I want to search for...
Permit #2025041583
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00470-0020 |
| GARAGE: 765 sqft |
| OPENED PORCH (WITH ROOF) : 347 sqft |
| CONDITIONED SPACE: 2376 sqft |
| OPENED PORCH (WITH ROOF) : 66 sqft |
| Total Square Footage: 3554 sqft |
| Block: 00470 |
| Subdivision: 7034 - |
| Job Phone: 832-726-2202 |
| Location Address: 20 ESSINGTON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/03/2025 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: ZZMZ CASPIAN LLC |
|
Address 1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
|
Address 164 ORLANDO, FL 32826 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
MOISES MERINO DIAZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3104 ORANOLE ROAD ORLANDO, FL 32810 |
CAC1820980 (Exp: 08/31/2026) | 407-225-3149 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/15/2026 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 05/08/2026 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, IRR with potable water, double check in place. | |||
| U -UTILITY RESIDENTIAL FINAL | 05/08/2026 | FINAL APPROVED | BHAINES |
| ROW - STORMWATER FINAL | 05/07/2026 | APPROVED | FSLADISH |
| Note: 5/7/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 05/07/2026 | APPROVED | FSLADISH |
| Note: 5/7/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/07/2026 | APPROVED - AS NOTED | FSLADISH |
| Note: 5/7/26 THIS IS A DUPLICATE INSPECTION REQUEST. I HAVE ALREADY APPROVED THIS FINAL SURVEY. I AM GOING TO APPROVE THIS REVIEW AS NOTED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/07/2026 | CANCELLED BY INSPECTOR | FSLADISH |
| Note: Inspector Notes from Inspection 9463 5/7/26 THIS IS A DUPLICATE INSPECTION REQUEST. I HAVE ALREADY APPROVED THIS FINAL SURVEY. I AM GOING TO APPROVE THIS REVIEW AS NOTED. 5/7/26 Effective 3/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certification for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/01/2026 | APPROVED | FSLADISH |
| Note: 5/1/26 BASED ON THE ENGINEER SIGNED AND SEALED LGADC MEETING THE COPC MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION, I AM APPROVING THIS DOCUMENT. Effective 3/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certification for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/21/2026 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/21/26 MET ON SITE WITH CM SUB AND GABE, TOM, ED AND RODNEY TO MOVE THIS FORWARD. DETERMINED IT WILL BE A POURED DRIVEWAY WITH A PAVER BORDER. LET CM KNOW THE REQUIREMENTS AND DETERMINED WE WILL ALLOW APPROX 3" OF CONCRETE PLUS PAVER IN A 12" SECTION FORMED OVER THE CULVERT PIPE. APPROVING AS NOTED. PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. _______________________________________________________________________________________________________________________________ 1/13/2026 - PREVIOUS INSPECTION NOTES 1/13/26 WASN'T SURE WHAT WAS GOING ON WITH THIS DRIVEWAY. SITE PLAN INDICATED CONCRETE POUR. UPON INSPECTION IT IS FORMED FOR PAVER RESTRAINTS, BUT MOT MEETING COPC STANDARDS AS THE POUR WOULD BE FLUSH AND THE PAVERS WOULD STICK OUT ABOVE THE POUR BASED ON THIS INSPECTION. CALLED MIKE CM AND HE INDICATED THAT THEY WANT TO HAVE A PAVER BORDER FOR THE DRIVEWAY. I LET HIM KNOW THAT HOW IT IS CURRENTL FORMED WILL NOT MEET COPC STANDARDS. I ADVISED HIM THAT HE NEEDS TO REVISE THE SITE PLAN TO SHOW THE ADDITION OF PAVER BORDER AND UPLOAD A PAVER OPTION SHEET AS WELL. I LET HIM KNOW THAT I WOULD DISAPPROVE IT WITH NO FEE TODAY AND IF HE HAD ADDITIONAL QUESTIONS OR COMMENTS TO PLEASE REACH OUT AND WE WILL DO OUR BEST TO ASSIST. PHOTOS FOR REFERENCE. Inspector Notes from Inspection 9470 7/24/25 CM COMMUNICATED THAT ALL CORRECTIONS WERE MADE ON 7/23/25. AS A COURTESY I EXTENDED DRAINAGE REINSPECTION TILL 7/24/25 . AT THE TIME OF THIS INSPECTION SITE MEETS MINIMUM COPC STANDARDS FOR RESIDENTIAL DRIVEWAY ENTRANCE. LET CM KNOW HE IS RESPONSIBLE FOR MAINTAING ENTRANCE THROUGHOUT CONSTRUCTION PROCESS. ____________________________________________________________________________________________________________________ 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 PLEASE READ PREVIOUS INSPECTORS NOTES. YOUR TEMPORARY PIPE IS ALMOST FULLY CLOGGED WITH DIRT AND SILT ON THE RIGHT AND ALSO THE SWALE ON THAT SIDE NEEDS TO BE CLEANED OUT TO GRADE. RIGHT SIDE NOT ALLOWING POSITIVE DRAINAGE FLOW IN THE COPC SWALE. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 7/23/25 AT WHICH TIME AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25 Inspector Notes from Inspection 9470 7/24/25 CM COMMUNICATED THAT ALL CORRECTIONS WERE MADE ON 7/23/25. AS A COURTESY I EXTENDED DRAINAGE REINSPECTION TILL 7/24/25 . AT THE TIME OF THIS INSPECTION SITE MEETS MINIMUM COPC STANDARDS FOR RESIDENTIAL DRIVEWAY ENTRANCE. LET CM KNOW HE IS RESPONSIBLE FOR MAINTAING ENTRANCE THROUGHOUT CONSTRUCTION PROCESS. ____________________________________________________________________________________________________________________ 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 PLEASE READ PREVIOUS INSPECTORS NOTES. YOUR TEMPORARY PIPE IS ALMOST FULLY CLOGGED WITH DIRT AND SILT ON THE RIGHT AND ALSO THE SWALE ON THAT SIDE NEEDS TO BE CLEANED OUT TO GRADE. RIGHT SIDE NOT ALLOWING POSITIVE DRAINAGE FLOW IN THE COPC SWALE. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 7/23/25 AT WHICH TIME AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25 | |||
| ROW- PRE-APRON (PRE-POUR) | 01/13/2026 | Disapproved - NO FEE | FSLADISH |
| Note: 1/13/26 WASN'T SURE WHAT WAS GOING ON WITH THIS DRIVEWAY. SITE PLAN INDICATED CONCRETE POUR. UPON INSPECTION IT IS FORMED FOR PAVER RESTRAINTS, BUT MOT MEETING COPC STANDARDS AS THE POUR WOULD BE FLUSH AND THE PAVERS WOULD STICK OUT ABOVE THE POUR BASED ON THIS INSPECTION. CALLED MIKE CM AND HE INDICATED THAT THEY WANT TO HAVE A PAVER BORDER FOR THE DRIVEWAY. I LET HIM KNOW THAT HOW IT IS CURRENTL FORMED WILL NOT MEET COPC STANDARDS. I ADVISED HIM THAT HE NEEDS TO REVISE THE SITE PLAN TO SHOW THE ADDITION OF PAVER BORDER AND UPLOAD A PAVER OPTION SHEET AS WELL. I LET HIM KNOW THAT I WOULD DISAPPROVE IT WITH NO FEE TODAY AND IF HE HAD ADDITIONAL QUESTIONS OR COMMENTS TO PLEASE REACH OUT AND WE WILL DO OUR BEST TO ASSIST. PHOTOS FOR REFERENCE. Inspector Notes from Inspection 9470 7/24/25 CM COMMUNICATED THAT ALL CORRECTIONS WERE MADE ON 7/23/25. AS A COURTESY I EXTENDED DRAINAGE REINSPECTION TILL 7/24/25 . AT THE TIME OF THIS INSPECTION SITE MEETS MINIMUM COPC STANDARDS FOR RESIDENTIAL DRIVEWAY ENTRANCE. LET CM KNOW HE IS RESPONSIBLE FOR MAINTAING ENTRANCE THROUGHOUT CONSTRUCTION PROCESS. ____________________________________________________________________________________________________________________ 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 PLEASE READ PREVIOUS INSPECTORS NOTES. YOUR TEMPORARY PIPE IS ALMOST FULLY CLOGGED WITH DIRT AND SILT ON THE RIGHT AND ALSO THE SWALE ON THAT SIDE NEEDS TO BE CLEANED OUT TO GRADE. RIGHT SIDE NOT ALLOWING POSITIVE DRAINAGE FLOW IN THE COPC SWALE. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 7/23/25 AT WHICH TIME AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25 Inspector Notes from Inspection 9470 7/24/25 CM COMMUNICATED THAT ALL CORRECTIONS WERE MADE ON 7/23/25. AS A COURTESY I EXTENDED DRAINAGE REINSPECTION TILL 7/24/25 . AT THE TIME OF THIS INSPECTION SITE MEETS MINIMUM COPC STANDARDS FOR RESIDENTIAL DRIVEWAY ENTRANCE. LET CM KNOW HE IS RESPONSIBLE FOR MAINTAING ENTRANCE THROUGHOUT CONSTRUCTION PROCESS. ____________________________________________________________________________________________________________________ 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 PLEASE READ PREVIOUS INSPECTORS NOTES. YOUR TEMPORARY PIPE IS ALMOST FULLY CLOGGED WITH DIRT AND SILT ON THE RIGHT AND ALSO THE SWALE ON THAT SIDE NEEDS TO BE CLEANED OUT TO GRADE. RIGHT SIDE NOT ALLOWING POSITIVE DRAINAGE FLOW IN THE COPC SWALE. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 7/23/25 AT WHICH TIME AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25 | |||
| ELECTRIC - EARLY POWER | 01/07/2026 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 12/08/2025 | Approval - Private Provider | PPROVIDER |
| SEWER TIE IN | 12/08/2025 | APPROVED | CVANSTRAHLEN |
| PEP TANK INSTALLATION REQUEST | 10/17/2025 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 10/03/2025 | Approval - Private Provider | PPROVIDER |
| INSULATION | 10/02/2025 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 09/26/2025 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 09/26/2025 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 09/02/2025 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 08/25/2025 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/25/2025 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 08/18/2025 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 08/05/2025 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/05/2025 | Approval - Private Provider | PPROVIDER |
