Permit #2025041059
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00550-0370 |
| CONDITIONED SPACE: 1908 sqft |
| GARAGE: 651 sqft |
| OPENED PORCH (WITH ROOF) : 182 sqft |
| OPENED PORCH (WITH ROOF) : 68 sqft |
| Total Square Footage: 2809 sqft |
| Block: 00550 |
| Subdivision: - |
| Job Phone: 407-476-8195 |
| Location Address: 2 RANSHIRE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/24/2025 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: INB BFS LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
|
Address SUITE 220 ORLANDO, FL 32803 |
| Lot: 0370 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/09/2026 | FINAL APPROVED | MCONTRYMAN |
| Note: 6/3/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-NEC 331.30- SECURING & SUPPORTING ( tug outlet ) #2-Missing PEP tank breaker #3-M1502.4.7 Exhaust duct required. Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked “future use. #4-Slidding door do not lock on one off the sides #5-car garage motor not connected to power for small garage door ( can't test ) #6-FBC-R . 302.6 seal all garage penetration ( holes ), wall and ceiling #7-Missing attic light #8-Missing insulation certificated | |||
| U -UTILITY RESIDENTIAL FINAL | 06/09/2026 | APPROVED - AS NOTED | TLOWE |
| Note: 6/5/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9035 No CC, No IRR pep tank stone broken Pep not working | |||
| ROW - STORMWATER FINAL | 06/05/2026 | APPROVED | FSLADISH |
| Note: 6/5/26 CULVERT CLEAR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________________ 5/29/2026 - PREVIOUS INSPECTION NOTES CULVERT MUST BE CLEAN OF SEDIMENT APPROVING AFTER POUR AND HOLDING STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL | 06/05/2026 | Disapproved - NO FEE | TLOWE |
| Note: Inspector Notes from Inspection 9035 No CC, No IRR Pep not working | |||
| BLD - BUILDING FINAL | 06/03/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: *** NOTES ADDED BY CVANSTRAHLEN 6/3/2026 2:28:46 PM *** #9- NEC 331.30-SECURING & SUPPORTING ( Conduit for ground wire under miter box ) Please fix items before next inspection #1-NEC 331.30- SECURING & SUPPORTING ( tug outlet ) #2-Missing PEP tank breaker #3-M1502.4.7 Exhaust duct required. Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked “future use. #4-Slidding door do not lock on one off the sides #5-car garage motor not connected to power for small garage door ( can't test ) #6-FBC-R . 302.6 seal all garage penetration ( holes ), wall and ceiling #7-Missing attic light #8-Missing insulation certificated | |||
| U-CROSS CONNECTION | 05/29/2026 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, No IRR | |||
| ROW - FINAL APRON (AFTER POUR) | 05/29/2026 | APPROVED - AS NOTED | TPOLACEK |
| Note: CULVERT MUST BE CLEAN OF SEDIMENT APPROVING AFTER POUR AND HOLDING STORMWATER FINAL | |||
| ROW - STORMWATER FINAL | 05/29/2026 | Disapproved - NO FEE | TPOLACEK |
| Note: CULVERT MUST BE CLEAN OF SEDIMENT APPROVING AFTER POUR AND HOLDING STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL | 05/26/2026 | Disapproved - NO FEE | BHAINES |
| Note: No power to pep tank | |||
| ROW - STORMWATER FINAL | 05/26/2026 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 05/26/2026 | CANCELLED BY APPLICANT | WEB |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/20/2026 | APPROVED | FSLADISH |
| Note: 5/20/26 BASED ON THE ENGINEER SIGNED AND SEALED LGADC MEETING THE COPC MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION, I AM APPROVING THIS DOCUMENT. Effective 3/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certification for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/20/2026 | CANCELLED BY INSPECTOR | FSLADISH |
| Note: 5/20/26 Effective 3/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certification for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/17/2026 | APPROVED | FSLADISH |
| Note: 4/17/26 PIPE INVERT IS GOOD AT TIME OF THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED. DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER AND VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ELECTRIC - EARLY POWER | 04/10/2026 | APPROVED | HCAMACHO |
| GRAVITY SEWER TEST | 04/09/2026 | APPROVED | CVANSTRAHLEN |
| SEWER TIE IN | 04/09/2026 | APPROVED | CVANSTRAHLEN |
