I want to search for...
Permit #2025041272
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00090-0080 |
| CONDITIONED SPACE: 1809 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 33 sqft |
| Total Square Footage: 2248 sqft |
| Block: 00090 |
| Subdivision: - |
| Job Phone: 239-571-5325 |
| Location Address: 16 PRINCE ERIC LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/16/2025 |
| NOC: RECORDED |
| Applicant name: RYAN SCOTT DAVIS |
| Owner: SYNERGY HOMES LLC |
|
Address 581 NW MERCANTILE PLACE PORT SAINT LUCIE, FL 34986 |
|
Address 106 PORT SAINT LUCIE, FL 34986 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SYNERGY HOMES, LLC
| Status | Location Address | State License Number |
| ACTIVE |
1 HARGROVE GRADE, SUITE B1 PALM COAST, FL 32137 |
CBC1254289 (Exp: 08/31/2026) |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/17/2025 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/17/2025 10:40:35 AM *** 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25: Cancelled by Applicant via text at @ 0718. 11/12/2025 - PREVIOUS INSPECTION NOTES 11/20/25: Cancelled by Applicant via text at @ 0920. 11/7/2025 - PREVIOUS INSPECTION NOTES 11/7/25: Cancelled by Applicant via text at @ 1155. | |||
| BLD - BUILDING FINAL | 11/13/2025 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/13/2025 9:10:55 AM *** 11/13/25: Cancelled by Applicant via text at @ 0718. 11/12/2025 - PREVIOUS INSPECTION NOTES 11/20/25: Cancelled by Applicant via text at @ 0920. 11/7/2025 - PREVIOUS INSPECTION NOTES 11/7/25: Cancelled by Applicant via text at @ 1155. | |||
| BLD - BUILDING FINAL | 11/12/2025 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/12/2025 10:59:43 AM *** Accidentally dated incorrectly. 11/12/25 - actual date. *** NOTES ADDED BY RSIMS 11/12/2025 9:23:20 AM *** 11/20/25: Cancelled by Applicant via text at @ 0920. 11/7/2025 - PREVIOUS INSPECTION NOTES 11/7/25: Cancelled by Applicant via text at @ 1155. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/12/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: 11/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9035 no irr-no cc Water meter pit needs to be located. contact utility -customer-service @palmcoastgov.com to request raise water meter box | |||
| ROW - STORMWATER FINAL | 11/07/2025 | APPROVED | FSLADISH |
| Note: 11/7/25 REQUIRED CULVERT CLEAN OUT COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. AT THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9272 11-04-25 TPOLACEK*** SPOKE WITH CM AND THEY HAVE A VAC TRUCK COMING TO CLEAN PIPE. I WILL APPROVE AFTER POUR AND HOLD THE ROW FINAL UNTIL COMPLETED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 11/07/2025 | Disapproved - NO FEE | BHAINES |
| Note: Inspector Notes from Inspection 9035 no irr-no cc Water meter pit needs to be located. | |||
| BLD - BUILDING FINAL | 11/07/2025 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/7/2025 1:15:15 PM *** 11/7/25: Cancelled by Applicant via text at @ 1155. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/04/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 11-04-25 TPOLACEK*** SPOKE WITH CM AND THEY HAVE A VAC TRUCK COMING TO CLEAN PIPE. I WILL APPROVE AFTER POUR AND HOLD THE ROW FINAL UNTIL COMPLETED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/04/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/04/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 10/08/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. Inspector Notes from Inspection 9470 08/26/25 TPOLACEK*** SOCK INLET PROTECTION INSTALLED. SOCK SEEMS TO BE SOFT AND MAY FAIL. BUILDER WILL NEED TO KEEP AN EYE ON THIS. IF INLET PROTECTION FAILS BUILDER WILL BE REQUIRED TO MAKE CORRECTIONS ASAP. IF SOCK FAILS IT IS RECOMMENDED THAT THE BUILDER INSTALL A SECTION OF SILT FENCE IN ADDITION TO SOCK. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 8/25/2025 - PREVIOUS INSPECTION NOTES 08/25/25 TPOLACEK**** BUILDER STILL NEEDS TO ADD INLET PROTECTION TO DRAIN BOX. BUILDER WILL BE RESPONSIBLE FOR ANY SEDIMENT WASHED INTO DRAIN BOX IMPEDING THE STORMWATER SYSTEM. INSPECTIONS/ ROW SEC 300,03 F3 V-21 3. SEC 300,03 F3 .When necessary, an Erosion Control Inspection (119) will be required if the subject property is adjacent to significantly lower property, such as a ditch, canal, water body or any other stormwater conveyance. A silt fence is required on the downstream end of the swale, at the property line, adjacent to a ditch, to protect a catch basin or stormwater inlet and at the discretion of the Stormwater Inspector. The applicant will be notified if additional Erosion Control Measures are required at the time the permit is issued. Lot clearing cannot begin prior to the permit being issued. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/22/2025 - PREVIOUS INSPECTION NOTES THE CONCRETE IS REMOVED AT THIS TIME YOU STILL NEED TO PLACE SILT FENCE ACROSSED THE FRONT OF LOT PLEASE INSTALL SILT AND LEAVE A ENTERANCE TO YOUR TEMP. CULVERT. WILL BE GIVING YOU TILL MONDAY TO PUT THE SILT FENCE IN THERE IS A INSPECTION HOLD ON THIS PERMIT AT THIS TIME. ------------------------------------------------------------------------------------------ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK*** BUILDER HAS FAILED TO COMPLY WITH THE REQUIRMENTS FOR CONSTRUCTION ENTRANCE. THERE IS ALSO AN ILLICIT DISCHARGE OF CONCRETE OVER POUR IN THE ROW THAT WILL CONTAMINATE THE DRAINAGE SYSTEM IF ALLOWED TO ENTER THE STORMWATER DRAIN BOX. THIS ILLICIT DISCHARGE AND THE FAILURE TO COMPLY RESULT IN A PERMIT HOLD BEING PLACED. IF NOT CORRECTED IN 24 HOURS THERE WILL BE A STOP WORK ORDER PLACED ON SITE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/15/2025 - PREVIOUS INSPECTION NOTES 08/15/25 TPOLACEK*** BUILDER NEEDS TO INSTALL EROSION PROTECTION ACROSS FRONT TO PROTECT THE INLET IN PHOTO ON RIGHT SIDE OF SWALE. FROM POWER POLE TO CONSTRUCTION ENTRANCE. 5 DAYS TO CORRECT DUE TO IMPORTANCE AND IMPENDING WEATHER CONDITIONS | |||
| ELECTRIC - EARLY POWER | 10/07/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 10/7/25 Email sent to FPL | |||
| U-CROSS CONNECTION | 09/18/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cc | |||
| GRAVITY SEWER TEST | 09/17/2025 | APPROVED - AS NOTED | MGIBSON |
| SEWER TIE IN | 09/17/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 09/15/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/15/2025 12:26:51 PM *** Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 9/10/2025 11:17:32 AM *** 9/10/25: 1). All bathroom exhausts need to be re-sealed at the roof deck as mastic has broken free. FBCR M1601.4.1 FBCR M1501.1 2). Dryer exhaust needs to be re-sealed at the roof deck as mastic has broken free. FBCR M1601.4.1 FBCR M1501.1 3). Please repair silt fence along front right side. FBC 3307.1 4). Please provide an undamaged set of plans. FBC-[A]107.3.1 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 9/4/2025 11:51:31 AM *** 9/4/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. Ok to shingle roof. *** Numerous trusses still have dirt cover and/or are covered with an unknown substance. These trusses will need to be thoroughly cleaned so that they can be properly moisture tested. See original notes from Inspection 2460. This will need to be completed prior to scheduling All Rough Inspection. Check at All Rough. Inspector Notes from Inspection 2460 8/29/25 1. Will need a new set of plans on site as the plans are wet from rain 2. Some truss' need to be cleaned and hopefully dried out. We will be checking framing members with moisture meters. | |||
| LATH/BRICK/ WATER BARRIER | 09/15/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/15/2025 12:27:04 PM *** Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 9/10/2025 11:17:32 AM *** 9/10/25: 1). All bathroom exhausts need to be re-sealed at the roof deck as mastic has broken free. FBCR M1601.4.1 FBCR M1501.1 2). Dryer exhaust needs to be re-sealed at the roof deck as mastic has broken free. FBCR M1601.4.1 FBCR M1501.1 3). Please repair silt fence along front right side. FBC 3307.1 4). Please provide an undamaged set of plans. FBC-[A]107.3.1 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 9/4/2025 11:51:31 AM *** 9/4/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. Ok to shingle roof. *** Numerous trusses still have dirt cover and/or are covered with an unknown substance. These trusses will need to be thoroughly cleaned so that they can be properly moisture tested. See original notes from Inspection 2460. This will need to be completed prior to scheduling All Rough Inspection. Check at All Rough. Inspector Notes from Inspection 2460 8/29/25 1. Will need a new set of plans on site as the plans are wet from rain 2. Some truss' need to be cleaned and hopefully dried out. We will be checking framing members with moisture meters. | |||
