I want to search for...

Permit #2025040690

Permit Details

Status: COED

Parcel Id: 07-11-31-7065-00190-0100
CONDITIONED SPACE: 1800 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 2246 sqft
Block: 00190
Subdivision: -
Job Phone: 689-250-2429
Location Address: 52 KANKAKEE TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/30/2025
NOC: RECORDED
Applicant name: RYAN M COURECH
Owner: A AND R MERIDIAN REAL ESTATE DEVELOPMENT LLC

Address

688 N ORLANDO AVENUE

ORLANDO, FL 32801

Address

SUITE 207

ORLANDO, FL 32801

Lot: 0100
Contracted Stated Job Value: ¤208,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN
Original Permit #: 2024010999

Contractor

MCH CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

668 N ORLANDO AVE, STE 207

MAITLAND, FL 32751

CBC1262898 (Exp: 08/31/2026) 407-602-8257

Sub Contractors

DUSTIN ARCHER
Status Location Address State License Number Phone
ACTIVE

2785 WRIGHTS ROAD SUITE 1133

OVIEDO, FL 32765

CMC1251099 (Exp: 08/31/2026) 407-391-1145
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 12/11/2025 APPROVED - AS NOTED FSLADISH
Note: 12/11/25 UPON CHECKING THE CORRECTION, DETRERMINED BUILDER HAS MADE THE REQIURED CORRECTION BY BRINGING UP THE RIGHT SIDE 2 TENTHS APPROX 15 FEET PAST THE CULVERT END 2 TENTHS, RUNNING SWALE FLAT TO A 2:1 SLOPE INTO AND OUT OF CULVERT PIPE AND THEN FLAT TO MEET GRADE ON LEFT SIDE PROPERTY LINE. APPROVING THIS INSPECTION AS NOTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _______________________________________________________________________________________________________________________________ 12/10/2025 - PREVIOUS INSPECTION NOTES 12/10/25 As discussed, the front yard swale on the left needs to match existing at the property line and remain flat until it reaches the culvert pipe. This allows the majority of water to sit inside the culvert. ------------------------------------------------------------------------------------------------------------------------------------ New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9465 12/8/25 UPON WALKING PROPERTY DETERMINED OVERALL SITE DRAINAGE WORKS. THE FRONT SWALE ON THE LEFT SIDE OF CULVERT PIPE DOES NOT HAVE POSITIVE DRAINAGE, A LARGE AMOUNT OF WATER IS BEING HELD ON YOUR SIDE. YOU WILL NEED TO EITHER LOWER THE SMALL AREA THAT IS HIGHER THAN YOU OR BRING YOUR SWALE UP TO ALLOW FLOW TO DRIAN. PHOTO FOR REFERENCE. I AM GOING TO APPROVE THIS FIELD SURVEY AS A COURTESY SO THAT YOU MAY MOVE FORWARD WITH INSPECTIONS, BUT CORRECTIONS ARE REQUIRED.
U -UTILITY RESIDENTIAL FINAL 12/11/2025 FINAL APPROVED BHAINES
Note: 12/9/2025 - PREVIOUS INSPECTION NOTES No power to pep tank.
ROW - STORMWATER FINAL 12/10/2025 CANCELLED BY APPLICANT WEB
Note: New inspection due to canceled inspection Inspector Notes from Inspection 9465 12/8/25 UPON WALKING PROPERTY DETERMINED OVERALL SITE DRAINAGE WORKS. THE FRONT SWALE ON THE LEFT SIDE OF CULVERT PIPE DOES NOT HAVE POSITIVE DRAINAGE, A LARGE AMOUNT OF WATER IS BEING HELD ON YOUR SIDE. YOU WILL NEED TO EITHER LOWER THE SMALL AREA THAT IS HIGHER THAN YOU OR BRING YOUR SWALE UP TO ALLOW FLOW TO DRIAN. PHOTO FOR REFERENCE. I AM GOING TO APPROVE THIS FIELD SURVEY AS A COURTESY SO THAT YOU MAY MOVE FORWARD WITH INSPECTIONS, BUT CORRECTIONS ARE REQUIRED.
ROW - STORMWATER FINAL 12/10/2025 Disapproved -FEE REQUIRED RRICKS
