Permit #2025041112

Permit Details

Status: COED

Parcel Id: 07-11-31-7011-00010-1170
CONDITIONED SPACE: 1873 sqft
GARAGE: 524 sqft
OPENED PORCH (WITH ROOF) : 249 sqft
Total Square Footage: 2646 sqft
Block: 00010
Subdivision: -
Job Phone: 352-433-8382
Location Address: 140 BELLEAIRE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/18/2025
NOC: RECORDED
Applicant name: ALFREDO E SCHEER
Owner: ESTELA LIVING LLC

Address

2601 S BAYSHORE DR

MIAMI, FL 33133

Lot: 1170
Contracted Stated Job Value: ¤185,000.00
Job Description: Single Family Residence
Type: CN

Contractor

ESTELA LIVING LLC
Status Location Address State License Number Phone
ACTIVE

237 S. DIXIE HWY, 4TH FLOOR

CORAL GABLES, FL 33133

CGC1534535 (Exp: 08/31/2026) 352-433-8382

Sub Contractors

JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
BARRY BRUCE NANNIE
Status Location Address Mailing Address State License Number Phone
HOLD

270 WEST PLANT ST

WINTER GARDEN, FL 34787

#310

WINTER GARDEN, FL 34787

EC13011261 (Exp: 08/31/2026) 407-702-0206
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/16/2026 FINAL APPROVED MKRASKI
ROW - FINAL APRON (AFTER POUR) 01/16/2026 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 01/16/2026 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 01/16/2026 FINAL APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/15/2026 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 01/15/2026 APPROVED - AS NOTED EMADISON
Note: ** 01/15/26 RIGHT SIDE ROADSIDE SWALE NEED TO FILL LOW AREA BEFORE THE CULVERT PIPE
U-CROSS CONNECTION 01/14/2026 APPROVED BWRIGHT
GRAVITY SEWER TEST 11/10/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 THIS WASAVIRTUAL INSPECTION WATER SERVICE NOT RAN YET
SEWER TIE IN 11/10/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2060 THIS WAS AVIRTUAL INSPECTION WATER SERVICE NOT RAN YET
ROW- PRE-APRON (PRE-POUR) 11/03/2025 APPROVED - AS NOTED EMADISON
Note: ** 11/03/25 READY TO POUR ENSURE YOU BACKFILL AOUND FORMS TO CONTAIN CONCRETE WITHIN THE POUR AREA OF ENTIRE DRIVEWAY ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL _____________________________________________________________________________________________________________________ 10/31/2025 - PREVIOUS INSPECTION NOTES 10-31-25 TPOLACEK*** THERE ARE TWO BENCHMARK NAILS IN THE POWER POLE. THEY ARE .120 DIFFERENT. BUILDER MUST HAVE SURVEY COMPANY REMOVE THE BM THAT IS NOT FOR THE PROPERTY. Inspector Notes from Inspection 9470 ** 10/24/25 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY AND WATERWAYS ______________________________________________________________________________________________________________ 10/22/2025 - PREVIOUS INSPECTION NOTES ** 10/22/25 PER G. BERTOLA THIS INSPECTION IS RESCHEDULED FOR FRIDAY 10/24/25 AFTER HE SPOKE WITH THE BUILDER REGARDING THE CORRECTIONS THAT ARE STILL REQUIRED ** THIS INSPECTION SCHEDULED FOR TODAY WILL BE DISAPPROVED WITH NO FEE ** NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/24/25 _______________________________________________________________________________________________________________ 10/21/2025 - PREVIOUS INSPECTION NOTES 10/21/25=According to the conversation we had last week, you should add comments to the applicant notes when you're about to start re-grading the property. I'm moving the inspection to tomorrow, 10/22/25. ============================================================================== 10/20/2025 - PREVIOUS INSPECTION NOTES ** 10/20/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/21/25 _________________________________________________________________________________________________________________ 10/17/2025 - PREVIOUS INSPECTION NOTES ** 10/17/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/20/25 _________________________________________________________________________________________________________________ 10/16/2025 - PREVIOUS INSPECTION NOTES ** 10/16/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/17/25 _________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES ** 10/15/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON 10/14/25 WAS NOT ASSIGNED AND COMPLETED TODAY NO CORRECTIONS MADE ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/16/25 ______________________________________________________________________________________________________________________ 10/10/2025 - PREVIOUS INSPECTION NOTES ** 10/10/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/14/25 ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** FOLLOW UP INSPECTION ON 10/10/25 _____________________________________________________________________________________________________________________ 10/8/2025 - PREVIOUS INSPECTION NOTES 10-08-25 TPOLACEK*** SITE IS IN DEPLORABLE CONDITION. THERE ARE MAJOR WASHOUTS INTO THE SWALE, TRASH AND DEBRIS SCATTERED ABOUT, OVER POUR CONCRETE AROUND ENTIRE SITE, SILT FENCE IS IMPROPERLY INSTALLED AND NOT DUG INTO GROUND AS REQUIRED FOR SEDIMENT CONTROL. THERE IS NO TEMPORARY CULVERT AND SWALE IS OVER FLOWING INTO ROADWAY. INSPECTIONS WILL BE DAILY UNTIL 10-10 WHEN CASE IS TURNED OVER TO CODE ENFORCMENT. =++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/7/2025 - PREVIOUS INSPECTION NOTES ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW- PRE-APRON (PRE-POUR) 10/31/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 10-31-25 TPOLACEK*** THERE ARE TWO BENCHMARK NAILS IN THE POWER POLE. THEY ARE .120 DIFFERENT. BUILDER MUST HAVE SURVEY COMPANY REMOVE THE BM THAT IS NOT FOR THE PROPERTY. Inspector Notes from Inspection 9470 ** 10/24/25 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY AND WATERWAYS ______________________________________________________________________________________________________________ 10/22/2025 - PREVIOUS INSPECTION NOTES ** 10/22/25 PER G. BERTOLA THIS INSPECTION IS RESCHEDULED FOR FRIDAY 10/24/25 AFTER HE SPOKE WITH THE BUILDER REGARDING THE CORRECTIONS THAT ARE STILL REQUIRED ** THIS INSPECTION SCHEDULED FOR TODAY WILL BE DISAPPROVED WITH NO FEE ** NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/24/25 _______________________________________________________________________________________________________________ 10/21/2025 - PREVIOUS INSPECTION NOTES 10/21/25=According to the conversation we had last week, you should add comments to the applicant notes when you're about to start re-grading the property. I'm moving the inspection to tomorrow, 10/22/25. ============================================================================== 10/20/2025 - PREVIOUS INSPECTION NOTES ** 10/20/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/21/25 _________________________________________________________________________________________________________________ 10/17/2025 - PREVIOUS INSPECTION NOTES ** 10/17/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/20/25 _________________________________________________________________________________________________________________ 10/16/2025 - PREVIOUS INSPECTION NOTES ** 10/16/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/17/25 _________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES ** 10/15/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON 10/14/25 WAS NOT ASSIGNED AND COMPLETED TODAY NO CORRECTIONS MADE ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/16/25 ______________________________________________________________________________________________________________________ 10/10/2025 - PREVIOUS INSPECTION NOTES ** 10/10/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/14/25 ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** FOLLOW UP INSPECTION ON 10/10/25 _____________________________________________________________________________________________________________________ 10/8/2025 - PREVIOUS INSPECTION NOTES 10-08-25 TPOLACEK*** SITE IS IN DEPLORABLE CONDITION. THERE ARE MAJOR WASHOUTS INTO THE SWALE, TRASH AND DEBRIS SCATTERED ABOUT, OVER POUR CONCRETE AROUND ENTIRE SITE, SILT FENCE IS IMPROPERLY INSTALLED AND NOT DUG INTO GROUND AS REQUIRED FOR SEDIMENT CONTROL. THERE IS NO TEMPORARY CULVERT AND SWALE IS OVER FLOWING INTO ROADWAY. INSPECTIONS WILL BE DAILY UNTIL 10-10 WHEN CASE IS TURNED OVER TO CODE ENFORCMENT. =++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/7/2025 - PREVIOUS INSPECTION NOTES ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/24/2025 APPROVED - AS NOTED EMADISON
Note: ** 10/24/25 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY AND WATERWAYS ______________________________________________________________________________________________________________ 10/22/2025 - PREVIOUS INSPECTION NOTES ** 10/22/25 PER G. BERTOLA THIS INSPECTION IS RESCHEDULED FOR FRIDAY 10/24/25 AFTER HE SPOKE WITH THE BUILDER REGARDING THE CORRECTIONS THAT ARE STILL REQUIRED ** THIS INSPECTION SCHEDULED FOR TODAY WILL BE DISAPPROVED WITH NO FEE ** NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/24/25 _______________________________________________________________________________________________________________ 10/21/2025 - PREVIOUS INSPECTION NOTES 10/21/25=According to the conversation we had last week, you should add comments to the applicant