I want to search for...

Permit #2025041099

Permit Details

Status: COED

Parcel Id: 07-11-31-7033-00480-0270
CONDITIONED SPACE: 1312 sqft
GARAGE: 433 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
Total Square Footage: 1761 sqft
Block: 00480
Subdivision: 7033 -
Job Phone: 352-433-8382
Location Address: 17 RENN LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/21/2025
NOC: RECORDED
Applicant name: ALFREDO E SCHEER
Owner: ESTELA LIVING LLC

Address

2601 SOUTH BAYSHORE DRIVE

MIAMI, FL 33133

Lot: 0270
Contracted Stated Job Value: ¤165,000.00
Job Description: Single Family Residence
Type: CN

Contractor

ESTELA LIVING LLC
Status Location Address State License Number Phone
ACTIVE

237 S. DIXIE HWY, 4TH FLOOR

CORAL GABLES, FL 33133

CGC1534535 (Exp: 08/31/2026) 352-433-8382

Sub Contractors

JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 02/10/2026 APPROVED GBERTOLA
Note: 2/10/26= Correction were made it 2/6/2026 - PREVIOUS INSPECTION NOTES ** 02/06/26 CONTACTED CHRIS CRAWFORD FROM THE UTILITY DEPT REGARDING THE BUILDERS CLAIM THEY DUG UP THE SWALE AT 16 RENN LN. I WAS INFORMED THAT DID NOT DIG UP THE SWALE ON TO POF THE FACT THEY WOULD USE BAHIA SOD NOT BERMUDA SOD TO MAKE SWALE REPAIRS. I ALSO CONFIRMED WITH STORMWATER SUPERVISOR R. DALTON THAT NO SWALE GRADE WORK WAS DONE ON RENN LN . THEY WOULD NOT USE THE BERMUDA SOD THEY USE BAHIA SOD . ** BUILDER IS ALSO REQUIRED TO REPAIR SWALE IN FRONT OF VACANT (RUTS) CAUSED DURING THE CONSTRUCTION OF HIS SITE AT 17 RENN LN. 1/16/2026 - PREVIOUS INSPECTION NOTES TALKED TO CM ON THE PHONE AND EXPLAINED ISSUES WITH VACANT LOT ACROSS THE STREET. AS A COURTESY I WILL CANCEL TODAYS INSPECTION AS CM WAS UNAWARE OF THE ISSUES. THERE WERE NO COMMENTS IN PREVIOUS INSPECTION NOTING THE ISSUES. 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 PLEASE READ PREVIOUS NOTES. ON THE LEFT SIDE PROPERTY LINE THERE IS A RIDGE THAT NEEDS TO HAVE DIRT ADDED AND COMPACTED THEN SLOPED TO MATCH FROM SEWER CLEAN OUT REARWARD FOR A CONSISTENT SLOPE Inspector Notes from Inspection 9465 1/7/26 DRAINAGE OVERALL WORKS BUT ON THE LEFT SIDE PROPERTY LINE THERE IS A RIDGE THAT NEEDS TO HAVE DIRT ADDED AND COMPACTED THEN SLOPED TO MATCH FROM SEWER CLEAN OUT REARWARD FOR A CONSISTENT SLOPE. APPROVING THIS FIELD INSPECTION AS A COURTESY SO YOU MAY MOVE FORWRD WITH INSPECTIONS. THIS AREA WILL NEED TO BE CORRECTED BEFORE ROW PASSAGE.
ROW - STORMWATER FINAL 02/06/2026 Disapproved -FEE REQUIRED EMADISON
Note: ** 02/06/26 CONTACTED CHRIS CRAWFORD FROM THE UTILITY DEPT REGARDING THE BUILDERS CLAIM THEY DUG UP THE SWALE AT 16 RENN LN. I WAS INFORMED THAT DID NOT DIG UP THE SWALE ON TO POF THE FACT THEY WOULD USE BAHIA SOD NOT BERMUDA SOD TO MAKE SWALE REPAIRS. I ALSO CONFIRMED WITH STORMWATER SUPERVISOR R. DALTON THAT NO SWALE GRADE WORK WAS DONE ON RENN LN . THEY WOULD NOT USE THE BERMUDA SOD THEY USE BAHIA SOD . ** BUILDER IS ALSO REQUIRED TO REPAIR SWALE IN FRONT OF VACANT (RUTS) CAUSED DURING THE CONSTRUCTION OF HIS SITE AT 17 RENN LN. 1/16/2026 - PREVIOUS INSPECTION NOTES TALKED TO CM ON THE PHONE AND EXPLAINED ISSUES WITH VACANT LOT ACROSS THE STREET. AS A COURTESY I WILL CANCEL TODAYS INSPECTION AS CM WAS UNAWARE OF THE ISSUES. THERE WERE NO COMMENTS IN PREVIOUS INSPECTION NOTING THE ISSUES. 