Note: 12/10/25 As discussed, the front yard swale on the left needs to match existing at the property line and remain flat until it reaches the culvert pipe. This allows the majority of water to sit inside the culvert. ------------------------------------------------------------------------------------------------------------------------------------ New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9465 12/8/25 UPON WALKING PROPERTY DETERMINED OVERALL SITE DRAINAGE WORKS. THE FRONT SWALE ON THE LEFT SIDE OF CULVERT PIPE DOES NOT HAVE POSITIVE DRAINAGE, A LARGE AMOUNT OF WATER IS BEING HELD ON YOUR SIDE. YOU WILL NEED TO EITHER LOWER THE SMALL AREA THAT IS HIGHER THAN YOU OR BRING YOUR SWALE UP TO ALLOW FLOW TO DRIAN. PHOTO FOR REFERENCE. I AM GOING TO APPROVE THIS FIELD SURVEY AS A COURTESY SO THAT YOU MAY MOVE FORWARD WITH INSPECTIONS, BUT CORRECTIONS ARE REQUIRED.
ROW - FINAL APRON (AFTER POUR) 12/10/2025 APPROVED RRICKS
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------------------------------------------------- 12/9/2025 - PREVIOUS INSPECTION NOTES 12/9/25 HAD GABE MEET ME AND JASON CM ON SITE. DISCUSSED WHAT CORRECTIONS ARE REQUIRED TO MOVE FORWARD. Inspector Notes from Inspection 9465 12/8/25 UPON WALKING PROPERTY DETERMINED OVERALL SITE DRAINAGE WORKS. THE FRONT SWALE ON THE LEFT SIDE OF CULVERT PIPE DOES NOT HAVE POSITIVE DRAINAGE, A LARGE AMOUNT OF WATER IS BEING HELD ON YOUR SIDE. YOU WILL NEED TO EITHER LOWER THE SMALL AREA THAT IS HIGHER THAN YOU OR BRING YOUR SWALE UP TO ALLOW FLOW TO DRIAN. PHOTO FOR REFERENCE. I AM GOING TO APPROVE THIS FIELD SURVEY AS A COURTESY SO THAT YOU MAY MOVE FORWARD WITH INSPECTIONS, BUT CORRECTIONS ARE REQUIRED.
ROW - FINAL APRON (AFTER POUR) 12/09/2025 Disapproved - NO FEE FSLADISH
Note: 12/9/25 HAD GABE MEET ME AND JASON CM ON SITE. DISCUSSED WHAT CORRECTIONS ARE REQUIRED TO MOVE FORWARD. Inspector Notes from Inspection 9465 12/8/25 UPON WALKING PROPERTY DETERMINED OVERALL SITE DRAINAGE WORKS. THE FRONT SWALE ON THE LEFT SIDE OF CULVERT PIPE DOES NOT HAVE POSITIVE DRAINAGE, A LARGE AMOUNT OF WATER IS BEING HELD ON YOUR SIDE. YOU WILL NEED TO EITHER LOWER THE SMALL AREA THAT IS HIGHER THAN YOU OR BRING YOUR SWALE UP TO ALLOW FLOW TO DRIAN. PHOTO FOR REFERENCE. I AM GOING TO APPROVE THIS FIELD SURVEY AS A COURTESY SO THAT YOU MAY MOVE FORWARD WITH INSPECTIONS, BUT CORRECTIONS ARE REQUIRED.
U -UTILITY RESIDENTIAL FINAL 12/09/2025 Disapproved - NO FEE BHAINES
Note: No power to pep tank.
ROW - STORMWATER FINAL 12/09/2025 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 9465 12/8/25 UPON WALKING PROPERTY DETERMINED OVERALL SITE DRAINAGE WORKS. THE FRONT SWALE ON THE LEFT SIDE OF CULVERT PIPE DOES NOT HAVE POSITIVE DRAINAGE, A LARGE AMOUNT OF WATER IS BEING HELD ON YOUR SIDE. YOU WILL NEED TO EITHER LOWER THE SMALL AREA THAT IS HIGHER THAN YOU OR BRING YOUR SWALE UP TO ALLOW FLOW TO DRIAN. PHOTO FOR REFERENCE. I AM GOING TO APPROVE THIS FIELD SURVEY AS A COURTESY SO THAT YOU MAY MOVE FORWARD WITH INSPECTIONS, BUT CORRECTIONS ARE REQUIRED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/08/2025 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 12/08/2025 APPROVED - AS NOTED FSLADISH
Note: 12/8/25 UPON WALKING PROPERTY DETERMINED OVERALL SITE DRAINAGE WORKS. THE FRONT SWALE ON THE LEFT SIDE OF CULVERT PIPE DOES NOT HAVE POSITIVE DRAINAGE, A LARGE AMOUNT OF WATER IS BEING HELD ON YOUR SIDE. YOU WILL NEED TO EITHER LOWER THE SMALL AREA THAT IS HIGHER THAN YOU OR BRING YOUR SWALE UP TO ALLOW FLOW TO DRIAN. PHOTO FOR REFERENCE. I AM GOING TO APPROVE THIS FIELD SURVEY AS A COURTESY SO THAT YOU MAY MOVE FORWARD WITH INSPECTIONS, BUT CORRECTIONS ARE REQUIRED.
BLD - BUILDING FINAL 11/24/2025 Approval - Private Provider PPROVIDER
Note: 11/20/2025 11:32:23 AM- PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 11/21/2025 CANCELLED BY APPLICANT MRAMOS
ROW- PROJECT STATUS 11/21/2025 Status Check PFLANAGAN