| ALL ROUGH | 09/10/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/10/2025 11:17:32 AM *** 9/10/25: 1). All bathroom exhausts need to be re-sealed at the roof deck as mastic has broken free. FBCR M1601.4.1 FBCR M1501.1 2). Dryer exhaust needs to be re-sealed at the roof deck as mastic has broken free. FBCR M1601.4.1 FBCR M1501.1 3). Please repair silt fence along front right side. FBC 3307.1 4). Please provide an undamaged set of plans. FBC-[A]107.3.1 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 9/4/2025 11:51:31 AM *** 9/4/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. Ok to shingle roof. *** Numerous trusses still have dirt cover and/or are covered with an unknown substance. These trusses will need to be thoroughly cleaned so that they can be properly moisture tested. See original notes from Inspection 2460. This will need to be completed prior to scheduling All Rough Inspection. Check at All Rough. Inspector Notes from Inspection 2460 8/29/25 1. Will need a new set of plans on site as the plans are wet from rain 2. Some truss' need to be cleaned and hopefully dried out. We will be checking framing members with moisture meters. | |||
| ROOF VALLEY & METAL | 09/04/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/4/2025 11:51:31 AM *** 9/4/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. Ok to shingle roof. *** Numerous trusses still have dirt cover and/or are covered with an unknown substance. These trusses will need to be thoroughly cleaned so that they can be properly moisture tested. See original notes from Inspection 2460. This will need to be completed prior to scheduling All Rough Inspection. Check at All Rough. Inspector Notes from Inspection 2460 8/29/25 1. Will need a new set of plans on site as the plans are wet from rain 2. Some truss' need to be cleaned and hopefully dried out. We will be checking framing members with moisture meters. | |||
| WALL SHEATHING | 08/29/2025 | APPROVED | MCONTRYMAN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/29/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 8/29/25 1. Will need a new set of plans on site as the plans are wet from rain 2. Some truss' need to be cleaned and hopefully dried out. We will be checking framing members with moisture meters | |||
| TIE BEAM / LINTEL | 08/27/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/27/2025 11:32:17 AM *** 8/22/2025 - PREVIOUS INSPECTION NOTES 8/22/25: 1). Back left side: Dowel / Down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4). Marked with Orange paint 2). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 Marked with Orange paint. 3). Down Cells need dirt cleaned out to allow proper fill. FBC-R606.3.5.3 Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 8/15/2025 12:35:04 PM *** 8/15/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and in accordance with FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 8/13/2025 - PREVIOUS INSPECTION NOTES 8/13/25: 1). Slab thicness in the whole middle area does not meet the minimum 3-1/2" depth required. FBC R506.1 > Garage floor specifies 4" thick on plans. (Does not appear to meet requirement. Please run string lines for confirmation). 2). Left front area and back left side footers have some minor dirt cave in that needs to be cleaned out. FBC [A]107.4 | |||