| Note: 8/4/2025 10:14:31 AM- PREVIOUS INSPECTION NOTES | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/01/2025 | Disapproved- Private Provider | PPROVIDER |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 07/28/2025 | APPROVED | RRICKS |
| ROW - DRAINAGE | 07/24/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/24/25 CM COMMUNICATED THAT ALL CORRECTIONS WERE MADE ON 7/23/25. AS A COURTESY I EXTENDED DRAINAGE REINSPECTION TILL 7/24/25 . AT THE TIME OF THIS INSPECTION SITE MEETS MINIMUM COPC STANDARDS FOR RESIDENTIAL DRIVEWAY ENTRANCE. LET CM KNOW HE IS RESPONSIBLE FOR MAINTAING ENTRANCE THROUGHOUT CONSTRUCTION PROCESS. ____________________________________________________________________________________________________________________ 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 PLEASE READ PREVIOUS INSPECTORS NOTES. YOUR TEMPORARY PIPE IS ALMOST FULLY CLOGGED WITH DIRT AND SILT ON THE RIGHT AND ALSO THE SWALE ON THAT SIDE NEEDS TO BE CLEANED OUT TO GRADE. RIGHT SIDE NOT ALLOWING POSITIVE DRAINAGE FLOW IN THE COPC SWALE. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 7/23/25 AT WHICH TIME AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25 | |||
| ROW - DRAINAGE | 07/22/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 7/22/25 PLEASE READ PREVIOUS INSPECTORS NOTES. YOUR TEMPORARY PIPE IS ALMOST FULLY CLOGGED WITH DIRT AND SILT ON THE RIGHT AND ALSO THE SWALE ON THAT SIDE NEEDS TO BE CLEANED OUT TO GRADE. RIGHT SIDE NOT ALLOWING POSITIVE DRAINAGE FLOW IN THE COPC SWALE. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 7/23/25 AT WHICH TIME AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT. _________________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25 | |||
| ROW - DRAINAGE | 07/14/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 07/14/25 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS MORE THAN 75% BLOCKED TO ALLOW FOR STORMWATER TO FLOW UNOBSTRUCTED AND NEGATIVELY IMPACTING ADJACENT PROPERTIES ** REMOVE SEDIMENT THAT HAS ERODED INTO THE ROAD SIDE SWALE ON THE RIGHT SIDE ** REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** RE-INSTALL SILT FENCE ACROSS FRONT RIGHT SIDE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 07/22/25 | |||
| WATER METER INSTALLATION REQUEST | 07/01/2025 | APPROVED | CBOWERMASTER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/25/2025 | APPROVED | PKNAPIK |
| WILDLIFE CHECK - ENVIRONMENTAL | 05/07/2025 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 05/06/2026 | 05/06/2026 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Missing attachment. | |||
| ZON | COMPLETE | 02/05/2026 | 02/05/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 02/04/2026 | 02/05/2026 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM completed pending Zoning hold for sod type/ Irrigation | |||
| ZON | HOLD | 02/04/2026 | 02/04/2026 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Revised landscape plan missing sod type and irrigation if applicable. | |||
| SW1 | COMPLETE | 01/21/2026 | 01/26/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/20/2026 | 01/20/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/16/2026 | 01/16/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please bring in originals to our office for recording | |||
| ENGIN1 | COMPLETE | 01/15/2026 | 01/16/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/15/2026 | 01/15/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/15/2026 | 01/15/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM For the paver boarder all the way to the right of way you will need to Fillout a Right of way agreement and have all owners on the deed sign and notarize the agreement. I have to sent the form to the emails on this permit. Please upload documents showing the authorized signers as this is an LLC. | |||
| SW1 | COMPLETE | 07/28/2025 | 07/28/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/28/2025 | 07/28/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/09/2025 | 07/10/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/09/2025 | 07/10/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/09/2025 | 07/09/2025 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/25/2025 | 06/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/21/2025 | 05/22/2025 |
| Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/21/2025 | 05/22/2025 |
| Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/21/2025 | 05/21/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/20/2025 | 05/20/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM LEFT SIDE DRAINAGE OF LOT NEEDS TO HAVE .30 FROM TOE OF THE DRAINAGE PATTERN TO THE TOP OF THE DRAINAGE PATTERN PER CITY CODE | |||