| INSULATION | 03/16/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/16/2026 4:25:14 PM *** Approved 3/12/2026 - PREVIOUS INSPECTION NOTES Items from previous inspection not been resolved #1-E-cals missing ducts lay-out Item #2 is not fix #3- dryer ven metal duct seams need to be seal per manufacture espec Inspector Notes from Inspection 2420 Please fix items before next inspection #1-Missing E-cals #2-NEC-200.6 (B)-Side 4 AWG or large an isulated grounded conductor shall be identified ( electrical main panel) 3/3/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-Plumbing not completed FBC [A]107.4-NOT READY - WORK INCOMPLETE required a full inspectio | |||
| INSULATION | 03/12/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Items from previous inspection not been resolved #1-E-cals missing ducts lay-out Item #2 is not fix #3- dryer ven metal duct seams need to be seal per manufacture espec Inspector Notes from Inspection 2420 Please fix items before next inspection #1-Missing E-cals #2-NEC-200.6 (B)-Side 4 AWG or large an isulated grounded conductor shall be identified ( electrical main panel) 3/3/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-Plumbing not completed FBC [A]107.4-NOT READY - WORK INCOMPLETE required a full inspectio | |||
| PEP TANK INSTALLATION REQUEST | 03/09/2026 | APPROVED | ISANDERSON |
| ALL ROUGH | 03/05/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-Missing E-cals #2-NEC-200.6 (B)-Side 4 AWG or large an isulated grounded conductor shall be identified ( electrical main panel) 3/3/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-Plumbing not completed FBC [A]107.4-NOT READY - WORK INCOMPLETE required a full inspectio | |||
| ELECTRIC-TUG | 03/03/2026 | APPROVED | CVANSTRAHLEN |
| Note: 2/27/2026 - PREVIOUS INSPECTION NOTES 2-27-26 1. Breakers are not labeled. 2. Protective pipe is SCH40 and it needs to be SCH80. | |||
| ALL ROUGH | 03/03/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-Plumbing not completed FBC [A]107.4-NOT READY - WORK INCOMPLETE required a full inspectio | |||
| ELECTRIC-TUG | 02/27/2026 | Disapproved - NO FEE | BTAYLOR |
| Note: 2-27-26 1. Breakers are not labeled. 2. Protective pipe is SCH40 and it needs to be SCH80. | |||
| LATH/BRICK/ WATER BARRIER | 02/27/2026 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/20/2026 | APPROVED | CVANSTRAHLEN |
| ROOF VALLEY & METAL | 02/20/2026 | APPROVED | CVANSTRAHLEN |
| ROOF SHEATHING | 02/17/2026 | APPROVED | CVANSTRAHLEN |
| WALL SHEATHING | 02/17/2026 | APPROVED | CVANSTRAHLEN |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 02/13/2026 | APPROVED | AMOBLEY |
| ROW - DRAINAGE | 02/13/2026 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE -------------------------------------------------------------------------- 12/4/2025 - PREVIOUS INSPECTION NOTES 12-4-25 TPOLACEK*** BUILDER NEEDS TO REMOVE PORTA POTTY FROM SWALE, SILT FENCE ACROSS LEFT SIDE LEAVING 20' CONSTRUCTION ENTRANCE AS SHOWN IN RESIDENTIAL CONSTRUCTION DIAGRAM ATTACHED AS PHOTO. 12/1/2025 - PREVIOUS INSPECTION NOTES 12-1-25 TPOLACEK*** SITE STILL HAS NO SILT FENCE AS REQUIRED. 3 DAYS TO COMPLY. 11/24/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 02/11/2026 | CANCELLED BY INSPECTOR | JMYERS |
| Note: 2/12/26 BUILDER CALLED, SCHEDULED WRONG INSPECTION INTENDED FOR ROW-DRAINAGE INSPECTION. | |||
| TIE BEAM / LINTEL | 02/03/2026 | APPROVED | CVANSTRAHLEN |
| Note: 1/30/2026 - PREVIOUS INSPECTION NOTES 1/30/26: 1). Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) Spray painted orange. 3 locations at the front entry. | |||
| TIE BEAM / LINTEL | 01/30/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/30/2026 1:07:14 PM *** 1/30/26: 1). Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) Spray painted orange. 3 locations at the front entry. | |||
| MONOLITHIC SLAB | 01/22/2026 | APPROVED | CVANSTRAHLEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/15/2026 | APPROVED | CVANSTRAHLEN |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 01/14/2026 | APPROVED | PKNAPIK |
