I want to search for...
Permit #2025041040
Permit Details
Status: COED
| Parcel Id: 07-11-31-7017-00080-0180 |
| CONDITIONED SPACE: 1809 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 33 sqft |
| Total Square Footage: 2248 sqft |
| Block: 00080 |
| Subdivision: - |
| Job Phone: 239-571-5325 |
| Location Address: 25 BOTANY LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/01/2025 |
| NOC: RECORDED |
| Applicant name: RYAN SCOTT DAVIS |
| Owner: SYNERGY HOMES LLC |
|
Address 581 NW MERCANTILE PLACE PORT ST LUCIE, FL 34986 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SYNERGY HOMES, LLC
| Status | Location Address | State License Number |
| ACTIVE |
1 HARGROVE GRADE, SUITE B1 PALM COAST, FL 32137 |
CBC1254289 (Exp: 08/31/2026) |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/14/2025 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 11/13/2025 | CANCELLED BY APPLICANT | JSTEWART |
| Note: 11/12/2025 - PREVIOUS INSPECTION NOTES 1. Missing (2) anchors at header height for garage door bucks. per plan. 2. Please seal garage ceiling garage door opener penetration. FBC R402 3. Please seal front garage door wall at ceiling penetration for saftey device wires. (Right side). FBC R402 11/10/2025 - PREVIOUS INSPECTION NOTES via text 11/7/2025 - PREVIOUS INSPECTION NOTES via text | |||
| BLD - BUILDING FINAL | 11/12/2025 | Disapproved - NO FEE | JSTEWART |
| Note: 1. Missing (2) anchors at header height for garage door bucks. per plan. 2. Please seal garage ceiling garage door opener penetration. FBC R402 3. Please seal front garage door wall at ceiling penetration for saftey device wires. (Right side). FBC R402 11/10/2025 - PREVIOUS INSPECTION NOTES via text 11/7/2025 - PREVIOUS INSPECTION NOTES via text | |||
| BLD - BUILDING FINAL | 11/10/2025 | CANCELLED BY APPLICANT | JSTEWART |
| Note: via text 11/7/2025 - PREVIOUS INSPECTION NOTES via text | |||
| ROW - FINAL APRON (AFTER POUR) | 11/07/2025 | APPROVED | TPOLACEK |
| Note: 11-07-25 TPOLACEK*** BUILDER NEEDS TO CREATE A 2-1 SLOPE COMNG OUT OF PIPE ON LEFT SIDE APPROVING AS NOTED. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 ** 10/28/25 BEFORE ROW STORMWATER FINAL CLEAN ENTIRE CULVERT | |||
| ROW - STORMWATER FINAL | 11/07/2025 | APPROVED | TPOLACEK |
| Note: , AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 ** 10/28/25 BEFORE ROW STORMWATER FINAL CLEAN ENTIRE CULVERT | |||
| U -UTILITY RESIDENTIAL FINAL | 11/07/2025 | FINAL APPROVED | BHAINES |
| BLD - BUILDING FINAL | 11/07/2025 | CANCELLED BY APPLICANT | JSTEWART |
| Note: via text | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/28/2025 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/28/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/28/25 BEFORE ROW STORMWATER FINAL CLEAN ENTIRE CULVERT | |||
| GRAVITY SEWER TEST | 10/15/2025 | APPROVED | MGIBSON |
| SEWER TIE IN | 10/15/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: CITY UTILITY MADE TAP TO LATERAL | |||
| ROW- PRE-APRON (PRE-POUR) | 09/18/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/18/25 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 09/17/2025 | APPROVED | CVANSTRAHLEN |
| INSULATION | 08/29/2025 | APPROVED | JSTEWART |
| Note: 8/28/2025 - PREVIOUS INSPECTION NOTES NO INSULATION BEING INSTALLED AT THIS LOCATION. NO MATERIAL ON SITE NO WORKERS. | |||
| INSULATION | 08/28/2025 | Disapproved - NO FEE | FWILLIS |
| Note: NO INSULATION BEING INSTALLED AT THIS LOCATION. NO MATERIAL ON SITE NO WORKERS. | |||
| LATH/BRICK/ WATER BARRIER | 08/28/2025 | APPROVED | FWILLIS |
| U-CROSS CONNECTION | 08/28/2025 | APPROVED | BWRIGHT |
| ALL ROUGH | 08/26/2025 | APPROVED | JSTEWART |
| WALL SHEATHING | 08/19/2025 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/19/2025 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 08/19/2025 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 08/07/2025 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 07/29/2025 | APPROVED | CVANSTRAHLEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/24/2025 | APPROVED | JSTEWART |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 07/21/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: Formboard Pass | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 07/17/2025 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 06/25/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/21/2025 | 07/21/2025 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM Formboard Pass | |||
| ZON | COMPLETE | 07/21/2025 | 07/21/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 07/17/2025 | 07/17/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/21/2025 | 04/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/21/2025 | 04/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/21/2025 | 04/29/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/21/2025 | 04/25/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/21/2025 | 04/21/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/21/2025 | 04/24/2025 |
| LOCATE | COMPLETE | 04/21/2025 | 04/24/2025 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/21/2025 | 04/24/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/21/2025 | 04/23/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/21/2025 | 04/22/2025 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/21/2025 | 05/06/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤50.00 | 05/01/2025 |
| ADJUSTMENT 10% | (¤120.20) | 05/01/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/01/2025 |
| INSPECTION - RESIDENTIAL | ¤913.00 | 05/01/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤258.96 | 05/01/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 05/01/2025 |
| IMPACT FEE FIRE | ¤434.51 | 05/01/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/01/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/01/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 05/01/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/01/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 05/01/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,189.82 | 05/01/2025 |
| SURCHARGE FS 533.721 | ¤10.82 | 05/01/2025 |
| SURCHARGE - FS 468.631 | ¤16.23 | 05/01/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/01/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/01/2025 |
| SW ENG PRE APRON | ¤30.00 | 05/01/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/01/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/01/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 05/01/2025 |
| SEWER CREDIT | (¤1,147.00) | 05/01/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 05/01/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 05/01/2025 |
| SEWER CAPITAL FACILITY | ¤3,930.70 | 05/01/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,496.74 | 05/01/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 05/01/2025 |
| WATER MAIN EXTENSION IMPACT | ¤854.40 | 05/01/2025 |
| SITE PLAN 30 | ¤30.00 | 05/01/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,496.92 |