Permit #2025041568

Permit Details

Status: COED

Parcel Id: 07-11-31-7033-00090-0080
GARAGE: 434 sqft
OPENED PORCH (WITH ROOF) : 108 sqft
CONDITIONED SPACE: 1800 sqft
OPENED PORCH (WITH ROOF) : 132 sqft
Total Square Footage: 2474 sqft
Block: 00090
Subdivision: -
Job Phone: 832-726-2202
Location Address: 27 RED MILL DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/13/2025
NOC: RECORDED
Applicant name: JONATHON AMBAR
Owner: CASPIAN A2Z LLC

Address

1802 N ALAFAYA TRL

ORLANDO, FL 32826

Address

SUITE 164

ORLANDO, FL 32826

Lot: 0080
Contracted Stated Job Value: ¤140,000.00
Job Description: Single Family Residence
Type: CN

Contractor

CASPIAN HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

SUITE 162

ORLANDO, FL 32826

CBC1264918 (Exp: 08/31/2026) 832-726-2202

Sub Contractors

MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/26/2025 Approval - Private Provider PPROVIDER
ROW - FINAL APRON (AFTER POUR) 11/17/2025 APPROVED FSLADISH
Note: 11/17/25 AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U-CROSS CONNECTION 11/17/2025 APPROVED BWRIGHT
ROW - STORMWATER FINAL 11/17/2025 APPROVED FSLADISH
Note: 11/17/25 AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 11/17/2025 FINAL APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/14/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 11/14/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
GRAVITY SEWER TEST 10/02/2025 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 09/30/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW - DRAINAGE 09/29/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/22/2025 - PREVIOUS INSPECTION NOTES 9/22/25 PLEASE REPAIR/RESET ANY DOWN OR DAMAGED SILT FENCE. REINSPECTION FOR COMPLIANCE ON 9/ 29/25 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 09-18-25 TPOLACEK*** BUILDER SHALL MAKE SURE TO PUMP ANY WATER OUT OF POUR AREA BEFORE POURING DRIVEWAY. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 8/18/2025 - PREVIOUS INSPECTION NOTES 8/18/25 YOUR TEMP PIPE IS CLOGGED. YOU HAVE TRASH ON SITE. YOUR SILT FENCE IS DOWN. SPOKE TO TOM AND HE SAID HE SPOKE WITH RICH THE GRADER AND HE WAS GOING TO GET OVER THERE TODAY TO GET SITE BACK IN COMPLIANCE. SEE PHOTO FOR REFERENCE. 8/14/2025 - PREVIOUS INSPECTION NOTES 08/14/25 TPOLACEK*** NO CHANGES TO SITE NEXT INSPECTION MONDAY 08/18 PERMIT WILL BE PLACED ON HOLD IF NOT CORRECTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/7/2025 - PREVIOUS INSPECTION NOTES 08/07/25 TPOLACEK*** PORTA POTTY HAS BEEN MOVED. AFTER SEVERE STORM ON TUESDAY TEMPORARY PIPE HAS WASHED IN AND IS ALMOST COMPLETELY CLOGGED PLEASE REESTABLISH TEMP CULVERT. I WILL PARTIALLY APPROVE THE DRAINAGE AS YOU DID AS REQUESTED HOWEVER SINCE THE LAST INSPECTION AS STATED WE HAD A BAD STORM. BUILDER SHOULD CHECK SITES AFTER STORMS TO ENSURE ALL EROSION AND SEDIMENT CONTROL DEVICES ARE STILL WORKING PROPERLY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/31/2025 - PREVIOUS INSPECTION NOTES 07/31/25 TPOLACEK**** BUILDER NEEDS TO REMOVE PORTA POTTY FROM ROW/SWALE. 7 DAYS
ROW - DRAINAGE 09/22/2025 Disapproved - NO FEE FSLADISH