| ROW - DRAINAGE | 08/26/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 08/26/25 TPOLACEK*** SOCK INLET PROTECTION INSTALLED. SOCK SEEMS TO BE SOFT AND MAY FAIL. BUILDER WILL NEED TO KEEP AN EYE ON THIS. IF INLET PROTECTION FAILS BUILDER WILL BE REQUIRED TO MAKE CORRECTIONS ASAP. IF SOCK FAILS IT IS RECOMMENDED THAT THE BUILDER INSTALL A SECTION OF SILT FENCE IN ADDITION TO SOCK. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 8/25/2025 - PREVIOUS INSPECTION NOTES 08/25/25 TPOLACEK**** BUILDER STILL NEEDS TO ADD INLET PROTECTION TO DRAIN BOX. BUILDER WILL BE RESPONSIBLE FOR ANY SEDIMENT WASHED INTO DRAIN BOX IMPEDING THE STORMWATER SYSTEM. INSPECTIONS/ ROW SEC 300,03 F3 V-21 3. SEC 300,03 F3 .When necessary, an Erosion Control Inspection (119) will be required if the subject property is adjacent to significantly lower property, such as a ditch, canal, water body or any other stormwater conveyance. A silt fence is required on the downstream end of the swale, at the property line, adjacent to a ditch, to protect a catch basin or stormwater inlet and at the discretion of the Stormwater Inspector. The applicant will be notified if additional Erosion Control Measures are required at the time the permit is issued. Lot clearing cannot begin prior to the permit being issued. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/22/2025 - PREVIOUS INSPECTION NOTES THE CONCRETE IS REMOVED AT THIS TIME YOU STILL NEED TO PLACE SILT FENCE ACROSSED THE FRONT OF LOT PLEASE INSTALL SILT AND LEAVE A ENTERANCE TO YOUR TEMP. CULVERT. WILL BE GIVING YOU TILL MONDAY TO PUT THE SILT FENCE IN THERE IS A INSPECTION HOLD ON THIS PERMIT AT THIS TIME. ------------------------------------------------------------------------------------------ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK*** BUILDER HAS FAILED TO COMPLY WITH THE REQUIRMENTS FOR CONSTRUCTION ENTRANCE. THERE IS ALSO AN ILLICIT DISCHARGE OF CONCRETE OVER POUR IN THE ROW THAT WILL CONTAMINATE THE DRAINAGE SYSTEM IF ALLOWED TO ENTER THE STORMWATER DRAIN BOX. THIS ILLICIT DISCHARGE AND THE FAILURE TO COMPLY RESULT IN A PERMIT HOLD BEING PLACED. IF NOT CORRECTED IN 24 HOURS THERE WILL BE A STOP WORK ORDER PLACED ON SITE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/15/2025 - PREVIOUS INSPECTION NOTES 08/15/25 TPOLACEK*** BUILDER NEEDS TO INSTALL EROSION PROTECTION ACROSS FRONT TO PROTECT THE INLET IN PHOTO ON RIGHT SIDE OF SWALE. FROM POWER POLE TO CONSTRUCTION ENTRANCE. 5 DAYS TO CORRECT DUE TO IMPORTANCE AND IMPENDING WEATHER CONDITIONS | |||
| ROW - DRAINAGE | 08/25/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 08/25/25 TPOLACEK**** BUILDER STILL NEEDS TO ADD INLET PROTECTION TO DRAIN BOX. BUILDER WILL BE RESPONSIBLE FOR ANY SEDIMENT WASHED INTO DRAIN BOX IMPEDING THE STORMWATER SYSTEM. INSPECTIONS/ ROW SEC 300,03 F3 V-21 3. SEC 300,03 F3 .When necessary, an Erosion Control Inspection (119) will be required if the subject property is adjacent to significantly lower property, such as a ditch, canal, water body or any other stormwater conveyance. A silt fence is required on the downstream end of the swale, at the property line, adjacent to a ditch, to protect a catch basin or stormwater inlet and at the discretion of the Stormwater Inspector. The applicant will be notified if additional Erosion Control Measures are required at the time the permit is issued. Lot clearing cannot begin prior to the permit being issued. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/22/2025 - PREVIOUS INSPECTION NOTES THE CONCRETE IS REMOVED AT THIS TIME YOU STILL NEED TO PLACE SILT FENCE ACROSSED THE FRONT OF LOT PLEASE INSTALL SILT AND LEAVE A ENTERANCE TO YOUR TEMP. CULVERT. WILL BE GIVING YOU TILL MONDAY TO PUT THE SILT FENCE IN THERE IS A INSPECTION HOLD ON THIS PERMIT AT THIS TIME. ------------------------------------------------------------------------------------------ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK*** BUILDER HAS FAILED TO COMPLY WITH THE REQUIRMENTS FOR CONSTRUCTION ENTRANCE. THERE IS ALSO AN ILLICIT DISCHARGE OF CONCRETE OVER POUR IN THE ROW THAT WILL CONTAMINATE THE DRAINAGE SYSTEM IF ALLOWED TO ENTER THE STORMWATER DRAIN BOX. THIS ILLICIT DISCHARGE AND THE FAILURE TO COMPLY RESULT IN A PERMIT HOLD BEING PLACED. IF NOT CORRECTED IN 24 HOURS THERE WILL BE A STOP WORK ORDER PLACED ON SITE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/15/2025 - PREVIOUS INSPECTION NOTES 08/15/25 TPOLACEK*** BUILDER NEEDS TO INSTALL EROSION PROTECTION ACROSS FRONT TO PROTECT THE INLET IN PHOTO ON RIGHT SIDE OF SWALE. FROM POWER POLE TO CONSTRUCTION ENTRANCE. 5 DAYS TO CORRECT DUE TO IMPORTANCE AND IMPENDING WEATHER CONDITIONS | |||
