: 4/15/2026 - PREVIOUS INSPECTION NOTES 4/15/26 1. Label breakers in meter/main NEC 408.4 2. Broken outlet cover in outside outlet by ODU and Lenai NEC 300.4 3. ODU unit pad not level FBCR 1307.1 4. Missing top weather strip on entry door FBC EC TABLE R402.4.1.1 5. Missing deadbolt lock or cover on garage entry door FBC 402.5.1.1 6. Seal up all wall and ceiling penetrations in garage FBC 402.5.1.1 7. Upper right side block on garage door wall cracked 8. Need to seal up floor by left side garage door FBC 402.5.1.1 9. Kitchen window loose 10. Dryer vent needs to be covered/capped inside when not in use FBC-M1502.4.7 11. 2nd attic access cover not secured FBC R302.6 12. Wire pinched at kitchen pendant light NEC 300.4 | |||
| BLD - BUILDING FINAL | 04/15/2026 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 4/15/26 1. Label breakers in meter/main NEC 408.4 2. Broken outlet cover in outside outlet by ODU and Lenai NEC 300.4 3. ODU unit pad not level FBCR 1307.1 4. Missing top weather strip on entry door FBC EC TABLE R402.4.1.1 5. Missing deadbolt lock or cover on garage entry door FBC 402.5.1.1 6. Seal up all wall and ceiling penetrations in garage FBC 402.5.1.1 7. Upper right side block on garage door wall cracked 8. Need to seal up floor by left side garage door FBC 402.5.1.1 9. Kitchen window loose 10. Dryer vent needs to be covered/capped inside when not in use FBC-M1502.4.7 11. 2nd attic access cover not secured FBC R302.6 12. Wire pinched at kitchen pendant light NEC 300.4 | |||
| BLD - BUILDING FINAL | 04/07/2026 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 04/07/2026 | APPROVED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 04/07/2026 | APPROVED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 04/07/2026 | APPROVED | BVEIGA |
| Note: Inspector Notes from Inspection 9035 No cc. No IRR | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/06/2026 | APPROVED | EMADISON |
| Note: ** 04/06/26 FINAL SURVEY WILL WORK DRAINAGE WILL NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY TO THE AS IT SHOWS ON THE FINAL SURVEY | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/06/2026 | CANCELLED BY INSPECTOR | EMADISON |
| Note: ** 04/06/26 ** Effective 03/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certificates for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types. ** PER P. BUCKLEY CHIEF BUILDING Inspector. ** SCHEDULE YOUR FINALS WHEN YOU ARE READY TO DO SO | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/27/2026 | Disapproved - NO FEE | EMADISON |
| Note: ** 03/27/26 RIGHT REAR SHOWS YOUR WATER WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY WATER FLOWING ONTO IT FROM YOUR PROPERTY. DRAINING ONTO ANOTHER PROPERTY IS NOT PERMITTED ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 | |||
| U-CROSS CONNECTION | 03/26/2026 | APPROVED - AS NOTED | BWRIGHT |
| Note: No cc. No IRR | |||
| ELECTRIC - EARLY POWER | 02/26/2026 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2200 1/12/26 Email sent to FPL | |||
| ROW- PRE-APRON (PRE-POUR) | 02/24/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. WOOD CONTROL JOINTS ARE PROHIBITED IN THE RIGHT-OF-WAY. SAWCUT SHALL BE PROVIDED AT THE EDGE OF ROW AND EVERY 12' THEREAFTER, OR A MINIMUM OF 2 SAWCUTS WHICHEVER IS GREATER" | |||
| INSULATION | 01/23/2026 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2420 1. No 5' head on the plumbing. FBCR P2503.7 *Will look at Insulation.* 1/15/2026 - PREVIOUS INSPECTION NOTES 1. Window in the guest bath needs to be tempered. R308.4.5 2. Need Energy Calcs & Duct layout to check A/C Ducts. FBC [A]107.4 3. Need Product Approval sheet to check windows and doors. FBC [A]107.4 4. No 5' head on the plumbing. FBCR P2503.7 Inspector Notes from Inspection 2460 12/30/25 1. Panel box frame out needs to have solid blocking on top with holes bored out for wires to meet proper annular spacing NEC 302.11(4) & 302.11.1 | |||
| LATH/BRICK/ WATER BARRIER | 01/16/2026 | APPROVED | HCAMACHO |
| ALL ROUGH | 01/16/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. No 5' head on the plumbing. FBCR P2503.7 *Will look at Insulation.* 1/15/2026 - PREVIOUS INSPECTION NOTES 1. Window in the guest bath needs to be tempered. R308.4.5 2. Need Energy Calcs & Duct layout to check A/C Ducts. FBC [A]107.4 3. Need Product Approval sheet to check windows and doors. FBC [A]107.4 4. No 5' head on the plumbing. FBCR P2503.7 Inspector Notes from Inspection 2460 12/30/25 1. Panel box frame out needs to have solid blocking on top with holes bored out for wires to meet proper annular spacing NEC 302.11(4) & 302.11.1 | |||
| ALL ROUGH | 01/15/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Window in the guest bath needs to be tempered. R308.4.5 2. Need Energy Calcs & Duct layout to check A/C Ducts. FBC [A]107.4 3. Need Product Approval sheet to check windows and doors. FBC [A]107.4 4. No 5' head on the plumbing. FBCR P2503.7 Inspector Notes from Inspection 2460 12/30/25 1. Panel box frame out needs to have solid blocking on top with holes bored out for wires to meet proper annular spacing NEC 302.11(4) & 302.11.1 | |||
| ELECTRIC-TUG | 01/12/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 1/12/26 Email sent to FPL | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/30/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 12/30/25 1. Panel box frame out needs to have solid blocking on top with holes bored out for wires to meet proper annular spacing NEC 302.11(4) & 302.11.1 | |||
| ROOF VALLEY & METAL | 12/19/2025 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2450 FBC 3302.2 NEEDS DUMPSTER - Please clean up by next inspection. | |||
| ROOF SHEATHING | 12/16/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: FBC 3302.2 NEEDS DUMPSTER - Please clean up by next inspection. | |||