Note: FORMBROAD SURVEY PASSED FFE IS GOOD AT THE TIME -------------------------------------------------------------------- 7/23/2025 - PREVIOUS INSPECTION NOTES CITY RESIDENTIAL STORMWATER INSPECTORS WENT BY THE PROPERTY AND REPORTED TO ME THEY HAVE REASON TO BELIEVE THE FFE OF THE COMPLETED SLAB IS OUT OF COMPLIANCE WITH THE APPROVED SITE PLAN. WE ARE HOLDING ALL INSPECTIONS UNTIL WE HAVE A FOUNDATION SURVEY THAT INDICATES THE FFE IS IN COMPLIANCE WITH THE CITY APPROVED SITE PLAN. PLEASE STOP WORK ON THE HOME UNTIL THE FOUNDATION SURVEY IS APPROVED BY THE CITY. PATRICK BUCKLEY PBUCKLEY@PALMCOASTGOV.COM 386-986-3786.
ROW- PRE-APRON (PRE-POUR) 11/14/2025 APPROVED FSLADISH
Note: 11/14/25 CULVERT PIPE IS NOW WITHIN SWALE PLAN DIAGRAM TOLERANCE (9.90 FLAT) AT THE TIME OF THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. AT THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 11/12/2025 - PREVIOUS INSPECTION NOTES 11/12/25 THE CULVERT PIPE IS OUT OF TOLERANCE TO THE SWALE PLAM DIAGRAM. BM VERIFIED TO COPC CL ELEVATIONS AT THE TIME OF THIS INSPECTION. ROADSIDE SWALE AND CULVERT SET WITHIN 0.10 Section 300.01 C(3) V-17 3) The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in thedirection of the drainage flow 11/6/2025 - PREVIOUS INSPECTION NOTES 11/6/25 THE BM YOU LEFT IN THE PP ELEVATION NUMBERS DO NOT MATCH UP TO THE COPC ELEVATION SHOTS. YOUR CULVERT PIPE IS OUT OF TOLERANCE TO SWALE DIAGRAM. PLEASE HAVE SURVEYOR CONFIRM BM. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow. 11/5/2025 - PREVIOUS INSPECTION NOTES 11/5/25 YOU HAVE TWO BM IN POWER POLE, BUILDER/SURVEYOR NEEDS TO IDENTIFY CORRECT ONE AND REMOVE INCORRECT ONE BEFORE A PREPOUR INSPECTION CAN BE PERFORMED. BENCHMARK EASILY IDENTIFIED Section 300.01 B(9) V-15 "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov" PHOTO FOR REFERENCE
ROW- PRE-APRON (PRE-POUR) 11/12/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 11/12/25 THE CULVERT PIPE IS OUT OF TOLERANCE TO THE SWALE PLAM DIAGRAM. BM VERIFIED TO COPC CL ELEVATIONS AT THE TIME OF THIS INSPECTION. ROADSIDE SWALE AND CULVERT SET WITHIN 0.10 Section 300.01 C(3) V-17 3) The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in thedirection of the drainage flow 11/6/2025 - PREVIOUS INSPECTION NOTES 11/6/25 THE BM YOU LEFT IN THE PP ELEVATION NUMBERS DO NOT MATCH UP TO THE COPC ELEVATION SHOTS. YOUR CULVERT PIPE IS OUT OF TOLERANCE TO SWALE DIAGRAM. PLEASE HAVE SURVEYOR CONFIRM BM. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow. 11/5/2025 - PREVIOUS INSPECTION NOTES 11/5/25 YOU HAVE TWO BM IN POWER POLE, BUILDER/SURVEYOR NEEDS TO IDENTIFY CORRECT ONE AND REMOVE INCORRECT ONE BEFORE A PREPOUR INSPECTION CAN BE PERFORMED. BENCHMARK EASILY IDENTIFIED Section 300.01 B(9) V-15 "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov" PHOTO FOR REFERENCE
ROW- PRE-APRON (PRE-POUR) 11/06/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 11/6/25 THE BM YOU LEFT IN THE PP ELEVATION NUMBERS DO NOT MATCH UP TO THE COPC ELEVATION SHOTS. YOUR CULVERT PIPE IS OUT OF TOLERANCE TO SWALE DIAGRAM. PLEASE HAVE SURVEYOR CONFIRM BM. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow. 11/5/2025 - PREVIOUS INSPECTION NOTES 11/5/25 YOU HAVE TWO BM IN POWER POLE, BUILDER/SURVEYOR NEEDS TO IDENTIFY CORRECT ONE AND REMOVE INCORRECT ONE BEFORE A PREPOUR INSPECTION CAN BE PERFORMED. BENCHMARK EASILY IDENTIFIED Section 300.01 B(9) V-15 "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov" PHOTO FOR REFERENCE
ROW- PRE-APRON (PRE-POUR) 11/05/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 11/5/25 YOU HAVE TWO BM IN POWER POLE, BUILDER/SURVEYOR NEEDS TO IDENTIFY CORRECT ONE AND REMOVE INCORRECT ONE BEFORE A PREPOUR INSPECTION CAN BE PERFORMED. BENCHMARK EASILY IDENTIFIED Section 300.01 B(9) V-15 "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov" PHOTO FOR REFERENCE