Note: 9/22/25 PLEASE REPAIR/RESET ANY DOWN OR DAMAGED SILT FENCE. REINSPECTION FOR COMPLIANCE ON 9/ 29/25 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 09-18-25 TPOLACEK*** BUILDER SHALL MAKE SURE TO PUMP ANY WATER OUT OF POUR AREA BEFORE POURING DRIVEWAY. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 8/18/2025 - PREVIOUS INSPECTION NOTES 8/18/25 YOUR TEMP PIPE IS CLOGGED. YOU HAVE TRASH ON SITE. YOUR SILT FENCE IS DOWN. SPOKE TO TOM AND HE SAID HE SPOKE WITH RICH THE GRADER AND HE WAS GOING TO GET OVER THERE TODAY TO GET SITE BACK IN COMPLIANCE. SEE PHOTO FOR REFERENCE. 8/14/2025 - PREVIOUS INSPECTION NOTES 08/14/25 TPOLACEK*** NO CHANGES TO SITE NEXT INSPECTION MONDAY 08/18 PERMIT WILL BE PLACED ON HOLD IF NOT CORRECTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/7/2025 - PREVIOUS INSPECTION NOTES 08/07/25 TPOLACEK*** PORTA POTTY HAS BEEN MOVED. AFTER SEVERE STORM ON TUESDAY TEMPORARY PIPE HAS WASHED IN AND IS ALMOST COMPLETELY CLOGGED PLEASE REESTABLISH TEMP CULVERT. I WILL PARTIALLY APPROVE THE DRAINAGE AS YOU DID AS REQUESTED HOWEVER SINCE THE LAST INSPECTION AS STATED WE HAD A BAD STORM. BUILDER SHOULD CHECK SITES AFTER STORMS TO ENSURE ALL EROSION AND SEDIMENT CONTROL DEVICES ARE STILL WORKING PROPERLY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/31/2025 - PREVIOUS INSPECTION NOTES 07/31/25 TPOLACEK**** BUILDER NEEDS TO REMOVE PORTA POTTY FROM ROW/SWALE. 7 DAYS
ROW- PRE-APRON (PRE-POUR) 09/18/2025 APPROVED - AS NOTED TPOLACEK
Note: 09-18-25 TPOLACEK*** BUILDER SHALL MAKE SURE TO PUMP ANY WATER OUT OF POUR AREA BEFORE POURING DRIVEWAY. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
ELECTRIC - EARLY POWER 09/16/2025 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 09/12/2025 APPROVED CBOWERMASTER
ROW - DRAINAGE 08/18/2025 Disapproved - NO FEE FSLADISH
Note: 8/18/25 YOUR TEMP PIPE IS CLOGGED. YOU HAVE TRASH ON SITE. YOUR SILT FENCE IS DOWN. SPOKE TO TOM AND HE SAID HE SPOKE WITH RICH THE GRADER AND HE WAS GOING TO GET OVER THERE TODAY TO GET SITE BACK IN COMPLIANCE. SEE PHOTO FOR REFERENCE. 8/14/2025 - PREVIOUS INSPECTION NOTES 08/14/25 TPOLACEK*** NO CHANGES TO SITE NEXT INSPECTION MONDAY 08/18 PERMIT WILL BE PLACED ON HOLD IF NOT CORRECTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/7/2025 - PREVIOUS INSPECTION NOTES 08/07/25 TPOLACEK*** PORTA POTTY HAS BEEN MOVED. AFTER SEVERE STORM ON TUESDAY TEMPORARY PIPE HAS WASHED IN AND IS ALMOST COMPLETELY CLOGGED PLEASE REESTABLISH TEMP CULVERT. I WILL PARTIALLY APPROVE THE DRAINAGE AS YOU DID AS REQUESTED HOWEVER SINCE THE LAST INSPECTION AS STATED WE HAD A BAD STORM. BUILDER SHOULD CHECK SITES AFTER STORMS TO ENSURE ALL EROSION AND SEDIMENT CONTROL DEVICES ARE STILL WORKING PROPERLY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/31/2025 - PREVIOUS INSPECTION NOTES 07/31/25 TPOLACEK**** BUILDER NEEDS TO REMOVE PORTA POTTY FROM ROW/SWALE. 7 DAYS
