I want to search for...
Permit #2025040664
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7004-00140-0080 |
| Block: 00140 |
| Subdivision: - |
| Job Phone: 786-512-4421 |
| Location Address: 33 CRYSTAL BAY CT |
| Type: DR - DRIVEWAY |
| Issue Date: 04/21/2025 |
| NOC: Unknown |
| Applicant name: ABEL MENENDEZ |
| Owner: SLAGLE BOBBY G JR & NATALIE H&W LIFE ESTATE |
|
Address 33 CRYSTAL BAY CT PALM COAST, FL 32137 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤4,000.00 |
| Job Description: Replace culvert pipes on both ends of drive way and install paver |
| Type: CN |
Contractor
ROYAL TILE & PAVERS INC
| Status | Location Address | Phone |
| ACTIVE |
69 FLEETWOOD DR PALM COAST, FL 32137 |
786-512-4421 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 10/23/2025 | FINAL APPROVED | BWRIGHT |
| ROW - FINAL INSPECTION | 10/20/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 06/17/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW - FINAL INSPECTION | 06/17/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO REMOVE ALL OVER POURED CONCRETE AND DIRT FROM CULVERT PIPE. 2) NEED TO REMOVE ALL MULCH AROUND MITER ENDS AND REPLACE WITH SOD AND ALL BARE AREAS IN THE RIGHT OF WAY NEEDS TO HAVE SOD. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/06/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 05/06/25 READY TO SET PAVERS _____________________________________________________________________________________________________________ 5/1/2025 - PREVIOUS INSPECTION NOTES 5/1/25 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 4/30/2025 - PREVIOUS INSPECTION NOTES 4/30/25 CULVERT PIPE ON CRYSTAL BAY SIDE IS OUT OF TOLERANCE, AS DISCUSSED IT SHOULD BE SET AT 6.10 FLAT. YOU ARE REQUIRED TO HAVE 36" APRON WINGS. NONE OF THE APRON WINGS MEET COPC STANDARDS AT THIS TIME. MET WITH PARREN AND GABE ON SITE AND DETERMINED DUE TO SITE SPECIFIC CONDITIONS WE WILL ALLOW 2-3 INCHES OF CONCRETE OVER THE CULVERT PIPE SO THAT YOU WHEN YOU ADD PAVER BASE AND PAVERS YOU WILL BE ABLE TO MATCH PAVERS TO CONCRETE GRADE BEHIND ROW. YOU WILL STILL BE REQUIRED TO POUR 5" OF CONCRETE IN THE DRIVEWAY APRON. SPOKE WITH ARMONDO AND RELAYED THESE REQUIREMENTS TO HIM AT THE TIME OF THIS INSPECTION. ________________________________________________________________________________________________________________________ 4/29/2025 - PREVIOUS INSPECTION NOTES 4/29/25 INSPECTOR NOTE..MET ON SITE WITH PARREN AND ARMONDO AND WENT OVER WHAT IS REQUIRED WITH THIS JOB. DETERMINED ON THE CRYSTAL BAY SIDE WE WOULD ALLOW 4 IN MINIMUM OVER THE CULVERT PIPE DUE TO SITE SPECIFIC CONDITIONS. ON THE CRAFT SIDE THE 5 IN COPC STANDARD WILL STILL BE REQUIRED. | |||
| ROW- PAVER RESTRAINTS | 05/01/2025 | APPROVED | FSLADISH |
| Note: 5/1/25 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PROJECT STATUS | 05/01/2025 | APPROVED | FSLADISH |
| ROW- PRE-APRON (PRE-POUR) | 05/01/2025 | PARTIALLY APPROVED | FSLADISH |