| ENGIN1 | COMPLETE | 05/20/2025 | 05/21/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/20/2025 | 05/20/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/15/2025 | 05/16/2025 |
| Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM Along the left property line towards the back there shall be a minimum of 0.2 fall from the top of the swale to the toe slope. On the right property line the inside swale shall be depicted an additional foot off the property line. As of now it is exceeding the 4:1 slope. | |||
| ENGIN1 | COMPLETE | 05/15/2025 | 05/16/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/15/2025 | 05/15/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/09/2025 | 05/12/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/09/2025 | 05/13/2025 |
| Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM Along the right property line proposed elevation shall match exisitng improved homes. There is a 1.5' difference 29.4 to 27.9 of toward the front of the house which exceeds the 4:1 slope and creates a steep drop base on the information provided. On the left side of property please add an existing grade where the 27.5 is. to clearly understand what is being changed. Please call 386-986-4726 or email if there are any other questions. | |||
| ENGIN1 | COMPLETE | 05/09/2025 | 05/12/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/02/2025 | 05/09/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/30/2025 | 05/05/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/30/2025 | 05/07/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/30/2025 | 05/02/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/30/2025 | 05/05/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/30/2025 | 05/06/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) YOUR FFE IS MORE THEN 10" ABOVE THE ADJACENT LOT TO THE LEFT NEED TO LOWER FFE TO MEET THE 10" TOLERANCE. PER CITY CODE 300.01C(3) 2) NEED TO HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF THE DRAINAGE PATTERN. 300.01 D(6) 3) THE DRAINAGE PATTERN AT THE BACK PROPOERTY LINE NEEDS TO BE INSIDE THE PROPERTY. | |||
| ZON | HOLD | 04/30/2025 | 04/30/2025 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Site plan missing width of driveway in front of garage. 2. Site plan missing width of walkway. Can't exceed greater than 6'. | |||
| PLENV | COMPLETE | 04/30/2025 | 05/07/2025 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 05/07/25 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/19/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/19/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/19/2026 |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 05/19/2026 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 06/03/2025 |
| PEP TANK INSTALL | ¤756.74 | 06/03/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,189.82 | 06/03/2025 |
| SURCHARGE FS 533.721 | ¤2.52 | 06/03/2025 |
| SURCHARGE - FS 468.631 | ¤3.78 | 06/03/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/03/2025 |
| WATER- TURN ON | ¤50.00 | 06/03/2025 |
| ADJUSTMENT 10% | (¤3.00) | 06/03/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/03/2025 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 06/03/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 06/03/2025 |
| IMPACT FEE FIRE | ¤434.51 | 06/03/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/03/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/03/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 06/03/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/03/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/03/2025 |
| SW ENG PRE APRON | ¤30.00 | 06/03/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/03/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/03/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 06/03/2025 |
| SEWER CREDIT | (¤2,788.82) | 06/03/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 06/03/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 06/03/2025 |
| SEWER CAPITAL FACILITY | ¤3,930.70 | 06/03/2025 |
| WATER CREDIT | (¤2.30) | 06/03/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,496.74 | 06/03/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 06/03/2025 |
| WATER MAIN EXTENSION IMPACT | ¤854.40 | 06/03/2025 |
| SITE PLAN 30 | ¤30.00 | 06/03/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,871.53 |