ROW - DRAINAGE 08/14/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 08/14/25 TPOLACEK*** NO CHANGES TO SITE NEXT INSPECTION MONDAY 08/18 PERMIT WILL BE PLACED ON HOLD IF NOT CORRECTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/7/2025 - PREVIOUS INSPECTION NOTES 08/07/25 TPOLACEK*** PORTA POTTY HAS BEEN MOVED. AFTER SEVERE STORM ON TUESDAY TEMPORARY PIPE HAS WASHED IN AND IS ALMOST COMPLETELY CLOGGED PLEASE REESTABLISH TEMP CULVERT. I WILL PARTIALLY APPROVE THE DRAINAGE AS YOU DID AS REQUESTED HOWEVER SINCE THE LAST INSPECTION AS STATED WE HAD A BAD STORM. BUILDER SHOULD CHECK SITES AFTER STORMS TO ENSURE ALL EROSION AND SEDIMENT CONTROL DEVICES ARE STILL WORKING PROPERLY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/31/2025 - PREVIOUS INSPECTION NOTES 07/31/25 TPOLACEK**** BUILDER NEEDS TO REMOVE PORTA POTTY FROM ROW/SWALE. 7 DAYS
ELECTRIC-TUG 08/11/2025 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 08/07/2025 PARTIALLY APPROVED TPOLACEK
Note: 08/07/25 TPOLACEK*** PORTA POTTY HAS BEEN MOVED. AFTER SEVERE STORM ON TUESDAY TEMPORARY PIPE HAS WASHED IN AND IS ALMOST COMPLETELY CLOGGED PLEASE REESTABLISH TEMP CULVERT. I WILL PARTIALLY APPROVE THE DRAINAGE AS YOU DID AS REQUESTED HOWEVER SINCE THE LAST INSPECTION AS STATED WE HAD A BAD STORM. BUILDER SHOULD CHECK SITES AFTER STORMS TO ENSURE ALL EROSION AND SEDIMENT CONTROL DEVICES ARE STILL WORKING PROPERLY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/31/2025 - PREVIOUS INSPECTION NOTES 07/31/25 TPOLACEK**** BUILDER NEEDS TO REMOVE PORTA POTTY FROM ROW/SWALE. 7 DAYS
LATH/BRICK/ WATER BARRIER 08/06/2025 Approval - Private Provider PPROVIDER
INSULATION 07/31/2025 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 07/31/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 07/31/25 TPOLACEK**** BUILDER NEEDS TO REMOVE PORTA POTTY FROM ROW/SWALE. 7 DAYS
ALL ROUGH 07/29/2025 Approval - Private Provider PPROVIDER
WALL SHEATHING 07/24/2025 Approval - Private Provider PPROVIDER
Note: 7/21/2025 3:47:01 PM- PREVIOUS INSPECTION NOTES
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/24/2025 Approval - Private Provider PPROVIDER
Note: 7/21/2025 3:46:46 PM- PREVIOUS INSPECTION NOTES
ROOF VALLEY & METAL 07/18/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/18/2025 Disapproved- Private Provider PPROVIDER
WALL SHEATHING 07/18/2025 Disapproved- Private Provider PPROVIDER
TIE BEAM / LINTEL 07/08/2025 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 06/26/2025 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 06/24/2025 Approval - Private Provider PPROVIDER
FORMBOARD SURVEY (OFFICE USE ONLY) 06/23/2025 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 06/20/2025 APPROVED JMUNSON
ROW - DRAINAGE 06/16/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/13/2025 - PREVIOUS INSPECTION NOTES 06/13/25 TPOLACEK*** BUILDER STILL NEEDS TO INSTALL SILT FENCE ALONG RED MILL DR. AS STATED IN PREVIOUS INSPECTION YOU ARE ALLOWED TO HAVE 50' CONSTRUCTION ENTRANCE ALL OTHER AREAS MUSTBE COVERED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/10/2025 - PREVIOUS INSPECTION NOTES NEED TO EXTEND THE SILT FENCE AROUND ENTIRE LOT AND YOU CAN HAVE A 5O' ENTERANCE FOR CONTRACTORS TO ENTER LOT THERE IS A INSPECTION HOLD TO THIS PERMIT SINCE ITS BEEN MORE THEN 7DAYS SINCE THE FIRST INSPECTIONS ---------------------------------------------------------------------------- 6/4/2025 - PREVIOUS INSPECTION NOTES 06/04/25 TPOLACEK*** BUILDER MUST INSTALL SILT FENCE AND MAKE SURE TO KEEP SWALE OPEN OR INSTALL TEMPORARY CULVERT. NEXT INSPECTION FRIDAY 06/06/25 3 SEC 9.04.04 erosion and sediment control measures (best management practices) LDC.9.04.04 Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources.