| ROW - DRAINAGE | 12/04/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 12-4-25 TPOLACEK*** BUILDER NEEDS TO REMOVE PORTA POTTY FROM SWALE, SILT FENCE ACROSS LEFT SIDE LEAVING 20' CONSTRUCTION ENTRANCE AS SHOWN IN RESIDENTIAL CONSTRUCTION DIAGRAM ATTACHED AS PHOTO. 12/1/2025 - PREVIOUS INSPECTION NOTES 12-1-25 TPOLACEK*** SITE STILL HAS NO SILT FENCE AS REQUIRED. 3 DAYS TO COMPLY. 11/24/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 11/30/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 12-1-25 TPOLACEK*** SITE STILL HAS NO SILT FENCE AS REQUIRED. 3 DAYS TO COMPLY. 11/24/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| WATER METER INSTALLATION REQUEST | 11/25/2025 | APPROVED | BVITALE |
| ROW - DRAINAGE | 11/24/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/20/2026 | 02/23/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/11/2026 | 02/13/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/12/2026 | 01/14/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/09/2026 | 01/12/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Please provide Final building pad certification letter. 2ND REQUEST | |||
| SW1 | COMPLETE | 01/09/2026 | 01/12/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/09/2026 | 01/09/2026 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/06/2026 | 01/06/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Please provide Final building pad certification letter. | |||
| MECH | COMPLETE | 11/05/2025 | 11/06/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/21/2025 | 04/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/21/2025 | 04/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/21/2025 | 04/29/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/21/2025 | 04/25/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/21/2025 | 04/21/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/21/2025 | 04/24/2025 |
| LOCATE | COMPLETE | 04/21/2025 | 04/29/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/21/2025 | 04/24/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/21/2025 | 04/28/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/21/2025 | 04/22/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/21/2025 | 05/08/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/04/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 05/27/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/27/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/27/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/27/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/27/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 05/27/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 05/27/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 05/27/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 05/27/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,189.82 | 10/24/2025 |
| SURCHARGE FS 533.721 | ¤12.28 | 10/24/2025 |
| SURCHARGE - FS 468.631 | ¤18.42 | 10/24/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/24/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/24/2025 |
| SW ENG PRE APRON | ¤30.00 | 10/24/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/24/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/24/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 10/24/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 10/24/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 10/24/2025 |
| SEWER CAPITAL FACILITY | ¤3,930.70 | 10/24/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,496.74 | 10/24/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 10/24/2025 |
| WATER MAIN EXTENSION IMPACT | ¤854.40 | 10/24/2025 |
| SITE PLAN 30 | ¤30.00 | 10/24/2025 |
| WATER- TURN ON | ¤50.00 | 10/24/2025 |
| ADJUSTMENT 10% | (¤136.43) | 10/24/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/24/2025 |
| INSPECTION - RESIDENTIAL | ¤1,039.50 | 10/24/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤294.84 | 10/24/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 10/24/2025 |
| IMPACT FEE FIRE | ¤434.51 | 10/24/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/24/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/24/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 10/24/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/24/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 10/24/2025 |
| PEP TANK INSTALL | ¤756.74 | 10/24/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤25,895.46 |