notes when you're about to start re-grading the property. I'm moving the inspection to tomorrow, 10/22/25. ============================================================================== 10/20/2025 - PREVIOUS INSPECTION NOTES ** 10/20/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/21/25 _________________________________________________________________________________________________________________ 10/17/2025 - PREVIOUS INSPECTION NOTES ** 10/17/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/20/25 _________________________________________________________________________________________________________________ 10/16/2025 - PREVIOUS INSPECTION NOTES ** 10/16/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/17/25 _________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES ** 10/15/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON 10/14/25 WAS NOT ASSIGNED AND COMPLETED TODAY NO CORRECTIONS MADE ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/16/25 ______________________________________________________________________________________________________________________ 10/10/2025 - PREVIOUS INSPECTION NOTES ** 10/10/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/14/25 ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** FOLLOW UP INSPECTION ON 10/10/25 _____________________________________________________________________________________________________________________ 10/8/2025 - PREVIOUS INSPECTION NOTES 10-08-25 TPOLACEK*** SITE IS IN DEPLORABLE CONDITION. THERE ARE MAJOR WASHOUTS INTO THE SWALE, TRASH AND DEBRIS SCATTERED ABOUT, OVER POUR CONCRETE AROUND ENTIRE SITE, SILT FENCE IS IMPROPERLY INSTALLED AND NOT DUG INTO GROUND AS REQUIRED FOR SEDIMENT CONTROL. THERE IS NO TEMPORARY CULVERT AND SWALE IS OVER FLOWING INTO ROADWAY. INSPECTIONS WILL BE DAILY UNTIL 10-10 WHEN CASE IS TURNED OVER TO CODE ENFORCMENT. =++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/7/2025 - PREVIOUS INSPECTION NOTES ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/22/2025 Disapproved - NO FEE EMADISON
Note: ** 10/22/25 PER G. BERTOLA THIS INSPECTION IS RESCHEDULED FOR FRIDAY 10/24/25 AFTER HE SPOKE WITH THE BUILDER REGARDING THE CORRECTIONS THAT ARE STILL REQUIRED ** THIS INSPECTION SCHEDULED FOR TODAY WILL BE DISAPPROVED WITH NO FEE ** NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/24/25 _______________________________________________________________________________________________________________ 10/21/2025 - PREVIOUS INSPECTION NOTES 10/21/25=According to the conversation we had last week, you should add comments to the applicant notes when you're about to start re-grading the property. I'm moving the inspection to tomorrow, 10/22/25. ============================================================================== 10/20/2025 - PREVIOUS INSPECTION NOTES ** 10/20/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/21/25 _________________________________________________________________________________________________________________ 10/17/2025 - PREVIOUS INSPECTION NOTES ** 10/17/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/20/25 _________________________________________________________________________________________________________________ 10/16/2025 - PREVIOUS INSPECTION NOTES ** 10/16/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/17/25 _________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES ** 10/15/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON 10/14/25 WAS NOT ASSIGNED AND COMPLETED TODAY NO CORRECTIONS MADE ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/16/25 ______________________________________________________________________________________________________________________ 10/10/2025 - PREVIOUS INSPECTION NOTES ** 10/10/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/14/25 ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** FOLLOW UP INSPECTION ON 10/10/25 _____________________________________________________________________________________________________________________ 10/8/2025 - PREVIOUS INSPECTION NOTES 10-08-25 TPOLACEK*** SITE IS IN DEPLORABLE CONDITION. THERE ARE MAJOR WASHOUTS INTO THE SWALE, TRASH AND DEBRIS SCATTERED ABOUT, OVER POUR CONCRETE AROUND ENTIRE SITE, SILT FENCE IS IMPROPERLY INSTALLED AND NOT DUG INTO GROUND AS REQUIRED FOR SEDIMENT CONTROL. THERE IS NO TEMPORARY CULVERT AND SWALE IS OVER FLOWING INTO ROADWAY. INSPECTIONS WILL BE DAILY UNTIL 10-10 WHEN CASE IS TURNED OVER TO CODE ENFORCMENT. =++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/7/2025 - PREVIOUS INSPECTION NOTES ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/21/2025 Disapproved - NO FEE GBERTOLA