| WALL SHEATHING | 12/16/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: FBC 3302.2 NEEDS DUMPSTER - Please clean up by next inspection. | |||
| TIE BEAM / LINTEL | 12/10/2025 | APPROVED | HCAMACHO |
| MONOLITHIC SLAB | 12/02/2025 | APPROVED | HCAMACHO |
| MONOLITHIC SLAB | 11/26/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Entire min slab depth is 4'' per note 2 on foundation page marked on print 2. 2 locations where the footings need to be cleaned out marked on print | |||
| GRAVITY SEWER TEST | 11/25/2025 | APPROVED | MGIBSON |
| SEWER TIE IN | 11/25/2025 | APPROVED | MGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/21/2025 | APPROVED | MGIBSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 11/20/2025 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 11/18/2025 | APPROVED | PKNAPIK |
| ROW - DRAINAGE | 11/14/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. ------------------------------------------------------------------------------------ 11/12/2025 - PREVIOUS INSPECTION NOTES TEMP. CULVERT IS INSTALLED. BUT THERE IS DIRT BLOCKING THE FLOW OF THE SWALE. YOU WILL HAVE TILL FRIDAY 11/14/25 TILL NEXT INSPECTION. ------------------------------------------------------------------------------- 11/6/2025 - PREVIOUS INSPECTION NOTES 11-06-25 TPOLACEK*** BUILDER NEEDS TO OPEN SWALE OR INSTALL TEMPORARY PIPE TO ALLOW DRAINAGE TO FLOW. 5 DAYS TO CORRECT | |||
| ROW - DRAINAGE | 11/11/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: TEMP. CULVERT IS INSTALLED. BUT THERE IS DIRT BLOCKING THE FLOW OF THE SWALE. YOU WILL HAVE TILL FRIDAY 11/14/25 TILL NEXT INSPECTION. ------------------------------------------------------------------------------- 11/6/2025 - PREVIOUS INSPECTION NOTES 11-06-25 TPOLACEK*** BUILDER NEEDS TO OPEN SWALE OR INSTALL TEMPORARY PIPE TO ALLOW DRAINAGE TO FLOW. 5 DAYS TO CORRECT | |||
| ROW - DRAINAGE | 11/06/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 11-06-25 TPOLACEK*** BUILDER NEEDS TO OPEN SWALE OR INSTALL TEMPORARY PIPE TO ALLOW DRAINAGE TO FLOW. 5 DAYS TO CORRECT | |||
| WATER METER INSTALLATION REQUEST | 11/05/2025 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 04/15/2025 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/06/2026 | 01/07/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/20/2025 | 11/20/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/20/2025 | 11/20/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/18/2025 | 11/18/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/07/2025 | 11/10/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/06/2025 | 11/07/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition 2. Design location on the heatload needs to be Daytona Beach | |||
| SWALE | COMPLETE | 04/22/2025 | 04/22/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 04/10/2025 | 04/15/2025 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 04/15/25 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| BADMIN | COMPLETE | 04/09/2025 | 04/15/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/09/2025 | 04/15/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/09/2025 | 04/17/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/09/2025 | 04/15/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/09/2025 | 04/10/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/09/2025 | 04/14/2025 |
| LOCATE | COMPLETE | 04/09/2025 | 04/14/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/09/2025 | 04/14/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/09/2025 | 04/16/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/09/2025 | 04/10/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/20/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 04/06/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/06/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/06/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 04/06/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 04/06/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 04/06/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,189.82 | 10/17/2025 |
| SURCHARGE FS 533.721 | ¤9.36 | 10/17/2025 |
| SURCHARGE - FS 468.631 | ¤14.04 | 10/17/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/17/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/17/2025 |
| SW ENG PRE APRON | ¤30.00 | 10/17/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/17/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/17/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 10/17/2025 |
| SEWER CREDIT | (¤1,144.10) | 10/17/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 10/17/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 10/17/2025 |
| SEWER CAPITAL FACILITY | ¤3,930.70 | 10/17/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,496.74 | 10/17/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 10/17/2025 |
| WATER MAIN EXTENSION IMPACT | ¤854.40 | 10/17/2025 |
| SITE PLAN 30 | ¤30.00 | 10/17/2025 |
| WATER- TURN ON | ¤50.00 | 10/17/2025 |
| ADJUSTMENT 10% | (¤103.96) | 10/17/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/17/2025 |
| INSPECTION - RESIDENTIAL | ¤786.50 | 10/17/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤223.08 | 10/17/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 10/17/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 10/17/2025 |
| IMPACT FEE FIRE | ¤434.51 | 10/17/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/17/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/17/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 10/17/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/17/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 10/17/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,600.03 |