I want to search for...

Permit #2025041583

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-00470-0020
GARAGE: 765 sqft
OPENED PORCH (WITH ROOF) : 347 sqft
CONDITIONED SPACE: 2376 sqft
OPENED PORCH (WITH ROOF) : 66 sqft
Total Square Footage: 3554 sqft
Block: 00470
Subdivision: 7034 -
Job Phone: 832-726-2202
Location Address: 20 ESSINGTON LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/03/2025
NOC: RECORDED
Applicant name: JONATHON AMBAR
Owner: ZZMZ CASPIAN LLC

Address

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

Address

164

ORLANDO, FL 32826

Lot: 0020
Contracted Stated Job Value: ¤131,500.00
Job Description: Single Family Residence
Type: CN

Contractor

CASPIAN HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

SUITE 162

ORLANDO, FL 32826

CBC1264918 (Exp: 08/31/2026) 832-726-2202

Sub Contractors

MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/15/2026 Approval - Private Provider PPROVIDER
U-CROSS CONNECTION 05/08/2026 APPROVED - AS NOTED BHAINES
Note: No CC, IRR with potable water, double check in place.
U -UTILITY RESIDENTIAL FINAL 05/08/2026 FINAL APPROVED BHAINES
ROW - STORMWATER FINAL 05/07/2026 APPROVED FSLADISH
Note: 5/7/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL APRON (AFTER POUR) 05/07/2026 APPROVED FSLADISH
Note: 5/7/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/07/2026 APPROVED - AS NOTED FSLADISH
Note: 5/7/26 THIS IS A DUPLICATE INSPECTION REQUEST. I HAVE ALREADY APPROVED THIS FINAL SURVEY. I AM GOING TO APPROVE THIS REVIEW AS NOTED.
ROW FIELD SURVEY /GRADING CERTIFICATION 05/07/2026 CANCELLED BY INSPECTOR FSLADISH
Note: Inspector Notes from Inspection 9463 5/7/26 THIS IS A DUPLICATE INSPECTION REQUEST. I HAVE ALREADY APPROVED THIS FINAL SURVEY. I AM GOING TO APPROVE THIS REVIEW AS NOTED. 5/7/26 Effective 3/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certification for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/01/2026 APPROVED FSLADISH
Note: 5/1/26 BASED ON THE ENGINEER SIGNED AND SEALED LGADC MEETING THE COPC MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION, I AM APPROVING THIS DOCUMENT. Effective 3/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certification for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types.
ROW- PRE-APRON (PRE-POUR) 01/21/2026 APPROVED - AS NOTED FSLADISH
Note: 1/21/26 MET ON SITE WITH CM SUB AND GABE, TOM, ED AND RODNEY TO MOVE THIS FORWARD. DETERMINED IT WILL BE A POURED DRIVEWAY WITH A PAVER BORDER. LET CM KNOW THE REQUIREMENTS AND DETERMINED WE WILL ALLOW APPROX 3" OF CONCRETE PLUS PAVER IN A 12" SECTION FORMED OVER THE CULVERT PIPE. APPROVING AS NOTED. PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. _______________________________________________________________________________________________________________________________ 1/13/2026 - PREVIOUS INSPECTION NOTES 1/13/26 WASN'T SURE WHAT WAS GOING ON WITH THIS DRIVEWAY. SITE PLAN INDICATED CONCRETE POUR. UPON INSPECTION IT IS FORMED FOR PAVER RESTRAINTS, BUT MOT MEETING COPC STANDARDS AS THE POUR WOULD BE FLUSH AND THE PAVERS WOULD STICK OUT ABOVE THE POUR BASED ON THIS INSPECTION. CALLED MIKE CM AND HE INDICATED THAT THEY WANT TO HAVE A PAVER BORDER FOR THE DRIVEWAY. I LET HIM KNOW THAT HOW IT IS CURRENTL FORMED WILL NOT MEET COPC STANDARDS. I ADVISED HIM THAT HE NEEDS TO REVISE THE SITE PLAN TO SHOW THE ADDITION OF PAVER BORDER AND UPLOAD A PAVER OPTION SHEET AS WELL. I LET HIM KNOW THAT I WOULD DISAPPROVE IT WITH NO FEE TODAY AND IF HE HAD ADDITIONAL QUESTIONS OR COMMENTS TO PLEASE REACH OUT AND WE WILL DO OUR BEST TO ASSIST. PHOTOS FOR REFERENCE. Inspector Notes from Inspection 9470 7/24/25 CM COMMUNICATED THAT ALL CORRECTIONS WERE MADE ON 7/23/25. AS A COURTESY I EXTENDED DRAINAGE REINSPECTION TILL 7/24/25 . AT THE TIME OF THIS INSPECTION SITE MEETS MINIMUM COPC STANDARDS FOR RESIDENTIAL DRIVEWAY ENTRANCE. LET CM KNOW HE IS RESPONSIBLE FOR MAINTAING ENTRANCE THROUGHOUT CONSTRUCTION PROCESS. ____________________________________________________________________________________________________________________ 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 PLEASE READ PREVIOUS INSPECTORS NOTES. YOUR TEMPORARY PIPE IS ALMOST FULLY CLOGGED WITH DIRT AND SILT ON THE RIGHT AND ALSO THE SWALE ON THAT SIDE NEEDS TO BE CLEANED OUT TO GRADE. RIGHT SIDE NOT ALLOWING POSITIVE DRAINAGE FLOW IN THE COPC SWALE. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 7/23/25 AT WHICH TIME AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25 Inspector Notes from Inspection 9470 7/24/25 CM COMMUNICATED THAT ALL CORRECTIONS WERE MADE ON 7/23/25. AS A COURTESY I EXTENDED DRAINAGE REINSPECTION TILL 7/24/25 . AT THE TIME OF THIS INSPECTION SITE MEETS MINIMUM COPC STANDARDS FOR RESIDENTIAL DRIVEWAY ENTRANCE. LET CM KNOW HE IS RESPONSIBLE FOR MAINTAING ENTRANCE THROUGHOUT CONSTRUCTION PROCESS. ____________________________________________________________________________________________________________________ 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 PLEASE READ PREVIOUS INSPECTORS NOTES. YOUR TEMPORARY PIPE IS ALMOST FULLY CLOGGED WITH DIRT AND SILT ON THE RIGHT AND ALSO THE SWALE ON THAT SIDE NEEDS TO BE CLEANED OUT TO GRADE. RIGHT SIDE NOT ALLOWING POSITIVE DRAINAGE FLOW IN THE COPC SWALE. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 7/23/25 AT WHICH TIME AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25
ROW- PRE-APRON (PRE-POUR) 01/13/2026 Disapproved - NO FEE FSLADISH
Note: 1/13/26 WASN'T SURE WHAT WAS GOING ON WITH THIS DRIVEWAY. SITE PLAN INDICATED CONCRETE POUR. UPON INSPECTION IT IS FORMED FOR PAVER RESTRAINTS, BUT MOT MEETING COPC STANDARDS AS THE POUR WOULD BE FLUSH AND THE PAVERS WOULD STICK OUT ABOVE THE POUR BASED ON THIS INSPECTION. CALLED MIKE CM AND HE INDICATED THAT THEY WANT TO HAVE A PAVER BORDER FOR THE DRIVEWAY. I LET HIM KNOW THAT HOW IT IS CURRENTL FORMED WILL NOT MEET COPC STANDARDS. I ADVISED HIM THAT HE NEEDS TO REVISE THE SITE PLAN TO SHOW THE ADDITION OF PAVER BORDER AND UPLOAD A PAVER OPTION SHEET AS WELL. I LET HIM KNOW THAT I WOULD DISAPPROVE IT WITH NO FEE TODAY AND IF HE HAD ADDITIONAL QUESTIONS OR COMMENTS TO PLEASE REACH OUT AND WE WILL DO OUR BEST TO ASSIST. PHOTOS FOR REFERENCE. Inspector Notes from Inspection 9470 7/24/25 CM COMMUNICATED THAT ALL CORRECTIONS WERE MADE ON 7/23/25. AS A COURTESY I EXTENDED DRAINAGE REINSPECTION TILL 7/24/25 . AT THE TIME OF THIS INSPECTION SITE MEETS MINIMUM COPC STANDARDS FOR RESIDENTIAL DRIVEWAY ENTRANCE. LET CM KNOW HE IS RESPONSIBLE FOR MAINTAING ENTRANCE THROUGHOUT CONSTRUCTION PROCESS. ____________________________________________________________________________________________________________________ 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 PLEASE READ PREVIOUS INSPECTORS NOTES. YOUR TEMPORARY PIPE IS ALMOST FULLY CLOGGED WITH DIRT AND SILT ON THE RIGHT AND ALSO THE SWALE ON THAT SIDE NEEDS TO BE CLEANED OUT TO GRADE. RIGHT SIDE NOT ALLOWING POSITIVE DRAINAGE FLOW IN THE COPC SWALE. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 7/23/25 AT WHICH TIME AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25 Inspector Notes from Inspection 9470 7/24/25 CM COMMUNICATED THAT ALL CORRECTIONS WERE MADE ON 7/23/25. AS A COURTESY I EXTENDED DRAINAGE REINSPECTION TILL 7/24/25 . AT THE TIME OF THIS INSPECTION SITE MEETS MINIMUM COPC STANDARDS FOR RESIDENTIAL DRIVEWAY ENTRANCE. LET CM KNOW HE IS RESPONSIBLE FOR MAINTAING ENTRANCE THROUGHOUT CONSTRUCTION PROCESS. ____________________________________________________________________________________________________________________ 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 PLEASE READ PREVIOUS INSPECTORS NOTES. YOUR TEMPORARY PIPE IS ALMOST FULLY CLOGGED WITH DIRT AND SILT ON THE RIGHT AND ALSO THE SWALE ON THAT SIDE NEEDS TO BE CLEANED OUT TO GRADE. RIGHT SIDE NOT ALLOWING POSITIVE DRAINAGE FLOW IN THE COPC SWALE. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 7/23/25 AT WHICH TIME AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25
ELECTRIC - EARLY POWER 01/07/2026 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 12/08/2025 Approval - Private Provider PPROVIDER
SEWER TIE IN 12/08/2025 APPROVED CVANSTRAHLEN
PEP TANK INSTALLATION REQUEST 10/17/2025 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 10/03/2025 Approval - Private Provider PPROVIDER
INSULATION 10/02/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 09/26/2025 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 09/26/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 09/02/2025 Approval - Private Provider PPROVIDER