ROW - DRAINAGE 06/13/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 06/13/25 TPOLACEK*** BUILDER STILL NEEDS TO INSTALL SILT FENCE ALONG RED MILL DR. AS STATED IN PREVIOUS INSPECTION YOU ARE ALLOWED TO HAVE 50' CONSTRUCTION ENTRANCE ALL OTHER AREAS MUSTBE COVERED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/10/2025 - PREVIOUS INSPECTION NOTES NEED TO EXTEND THE SILT FENCE AROUND ENTIRE LOT AND YOU CAN HAVE A 5O' ENTERANCE FOR CONTRACTORS TO ENTER LOT THERE IS A INSPECTION HOLD TO THIS PERMIT SINCE ITS BEEN MORE THEN 7DAYS SINCE THE FIRST INSPECTIONS ---------------------------------------------------------------------------- 6/4/2025 - PREVIOUS INSPECTION NOTES 06/04/25 TPOLACEK*** BUILDER MUST INSTALL SILT FENCE AND MAKE SURE TO KEEP SWALE OPEN OR INSTALL TEMPORARY CULVERT. NEXT INSPECTION FRIDAY 06/06/25 3 SEC 9.04.04 erosion and sediment control measures (best management practices) LDC.9.04.04 Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources.
ROW - DRAINAGE 06/10/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO EXTEND THE SILT FENCE AROUND ENTIRE LOT AND YOU CAN HAVE A 5O' ENTERANCE FOR CONTRACTORS TO ENTER LOT THERE IS A INSPECTION HOLD TO THIS PERMIT SINCE ITS BEEN MORE THEN 7DAYS SINCE THE FIRST INSPECTIONS ---------------------------------------------------------------------------- 6/4/2025 - PREVIOUS INSPECTION NOTES 06/04/25 TPOLACEK*** BUILDER MUST INSTALL SILT FENCE AND MAKE SURE TO KEEP SWALE OPEN OR INSTALL TEMPORARY CULVERT. NEXT INSPECTION FRIDAY 06/06/25 3 SEC 9.04.04 erosion and sediment control measures (best management practices) LDC.9.04.04 Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources.
ROW - DRAINAGE 06/06/2025 CANCELLED BY INSPECTOR TPOLACEK
Note: 6/4/2025 - PREVIOUS INSPECTION NOTES 06/04/25 TPOLACEK*** BUILDER MUST INSTALL SILT FENCE AND MAKE SURE TO KEEP SWALE OPEN OR INSTALL TEMPORARY CULVERT. NEXT INSPECTION FRIDAY 06/06/25 3 SEC 9.04.04 erosion and sediment control measures (best management practices) LDC.9.04.04 Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources.
WATER METER INSTALLATION REQUEST 06/05/2025 APPROVED CBOWERMASTER
ROW - DRAINAGE 06/04/2025 Disapproved - NO FEE TPOLACEK
Note: 06/04/25 TPOLACEK*** BUILDER MUST INSTALL SILT FENCE AND MAKE SURE TO KEEP SWALE OPEN OR INSTALL TEMPORARY CULVERT. NEXT INSPECTION FRIDAY 06/06/25 3 SEC 9.04.04 erosion and sediment control measures (best management practices) LDC.9.04.04 Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources.
WILDLIFE CHECK - ENVIRONMENTAL 05/07/2025 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
BLD COMPLETE 06/20/2025 06/20/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/20/2025 06/23/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 06/20/2025 06/20/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 05/09/2025 05/09/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN HOLD 05/09/2025 05/09/2025