Note: 10/21/25=According to the conversation we had last week, you should add comments to the applicant notes when you're about to start re-grading the property. I'm moving the inspection to tomorrow, 10/22/25. ============================================================================== 10/20/2025 - PREVIOUS INSPECTION NOTES ** 10/20/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/21/25 _________________________________________________________________________________________________________________ 10/17/2025 - PREVIOUS INSPECTION NOTES ** 10/17/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/20/25 _________________________________________________________________________________________________________________ 10/16/2025 - PREVIOUS INSPECTION NOTES ** 10/16/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/17/25 _________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES ** 10/15/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON 10/14/25 WAS NOT ASSIGNED AND COMPLETED TODAY NO CORRECTIONS MADE ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/16/25 ______________________________________________________________________________________________________________________ 10/10/2025 - PREVIOUS INSPECTION NOTES ** 10/10/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/14/25 ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** FOLLOW UP INSPECTION ON 10/10/25 _____________________________________________________________________________________________________________________ 10/8/2025 - PREVIOUS INSPECTION NOTES 10-08-25 TPOLACEK*** SITE IS IN DEPLORABLE CONDITION. THERE ARE MAJOR WASHOUTS INTO THE SWALE, TRASH AND DEBRIS SCATTERED ABOUT, OVER POUR CONCRETE AROUND ENTIRE SITE, SILT FENCE IS IMPROPERLY INSTALLED AND NOT DUG INTO GROUND AS REQUIRED FOR SEDIMENT CONTROL. THERE IS NO TEMPORARY CULVERT AND SWALE IS OVER FLOWING INTO ROADWAY. INSPECTIONS WILL BE DAILY UNTIL 10-10 WHEN CASE IS TURNED OVER TO CODE ENFORCMENT. =++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/7/2025 - PREVIOUS INSPECTION NOTES ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/20/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/20/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/21/25 _________________________________________________________________________________________________________________ 10/17/2025 - PREVIOUS INSPECTION NOTES ** 10/17/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/20/25 _________________________________________________________________________________________________________________ 10/16/2025 - PREVIOUS INSPECTION NOTES ** 10/16/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/17/25 _________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES ** 10/15/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON 10/14/25 WAS NOT ASSIGNED AND COMPLETED TODAY NO CORRECTIONS MADE ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/16/25 ______________________________________________________________________________________________________________________ 10/10/2025 - PREVIOUS INSPECTION NOTES ** 10/10/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/14/25 ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** FOLLOW UP INSPECTION ON 10/10/25 _____________________________________________________________________________________________________________________ 10/8/2025 - PREVIOUS INSPECTION NOTES 10-08-25 TPOLACEK*** SITE IS IN DEPLORABLE CONDITION. THERE ARE MAJOR WASHOUTS INTO THE SWALE, TRASH AND DEBRIS SCATTERED ABOUT, OVER POUR CONCRETE AROUND ENTIRE SITE, SILT FENCE IS IMPROPERLY INSTALLED AND NOT DUG INTO GROUND AS REQUIRED FOR SEDIMENT CONTROL. THERE IS NO TEMPORARY CULVERT AND SWALE IS OVER FLOWING INTO ROADWAY. INSPECTIONS WILL BE DAILY UNTIL 10-10 WHEN CASE IS TURNED OVER TO CODE ENFORCMENT. =++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/7/2025 - PREVIOUS INSPECTION NOTES ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ELECTRIC - EARLY POWER 10/20/2025 APPROVED - AS NOTED JSTEWART
Note: Authorize release of email.