| ROW - DRAINAGE | 08/22/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE CONCRETE IS REMOVED AT THIS TIME YOU STILL NEED TO PLACE SILT FENCE ACROSSED THE FRONT OF LOT PLEASE INSTALL SILT AND LEAVE A ENTERANCE TO YOUR TEMP. CULVERT. WILL BE GIVING YOU TILL MONDAY TO PUT THE SILT FENCE IN THERE IS A INSPECTION HOLD ON THIS PERMIT AT THIS TIME. ------------------------------------------------------------------------------------------ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK*** BUILDER HAS FAILED TO COMPLY WITH THE REQUIRMENTS FOR CONSTRUCTION ENTRANCE. THERE IS ALSO AN ILLICIT DISCHARGE OF CONCRETE OVER POUR IN THE ROW THAT WILL CONTAMINATE THE DRAINAGE SYSTEM IF ALLOWED TO ENTER THE STORMWATER DRAIN BOX. THIS ILLICIT DISCHARGE AND THE FAILURE TO COMPLY RESULT IN A PERMIT HOLD BEING PLACED. IF NOT CORRECTED IN 24 HOURS THERE WILL BE A STOP WORK ORDER PLACED ON SITE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/15/2025 - PREVIOUS INSPECTION NOTES 08/15/25 TPOLACEK*** BUILDER NEEDS TO INSTALL EROSION PROTECTION ACROSS FRONT TO PROTECT THE INLET IN PHOTO ON RIGHT SIDE OF SWALE. FROM POWER POLE TO CONSTRUCTION ENTRANCE. 5 DAYS TO CORRECT DUE TO IMPORTANCE AND IMPENDING WEATHER CONDITIONS | |||
| TIE BEAM / LINTEL | 08/22/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/22/2025 11:07:09 AM *** 8/22/25: 1). Back left side: Dowel / Down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4). Marked with Orange paint 2). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 Marked with Orange paint. 3). Down Cells need dirt cleaned out to allow proper fill. FBC-R606.3.5.3 Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 8/15/2025 12:35:04 PM *** 8/15/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and in accordance with FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 8/13/2025 - PREVIOUS INSPECTION NOTES 8/13/25: 1). Slab thicness in the whole middle area does not meet the minimum 3-1/2" depth required. FBC R506.1 > Garage floor specifies 4" thick on plans. (Does not appear to meet requirement. Please run string lines for confirmation). 2). Left front area and back left side footers have some minor dirt cave in that needs to be cleaned out. FBC [A]107.4 | |||
| ROW - DRAINAGE | 08/20/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 08/20/25 TPOLACEK*** BUILDER HAS FAILED TO COMPLY WITH THE REQUIRMENTS FOR CONSTRUCTION ENTRANCE. THERE IS ALSO AN ILLICIT DISCHARGE OF CONCRETE OVER POUR IN THE ROW THAT WILL CONTAMINATE THE DRAINAGE SYSTEM IF ALLOWED TO ENTER THE STORMWATER DRAIN BOX. THIS ILLICIT DISCHARGE AND THE FAILURE TO COMPLY RESULT IN A PERMIT HOLD BEING PLACED. IF NOT CORRECTED IN 24 HOURS THERE WILL BE A STOP WORK ORDER PLACED ON SITE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/15/2025 - PREVIOUS INSPECTION NOTES 08/15/25 TPOLACEK*** BUILDER NEEDS TO INSTALL EROSION PROTECTION ACROSS FRONT TO PROTECT THE INLET IN PHOTO ON RIGHT SIDE OF SWALE. FROM POWER POLE TO CONSTRUCTION ENTRANCE. 5 DAYS TO CORRECT DUE TO IMPORTANCE AND IMPENDING WEATHER CONDITIONS | |||
| ROW - DRAINAGE | 08/15/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 08/15/25 TPOLACEK*** BUILDER NEEDS TO INSTALL EROSION PROTECTION ACROSS FRONT TO PROTECT THE INLET IN PHOTO ON RIGHT SIDE OF SWALE. FROM POWER POLE TO CONSTRUCTION ENTRANCE. 5 DAYS TO CORRECT DUE TO IMPORTANCE AND IMPENDING WEATHER CONDITIONS | |||
| MONOLITHIC SLAB | 08/15/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/15/2025 12:35:04 PM *** 8/15/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and in accordance with FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 8/13/2025 - PREVIOUS INSPECTION NOTES 8/13/25: 1). Slab thicness in the whole middle area does not meet the minimum 3-1/2" depth required. FBC R506.1 > Garage floor specifies 4" thick on plans. (Does not appear to meet requirement. Please run string lines for confirmation). 2). Left front area and back left side footers have some minor dirt cave in that needs to be cleaned out. FBC [A]107.4 | |||