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 PLEASE READ PREVIOUS NOTES. ON THE LEFT SIDE PROPERTY LINE THERE IS A RIDGE THAT NEEDS TO HAVE DIRT ADDED AND COMPACTED THEN SLOPED TO MATCH FROM SEWER CLEAN OUT REARWARD FOR A CONSISTENT SLOPE Inspector Notes from Inspection 9465 1/7/26 DRAINAGE OVERALL WORKS BUT ON THE LEFT SIDE PROPERTY LINE THERE IS A RIDGE THAT NEEDS TO HAVE DIRT ADDED AND COMPACTED THEN SLOPED TO MATCH FROM SEWER CLEAN OUT REARWARD FOR A CONSISTENT SLOPE. APPROVING THIS FIELD INSPECTION AS A COURTESY SO YOU MAY MOVE FORWRD WITH INSPECTIONS. THIS AREA WILL NEED TO BE CORRECTED BEFORE ROW PASSAGE.
ROW - STORMWATER FINAL 01/16/2026 CANCELLED BY APPLICANT TPOLACEK
Note: TALKED TO CM ON THE PHONE AND EXPLAINED ISSUES WITH VACANT LOT ACROSS THE STREET. AS A COURTESY I WILL CANCEL TODAYS INSPECTION AS CM WAS UNAWARE OF THE ISSUES. THERE WERE NO COMMENTS IN PREVIOUS INSPECTION NOTING THE ISSUES. 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 PLEASE READ PREVIOUS NOTES. ON THE LEFT SIDE PROPERTY LINE THERE IS A RIDGE THAT NEEDS TO HAVE DIRT ADDED AND COMPACTED THEN SLOPED TO MATCH FROM SEWER CLEAN OUT REARWARD FOR A CONSISTENT SLOPE Inspector Notes from Inspection 9465 1/7/26 DRAINAGE OVERALL WORKS BUT ON THE LEFT SIDE PROPERTY LINE THERE IS A RIDGE THAT NEEDS TO HAVE DIRT ADDED AND COMPACTED THEN SLOPED TO MATCH FROM SEWER CLEAN OUT REARWARD FOR A CONSISTENT SLOPE. APPROVING THIS FIELD INSPECTION AS A COURTESY SO YOU MAY MOVE FORWRD WITH INSPECTIONS. THIS AREA WILL NEED TO BE CORRECTED BEFORE ROW PASSAGE.
U -UTILITY RESIDENTIAL FINAL 01/15/2026 FINAL APPROVED BWRIGHT
Note: 1/9/2026 - PREVIOUS INSPECTION NOTES Water meter pit needs to be lowered to grade.
BLD - BUILDING FINAL 01/13/2026 APPROVED CVANSTRAHLEN
Note: 1/12/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection . Item #2 was not resolved before inspection , please fix item 1/9/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspectionn #1--NEC-250.64.(B) Securing and protecting against fisical damage ,where exposed a graunding electrode conductor or its enclosure , should be securely fastened to the surfece on witch it is carried . installed on or through framing members ( by Ac unit by cooling lines ) #2-Missing AC grill at living room ceiling #3- Share Bathroom right side draine is leaking ( water on cabinet floor ) #4-Master bathroom left side fauce not water ( valves are turn off ) #5-FBC-R . 302.6 seal all garage penetration , wall and ceiling ( hole on wall right side by water heater ) #6-FBCR 318-TERMITE TREATMENT OR NOTICE OF INTENT FOR BORACARE ( final certificated )
BLD - BUILDING FINAL 01/12/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspection . Item #2 was not resolved before inspection , please fix item 1/9/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspectionn #1--NEC-250.64.(B) Securing and protecting against fisical damage ,where exposed a graunding electrode conductor or its enclosure , should be securely fastened to the surfece on witch it is carried . installed on or through framing members ( by Ac unit by cooling lines ) #2-Missing AC grill at living room ceiling #3- Share Bathroom right side draine is leaking ( water on cabinet floor ) #4-Master bathroom left side fauce not water ( valves are turn off ) #5-FBC-R . 302.6 seal all garage penetration , wall and ceiling ( hole on wall right side by water heater ) #6-FBCR 318-TERMITE TREATMENT OR NOTICE OF INTENT FOR BORACARE ( final certificated )