ROW - DRAINAGE 10/17/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/17/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/20/25 _________________________________________________________________________________________________________________ 10/16/2025 - PREVIOUS INSPECTION NOTES ** 10/16/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/17/25 _________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES ** 10/15/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON 10/14/25 WAS NOT ASSIGNED AND COMPLETED TODAY NO CORRECTIONS MADE ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/16/25 ______________________________________________________________________________________________________________________ 10/10/2025 - PREVIOUS INSPECTION NOTES ** 10/10/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/14/25 ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** FOLLOW UP INSPECTION ON 10/10/25 _____________________________________________________________________________________________________________________ 10/8/2025 - PREVIOUS INSPECTION NOTES 10-08-25 TPOLACEK*** SITE IS IN DEPLORABLE CONDITION. THERE ARE MAJOR WASHOUTS INTO THE SWALE, TRASH AND DEBRIS SCATTERED ABOUT, OVER POUR CONCRETE AROUND ENTIRE SITE, SILT FENCE IS IMPROPERLY INSTALLED AND NOT DUG INTO GROUND AS REQUIRED FOR SEDIMENT CONTROL. THERE IS NO TEMPORARY CULVERT AND SWALE IS OVER FLOWING INTO ROADWAY. INSPECTIONS WILL BE DAILY UNTIL 10-10 WHEN CASE IS TURNED OVER TO CODE ENFORCMENT. =++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/7/2025 - PREVIOUS INSPECTION NOTES ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/16/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/16/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/17/25 _________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES ** 10/15/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON 10/14/25 WAS NOT ASSIGNED AND COMPLETED TODAY NO CORRECTIONS MADE ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/16/25 ______________________________________________________________________________________________________________________ 10/10/2025 - PREVIOUS INSPECTION NOTES ** 10/10/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/14/25 ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** FOLLOW UP INSPECTION ON 10/10/25 _____________________________________________________________________________________________________________________ 10/8/2025 - PREVIOUS INSPECTION NOTES 10-08-25 TPOLACEK*** SITE IS IN DEPLORABLE CONDITION. THERE ARE MAJOR WASHOUTS INTO THE SWALE, TRASH AND DEBRIS SCATTERED ABOUT, OVER POUR CONCRETE AROUND ENTIRE SITE, SILT FENCE IS IMPROPERLY INSTALLED AND NOT DUG INTO GROUND AS REQUIRED FOR SEDIMENT CONTROL. THERE IS NO TEMPORARY CULVERT AND SWALE IS OVER FLOWING INTO ROADWAY. INSPECTIONS WILL BE DAILY UNTIL 10-10 WHEN CASE IS TURNED OVER TO CODE ENFORCMENT. =++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/7/2025 - PREVIOUS INSPECTION NOTES ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/15/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/15/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION INSPECTION THAT WAS TO BE DONE ON 10/14/25 WAS NOT ASSIGNED AND COMPLETED TODAY NO CORRECTIONS MADE ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/16/25 ______________________________________________________________________________________________________________________ 10/10/2025 - PREVIOUS INSPECTION NOTES ** 10/10/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/14/25 ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** FOLLOW UP INSPECTION ON 10/10/25 _____________________________________________________________________________________________________________________ 10/8/2025 - PREVIOUS INSPECTION NOTES 10-08-25 TPOLACEK*** SITE IS IN DEPLORABLE CONDITION. THERE ARE MAJOR WASHOUTS INTO THE SWALE, TRASH AND DEBRIS SCATTERED ABOUT, OVER POUR CONCRETE AROUND ENTIRE SITE, SILT FENCE IS IMPROPERLY INSTALLED AND NOT DUG INTO GROUND AS REQUIRED FOR SEDIMENT CONTROL. THERE IS NO TEMPORARY CULVERT AND SWALE IS OVER FLOWING INTO ROADWAY. INSPECTIONS WILL BE DAILY UNTIL 10-10 WHEN CASE IS TURNED OVER TO CODE ENFORCMENT. =++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/7/2025 - PREVIOUS INSPECTION NOTES ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/10/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/10/25 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS AND PREVIUOS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/14/25 ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** FOLLOW UP INSPECTION ON 10/10/25 _____________________________________________________________________________________________________________________ 10/8/2025 - PREVIOUS INSPECTION NOTES 10-08-25 TPOLACEK*** SITE IS IN DEPLORABLE CONDITION. THERE ARE MAJOR WASHOUTS INTO THE SWALE, TRASH AND DEBRIS SCATTERED ABOUT, OVER POUR CONCRETE AROUND ENTIRE SITE, SILT FENCE IS IMPROPERLY INSTALLED