ROW - DRAINAGE 11/05/2025 APPROVED FSLADISH
Note: 10/31/2025 - PREVIOUS INSPECTION NOTES 10/31/25 THERE IS A DUMP TRUCK LOAD OF DIRT SITTING IN THE COPC ROW SWALE. THIS NEEDS TO BE MOVED TO ALLOW SWALE DRAINAGE. ________________________________________________________________________________________________________________________ 10/29/2025 - PREVIOUS INSPECTION NOTES 10/29/25 THEY ARE STARTING TO DO FINAL GRADE AT THE TIME OF THIS INSPECTION. I WII PARTIALLY APPROVE THIS INSPECTION AND REINSPECT ON 10/31/25 FOR COMPLIANCE. ________________________________________________________________________________________________________________________ 10/27/2025 - PREVIOUS INSPECTION NOTES 10/27/25 YOU ARE REQUIRED TO CLEAN OUT TEMPORARY PIPE OF DIRT AND SEDIMENT. PIU ADDITIONAL COVERAGE OVER EXPOSED PIPE AND REPAIR RESET FRONT AND SIDE SILT FENCE. *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. PHOTO FOR REFERENCE.
ROW - DRAINAGE 10/31/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 10/31/25 THERE IS A DUMP TRUCK LOAD OF DIRT SITTING IN THE COPC ROW SWALE. THIS NEEDS TO BE MOVED TO ALLOW SWALE DRAINAGE. ________________________________________________________________________________________________________________________ 10/29/2025 - PREVIOUS INSPECTION NOTES 10/29/25 THEY ARE STARTING TO DO FINAL GRADE AT THE TIME OF THIS INSPECTION. I WII PARTIALLY APPROVE THIS INSPECTION AND REINSPECT ON 10/31/25 FOR COMPLIANCE. ________________________________________________________________________________________________________________________ 10/27/2025 - PREVIOUS INSPECTION NOTES 10/27/25 YOU ARE REQUIRED TO CLEAN OUT TEMPORARY PIPE OF DIRT AND SEDIMENT. PIU ADDITIONAL COVERAGE OVER EXPOSED PIPE AND REPAIR RESET FRONT AND SIDE SILT FENCE. *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. PHOTO FOR REFERENCE.
ROW - DRAINAGE 10/29/2025 PARTIALLY APPROVED FSLADISH
Note: 10/29/25 THEY ARE STARTING TO DO FINAL GRADE AT THE TIME OF THIS INSPECTION. I WII PARTIALLY APPROVE THIS INSPECTION AND REINSPECT ON 10/31/25 FOR COMPLIANCE. ________________________________________________________________________________________________________________________ 10/27/2025 - PREVIOUS INSPECTION NOTES 10/27/25 YOU ARE REQUIRED TO CLEAN OUT TEMPORARY PIPE OF DIRT AND SEDIMENT. PIU ADDITIONAL COVERAGE OVER EXPOSED PIPE AND REPAIR RESET FRONT AND SIDE SILT FENCE. *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. PHOTO FOR REFERENCE.
ROW - DRAINAGE 10/27/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 10/27/25 YOU ARE REQUIRED TO CLEAN OUT TEMPORARY PIPE OF DIRT AND SEDIMENT. PIU ADDITIONAL COVERAGE OVER EXPOSED PIPE AND REPAIR RESET FRONT AND SIDE SILT FENCE. *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. PHOTO FOR REFERENCE.
U-CROSS CONNECTION 10/14/2025 APPROVED BHAINES
Note: No CC, no IRR installed
GRAVITY SEWER TEST 10/14/2025 Approval - Private Provider PPROVIDER
SEWER TIE IN 10/14/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS APPROVED 10/10/25
ELECTRIC - EARLY POWER 10/07/2025 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 09/16/2025 APPROVED CBOWERMASTER
INSULATION 08/27/2025 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 08/26/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 08/20/2025 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 08/19/2025 APPROVED FSLADISH
