I want to search for...
Permit #2025041531
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00860-0070 |
| GARAGE: 434 sqft |
| SCREEN PORCH (SOLID ROOF) : 132 sqft |
| CONDITIONED SPACE: 1800 sqft |
| SCREEN PORCH (SOLID ROOF) : 108 sqft |
| Total Square Footage: 2474 sqft |
| Block: 00860 |
| Subdivision: - |
| Job Phone: 832-726-2202 |
| Location Address: 97 ROBINSON DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/13/2025 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: CASPIAN A2Z LLC |
|
Address 1802 N ALAFAYA TRL ORLANDO, FL 32826 |
|
Address SUITE 164 ORLANDO, FL 32826 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
MOISES MERINO DIAZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3104 ORANOLE ROAD ORLANDO, FL 32810 |
CAC1820980 (Exp: 08/31/2026) | 407-225-3149 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/31/2025 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 12/17/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, No IRR. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/17/2025 | FINAL APPROVED | BHAINES |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/09/2025 | APPROVED | TPOLACEK |
| Note: 11/20/2025 - PREVIOUS INSPECTION NOTES 11-20-25 TPOLACEK*** LEFT SIDE PROPERTY LINE MUST BE GRADED TO A 4:1 SLOPE AS REQUIRED BY COPC TECH MANUAL Building Residential Final Survey Plan Reviews Technical Manual Section 300.01 (C) (8) (V-16) The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation.(L) Technical Manual Section 300.01 (C) (8) (V-16) | |||
| ROW - STORMWATER FINAL | 12/09/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 12/09/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/20/2025 | APPROVED | TPOLACEK |
| Note: 11/13/2025 - PREVIOUS INSPECTION NOTES 11-13-25 TPOLACEK*** FINAL SURVEY MUST INDICATE THE TYPE OF CONSTRUCTION TO DETERMINE THE PROPER THE FALL FROM FFE TO OUTSIDE ELEVATION. D.Florida Building Code, Residential, Chapter 4, R404.1.6 Chapter 4, R404.1.6 Chapter 4, R404.1.6- Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. (D) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/20/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11-20-25 TPOLACEK*** LEFT SIDE PROPERTY LINE MUST BE GRADED TO A 4:1 SLOPE AS REQUIRED BY COPC TECH MANUAL Building Residential Final Survey Plan Reviews Technical Manual Section 300.01 (C) (8) (V-16) The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation.(L) Technical Manual Section 300.01 (C) (8) (V-16) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/13/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 11-13-25 TPOLACEK*** FINAL SURVEY MUST INDICATE THE TYPE OF CONSTRUCTION TO DETERMINE THE PROPER THE FALL FROM FFE TO OUTSIDE ELEVATION. D.Florida Building Code, Residential, Chapter 4, R404.1.6 Chapter 4, R404.1.6 Chapter 4, R404.1.6- Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. (D) | |||
| ROW- PRE-APRON (PRE-POUR) | 10/06/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. | |||
| ELECTRIC - EARLY POWER | 09/12/2025 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 08/11/2025 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 08/01/2025 | Approval - Private Provider | PPROVIDER |
| INSULATION | 07/31/2025 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 07/24/2025 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 07/21/2025 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 07/16/2025 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 07/15/2025 | CANCELLED BY INSPECTOR | PPROVIDER |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 07/14/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| WALL SHEATHING | 07/09/2025 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/09/2025 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 07/03/2025 | Approval - Private Provider | PPROVIDER |
| Note: 7/2/2025 8:42:45 AM- PREVIOUS INSPECTION NOTES 7/1/2025 4:57:00 PM- PREVIOUS INSPECTION NOTES | |||
| TIE BEAM / LINTEL | 07/02/2025 | CANCELLED BY APPLICANT | PPROVIDER |
| Note: 7/1/2025 4:57:00 PM- PREVIOUS INSPECTION NOTES | |||
| TIE BEAM / LINTEL | 07/01/2025 | CANCELLED BY APPLICANT | PPROVIDER |
| MONOLITHIC SLAB | 06/20/2025 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/16/2025 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/11/2025 | APPROVED | JMUNSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 06/06/2025 | APPROVED | AMOBLEY |
