Permit #2025040550
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00510-0110 |
| CONDITIONED SPACE: 2009 sqft |
| GARAGE: 409 sqft |
| OPENED PORCH (WITH ROOF) : 30 sqft |
| OPENED PORCH (WITH ROOF) : 193 sqft |
| Total Square Footage: 2641 sqft |
| Block: 00510 |
| Subdivision: - |
| Job Phone: 239-571-5325 |
| Location Address: 50 FRANCISCAN LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/28/2025 |
| NOC: RECORDED |
| Applicant name: RYAN SCOTT DAVIS |
| Owner: SYNERGY HOMES LLC |
|
Address 581 NW MERCANTILE PLACE PORT SAINT LUCIE, FL 34986 |
|
Address SUITE 106 PORT SAINT LUCIE, FL 34986 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SYNERGY HOMES, LLC
| Status | Location Address | State License Number |
| ACTIVE |
1 HARGROVE GRADE, SUITE B1 PALM COAST, FL 32137 |
CBC1254289 (Exp: 08/31/2026) |
Sub Contractors
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 01/26/2026 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 01/26/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cc | |||
| U -UTILITY RESIDENTIAL FINAL | 01/12/2026 | FINAL APPROVED | BHAINES |
| ROW - FINAL APRON (AFTER POUR) | 01/09/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/09/2026 | APPROVED | TPOLACEK |
| Note: 01-09-26 TPOLACEK*** ALTHOUGH FINAL SURVEY DOES NOT CAPTURE DRAINAGE PATTERN IN REAR OF STRUCTURE THERE IS A WELL DEFINED SWALE THAT WILL MOVE DRAINAGE AS INTENDED 1/7/2026 - PREVIOUS INSPECTION NOTES 01-07-26 TPOLACEK** FINAL SURVEY IS REQUYIRED TO HAVE 10' OFF SHOTS ON ALL ADJOINING PROPERTIES. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(2) (2) The elevations on all adjacent properties at a minimum of 20-foot intervals on a 10-foot offset outside the property lines. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/09/2026 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 01/09/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| BLD - BUILDING FINAL | 01/09/2026 | FINAL APPROVED | MCONTRYMAN |
| Note: 1/6/2026 - PREVIOUS INSPECTION NOTES 1. No house number, needs 4" # affix to the house.. FBCR 319.1 2. Breaker for AHU needs to be 50 amp/240V, a 45 amp is installed. 3. The numbers on the AHU does not match the numbers on the energy calcs. Revise. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/07/2026 | Disapproved - NO FEE | TPOLACEK |
| Note: 01-07-26 TPOLACEK** FINAL SURVEY IS REQUYIRED TO HAVE 10' OFF SHOTS ON ALL ADJOINING PROPERTIES. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(2) (2) The elevations on all adjacent properties at a minimum of 20-foot intervals on a 10-foot offset outside the property lines. | |||
| BLD - BUILDING FINAL | 01/06/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. No house number, needs 4" # affix to the house.. FBCR 319.1 2. Breaker for AHU needs to be 50 amp/240V, a 45 amp is installed. 3. The numbers on the AHU does not match the numbers on the energy calcs. Revise. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/03/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 12/03/25 CORRECTIONS MADE READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 12/2/2025 - PREVIOUS INSPECTION NOTES ** 12/02/25 CULVERT IS OUT OF TOLERANCE IT IS ALSO PITCHED IN WRONG DIRECTION WATER IS TO FLOW FROM THE RIGHT TO THE LEFT ** NEED TO BACK FILL AROUND FORMBOARDS IN THE ROW ** MATERIAL NEEDS COMPACTION IN ROW TOO LOOSE _________________________________________________________________________________________________________________________ 12/1/2025 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM CM ASKING TO CANCEL INSPECTION FOR TODAY | |||
| ROW- PRE-APRON (PRE-POUR) | 12/02/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/02/25 CULVERT IS OUT OF TOLERANCE IT IS ALSO PITCHED IN WRONG DIRECTION WATER IS TO FLOW FROM THE RIGHT TO THE LEFT ** NEED TO BACK FILL AROUND FORMBOARDS IN THE ROW ** MATERIAL NEEDS COMPACTION IN ROW TOO LOOSE _________________________________________________________________________________________________________________________ 12/1/2025 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM CM ASKING TO CANCEL INSPECTION FOR TODAY | |||
| ROW- PRE-APRON (PRE-POUR) | 12/01/2025 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: RECIEVED TEXT FROM CM ASKING TO CANCEL INSPECTION FOR TODAY | |||
| ELECTRIC - EARLY POWER | 12/01/2025 | APPROVED | HCAMACHO |
| GRAVITY SEWER TEST | 11/05/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 11/05/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTON THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 11/03/2025 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 Revise energy calcs to match duct size and layout | |||
| LATH/BRICK/ WATER BARRIER | 10/31/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: Inspector Notes from Inspection 2420 Revise energy calcs to match duct size and layout | |||
| ALL ROUGH | 10/29/2025 | APPROVED - AS NOTED | KSANDOE |
| Note: Revise energy calcs to match duct size and layout | |||
| ROOF VALLEY & METAL | 08/28/2025 | CANCELLED BY APPLICANT | FWILLIS |
| Note: 8/27/2025 - PREVIOUS INSPECTION NOTES No drip edge metal installed. | |||
| ROOF VALLEY & METAL | 08/28/2025 | APPROVED | FWILLIS |
| Note: 8/28/25 - CANCELLED BY MISTAKE PREVIOUSLY. INSPECTION HAS BEEN APPROVED. 8/28/2025 - PREVIOUS INSPECTION NOTES 8/27/2025 - PREVIOUS INSPECTION NOTES No drip edge metal installed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/27/2025 | APPROVED | JSTEWART |
| Note: 8/22/2025 - PREVIOUS INSPECTION NOTES 1. When I arrived at 9:40 the framers were still working on the roof and finishing the tied downs nad interior framing. Not ready for inspection. 2. A new set of plans are needed for inspection. The set that is here is all wet and torn up. FBC [A]107.3.1 | |||