BLD - BUILDING FINAL 01/09/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspectionn #1--NEC-250.64.(B) Securing and protecting against fisical damage ,where exposed a graunding electrode conductor or its enclosure , should be securely fastened to the surfece on witch it is carried . installed on or through framing members ( by Ac unit by cooling lines ) #2-Missing AC grill at living room ceiling #3- Share Bathroom right side draine is leaking ( water on cabinet floor ) #4-Master bathroom left side fauce not water ( valves are turn off ) #5-FBC-R . 302.6 seal all garage penetration , wall and ceiling ( hole on wall right side by water heater ) #6-FBCR 318-TERMITE TREATMENT OR NOTICE OF INTENT FOR BORACARE ( final certificated )
U-CROSS CONNECTION 01/09/2026 APPROVED - AS NOTED BHAINES
Note: No CC, No IRR.
ROW - FINAL APRON (AFTER POUR) 01/09/2026 APPROVED FSLADISH
Note: 1/9/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 1/7/26 DRAINAGE OVERALL WORKS BUT ON THE LEFT SIDE PROPERTY LINE THERE IS A RIDGE THAT NEEDS TO HAVE DIRT ADDED AND COMPACTED THEN SLOPED TO MATCH FROM SEWER CLEAN OUT REARWARD FOR A CONSISTENT SLOPE. APPROVING THIS FIELD INSPECTION AS A COURTESY SO YOU MAY MOVE FORWRD WITH INSPECTIONS. THIS AREA WILL NEED TO BE CORRECTED BEFORE ROW PASSAGE.
U -UTILITY RESIDENTIAL FINAL 01/09/2026 Disapproved - NO FEE BHAINES
Note: Water meter pit needs to be lowered to grade.
ROW - STORMWATER FINAL 01/09/2026 Disapproved -FEE REQUIRED FSLADISH
Note: 1/9/26 PLEASE READ PREVIOUS NOTES. ON THE LEFT SIDE PROPERTY LINE THERE IS A RIDGE THAT NEEDS TO HAVE DIRT ADDED AND COMPACTED THEN SLOPED TO MATCH FROM SEWER CLEAN OUT REARWARD FOR A CONSISTENT SLOPE Inspector Notes from Inspection 9465 1/7/26 DRAINAGE OVERALL WORKS BUT ON THE LEFT SIDE PROPERTY LINE THERE IS A RIDGE THAT NEEDS TO HAVE DIRT ADDED AND COMPACTED THEN SLOPED TO MATCH FROM SEWER CLEAN OUT REARWARD FOR A CONSISTENT SLOPE. APPROVING THIS FIELD INSPECTION AS A COURTESY SO YOU MAY MOVE FORWRD WITH INSPECTIONS. THIS AREA WILL NEED TO BE CORRECTED BEFORE ROW PASSAGE.
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/07/2026 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 01/07/2026 APPROVED - AS NOTED FSLADISH
Note: 1/7/26 DRAINAGE OVERALL WORKS BUT ON THE LEFT SIDE PROPERTY LINE THERE IS A RIDGE THAT NEEDS TO HAVE DIRT ADDED AND COMPACTED THEN SLOPED TO MATCH FROM SEWER CLEAN OUT REARWARD FOR A CONSISTENT SLOPE. APPROVING THIS FIELD INSPECTION AS A COURTESY SO YOU MAY MOVE FORWRD WITH INSPECTIONS. THIS AREA WILL NEED TO BE CORRECTED BEFORE ROW PASSAGE.
ROW- PRE-APRON (PRE-POUR) 12/17/2025 APPROVED FSLADISH
Note: 12/17/25 AREA A LITTLE SOFT, BUILDERS RESPOSIBILITY TO DOUBLE CHECK ELEVATIONS BEFORE POURING. PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. AT THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 12/8/2025 - PREVIOUS INSPECTION NOTES 12-8-25 TPOLACEK*** POUR AREA IS UNDER WATER.
ROW- PRE-APRON (PRE-POUR) 12/08/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 12-8-25 TPOLACEK*** POUR AREA IS UNDER WATER.