| Note: 5/1/25 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 4/30/2025 - PREVIOUS INSPECTION NOTES 4/30/25 CULVERT PIPE ON CRYSTAL BAY SIDE IS OUT OF TOLERANCE, AS DISCUSSED IT SHOULD BE SET AT 6.10 FLAT. YOU ARE REQUIRED TO HAVE 36" APRON WINGS. NONE OF THE APRON WINGS MEET COPC STANDARDS AT THIS TIME. MET WITH PARREN AND GABE ON SITE AND DETERMINED DUE TO SITE SPECIFIC CONDITIONS WE WILL ALLOW 2-3 INCHES OF CONCRETE OVER THE CULVERT PIPE SO THAT YOU WHEN YOU ADD PAVER BASE AND PAVERS YOU WILL BE ABLE TO MATCH PAVERS TO CONCRETE GRADE BEHIND ROW. YOU WILL STILL BE REQUIRED TO POUR 5" OF CONCRETE IN THE DRIVEWAY APRON. SPOKE WITH ARMONDO AND RELAYED THESE REQUIREMENTS TO HIM AT THE TIME OF THIS INSPECTION. ________________________________________________________________________________________________________________________ 4/29/2025 - PREVIOUS INSPECTION NOTES 4/29/25 INSPECTOR NOTE..MET ON SITE WITH PARREN AND ARMONDO AND WENT OVER WHAT IS REQUIRED WITH THIS JOB. DETERMINED ON THE CRYSTAL BAY SIDE WE WOULD ALLOW 4 IN MINIMUM OVER THE CULVERT PIPE DUE TO SITE SPECIFIC CONDITIONS. ON THE CRAFT SIDE THE 5 IN COPC STANDARD WILL STILL BE REQUIRED. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/30/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 4/30/25 CULVERT PIPE ON CRYSTAL BAY SIDE IS OUT OF TOLERANCE, AS DISCUSSED IT SHOULD BE SET AT 6.10 FLAT. YOU ARE REQUIRED TO HAVE 36" APRON WINGS. NONE OF THE APRON WINGS MEET COPC STANDARDS AT THIS TIME. MET WITH PARREN AND GABE ON SITE AND DETERMINED DUE TO SITE SPECIFIC CONDITIONS WE WILL ALLOW 2-3 INCHES OF CONCRETE OVER THE CULVERT PIPE SO THAT YOU WHEN YOU ADD PAVER BASE AND PAVERS YOU WILL BE ABLE TO MATCH PAVERS TO CONCRETE GRADE BEHIND ROW. YOU WILL STILL BE REQUIRED TO POUR 5" OF CONCRETE IN THE DRIVEWAY APRON. SPOKE WITH ARMONDO AND RELAYED THESE REQUIREMENTS TO HIM AT THE TIME OF THIS INSPECTION. ________________________________________________________________________________________________________________________ 4/29/2025 - PREVIOUS INSPECTION NOTES 4/29/25 INSPECTOR NOTE..MET ON SITE WITH PARREN AND ARMONDO AND WENT OVER WHAT IS REQUIRED WITH THIS JOB. DETERMINED ON THE CRYSTAL BAY SIDE WE WOULD ALLOW 4 IN MINIMUM OVER THE CULVERT PIPE DUE TO SITE SPECIFIC CONDITIONS. ON THE CRAFT SIDE THE 5 IN COPC STANDARD WILL STILL BE REQUIRED. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/29/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 4/29/25 INSPECTOR NOTE..MET ON SITE WITH PARREN AND ARMONDO AND WENT OVER WHAT IS REQUIRED WITH THIS JOB. DETERMINED ON THE CRYSTAL BAY SIDE WE WOULD ALLOW 4 IN MINIMUM OVER THE CULVERT PIPE DUE TO SITE SPECIFIC CONDITIONS. ON THE CRAFT SIDE THE 5 IN COPC STANDARD WILL STILL BE REQUIRED. |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 04/15/2025 | 04/15/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/11/2025 | 04/11/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 04/11/2025 | 04/14/2025 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/11/2025 | 04/11/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utilization Agreement. | |||
| SWALE | COMPLETE | 04/11/2025 | 04/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/22/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/22/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/21/2025 |
| SITE PLAN 15 | ¤15.00 | 04/21/2025 |
| ADJUSTMENT 10% | (¤3.00) | 04/21/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/21/2025 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 04/21/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 04/21/2025 |
| SW ENG PRE APRON | ¤30.00 | 04/21/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤406.00 |