Note: 8/19/25 ALL REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. AS STATED PREVIOUSLY, PLEASE MAINTAIN TIS SITE TO COPC STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. _______________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES NEED TO DO THE FOLLOWING 1) NEED TO OPEN SWALE AND TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 2) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT OF LOT SO SEDIMENT WILL RUN IN TO SWALE AGAIN 3) NEED TO PUSH DUMPSTER ON TO YOUR LOT AND OUT OF THE RIGHT OF WAY YOU WILL HAVE TILL 8/19/25 TO CORRECT ALL ISSUES DUE TO YOU HAVE HAD DRAINAGE ON THIS HOUSE BEFORE YOU WAS TOLD TO KEEP EROSION CONTROL PRACTICES UP TO CITY STANDARDS. IF CORRECTS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 08/15/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO DO THE FOLLOWING 1) NEED TO OPEN SWALE AND TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 2) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT OF LOT SO SEDIMENT WILL RUN IN TO SWALE AGAIN 3) NEED TO PUSH DUMPSTER ON TO YOUR LOT AND OUT OF THE RIGHT OF WAY YOU WILL HAVE TILL 8/19/25 TO CORRECT ALL ISSUES DUE TO YOU HAVE HAD DRAINAGE ON THIS HOUSE BEFORE YOU WAS TOLD TO KEEP EROSION CONTROL PRACTICES UP TO CITY STANDARDS. IF CORRECTS ARE NOT COMPLETED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROOF VALLEY & METAL 08/15/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/06/2025 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 08/05/2025 APPROVED - AS NOTED FSLADISH
Note: 8/5/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. IT IS THE BUILDERS RESPOSIBILITY TO MAINTAIN COPC CONSTRUCTION SITE STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. WILL MONITOR SITE FOR CONTINUED COMPLIANCE TO COPC STANDARDS. APPOVING AS NOTED.
ROW - DRAINAGE 08/04/2025 Status Check FSLADISH
Note: 8/4/25 RECEIVED CALL FROM JASON CM THAT THEY WERE ON TRACK FOR LUMBER DELIVERY TODAY AND ALL REQUIRED CORRECTIONS WILL BE COMPLETED AND SITE MAINTAINED TO COPC STANDARDS. WILL REINSPECT SITE 8/5/25. _________________________________________________________________________________________________________________________ *** INSPECTORS NOTE. SPOKE WITH JASON CM AND HE ASKED IF WE COULD GIVE HIM UNTIL 8/5/25 TO HAVE CORRECTIONS COMPLETED AS HE IS HAVING LUMBER DELIVED ON 8/4/25. I ASKED HIM TO PLEASE CONTACT ME MONDAY WITH A UPDATE AND WE WOULD TRY TO ACCOMODATE HIS REQUEST. *** 7/31/2025 - PREVIOUS INSPECTION NOTES 7/31/25 CONCRETE SLAG AND DIRT ON ROAD HAVE BEEN REMOVED AT THE TIME OF THIS INSPECTION. YOU ARE STILL REQUIRED TO MAKE OTHER NOTED CORRECTIONS BY 8/4/25 OR A INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/30/2025 - PREVIOUS INSPECTION NOTES 7/30/25 YOU HAVE BEEN GIVEN AMPLE WARNING TO REMOVE CONCRETE SLAG FROM COPC STORMWATER DRAINAGE CONVEYANCE. IT IS STILL THERE AS OF 12:19 7/30/25. IF THIS IS NOT REMEDIED TODAY A STOP WORK ORDER WILL BE PLACED ON THIS PERMIT. 7/28/2025 - PREVIOUS INSPECTION NOTES 7/28/25 YOU HAVE CONCRETE SLAG AND CHUNKS IN THE COPC STORMWATER DRAINAGE CONVEYANCE. THIS IS CONSIDERED AN ILLICIT DISCHARGE AND NEEDS TO BE REMEDIED IMMEDIATELY. YOU NEED TO ENCLOSE YOUR ENTIRE SITE WITH SILT FENCE AND SET YOUR COSTRUCTION ENTRANCE TO COPC STANDARDS. YOU ARE REQUIRED TO REMOVE YOUR PORTA JOHN FROM THE COPC ROW AND ONTO YOUR SITE. YOU NEED TO CLEAN THE DIRT OFF OF THE ROAD AND OUT OF THE TEMPORARY PIPE ON KANKAKEE IT IS A SAFETY AND DRAINAGE ISSUE. I WILL BE BACK ON 7/29/25 TO REINSPECT FOR CONCRETE SLAG REMOVAL. YOU HAVE 7 DAYS TO MAKE ALL OTHER REQUIRED CORRECTIONS. PHOTO FOR REFERENCE.
TIE BEAM / LINTEL 08/01/2025 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 07/31/2025 Disapproved - NO FEE FSLADISH