| WATER METER INSTALLATION REQUEST | 05/29/2025 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 05/06/2025 | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/30/2025 | 09/30/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/30/2025 | 09/30/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/30/2025 | 09/30/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/26/2025 | 09/29/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading comments: Benchmarks do not match approved site plan and formboard survey by 0.2'. Benchmark shall be maintained throughtout construction cycle. Please call me if there are any issues or concerns. | |||
| ZON | COMPLETE | 09/26/2025 | 09/26/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/02/2025 | 07/02/2025 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM was submitted twice | |||
| BLD | COMPLETE | 06/06/2025 | 06/11/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/05/2025 | 06/06/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/05/2025 | 06/06/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | CANCEL | 05/09/2025 | 05/09/2025 |
| ENGIN1 | CANCEL | 05/09/2025 | 05/09/2025 |
| ZON | CANCEL | 05/09/2025 | 05/09/2025 |
| ENGIN1 | COMPLETE | 05/09/2025 | 05/12/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/09/2025 | 05/12/2025 |
| Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/09/2025 | 05/12/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/08/2025 | 05/09/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/08/2025 | 05/09/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/08/2025 | 05/09/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/08/2025 | 05/09/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM AS STATED IN LAST REVIEW BENCH MARK CAN NOT BE IN THE PAVEMENT. PER CITY CODE THAT STATES An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. | |||
| PLENV | COMPLETE | 05/06/2025 | 05/06/2025 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 05/06/2025 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| SWALE | COMPLETE | 05/02/2025 | 05/09/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| PLENV | HOLD | 04/30/2025 | 05/06/2025 |
| Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 05/06/2025 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| BADMIN | HOLD | 04/29/2025 | 04/29/2025 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM the private provider stamp must be on all docs. Ex: roofing worksheet, product sheet, etc | |||
| CUSVC | COMPLETE | 04/29/2025 | 05/07/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/29/2025 | 05/02/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/29/2025 | 05/05/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/29/2025 | 05/05/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE ,30 TO THE TOP OF THE DRINAGE PATTERN TO THE TOE OF THE DRINAGE PATTERN PER CITY CODE 300.01 D(6) BENCHMARK CAN NOT BE IN THE PAVEMENT PER CITY CODE 300.01 B(9) YOU CAN NOT CHANGE THE BACK PROPERTY LINE ELEVATIONS NO MORE THEN .10. | |||
| ZON | HOLD | 04/29/2025 | 04/29/2025 |
| Note: Held By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM 1. Site Plan is missing driveway width. 2. On Landscape Plan, missing the rear shrubs wrapping the back corner of the house on the street side. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 12/18/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,189.82 | 05/13/2025 |
| SURCHARGE FS 533.721 | ¤2.52 | 05/13/2025 |
| SURCHARGE - FS 468.631 | ¤3.78 | 05/13/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/13/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/13/2025 |
| SW ENG PRE APRON | ¤30.00 | 05/13/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/13/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/13/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 05/13/2025 |
| SEWER CREDIT | (¤1,146.39) | 05/13/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 05/13/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 05/13/2025 |
| SEWER CAPITAL FACILITY | ¤3,930.70 | 05/13/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,496.74 | 05/13/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 05/13/2025 |
| WATER MAIN EXTENSION IMPACT | ¤854.40 | 05/13/2025 |
| SITE PLAN 30 | ¤30.00 | 05/13/2025 |
| WATER- TURN ON | ¤50.00 | 05/13/2025 |
| ADJUSTMENT 10% | (¤3.00) | 05/13/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/13/2025 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 05/13/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 05/13/2025 |
| IMPACT FEE FIRE | ¤434.51 | 05/13/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/13/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/13/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 05/13/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/13/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 05/13/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,682.02 |