| ROOF VALLEY & METAL | 08/27/2025 | Disapproved - NO FEE | JSTEWART |
| Note: No drip edge metal installed. | |||
| WALL SHEATHING | 08/27/2025 | APPROVED | JSTEWART |
| Note: 8/22/2025 - PREVIOUS INSPECTION NOTES 1. Framers were still working, house not ready for inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/22/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. When I arrived at 9:40 the framers were still working on the roof and finishing the tied downs nad interior framing. Not ready for inspection. 2. A new set of plans are needed for inspection. The set that is here is all wet and torn up. FBC [A]107.3.1 | |||
| WALL SHEATHING | 08/22/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Framers were still working, house not ready for inspection. | |||
| TIE BEAM / LINTEL | 08/18/2025 | APPROVED | HCAMACHO |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 08/14/2025 | APPROVED | AMOBLEY |
| MONOLITHIC SLAB | 08/06/2025 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/30/2025 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 07/17/2025 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 05/06/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/07/2026 | 01/07/2026 |
| Note: Released By: KENNETH SANDOE - - KSANDOE@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/07/2025 | 11/07/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/29/2025 | 10/30/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/14/2025 | 08/14/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/14/2025 | 08/14/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/23/2025 | 07/24/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Formboard dimensions are off by a 1' in the back of home. Please resubmit formboard survey or revised site plan for review. | |||
| ZON | COMPLETE | 07/23/2025 | 07/23/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 07/17/2025 | 07/17/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/24/2025 | 06/27/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/24/2025 | 06/27/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/24/2025 | 06/25/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/21/2025 | 04/21/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/21/2025 | 04/25/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 04/21/2025 | 04/24/2025 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Attached letter from the QEP meets city requirements for compliance With 10.04.01 of the LDC. If any Gopher Tortoises or their burrows are found in the future, further coordination may be needed. | |||
| ENGIN1 | COMPLETE | 04/21/2025 | 04/21/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/21/2025 | 04/23/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/10/2025 | 04/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| PLENV | HOLD | 04/10/2025 | 04/15/2025 |
| Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 04/15/25 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed. | |||
| BADMIN | COMPLETE | 04/09/2025 | 04/15/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/09/2025 | 04/15/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/09/2025 | 04/17/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 04/09/2025 | 04/15/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in laundry need to be GFCI protected. NEC 2020 210.8 2. Need correct outlet spacing in master bedroom. Behind door. NEC 2020 210.52 | |||
| ENGIN1 | COMPLETE | 04/09/2025 | 04/10/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/09/2025 | 04/14/2025 |
| LOCATE | COMPLETE | 04/09/2025 | 04/14/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/09/2025 | 04/14/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/09/2025 | 04/16/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/09/2025 | 04/10/2025 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SITE PLAN MISSING 2ND FLOOD MAP PANEL # |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 01/23/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/23/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 04/28/2025 |
| IMPACT FEE FIRE | ¤434.51 | 04/28/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/28/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/28/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 04/28/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/28/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 04/28/2025 |
| WATER- TURN ON | ¤50.00 | 04/28/2025 |
| ADJUSTMENT 10% | (¤136.43) | 04/28/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/28/2025 |
| INSPECTION - RESIDENTIAL | ¤1,039.50 | 04/28/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤294.84 | 04/28/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,189.82 | 04/28/2025 |
| SURCHARGE FS 533.721 | ¤12.28 | 04/28/2025 |
| SURCHARGE - FS 468.631 | ¤18.42 | 04/28/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/28/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/28/2025 |
| SW ENG PRE APRON | ¤30.00 | 04/28/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/28/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/28/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 04/28/2025 |
| SEWER CREDIT | (¤2,465.75) | 04/28/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 04/28/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 04/28/2025 |
| SEWER CAPITAL FACILITY | ¤3,930.70 | 04/28/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,496.74 | 04/28/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 04/28/2025 |
| WATER MAIN EXTENSION IMPACT | ¤854.40 | 04/28/2025 |
| SITE PLAN 30 | ¤30.00 | 04/28/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,395.47 |