Note: 7/31/25 CONCRETE SLAG AND DIRT ON ROAD HAVE BEEN REMOVED AT THE TIME OF THIS INSPECTION. YOU ARE STILL REQUIRED TO MAKE OTHER NOTED CORRECTIONS BY 8/4/25 OR A INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/30/2025 - PREVIOUS INSPECTION NOTES 7/30/25 YOU HAVE BEEN GIVEN AMPLE WARNING TO REMOVE CONCRETE SLAG FROM COPC STORMWATER DRAINAGE CONVEYANCE. IT IS STILL THERE AS OF 12:19 7/30/25. IF THIS IS NOT REMEDIED TODAY A STOP WORK ORDER WILL BE PLACED ON THIS PERMIT. 7/28/2025 - PREVIOUS INSPECTION NOTES 7/28/25 YOU HAVE CONCRETE SLAG AND CHUNKS IN THE COPC STORMWATER DRAINAGE CONVEYANCE. THIS IS CONSIDERED AN ILLICIT DISCHARGE AND NEEDS TO BE REMEDIED IMMEDIATELY. YOU NEED TO ENCLOSE YOUR ENTIRE SITE WITH SILT FENCE AND SET YOUR COSTRUCTION ENTRANCE TO COPC STANDARDS. YOU ARE REQUIRED TO REMOVE YOUR PORTA JOHN FROM THE COPC ROW AND ONTO YOUR SITE. YOU NEED TO CLEAN THE DIRT OFF OF THE ROAD AND OUT OF THE TEMPORARY PIPE ON KANKAKEE IT IS A SAFETY AND DRAINAGE ISSUE. I WILL BE BACK ON 7/29/25 TO REINSPECT FOR CONCRETE SLAG REMOVAL. YOU HAVE 7 DAYS TO MAKE ALL OTHER REQUIRED CORRECTIONS. PHOTO FOR REFERENCE.
ROW - DRAINAGE 07/30/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 7/30/25 YOU HAVE BEEN GIVEN AMPLE WARNING TO REMOVE CONCRETE SLAG FROM COPC STORMWATER DRAINAGE CONVEYANCE. IT IS STILL THERE AS OF 12:19 7/30/25. IF THIS IS NOT REMEDIED TODAY A STOP WORK ORDER WILL BE PLACED ON THIS PERMIT. 7/28/2025 - PREVIOUS INSPECTION NOTES 7/28/25 YOU HAVE CONCRETE SLAG AND CHUNKS IN THE COPC STORMWATER DRAINAGE CONVEYANCE. THIS IS CONSIDERED AN ILLICIT DISCHARGE AND NEEDS TO BE REMEDIED IMMEDIATELY. YOU NEED TO ENCLOSE YOUR ENTIRE SITE WITH SILT FENCE AND SET YOUR COSTRUCTION ENTRANCE TO COPC STANDARDS. YOU ARE REQUIRED TO REMOVE YOUR PORTA JOHN FROM THE COPC ROW AND ONTO YOUR SITE. YOU NEED TO CLEAN THE DIRT OFF OF THE ROAD AND OUT OF THE TEMPORARY PIPE ON KANKAKEE IT IS A SAFETY AND DRAINAGE ISSUE. I WILL BE BACK ON 7/29/25 TO REINSPECT FOR CONCRETE SLAG REMOVAL. YOU HAVE 7 DAYS TO MAKE ALL OTHER REQUIRED CORRECTIONS. PHOTO FOR REFERENCE.
ROW - DRAINAGE 07/28/2025 Disapproved - NO FEE FSLADISH
Note: 7/28/25 YOU HAVE CONCRETE SLAG AND CHUNKS IN THE COPC STORMWATER DRAINAGE CONVEYANCE. THIS IS CONSIDERED AN ILLICIT DISCHARGE AND NEEDS TO BE REMEDIED IMMEDIATELY. YOU NEED TO ENCLOSE YOUR ENTIRE SITE WITH SILT FENCE AND SET YOUR COSTRUCTION ENTRANCE TO COPC STANDARDS. YOU ARE REQUIRED TO REMOVE YOUR PORTA JOHN FROM THE COPC ROW AND ONTO YOUR SITE. YOU NEED TO CLEAN THE DIRT OFF OF THE ROAD AND OUT OF THE TEMPORARY PIPE ON KANKAKEE IT IS A SAFETY AND DRAINAGE ISSUE. I WILL BE BACK ON 7/29/25 TO REINSPECT FOR CONCRETE SLAG REMOVAL. YOU HAVE 7 DAYS TO MAKE ALL OTHER REQUIRED CORRECTIONS. PHOTO FOR REFERENCE.
FORMBOARD SURVEY (OFFICE USE ONLY) 07/23/2025 APPROVED RRICKS
ROW- PROJECT STATUS 07/14/2025 Disapproved - NO FEE GBERTOLA
Note: CITY RESIDENTIAL STORMWATER INSPECTORS WENT BY THE PROPERTY AND REPORTED TO ME THEY HAVE REASON TO BELIEVE THE FFE OF THE COMPLETED SLAB IS OUT OF COMPLIANCE WITH THE APPROVED SITE PLAN. WE ARE HOLDING ALL INSPECTIONS UNTIL WE HAVE A FOUNDATION SURVEY THAT INDICATES THE FFE IS IN COMPLIANCE WITH THE CITY APPROVED SITE PLAN. PLEASE STOP WORK ON THE HOME UNTIL THE FOUNDATION SURVEY IS APPROVED BY THE CITY. PATRICK BUCKLEY PBUCKLEY@PALMCOASTGOV.COM 386-986-3786.
MONOLITHIC SLAB 07/11/2025 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 07/03/2025 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 06/20/2025 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 06/18/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BADMIN INFORMATION 08/25/2025 08/25/2025
Note: Marked INFORMATION By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM INSPECTION CODE INCORRECT. SHOULD BE 2420