WALL SHEATHING 08/25/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/25/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 08/18/2025 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 08/05/2025 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 08/05/2025 Approval - Private Provider PPROVIDER
Note: 8/4/2025 10:14:31 AM- PREVIOUS INSPECTION NOTES
PLUMBING 1ST ROUGH UNDERGROUND 08/01/2025 Disapproved- Private Provider PPROVIDER
FORMBOARD SURVEY (OFFICE USE ONLY) 07/28/2025 APPROVED RRICKS
ROW - DRAINAGE 07/24/2025 APPROVED - AS NOTED FSLADISH
Note: 7/24/25 CM COMMUNICATED THAT ALL CORRECTIONS WERE MADE ON 7/23/25. AS A COURTESY I EXTENDED DRAINAGE REINSPECTION TILL 7/24/25 . AT THE TIME OF THIS INSPECTION SITE MEETS MINIMUM COPC STANDARDS FOR RESIDENTIAL DRIVEWAY ENTRANCE. LET CM KNOW HE IS RESPONSIBLE FOR MAINTAING ENTRANCE THROUGHOUT CONSTRUCTION PROCESS. ____________________________________________________________________________________________________________________ 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 PLEASE READ PREVIOUS INSPECTORS NOTES. YOUR TEMPORARY PIPE IS ALMOST FULLY CLOGGED WITH DIRT AND SILT ON THE RIGHT AND ALSO THE SWALE ON THAT SIDE NEEDS TO BE CLEANED OUT TO GRADE. RIGHT SIDE NOT ALLOWING POSITIVE DRAINAGE FLOW IN THE COPC SWALE. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 7/23/25 AT WHICH TIME AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25
ROW - DRAINAGE 07/22/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 7/22/25 PLEASE READ PREVIOUS INSPECTORS NOTES. YOUR TEMPORARY PIPE IS ALMOST FULLY CLOGGED WITH DIRT AND SILT ON THE RIGHT AND ALSO THE SWALE ON THAT SIDE NEEDS TO BE CLEANED OUT TO GRADE. RIGHT SIDE NOT ALLOWING POSITIVE DRAINAGE FLOW IN THE COPC SWALE. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 7/23/25 AT WHICH TIME AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25
ROW - DRAINAGE 07/14/2025 Disapproved - NO FEE EMADISON
Note: ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25
WATER METER INSTALLATION REQUEST 07/01/2025 APPROVED CBOWERMASTER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 06/25/2025 APPROVED PKNAPIK
WILDLIFE CHECK - ENVIRONMENTAL 05/07/2025 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
BADMIN INFORMATION 05/06/2026 05/06/2026
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Missing attachment.
ZON COMPLETE 02/05/2026 02/05/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
URB COMPLETE 02/04/2026 02/05/2026
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM completed pending Zoning hold for sod type/ Irrigation
ZON HOLD 02/04/2026 02/04/2026
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Revised landscape plan missing sod type and irrigation if applicable.
SW1 COMPLETE 01/21/2026 01/26/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 01/20/2026 01/20/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON HOLD 01/16/2026 01/16/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please bring in originals to our office for recording
ENGIN1 COMPLETE 01/15/2026 01/16/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 COMPLETE 01/15/2026 01/15/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON HOLD 01/15/2026 01/15/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM For the paver boarder all the way to the right of way you will need to Fillout a Right of way agreement and have all owners on the deed sign and notarize the agreement. I have to sent the form to the emails on this permit. Please upload documents showing the authorized signers as this is an LLC.
SW1 COMPLETE 07/28/2025 07/28/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 07/28/2025 07/28/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/09/2025 07/10/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
SW1 COMPLETE 07/09/2025 07/10/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 07/09/2025 07/09/2025
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BLD COMPLETE 06/25/2025 06/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 05/21/2025 05/22/2025
Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/21/2025 05/22/2025
Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 05/21/2025 05/21/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 05/20/2025 05/20/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM LEFT SIDE DRAINAGE OF LOT NEEDS TO HAVE .30 FROM TOE OF THE DRAINAGE PATTERN TO THE TOP OF THE DRAINAGE PATTERN PER CITY CODE
ENGIN1 COMPLETE 05/20/2025 05/21/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 05/20/2025 05/20/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 05/15/2025 05/16/2025
Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM Along the left property line towards the back there shall be a minimum of 0.2 fall from the top of the swale to the toe slope. On the right property line the inside swale shall be depicted an additional foot off the property line. As of now it is exceeding the 4:1 slope.
ENGIN1 COMPLETE 05/15/2025 05/16/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 05/15/2025 05/15/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON COMPLETE 05/09/2025 05/12/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 05/09/2025 05/13/2025
Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM Along the right property line proposed elevation shall match exisitng improved homes. There is a 1.5' difference 29.4 to 27.9 of toward the front of the house which exceeds the 4:1 slope and creates a steep drop base on the information provided. On the left side of property please add an existing grade where the 27.5 is. to clearly understand what is being changed. Please call 386-986-4726 or email if there are any other questions.
ENGIN1 COMPLETE 05/09/2025 05/12/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SWALE COMPLETE 05/02/2025 05/09/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 04/30/2025 05/05/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 04/30/2025 05/07/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/30/2025 05/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
LOCATE COMPLETE 04/30/2025 05/05/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 04/30/2025 05/06/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) YOUR FFE IS MORE THEN 10" ABOVE THE ADJACENT LOT TO THE LEFT NEED TO LOWER FFE TO MEET THE 10" TOLERANCE. PER CITY CODE 300.01C(3) 2) NEED TO HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF THE DRAINAGE PATTERN. 300.01 D(6) 3) THE DRAINAGE PATTERN AT THE BACK PROPOERTY LINE NEEDS TO BE INSIDE THE PROPERTY.
ZON HOLD 04/30/2025 04/30/2025
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Site plan missing width of driveway in front of garage. 2. Site plan missing width of walkway. Can't exceed greater than 6'.
PLENV COMPLETE 04/30/2025 05/07/2025
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 05/07/25 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - INSPECTION 20 ¤20.00 05/19/2026
SW ENG - INSPECTION 20 ¤20.00 05/19/2026
SW ENG - INSPECTION 20 ¤20.00 05/19/2026
RECORDING FEE REIMBURSE DOC ¤52.50 05/19/2026
IMPACT FEE TRANSPORTATION ¤1,916.00 06/03/2025
PEP TANK INSTALL ¤756.74 06/03/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,189.82 06/03/2025
SURCHARGE FS 533.721 ¤2.52 06/03/2025
SURCHARGE - FS 468.631 ¤3.78 06/03/2025
SW ENG - FOUNDATION SURVEY ¤20.00 06/03/2025
WATER- TURN ON ¤50.00 06/03/2025
ADJUSTMENT 10% (¤3.00) 06/03/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/03/2025
ADMINISTRATIVE - RESID PP ¤225.00 06/03/2025
FC IMPACT FEE EMS ¤62.00 06/03/2025
IMPACT FEE FIRE ¤434.51 06/03/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/03/2025
FC IMPACT FEE LIBRARY ¤268.00 06/03/2025
IMPACT FEE PARKS ¤1,828.01 06/03/2025
IMPACT FEE SCHOOL ¤5,450.00 06/03/2025
SW ENG INSPECTION 80 ¤80.00 06/03/2025
SW ENG PRE APRON ¤30.00 06/03/2025
SW ENG - REVIEW 20 ¤20.00 06/03/2025
SW ENG RES REVIEW 200 ¤200.00 06/03/2025
WATER METER W/ TAP ¤2,326.93 06/03/2025
SEWER CREDIT (¤2,788.82) 06/03/2025
WASTEWATER PERM INSPECTION ¤80.00 06/03/2025
WASTEWATER PERM REVIEW ¤25.00 06/03/2025
SEWER CAPITAL FACILITY ¤3,930.70 06/03/2025
WATER CREDIT (¤2.30) 06/03/2025
WATER CAPITAL FACILITY FEE ¤3,496.74 06/03/2025
WATER PERMIT REVIEW ¤25.00 06/03/2025
WATER MAIN EXTENSION IMPACT ¤854.40 06/03/2025
SITE PLAN 30 ¤30.00 06/03/2025
Fees Total Due: ¤0.00 Total Paid: ¤21,871.53