AND NOT DUG INTO GROUND AS REQUIRED FOR SEDIMENT CONTROL. THERE IS NO TEMPORARY CULVERT AND SWALE IS OVER FLOWING INTO ROADWAY. INSPECTIONS WILL BE DAILY UNTIL 10-10 WHEN CASE IS TURNED OVER TO CODE ENFORCMENT. =++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/7/2025 - PREVIOUS INSPECTION NOTES ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/09/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/09/25 THE FOLLOWING CORRECTIONS ARE STILL REQUIRED AS THEY HAVE NOT BEEN ADDRESSED DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** FOLLOW UP INSPECTION ON 10/10/25 _____________________________________________________________________________________________________________________ 10/8/2025 - PREVIOUS INSPECTION NOTES 10-08-25 TPOLACEK*** SITE IS IN DEPLORABLE CONDITION. THERE ARE MAJOR WASHOUTS INTO THE SWALE, TRASH AND DEBRIS SCATTERED ABOUT, OVER POUR CONCRETE AROUND ENTIRE SITE, SILT FENCE IS IMPROPERLY INSTALLED AND NOT DUG INTO GROUND AS REQUIRED FOR SEDIMENT CONTROL. THERE IS NO TEMPORARY CULVERT AND SWALE IS OVER FLOWING INTO ROADWAY. INSPECTIONS WILL BE DAILY UNTIL 10-10 WHEN CASE IS TURNED OVER TO CODE ENFORCMENT. =++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/7/2025 - PREVIOUS INSPECTION NOTES ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/08/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 10-08-25 TPOLACEK*** SITE IS IN DEPLORABLE CONDITION. THERE ARE MAJOR WASHOUTS INTO THE SWALE, TRASH AND DEBRIS SCATTERED ABOUT, OVER POUR CONCRETE AROUND ENTIRE SITE, SILT FENCE IS IMPROPERLY INSTALLED AND NOT DUG INTO GROUND AS REQUIRED FOR SEDIMENT CONTROL. THERE IS NO TEMPORARY CULVERT AND SWALE IS OVER FLOWING INTO ROADWAY. INSPECTIONS WILL BE DAILY UNTIL 10-10 WHEN CASE IS TURNED OVER TO CODE ENFORCMENT. =++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/7/2025 - PREVIOUS INSPECTION NOTES ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/07/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/07/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/08/25 ________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/06/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/06/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS BEING PLACED ON A PRIORITY (1) STATUS INSPECTION HOLD INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE. IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED BY 10/10/25 THIS WILL BE TURNED OVER TO CODE AND THE INSPECTIONS WILL CONTINUE DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/07/25 ________________________________________________________________________________________________________________ 10/3/2025 - PREVIOUS INSPECTION NOTES ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/03/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/03/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/06/25 ________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
ROW - DRAINAGE 10/01/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/01/25 ROW DRAINAGE INSPECTIONS HAVE BEEN IMPOSED ON THIS SITE PREVIOUSLY ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ** BUILDER IS REQUIRED TO OPEN ROAD SIDE SWALE SO THAT STORMWATER WILL FLOW ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE ACROSS FRONT OF SITE TO CONTAIN THE ERRODED SEDIMENT AND MATERIAL ON SITEAND NOT NEGATIVELY IMPACT THE STORMWATER SYSTEM ** BUILDER IS REQUIRED TO REMOVE CONCRETE DUMPED IN THE ROW ** BUILDER REQUIRED TO CLEAN UP SITE OF ALL TRASH AND CONSTRUCTION DEBRIS ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 10/03/25 ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
LATH/BRICK/ WATER BARRIER 09/16/2025 APPROVED FWILLIS
INSULATION 09/12/2025 APPROVED JSTEWART
Note: Inspector Notes from Inspection 2420 1. Please submit a revision of Product approval for windows/doors installed. dont match. FBC (A) 107.4 2. Please repair/add silt fence. FBC 3307.1 & City of palm coast ordinance guidelines. will check at insulation
ALL ROUGH 09/05/2025 APPROVED - AS NOTED JSTEWART
Note: 1. Please submit a revision of Product approval for windows/doors installed. dont match. FBC (A) 107.4 2. Please repair/add silt fence. FBC 3307.1 & City of palm coast ordinance guidelines. will check at insulation
WALL SHEATHING 08/27/2025 FINAL APPROVED FWILLIS
ROOF VALLEY & METAL 08/25/2025 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/22/2025 APPROVED FWILLIS
TIE BEAM / LINTEL 08/13/2025 APPROVED FWILLIS
Note: 8/13/25 TRUSS'S STILL ON THE GROUND. 8/12/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2250 8/1/25 --Trusses are on site. Delivered 7/31/25 and placed on ground