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Permit application estimated value incorrect. Please upload a manual permit application with correct amount.
BADMIN COMPLETE 05/09/2025 05/09/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
ZON HOLD 05/08/2025 05/08/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Gallon size missing for the jack frost plants on the legend of landscape plan
SW1 COMPLETE 05/08/2025 05/09/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/08/2025 05/08/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SWALE COMPLETE 05/02/2025 05/09/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 04/30/2025 05/05/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 04/30/2025 05/07/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/30/2025 05/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
LOCATE COMPLETE 04/30/2025 05/05/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 04/30/2025 05/06/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOOP OF THE DRAINAGE PATTERN.
ZON HOLD 04/30/2025 04/30/2025
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Site plan missing book and page number. 2. Landscape plan missing additional plantings on street side.
PLENV COMPLETE 04/30/2025 05/07/2025
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 05/07/25 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - INSPECTION 20 ¤20.00 11/30/2025
SW ENG - INSPECTION 20 ¤20.00 11/30/2025
SW ENG - INSPECTION 20 ¤20.00 11/30/2025
SW ENG - INSPECTION 20 ¤20.00 11/30/2025
SW ENG - INSPECTION 20 ¤20.00 11/30/2025
SW ENG - INSPECTION 20 ¤20.00 11/30/2025
SW ENG - INSPECTION 20 ¤20.00 11/30/2025
SW ENG - INSPECTION 20 ¤20.00 11/30/2025
SW ENG - INSPECTION 20 ¤20.00 11/30/2025
SW ENG - INSPECTION 20 ¤20.00 11/30/2025
SW ENG - INSPECTION 20 ¤20.00 11/30/2025
SW ENG INSPECTION 80 ¤80.00 05/13/2025
SW ENG PRE APRON ¤30.00 05/13/2025
SW ENG - REVIEW 20 ¤20.00 05/13/2025
SW ENG RES REVIEW 200 ¤200.00 05/13/2025
WATER METER W/ TAP ¤2,326.93 05/13/2025
SEWER CREDIT (¤2,465.75) 05/13/2025
WASTEWATER PERM INSPECTION ¤80.00 05/13/2025
WASTEWATER PERM REVIEW ¤25.00 05/13/2025
SEWER CAPITAL FACILITY ¤3,930.70 05/13/2025
WATER CAPITAL FACILITY FEE ¤3,496.74 05/13/2025
WATER PERMIT REVIEW ¤25.00 05/13/2025
WATER MAIN EXTENSION IMPACT ¤854.40 05/13/2025
SITE PLAN 30 ¤30.00 05/13/2025
WATER- TURN ON ¤50.00 05/13/2025
ADJUSTMENT 10% (¤3.00) 05/13/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/13/2025
ADMINISTRATIVE - RESID PP ¤225.00 05/13/2025
FC IMPACT FEE EMS ¤62.00 05/13/2025
IMPACT FEE FIRE ¤434.51 05/13/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/13/2025
FC IMPACT FEE LIBRARY ¤268.00 05/13/2025
IMPACT FEE PARKS ¤1,828.01 05/13/2025
IMPACT FEE SCHOOL ¤5,450.00 05/13/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 05/13/2025
PEP TANK INSTALL ¤756.74 05/13/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,189.82 05/13/2025
SURCHARGE FS 533.721 ¤2.52 05/13/2025
SURCHARGE - FS 468.631 ¤3.78 05/13/2025
SW ENG - FOUNDATION SURVEY ¤20.00 05/13/2025
Fees Total Due: ¤0.00 Total Paid: ¤22,304.40