GRAVITY SEWER TEST 10/07/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 REMOVE ANY AND ALL ROOTS FROM FOOTER AREAS THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 10/07/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2060 REMOVE ANY AND ALL ROOTS FROM FOOTER AREAS THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2060 REMOVE ANY AND ALL ROOTS FROM FOOTER AREAS THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 09/24/2025 APPROVED CVANSTRAHLEN
Note:
ELECTRIC - EARLY POWER 09/22/2025 Disapproved - NO FEE MKRASKI
Note: 1. Mot ready Strada on site working on electrical
PEP TANK INSTALLATION REQUEST 09/18/2025 APPROVED CBOWERMASTER
INSULATION 08/20/2025 APPROVED CVANSTRAHLEN
Note:
INSULATION 08/19/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspection ( new permit , set of plans , E-cals , need attention ) #1-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE #2-Need E-cals documents #3- Documetns for inspection need to be on permit box , installed out side of contruction #4-FBC [A] 105.7 -NEEDS PERMIT ON SITE
LATH/BRICK/ WATER BARRIER 08/15/2025 APPROVED CVANSTRAHLEN
ALL ROUGH 08/15/2025 APPROVED CVANSTRAHLEN
Note:
ALL ROUGH 08/13/2025 Disapproved -FEE REQUIRED MKRASKI
Note: 8/13/25 1. Truss A1A still not repaired properly, repair per MiTek engineering packet or submit a engineered letter and have it approved Building Dept. before re-inspection 2. Clean all truss's of debris per manufacturer spec 3. Secure all plumbing stacks per 8/8/25 Please fix items before next inspection #1- item from previous inspection was not fix #2-FBC [A]107.4-DUCT LAYOUT DOES NOT MATCH ENERGY CALCS ( 3 E-cals packs ? ), dutc work diferent size or what is on E-cals #3-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #4-FBCR P2503.5 -NEEDS PRESSURE TEST ON WATER LINES #5-MIssing FL approval sheet for windows and doors Inspector Notes from Inspection 2460 Please fix item before next inspection #1-Repair trusse A1A by Mitek pack specifications , provide a engineer letter for revision and approval for the building deparment 7/25/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE , incluid trusses layout
ALL ROUGH 08/08/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspection #1- item from previous inspection was not fix #2-FBC [A]107.4-DUCT LAYOUT DOES NOT MATCH ENERGY CALCS ( 3 E-cals packs ? ), dutc work diferent size or what is on E-cals #3-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #4-FBCR P2503.5 -NEEDS PRESSURE TEST ON WATER LINES #5-MIssing FL approval sheet for windows and doors Inspector Notes from Inspection 2460 Please fix item before next inspection #1-Repair trusse A1A by Mitek pack specifications , provide a engineer letter for revision and approval for the building deparment 7/25/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE , incluid trusses layout
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/05/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please fix item before next inspection #1-Repair trusse A1A by Mitek pack specifications , provide a engineer letter for revision and approval for the building deparment 7/25/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE , incluid trusses layout