TIE BEAM / LINTEL 08/12/2025 CANCELLED BY APPLICANT FWILLIS
Note: Inspector Notes from Inspection 2250 8/1/25 --Trusses are on site. Delivered 7/31/25 and placed on ground
MONOLITHIC SLAB 08/01/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 8/1/25 --Trusses are on site. Delivered 7/31/25 and placed on ground
ROW - DRAINAGE 07/29/2025 APPROVED - AS NOTED EMADISON
Note: ** 07/29/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _______________________________________________________________________________________________________________________ 7/21/2025 - PREVIOUS INSPECTION NOTES ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
PLUMBING 1ST ROUGH UNDERGROUND 07/28/2025 APPROVED - AS NOTED MGIBSON
Note: WATER SERVICE NOT RAN YET
FORMBOARD SURVEY (OFFICE USE ONLY) 07/25/2025 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 07/25/2025 APPROVED CPISCITELLI
ROW - DRAINAGE 07/21/2025 Disapproved - NO FEE EMADISON
Note: ** 07/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE OR INSTALL A TEMPORARY CULVERT PIPE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OG THE PROPERTY. ** NEED TO ALSO REMOVE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ON JOB SITE ** CLEAN SEDIMENT FROM ROADWAY ** YOU WILL HAVE 7 DAYS TO MAKE ALL REQUIRED (NOTED) CORRECTIONS IF ALL CORRECTIONS ARE NOT MADE THIS PERMIT WILL BE PLACED ON PRIORITY 1 STATUS INSPECTION HOLD UNTILALL CORRECTIONS ARE MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/29/25
WATER METER INSTALLATION REQUEST 07/11/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 09/05/2025 09/08/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 07/25/2025 07/25/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 07/25/2025 07/25/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 07/23/2025 07/25/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 07/22/2025 07/22/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide initial geotech report. A defferred submittal was requested with the permit.
SW1 COMPLETE 06/12/2025 06/16/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved contingent on final survey.
ENGIN1 COMPLETE 06/12/2025 06/13/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 06/12/2025 06/13/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 06/09/2025 06/11/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Along the front property line only one proposed elevation was changed on both sides creating a low spot along the front property line. Please revise elevations along the front property line so it is flat AND water stay contained to the side drainage swales.
ENGIN1 COMPLETE 06/09/2025 06/10/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 06/09/2025 06/09/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 06/04/2025 06/06/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Previous comments not addessed: Proposed flow lines at the front of the property is higher than elevations along the front property line. Please revise
ENGIN1 COMPLETE 06/04/2025 06/05/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 06/04/2025 06/05/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 05/29/2025 06/02/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM When proposing flow lines, they should be proposed lower than adjacent areas to considered flow lines. Please check all proposed flow lines along property lines. Previous comments not addressed: There shall be a minimum fall of 0.5' in the first 10' from the house on the right side. You have a 28.30 going to a 28.00 which does not meet the COPC standards. Additionally, based on the proposed eleavations there is a lot spot at the back right corner of the house due to proposed flow lines being higher than adjacent elevations. As always please feel free to call if there are questions or concerns.
ENGIN1 COMPLETE 05/29/2025 05/30/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 05/29/2025 05/29/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 05/20/2025 05/28/2025
Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM In the back yard on the left side this is only 0.25' (28.30 to 28.05) fall in the first 10' from house. Also on the right side of the home where the drainage swale is proposed there is there needs to be a minimum of 0.5' from the home in the first 10' per Florida Building Code Per COPC Technical Manual when proposing a common swale or interior swale there shall be a minimum of 0.2' fall from the top of the swale to the toe of the slope. On the left property line there is an PL of 27.68' and a flow line of 27.65'. Please revise to meet COPC standards. Proposed elevations along the front yard should higher than the flow lines at the front of the house. This will keep most of the water in the proposed drainage swale and not the entire front yard in a heavy storm.
