I want to search for...

Permit #2025040602

Permit Details

Status: COED

Parcel Id: 03-12-31-1125-00000-0590
CONDITIONED SPACE: 2394 sqft
GARAGE: 502 sqft
OPENED PORCH (WITH ROOF) : 43 sqft
OPENED PORCH (WITH ROOF) : 176 sqft
Total Square Footage: 3115 sqft
Subdivision: 2112 - COLBERT LANDINGS PH 1
Job Phone: 813-917-1689
Location Address: 16 GEOSAM DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/22/2025
NOC: RECORDED
Applicant name: SCOTT EVAN KEUNING
Owner: TAYLOR MORRISON OF FLORIDA INC

Address

1275 W GRANADA BLVD

ORMOND BEACH, FL 32174

Address

SUITE 3B

ORMOND BEACH, FL 32174

Lot: 59
Contracted Stated Job Value: ¤183,103.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

TAYLOR MORRISON OF FLORIDA INC
Status Location Address State License Number Phone
ACTIVE

7785 BAY MEADOWS WAY, SUITE 105

JACKSONVILLE, FL 32256

CBC1265083 (Exp: 08/31/2026) 813-917-1689

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
BENJAMIN MICHAEL RAY
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

6310 MABLETON PKWY

JACKSONVILLE, FL 32216

SUITE 1000

MABLETON, GA 30126

CFC1428415 (Exp: 08/31/2026) 904-861-5421 904-861-5426
CHASE RANDOLPH MASSEY
Status Location Address State License Number Phone
ACTIVE