ROW - DRAINAGE 08/04/2025 APPROVED TPOLACEK
Note: 08/04/25 TPOLACEK*** BUILDER HAS MADE ALL CORRECTIONS AT THIS TIME. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/30/2025 - PREVIOUS INSPECTION NOTES 07/30/25 TPOLACEK*** CONCRETE HAS BEEN REMOVED FROM ROW, TRASH STILL REMAINS AS WELL AS TEMPORARY PIPE CLOGGED. WILL GIVE AN ADDITIONAL 24 HOURS BEFORE STOP WORK ORDER. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/29/2025 - PREVIOUS INSPECTION NOTES 07/29/25 TPOLACEK*** TEMP PIPE IS NOW CLOGGED AGAIN, CONCRETE REMAINS IN ROW AS WELL AS TRASH IN ROW. A STOP WORK ORDER WILL BE PLACED ON SITE IF NOT CORRECTED IN 24HRS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/28/2025 - PREVIOUS INSPECTION NOTES 07/28/25 TPOLACEK*** SITE REMAINS UNCHANGED PRIORITY 1 INSPECTION HOLD UNTIL CONDITIONS ARE CORRECTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/23/2025 - PREVIOUS INSPECTION NOTES 07/23 25 TPOLACEK*** CONDITIONS OF SITE STILL REMAIN. PERMIT WILL BE PLACED ON PRIORITY 1 UNTIL CONDITIONS ARE CORRECTED. NEXT INSPECTION MONDAY 7/16/2025 - PREVIOUS INSPECTION NOTES ** 07/16/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE TO ALLOW FOR THE STORMWATER TO FLOW WITHOUT OBSTRUCTION ** NEED TO REVOVE ALL CONSTRUCTION MATERIAL OUT OF THE ROW (RIGHT OF WAY) INCLUDING DUMPED CONCRETE AS WELL AS THE CONCRETE DUMPED INSIDE SITE THIS IS AN ILLICIT DISCHARGE ** CLEAN DIRT FROM EDGE OF ROAD ** YOU WILL HAVE 7 DAYS FROM TODAY TO MAKE ALL NECESSARY CORRECTIONS IT ALL ARE NOT COMPLETED BY THE NEXT SCHEDULED INSPECTION YOUR SITE WILL BE PLACED ON AN INSPECTION HOLD UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE AS WELL AS INSPECTIONS WILL BE CONDUCTED DAILY AS WELL ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/23/25
ROW - DRAINAGE 07/30/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 07/30/25 TPOLACEK*** CONCRETE HAS BEEN REMOVED FROM ROW, TRASH STILL REMAINS AS WELL AS TEMPORARY PIPE CLOGGED. WILL GIVE AN ADDITIONAL 24 HOURS BEFORE STOP WORK ORDER. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/29/2025 - PREVIOUS INSPECTION NOTES 07/29/25 TPOLACEK*** TEMP PIPE IS NOW CLOGGED AGAIN, CONCRETE REMAINS IN ROW AS WELL AS TRASH IN ROW. A STOP WORK ORDER WILL BE PLACED ON SITE IF NOT CORRECTED IN 24HRS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/28/2025 - PREVIOUS INSPECTION NOTES 07/28/25 TPOLACEK*** SITE REMAINS UNCHANGED PRIORITY 1 INSPECTION HOLD UNTIL CONDITIONS ARE CORRECTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/23/2025 - PREVIOUS INSPECTION NOTES 07/23 25 TPOLACEK*** CONDITIONS OF SITE STILL REMAIN. PERMIT WILL BE PLACED ON PRIORITY 1 UNTIL CONDITIONS ARE CORRECTED. NEXT INSPECTION MONDAY 7/16/2025 - PREVIOUS INSPECTION NOTES ** 07/16/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE TO ALLOW FOR THE STORMWATER TO FLOW WITHOUT OBSTRUCTION ** NEED TO REVOVE ALL CONSTRUCTION MATERIAL OUT OF THE ROW (RIGHT OF WAY) INCLUDING DUMPED CONCRETE AS WELL AS THE CONCRETE DUMPED INSIDE SITE THIS IS AN ILLICIT DISCHARGE ** CLEAN DIRT FROM EDGE OF ROAD ** YOU WILL HAVE 7 DAYS FROM TODAY TO MAKE ALL NECESSARY CORRECTIONS IT ALL ARE NOT COMPLETED BY THE NEXT SCHEDULED INSPECTION YOUR SITE WILL BE PLACED ON AN INSPECTION HOLD UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE AS WELL AS INSPECTIONS WILL BE CONDUCTED DAILY AS WELL ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/23/25