ENGIN1 COMPLETE 05/20/2025 05/21/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 05/20/2025 05/20/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 05/08/2025 05/14/2025
Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM 1- Along the both side property lines towards the front, please lower "FL" and "B" to match the elevation drop going to the front of the house. 2- Along the front property line match elevations so the drop isn't so drastic. 3- Slopes shall not exceed 4:1 There are several locations on the right property line where the slope is greater from the side property line to the drainage swale. Please indicate how far off the proerty line the proposed drainage swale, this will help indentifying exactly how steep the slope is. Note: Along property lines where there is a common on v swale proposed there shall be a minimum fall of 0.2' between the top of the swale to the toe of the slope. This ensures that water stays contained to this lot.
ENGIN1 COMPLETE 05/08/2025 05/08/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 05/08/2025 05/08/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON COMPLETE 04/30/2025 05/01/2025
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
SW1 HOLD 04/30/2025 05/05/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED MAKE GRADE A "B" DRAINAGE SO MATCHES ADJACENT LOTS GRADES
ENGIN1 COMPLETE 04/30/2025 05/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 04/22/2025 04/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 04/22/2025 04/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 04/22/2025 04/29/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 04/22/2025 04/28/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/22/2025 04/22/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 04/22/2025 04/24/2025
LOCATE COMPLETE 04/22/2025 04/24/2025
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 04/22/2025 04/25/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 04/22/2025 04/29/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Proposed FFE is more than .83' (10") of adjacent lot 118. Please lower FFE to comply with COPC standards.
ZON HOLD 04/22/2025 04/23/2025
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Landscape plan missing 1 tree. ( 1 Tree for every 2,500 SQ. FT>)
SWALE COMPLETE 04/22/2025 05/08/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI REINSPECTION 1 ¤35.00 01/16/2026
RSI REINSPECTION 1 ¤35.00 01/16/2026
RSI REINSPECTION 1 ¤35.00 01/16/2026
RSI REINSPECTION 1 ¤35.00 01/16/2026
RSI REINSPECTION 1 ¤35.00 01/16/2026
RSI REINSPECTION 1 ¤35.00 01/16/2026
RSI REINSPECTION 1 ¤35.00 01/16/2026
RSI REINSPECTION 1 ¤35.00 01/16/2026
RSI REINSPECTION 1 ¤35.00 01/16/2026
RSI REINSPECTION 2 ¤75.00 01/16/2026
SW ENG - INSPECTION 20 ¤20.00 01/16/2026
SW ENG - INSPECTION 20 ¤20.00 01/16/2026
SW ENG - INSPECTION 20 ¤20.00 01/16/2026
SW ENG - INSPECTION 20 ¤20.00 01/16/2026
SW ENG - INSPECTION 20 ¤20.00 01/16/2026
SW ENG - INSPECTION 20 ¤20.00 01/16/2026
SW ENG - INSPECTION 20 ¤20.00 01/16/2026
SW ENG INSPECTION 80 ¤80.00 06/18/2025
SW ENG PRE APRON ¤30.00 06/18/2025
SW ENG - REVIEW 20 ¤20.00 06/18/2025
SW ENG RES REVIEW 200 ¤200.00 06/18/2025
WATER METER W/ TAP ¤2,326.93 06/18/2025
SEWER CREDIT (¤1,147.00) 06/18/2025
WASTEWATER PERM INSPECTION ¤80.00 06/18/2025
WASTEWATER PERM REVIEW ¤25.00 06/18/2025
SEWER CAPITAL FACILITY ¤3,930.70 06/18/2025
WATER CAPITAL FACILITY FEE ¤3,496.74 06/18/2025
WATER PERMIT REVIEW ¤25.00 06/18/2025
WATER MAIN EXTENSION IMPACT ¤854.40 06/18/2025
SITE PLAN 30 ¤30.00 06/18/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,189.82 06/18/2025
SURCHARGE FS 533.721 ¤11.83 06/18/2025
SURCHARGE - FS 468.631 ¤17.75 06/18/2025
SW ENG - FOUNDATION SURVEY ¤20.00 06/18/2025
WATER- TURN ON ¤50.00 06/18/2025
ADJUSTMENT 10% (¤131.49) 06/18/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/18/2025
INSPECTION - RESIDENTIAL ¤1,001.00 06/18/2025
PLAN REVIEW - RESIDENTIAL ¤283.92 06/18/2025
FC IMPACT FEE EMS ¤62.00 06/18/2025
IMPACT FEE FIRE ¤434.51 06/18/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/18/2025
FC IMPACT FEE LIBRARY ¤268.00 06/18/2025
IMPACT FEE PARKS ¤1,828.01 06/18/2025
IMPACT FEE SCHOOL ¤5,450.00 06/18/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 06/18/2025
Fees Total Due: ¤0.00 Total Paid: ¤24,131.12