SW1 COMPLETE 07/23/2025 07/23/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved, disregard last comments.
SW1 HOLD 07/18/2025 07/18/2025
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM The proposed elevations shall be shown at all locations of existing elevations per thetopographic survey. The foundation survey and site plan need to match FFE
ZON COMPLETE 07/18/2025 07/18/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 06/18/2025 06/20/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 05/29/2025 05/29/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 05/22/2025 05/22/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM New elevation to show banding is labeled incorrectly. Windows are on right side facing street plan shows it labeled left side.
BLD COMPLETE 05/22/2025 05/28/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON HOLD 05/15/2025 05/16/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM the right side of the home needs to show a window and banding as it faces a row no windowless walls
BLD COMPLETE 05/15/2025 05/21/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON HOLD 05/12/2025 05/12/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment Right Street side of home needs to show banding on windows as it faces the ROW
SW1 COMPLETE 05/12/2025 05/15/2025
Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/12/2025 05/13/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
MECH COMPLETE 05/12/2025 05/14/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 05/06/2025 05/06/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Right Street side of home needs to show banding on windows as it faces the ROW
SW1 HOLD 05/06/2025 05/09/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE ELEVATION OF 21.9 ON THE LEFT PROPOERTY LINE NEED TO BE AT 21.6 TO GIVE YOU .30 FROM THE DRAINAGE PATTERN TO THE 10' OFF ELEVATION IN THE ADJACENT PROPERTY THEN YOU NEED DROP .10 EVERY ELEVATION TO THE FRONT PROPERTY LINE.
ENGIN1 COMPLETE 05/06/2025 05/07/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON HOLD 04/30/2025 04/30/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Right Street side of home needs to show banding on windows Street on the right side is spelled incorrect on site plan/survey Should be Kashmir Trail
SW1 HOLD 04/30/2025 05/05/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL ELEVATIONS ON THE DRAINAGE PATTERN NEEDS TO BE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF DRAINAGE PATTERN PER CITY CODE 3001.01 D(6)
ENGIN1 COMPLETE 04/30/2025 05/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SWALE COMPLETE 04/14/2025 04/25/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON HOLD 04/14/2025 04/14/2025
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Right Street side of home needs to show banding on windows
BADMIN COMPLETE 04/11/2025 04/14/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 04/11/2025 04/23/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/11/2025 04/14/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
LOCATE COMPLETE 04/11/2025 04/15/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 04/11/2025 04/17/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Per COPC Technical Manual 300.01A.1.b.2 the FFE of the living area of all improved structures on adjacent lots shall be depicted. 1- Please indicate the FFE for lot 11 and 12. 2- There must be positive fall - .01' per 20' is considered positive fall. There is a flat spot in the back 21.5 to 21.5. 3- All hard elevations shall be depicted to the nearest .01' Please show proposed FFE to the nearest .01'
MECH HOLD 04/11/2025 04/14/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM upload state card