ROW - DRAINAGE 07/29/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 07/29/25 TPOLACEK*** TEMP PIPE IS NOW CLOGGED AGAIN, CONCRETE REMAINS IN ROW AS WELL AS TRASH IN ROW. A STOP WORK ORDER WILL BE PLACED ON SITE IF NOT CORRECTED IN 24HRS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/28/2025 - PREVIOUS INSPECTION NOTES 07/28/25 TPOLACEK*** SITE REMAINS UNCHANGED PRIORITY 1 INSPECTION HOLD UNTIL CONDITIONS ARE CORRECTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/23/2025 - PREVIOUS INSPECTION NOTES 07/23 25 TPOLACEK*** CONDITIONS OF SITE STILL REMAIN. PERMIT WILL BE PLACED ON PRIORITY 1 UNTIL CONDITIONS ARE CORRECTED. NEXT INSPECTION MONDAY 7/16/2025 - PREVIOUS INSPECTION NOTES ** 07/16/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE TO ALLOW FOR THE STORMWATER TO FLOW WITHOUT OBSTRUCTION ** NEED TO REVOVE ALL CONSTRUCTION MATERIAL OUT OF THE ROW (RIGHT OF WAY) INCLUDING DUMPED CONCRETE AS WELL AS THE CONCRETE DUMPED INSIDE SITE THIS IS AN ILLICIT DISCHARGE ** CLEAN DIRT FROM EDGE OF ROAD ** YOU WILL HAVE 7 DAYS FROM TODAY TO MAKE ALL NECESSARY CORRECTIONS IT ALL ARE NOT COMPLETED BY THE NEXT SCHEDULED INSPECTION YOUR SITE WILL BE PLACED ON AN INSPECTION HOLD UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE AS WELL AS INSPECTIONS WILL BE CONDUCTED DAILY AS WELL ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/23/25
ROW - DRAINAGE 07/27/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 07/28/25 TPOLACEK*** SITE REMAINS UNCHANGED PRIORITY 1 INSPECTION HOLD UNTIL CONDITIONS ARE CORRECTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/23/2025 - PREVIOUS INSPECTION NOTES 07/23 25 TPOLACEK*** CONDITIONS OF SITE STILL REMAIN. PERMIT WILL BE PLACED ON PRIORITY 1 UNTIL CONDITIONS ARE CORRECTED. NEXT INSPECTION MONDAY 7/16/2025 - PREVIOUS INSPECTION NOTES ** 07/16/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE TO ALLOW FOR THE STORMWATER TO FLOW WITHOUT OBSTRUCTION ** NEED TO REVOVE ALL CONSTRUCTION MATERIAL OUT OF THE ROW (RIGHT OF WAY) INCLUDING DUMPED CONCRETE AS WELL AS THE CONCRETE DUMPED INSIDE SITE THIS IS AN ILLICIT DISCHARGE ** CLEAN DIRT FROM EDGE OF ROAD ** YOU WILL HAVE 7 DAYS FROM TODAY TO MAKE ALL NECESSARY CORRECTIONS IT ALL ARE NOT COMPLETED BY THE NEXT SCHEDULED INSPECTION YOUR SITE WILL BE PLACED ON AN INSPECTION HOLD UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE AS WELL AS INSPECTIONS WILL BE CONDUCTED DAILY AS WELL ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/23/25
ROOF VALLEY & METAL 07/25/2025 APPROVED CVANSTRAHLEN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/25/2025 Disapproved - NO FEE CVANSTRAHLEN
Note: Please fix items before next inspection #1-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE , incluid trusses layout
WALL SHEATHING 07/23/2025 APPROVED CVANSTRAHLEN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/23/2025 CANCELLED BY APPLICANT WEB