| MONOLITHIC SLAB | 08/13/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/13/2025 2:19:14 PM *** 8/13/25: 1). Slab thicness in the whole middle area does not meet the minimum 3-1/2" depth required. FBC R506.1 > Garage floor specifies 4" thick on plans. (Does not appear to meet requirement. Please run string lines for confirmation). 2). Left front area and back left side footers have some minor dirt cave in that needs to be cleaned out. FBC [A]107.4 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/11/2025 | APPROVED | MGIBSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 08/04/2025 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 07/31/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 07/14/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 08/01/2025 | 08/04/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/01/2025 | 08/01/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/31/2025 | 07/31/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/08/2025 | 05/08/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/08/2025 | 05/15/2025 |
| Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/08/2025 | 05/08/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/24/2025 | 04/29/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/24/2025 | 04/29/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/24/2025 | 04/29/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/24/2025 | 04/28/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/24/2025 | 04/24/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/24/2025 | 04/25/2025 |
| LOCATE | COMPLETE | 04/24/2025 | 04/24/2025 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/24/2025 | 04/28/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/24/2025 | 05/02/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Based on the information provided but adjacent lots are draining to front. Please change drainage to an A drainage. | |||
| ZON | HOLD | 04/24/2025 | 04/24/2025 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Site plan missing size of walkway. | |||
| SWALE | COMPLETE | 04/24/2025 | 05/12/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/10/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/10/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/10/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/10/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/10/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/16/2025 |
| SW ENG PRE APRON | ¤30.00 | 05/16/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/16/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/16/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 05/16/2025 |
| SEWER CREDIT | (¤2,465.75) | 05/16/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 05/16/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 05/16/2025 |
| SEWER CAPITAL FACILITY | ¤3,930.70 | 05/16/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,496.74 | 05/16/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 05/16/2025 |
| WATER MAIN EXTENSION IMPACT | ¤854.40 | 05/16/2025 |
| SITE PLAN 30 | ¤30.00 | 05/16/2025 |
| WATER- TURN ON | ¤50.00 | 05/16/2025 |
| ADJUSTMENT 10% | (¤120.20) | 05/16/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/16/2025 |
| INSPECTION - RESIDENTIAL | ¤913.00 | 05/16/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤258.96 | 05/16/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 05/16/2025 |
| IMPACT FEE FIRE | ¤434.51 | 05/16/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/16/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/16/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 05/16/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/16/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 05/16/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,189.82 | 05/16/2025 |
| SURCHARGE FS 533.721 | ¤10.82 | 05/16/2025 |
| SURCHARGE - FS 468.631 | ¤16.23 | 05/16/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/16/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,278.17 |