10048 103RD ST

JACKSONVILLE, FL 32210

CCC1332486 (Exp: 08/31/2026) 904-248-1133

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 10/03/2025 APPROVED BHAINES
ROW - STORMWATER FINAL 10/03/2025 APPROVED FSLADISH
Note: 10/3/25 REQUIRED CORRECTION MADE AT THE TIME OF THIS INSPECTION. THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. ___________________________________________________________________________________________________________________________ ***INSPECTORS NOTE. SILT FENCING REQUIRED ON LEFT SIDE PROPERTY LINE BEFORE ROW FINAL PASSAGE.***
U -UTILITY RESIDENTIAL FINAL 10/03/2025 FINAL APPROVED BHAINES
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/02/2025 APPROVED FSLADISH
Note: 10/2/25 SURVEY NOW SHOWS ELEVATION SHOTS MEETING MINIMUM COPC STANDARDS. ____________________________________________________________________________________________________________________________ 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/26 YOUR SURVEY SHOWS THAT YOUR DRAINAGE FROM THE REAR OF STRUCTURE WILL NOT FLOW TO THE FRONT SWALE. SEE PHOTO FOR REFERENCE. REAR YARD DRAINAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feeT
ROW FIELD SURVEY /GRADING CERTIFICATION 10/02/2025 APPROVED FSLADISH
Note: 10/2/25 . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL APRON (AFTER POUR) 10/02/2025 APPROVED FSLADISH
Note: 10/2/25 CRACK IN CURBING IS BUILDERS RESONSIBILITY TO ADDRESS AT HOA TURNOVER. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/26/2025 Disapproved - NO FEE FSLADISH
Note: 9/26/26 YOUR SURVEY SHOWS THAT YOUR DRAINAGE FROM THE REAR OF STRUCTURE WILL NOT FLOW TO THE FRONT SWALE. SEE PHOTO FOR REFERENCE. REAR YARD DRAINAGE Section 300.01 C(6) V-16 "6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement." POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feeT
BLD - BUILDING FINAL 09/22/2025 FINAL APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 07/24/2025 APPROVED BTAYLOR
ELECTRIC - EARLY POWER 07/21/2025 APPROVED CVANSTRAHLEN
Note: Inspector Notes from Inspection 2200 5-29-25 1. Emailed FPL at 11:15. 5/27/2025 - PREVIOUS INSPECTION NOTES 5-27-25 1. Work not complete.
ROW- PRE-APRON (PRE-POUR) 07/15/2025 APPROVED FSLADISH
Note: 7/15/25 BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 7/14/2025 - PREVIOUS INSPECTION NOTES ** CANCELLED ON-SITE BY BUILDER _________________________________________________________________________________________________________________________ 7/10/2025 - PREVIOUS INSPECTION NOTES 7/10/25 SPOKE TO BOBBY CM, I AM CANCELING THIS PREPOUR AS A ONE TIME COURTESY.
ROW- PRE-APRON (PRE-POUR) 07/14/2025 CANCELLED BY APPLICANT EMADISON
Note: ** CANCELLED ON-SITE BY BUILDER _________________________________________________________________________________________________________________________ 7/10/2025 - PREVIOUS INSPECTION NOTES 7/10/25 SPOKE TO BOBBY CM, I AM CANCELING THIS PREPOUR AS A ONE TIME COURTESY.
ROW- PRE-APRON (PRE-POUR) 07/10/2025 CANCELLED BY APPLICANT FSLADISH
Note: 7/10/25 SPOKE TO BOBBY CM, I AM CANCELING THIS PREPOUR AS A ONE TIME COURTESY.
GRAVITY SEWER TEST 07/07/2025 APPROVED MGIBSON
SEWER TIE IN 07/07/2025 APPROVED MGIBSON
INSULATION 06/13/2025 APPROVED BTAYLOR
Note: 6/12/2025 - PREVIOUS INSPECTION NOTES 6-12-25 1. Not started. 2. Need to post address. Inspector Notes from Inspection 2420 6-6-25 1. Above the front door gap is too big. Need to add wood into space to close gap to 1/4"
INSULATION 06/12/2025 Disapproved - NO FEE BTAYLOR
Note: 6-12-25 1. Not started. 2. Need to post address. Inspector Notes from Inspection 2420 6-6-25 1. Above the front door gap is too big. Need to add wood into space to close gap to 1/4"
ALL ROUGH 06/06/2025 APPROVED - AS NOTED BTAYLOR
Note: 6-6-25 1. Above the front door gap is too big. Need to add wood into space to close gap to 1/4"
LATH/BRICK/ WATER BARRIER 05/29/2025 APPROVED BTAYLOR
ELECTRIC-TUG 05/29/2025 APPROVED - AS NOTED BTAYLOR
Note: 5-29-25 1. Emailed FPL at 11:15. 5/27/2025 - PREVIOUS INSPECTION NOTES 5-27-25 1. Work not complete.
ELECTRIC-TUG 05/27/2025 Disapproved - NO FEE BTAYLOR
Note: 5-27-25 1. Work not complete.
ROOF VALLEY & METAL 05/27/2025 APPROVED BTAYLOR
Note: 5/23/2025 - PREVIOUS INSPECTION NOTES 5/23/25 1. Cap nails for underlayment must be a max of 6" oc on the edges and 12" oc in the field 905.1.1.1(4)
ROOF VALLEY & METAL 05/23/2025 Disapproved - NO FEE MCONTRYMAN
Note: 5/23/25 1. Cap nails for underlayment must be a max of 6" oc on the edges and 12" oc in the field 905.1.1.1(4)
WALL SHEATHING 05/20/2025 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/20/2025 APPROVED - AS NOTED BTAYLOR
Note: 5-20-25 1. Missing engineering on truss A14.
FORMBOARD SURVEY (OFFICE USE ONLY) 05/13/2025 APPROVED RRICKS
MONOLITHIC SLAB 05/05/2025 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 04/30/2025 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 04/30/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BADMIN INFORMATION 09/17/2025 09/17/2025
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Already got blower door.
ENGIN1 COMPLETE 05/13/2025 05/13/2025
Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 05/13/2025 05/13/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
URB COMPLETE 04/11/2025 04/21/2025
Note: Released By: MATTHEW SIERRA - (386)286-2002 - MSIERRA@PALMCOASTGOV.COM
BADMIN COMPLETE 04/10/2025 04/16/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 04/10/2025 04/16/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 04/10/2025 04/16/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 04/10/2025 04/15/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/10/2025 04/11/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 04/10/2025 04/14/2025
LOCATE COMPLETE 04/10/2025 04/14/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 04/10/2025 04/14/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 04/10/2025 04/16/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/10/2025 04/11/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤965.03 04/22/2025
WATER- TURN ON ¤50.00 04/22/2025
WATER- TURN ON ¤50.00 04/22/2025
ADJUSTMENT 10% (¤161.14) 04/22/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/22/2025
INSPECTION - RESIDENTIAL ¤1,232.00 04/22/2025
PLAN REVIEW - RESIDENTIAL ¤349.44 04/22/2025
FC IMPACT FEE EMS ¤62.00 04/22/2025
IMPACT FEE FIRE ¤434.51 04/22/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/22/2025
FC IMPACT FEE LIBRARY ¤268.00 04/22/2025
IMPACT FEE PARKS ¤1,828.01 04/22/2025
IMPACT FEE TRANSPORTATION ¤3,502.00 04/22/2025
WATER METER W/OUT TAP ¤965.03 04/22/2025
SURCHARGE FS 533.721 ¤14.50 04/22/2025
SURCHARGE - FS 468.631 ¤21.75 04/22/2025
SW ENG - FOUNDATION SURVEY ¤20.00 04/22/2025
SW ENG INSPECTION 80 ¤80.00 04/22/2025
SW ENG PRE APRON ¤30.00 04/22/2025
SW ENG - REVIEW 20 ¤20.00 04/22/2025
SW ENG RES REVIEW 200 ¤200.00 04/22/2025
WASTEWATER PERM INSPECTION ¤80.00 04/22/2025
WASTEWATER PERM REVIEW ¤25.00 04/22/2025
WATER CAPITAL FACILITY FEE ¤3,129.62 04/22/2025
WATER PERMIT INSPECTION ¤40.00 04/22/2025
WATER PERMIT REVIEW ¤25.00 04/22/2025
WATER MAIN EXTENSION IMPACT ¤2,745.73 04/22/2025
SITE PLAN 30 ¤30.00 04/22/2025
Fees Total Due: ¤0.00 Total Paid: ¤16,254.48