ROW - DRAINAGE 07/23/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 07/23 25 TPOLACEK*** CONDITIONS OF SITE STILL REMAIN. PERMIT WILL BE PLACED ON PRIORITY 1 UNTIL CONDITIONS ARE CORRECTED. NEXT INSPECTION MONDAY 7/16/2025 - PREVIOUS INSPECTION NOTES ** 07/16/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE TO ALLOW FOR THE STORMWATER TO FLOW WITHOUT OBSTRUCTION ** NEED TO REVOVE ALL CONSTRUCTION MATERIAL OUT OF THE ROW (RIGHT OF WAY) INCLUDING DUMPED CONCRETE AS WELL AS THE CONCRETE DUMPED INSIDE SITE THIS IS AN ILLICIT DISCHARGE ** CLEAN DIRT FROM EDGE OF ROAD ** YOU WILL HAVE 7 DAYS FROM TODAY TO MAKE ALL NECESSARY CORRECTIONS IT ALL ARE NOT COMPLETED BY THE NEXT SCHEDULED INSPECTION YOUR SITE WILL BE PLACED ON AN INSPECTION HOLD UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE AS WELL AS INSPECTIONS WILL BE CONDUCTED DAILY AS WELL ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/23/25
TIE BEAM / LINTEL 07/16/2025 APPROVED HCAMACHO
Note: 7/14/2025 - PREVIOUS INSPECTION NOTES Please fix item before enxt inspection #1-FBCR 606.3.1-HEAD AND BED JOINT LIMITS ( mark on page S-4 , please fix under sill plate bed joint limits #2- missing window sill on master bath, plan call for window sill on page S-5 #3- trusses are been delivery before inspection , documents on permit box , not delivery date mark , not wood on materila under trusses for protection for contact with ground ( trusses just lay on ground )
ROW - DRAINAGE 07/16/2025 Disapproved - NO FEE EMADISON
Note: ** 07/16/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE TO ALLOW FOR THE STORMWATER TO FLOW WITHOUT OBSTRUCTION ** NEED TO REVOVE ALL CONSTRUCTION MATERIAL OUT OF THE ROW (RIGHT OF WAY) INCLUDING DUMPED CONCRETE AS WELL AS THE CONCRETE DUMPED INSIDE SITE THIS IS AN ILLICIT DISCHARGE ** CLEAN DIRT FROM EDGE OF ROAD ** YOU WILL HAVE 7 DAYS FROM TODAY TO MAKE ALL NECESSARY CORRECTIONS IT ALL ARE NOT COMPLETED BY THE NEXT SCHEDULED INSPECTION YOUR SITE WILL BE PLACED ON AN INSPECTION HOLD UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE AS WELL AS INSPECTIONS WILL BE CONDUCTED DAILY AS WELL ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/23/25
TIE BEAM / LINTEL 07/14/2025 Disapproved - NO FEE CVANSTRAHLEN
Note: Please fix item before enxt inspection #1-FBCR 606.3.1-HEAD AND BED JOINT LIMITS ( mark on page S-4 , please fix under sill plate bed joint limits #2- missing window sill on master bath, plan call for window sill on page S-5 #3- trusses are been delivery before inspection , documents on permit box , not delivery date mark , not wood on materila under trusses for protection for contact with ground ( trusses just lay on ground )
MONOLITHIC SLAB 07/01/2025 APPROVED CVANSTRAHLEN
FORMBOARD SURVEY (OFFICE USE ONLY) 07/01/2025 APPROVED RRICKS
PLUMBING 1ST ROUGH UNDERGROUND 06/26/2025 APPROVED - AS NOTED MGIBSON
Note: REMOVE ANY AND ALL ROOTS FROM FOOTER AREAS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 06/25/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 06/13/2025 APPROVED CBOWERMASTER
Note: 6/12/2025 7:50:38 AM- PREVIOUS INSPECTION NOTES 6/4/2025 8:04:48 AM- PREVIOUS INSPECTION NOTES Wooded lot Clearing still
WATER METER INSTALLATION REQUEST 06/11/2025 Disapproved -FEE REQUIRED CBOWERMASTER
Note: 6/4/2025 8:04:48 AM- PREVIOUS INSPECTION NOTES Wooded lot Clearing still
WATER METER INSTALLATION REQUEST 06/03/2025 Disapproved -FEE REQUIRED CBOWERMASTER
Note: Wooded lot