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI REINSPECTION 1 ¤35.00 12/11/2025
RSI REINSPECTION 1 ¤35.00 12/11/2025
RSI REINSPECTION 1 ¤35.00 12/11/2025
RSI REINSPECTION 1 ¤35.00 12/11/2025
RSI REINSPECTION 1 ¤35.00 12/11/2025
RSI REINSPECTION 1 ¤35.00 12/11/2025
RSI REINSPECTION 1 ¤35.00 12/11/2025
RSI REINSPECTION 1 ¤35.00 12/11/2025
SW ENG - INSPECTION 20 ¤20.00 12/11/2025
SW ENG - INSPECTION 20 ¤20.00 12/11/2025
SW ENG - INSPECTION 20 ¤20.00 12/11/2025
SW ENG - INSPECTION 20 ¤20.00 12/11/2025
SW ENG - INSPECTION 20 ¤20.00 12/11/2025
SW ENG - INSPECTION 20 ¤20.00 12/11/2025
SW ENG - INSPECTION 20 ¤20.00 12/11/2025
SW ENG INSPECTION 80 ¤80.00 05/30/2025
SW ENG PRE APRON ¤30.00 05/30/2025
SW ENG - REVIEW 20 ¤20.00 05/30/2025
SW ENG RES REVIEW 200 ¤200.00 05/30/2025
WATER METER W/ TAP ¤2,326.93 05/30/2025
SEWER CREDIT (¤850.00) 05/30/2025
WASTEWATER PERM INSPECTION ¤80.00 05/30/2025
WASTEWATER PERM REVIEW ¤25.00 05/30/2025
SEWER CAPITAL FACILITY ¤3,930.70 05/30/2025
WATER CAPITAL FACILITY FEE ¤3,496.74 05/30/2025
WATER PERMIT REVIEW ¤25.00 05/30/2025
WATER MAIN EXTENSION IMPACT ¤854.40 05/30/2025
SITE PLAN 30 ¤30.00 05/30/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,189.82 05/30/2025
SURCHARGE FS 533.721 ¤6.88 05/30/2025
SURCHARGE - FS 468.631 ¤10.32 05/30/2025
SW ENG - FOUNDATION SURVEY ¤20.00 05/30/2025
WATER- TURN ON ¤50.00 05/30/2025
ADJUSTMENT 10% (¤76.42) 05/30/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/30/2025
INSPECTION - RESIDENTIAL ¤572.00 05/30/2025
PLAN REVIEW - RESIDENTIAL ¤162.24 05/30/2025
FC IMPACT FEE EMS ¤62.00 05/30/2025
IMPACT FEE FIRE ¤434.51 05/30/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/30/2025
FC IMPACT FEE LIBRARY ¤268.00 05/30/2025
IMPACT FEE PARKS ¤1,828.01 05/30/2025
IMPACT FEE SCHOOL ¤5,450.00 05/30/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 05/30/2025
PEP TANK INSTALL ¤756.74 05/30/2025
Fees Total Due: ¤0.00 Total Paid: ¤24,566.87