Review History

Department Status Date In Date Out
MECH COMPLETE 08/11/2025 08/12/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/01/2025 07/01/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 07/01/2025 07/01/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 06/24/2025 06/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 06/23/2025 06/23/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 05/20/2025 05/20/2025
Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/20/2025 05/21/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 05/20/2025 05/20/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 05/14/2025 05/14/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM No zoning only stormwater changes
SW1 HOLD 05/14/2025 05/19/2025
Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM 1- Front left FL is higher than the PL. 2- In the front yard there must be a 6" fall in the first 10' of the home. 3- There is a flat spot in the back yard. There must be a minumum of 0.1' fall every 20' to ensure there is positve flow.
ENGIN1 COMPLETE 05/14/2025 05/15/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 HOLD 05/13/2025 05/14/2025
Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/13/2025 05/13/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON HOLD 05/13/2025 05/13/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM New Site plan submitted not for this address
SW1 HOLD 04/30/2025 05/05/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM PLEASE EXPLAIN WHY YOU ARE DROPING THE RIGHT OF WAY ELEVATIONS SO MUCH FROM THE GRADE INSIDE THE PROPERTY LINE.
ENGIN1 COMPLETE 04/30/2025 05/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 04/30/2025 05/01/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 04/22/2025 05/08/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 04/21/2025 04/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 04/21/2025 04/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 04/21/2025 04/29/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 04/21/2025 04/25/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/21/2025 04/22/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 04/21/2025 04/24/2025
LOCATE COMPLETE 04/21/2025 04/29/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 04/21/2025 04/24/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 04/21/2025 04/28/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL FRONT PROPERTY LINE / RIGHT OF WAY LINE NEEDS TO BE EQUAL OR GREATER THEN THE EDGE OF PAVEMENT. PLEASE FIX DRAINAGE PLAN SO IT MEETS ALL CITY STANDARDS
ZON COMPLETE 04/21/2025 04/22/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 02/13/2026
REINSPECTION RESIDENTIAL ¤40.00 02/13/2026
REINSPECTION RESIDENTIAL ¤40.00 02/13/2026
REINSPECTION RESIDENTIAL ¤40.00 02/13/2026
REINSPECTION RESIDENTIAL ¤40.00 02/13/2026
REINSPECTION FEE ¤40.00 02/13/2026
REINSPECTION FEE ¤40.00 02/13/2026
RSI REINSPECTION 1 ¤35.00 02/13/2026
RSI REINSPECTION 1 ¤35.00 02/13/2026
RSI REINSPECTION 1 ¤35.00 02/13/2026
SW ENG - INSPECTION 20 ¤20.00 02/13/2026
SW ENG - INSPECTION 20 ¤20.00 02/13/2026
SW ENG - INSPECTION 20 ¤20.00 02/13/2026
SW ENG - INSPECTION 20 ¤20.00 02/13/2026
SW ENG - INSPECTION 20 ¤20.00 02/13/2026
SW ENG - INSPECTION 20 ¤20.00 02/13/2026
SW ENG INSPECTION 80 ¤80.00 05/21/2025
SW ENG PRE APRON ¤30.00 05/21/2025
SW ENG - REVIEW 20 ¤20.00 05/21/2025
SW ENG RES REVIEW 200 ¤200.00 05/21/2025
WASTEWATER PERM INSPECTION ¤80.00 05/21/2025
WASTEWATER PERM REVIEW ¤25.00 05/21/2025
SURCHARGE FS 533.721 ¤8.18 05/21/2025
SURCHARGE - FS 468.631 ¤12.27 05/21/2025
SW ENG - FOUNDATION SURVEY ¤20.00 05/21/2025
WATER PERMIT REVIEW ¤25.00 05/21/2025
ADJUSTMENT 10% (¤90.90) 05/21/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/21/2025
INSPECTION - RESIDENTIAL ¤684.75 05/21/2025
PLAN REVIEW - RESIDENTIAL ¤194.22 05/21/2025
FC IMPACT FEE EMS ¤62.00 05/21/2025
IMPACT FEE FIRE ¤434.51 05/21/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/21/2025
FC IMPACT FEE LIBRARY ¤268.00 05/21/2025
IMPACT FEE PARKS ¤1,828.01 05/21/2025
IMPACT FEE SCHOOL ¤5,450.00 05/21/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 05/21/2025
SITE PLAN 30 ¤30.00 05/21/2025
WATER- TURN ON ¤50.00 05/15/2025
PEP TANK INSTALL ¤756.74 05/15/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,189.82 05/15/2025
WATER MAIN EXTENSION IMPACT ¤854.40 05/15/2025
SEWER CAPITAL FACILITY ¤3,930.70 05/15/2025
WATER CAPITAL FACILITY FEE ¤3,496.74 05/15/2025
WATER METER W/ TAP ¤2,326.93 05/15/2025
Fees Total Due: ¤0.00 Total Paid: ¤25,635.37